ATT D1 QASP Contractual Laboratory Staff.docx

DOCX document 32 KB Posted

Attached to
R499--Histopathology Technician and Medical Technologist
Solicitation number
36C25624Q1317
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract. The QASP outlines the government's plan to monitor and evaluate the contractor's performance in providing laboratory staffing services.

The key details include:

  • The contract number and time period are not specified.
  • The government roles and responsibilities are defined, including the Contracting Officer (CO) and Contracting Officer's Representative (COR).
  • The performance standards and acceptable quality levels are described across areas such as personnel qualifications, availability, patient safety, training, privacy, and billing.
  • The surveillance methods include 100% direct observation, periodic inspections, monitoring of customer complaints, random sampling, and review of contractor documentation.
  • The contractor performance will be rated using a 5-level scale from Exceptional to Unsatisfactory, which will be documented in the Contractor Performance Assessment Report (CPAR).
  • The QASP also includes a sample Contract Report template to document and address any performance deficiencies.

View the file

Other files

File Type Posted
36C25624Q1317 0002.docx DOCX document
36C25624Q1317 0001.docx DOCX document
ATT 1 B.2 Price_Cost Schedule Updated.docx DOCX document
ATT D3 KEY PERSONNEL- Conflict of Interest.docx DOCX document
36C25624Q1317.docx DOCX document
ATT D5 WD 2015-5153 rev 25.pdf PDF
ATT D2 CONTRACTOR CERTIFICATION IMM.docx DOCX document
ATT D4 VA Equipment listing for contractual laboratory staff.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract number:________ Time Period reporting:_______________

The contractor will be evaluated in accordance with the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Melanie Hawley Organization or Agency: NCO16

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: TBD at time of award Organization or Agency: Southeast Louisiana Veterans Health Care Systems

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.

Primary: __________________ Alternate:__ _____________ ATT D1- Quality Assurance Surveillance Plan (QASP)

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. 100% surveillance: The contractor will provide 100% on site Professional Laboratory Services at various times and in various areas of the Laboratory.

b. PERIODIC INSPECTION. Inspections scheduled and reported every 2 months per COR delegation or as needed. The Government will randomly select 10 patient files per 2 month period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.

c. VALIDATED USER/CUSTOMER COMPLAINTS. The Government will monitor the incidence of Joint Patient Safety Reporting (JPSR) complaints related to Contractor staff performance on an ongoing basis to be reported every 2 months.

d. RANDOM SAMPLING. The Government will monitor 100% of performance errors.

e. Verification and/or documentation provided by Contractor. The Government will monitor the Contractor by on-site inspections and written documentation.

6. QASP PERFORMANCE REPORT

Measures
PWS

Reference

Performance Requirement

Standard
Acceptable Quality Level
Surveillance

Method

RATING

Personnel Quality Performance
4.6.3.1
Ongoing MT/ MLS & HT competency shall be assessed in accordance with clinical laboratory standards
100%
Competency in assigned areas must be 90% or greater
Direct
Qualifications of Key Personnel
4.6.3.2
All Contractor Medical Technologist(s)/Clinical Laboratory Scientist(s) shall maintain an up-to-date certification as an MT/CLS by the ASCP, AMT, or equivalent
Contractor’s Medical Technologist(s)/Clinical Laboratory Scientist(s) maintain current certification as required in PWS.
100% Compliance
Random Inspection of qualification documents
Medical Technologist(s)/Clinical Laboratory Scientist(s) Availability- meeting schedule
4.6.3.3
Presence of ASCP certified Medical Technologist(s)/Clinical Laboratory Scientist(s) during normal business hours on scheduled days
Presence of ASCP certified Medical Technologist(s)/Clinical Laboratory Scientist(s) during normal business hours (8:00 am – 4:30 pm, M-F (exclusive of federal holidays).
Contractor’s Medical Technologist(s)/Clinical Laboratory Scientist(s) is on-time and available to perform services 100% of the time
Periodic inspection
Patient Safety
4.6.3.4
Patient safety incidents shall be reported using Patient Safety Report. All incidents reported immediately (within 24 hours.)
All (100%) of patient safety incidents are reported using Patient Safety Report within 24 hours of incident.
100%of patient safety incidents are reported using VA Patient Safety Reporting System within 24 hours of incident.
Direct observation or Periodic Inspection
Mandatory Training
4.6.3.5
Contractor shall complete all required training per VAMC policy
All (100%) of required training is complete on time by Contractor’s personnel(s).
100% completions

Periodic Inspection or Random Sampling

Privacy, Confidentiality and HIPAA
4.6.3.6
Contractor is aware of all laws, regulations, policies, and procedures relating to Privacy, Confidentiality and HIPAA and complies with all standards Zero breaches of privacy or confidentiality
All (100%) contractor personnel(s) comply with all laws, regulations, policies, and procedures relating to Privacy, Confidentiality and HIPAA
100% compliance

Periodic Inspection or Random Sampling. Contractor shall provide evidence of annual training required by VAMC, reports violations per VA Handbook 6500.6.

Timeliness and Accuracy of Billing
4.6.3.7
Contractor shall submit invoices by the 5th day of each month
100% of the time
100% compliance
Periodic

7. CPAR RATINGS ASSIGNED TO QASP ITEMS:

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/documents/CPARS-Guidance.pdf):

EXCEPTIONAL:
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.

SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.

MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of thecontractual deficiency (e.g., Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., Management, Quality, Safety or Environmental Deficiency Reports, or letters).

DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR on the following page.

8. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

COR NAME/TITLE

SIGNED:

CONTRACTOR NAME/TITLE DATE

CONTRACT REPORT

1. CONTRACT NUMBER
2. REPORT NUMBER FOR THIS DISCREPANCY (USE DATE)
3. TO: (Contracting Officer)
4. FROM: (Name of COR)

5. DATES

a. CR PREPARED

b. RETURNED BY CONTRACTOR:
c. ACTION COMPLETE

6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR
Date:
8. SIGNATURE OF CONTRACTING OFFICER
Date:
9a. TO (Contracting Officer)
9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE
Date:

12. GOVERNMENT EVALUATION.

13. GOVERNMENT ACTIONS

14. CLOSE OUT

NAME
TITLE
SIGNATURE
DATE

CONTRACTOR NOTIFIED

COR

CONTRACTING OFFICER

File details come from the government source that posted it. Updated .