About this file

This document is a Presolicitation Notice for a federal contract opportunity. The Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 is seeking a contractor to provide preventive maintenance, inspection, cleaning, and testing of the electrical switchgear and distribution system at the Overton Brooks VA Medical Center in Shreveport, Louisiana.

The contract requires the contractor to furnish all labor, parts, transportation, and equipment to perform tri-annual testing and verification of the facility's electrical infrastructure, including transformers, breakers, switchgear, emergency generators, and transfer switches. The contractor must be certified by the InterNational Electrical Testing Association (NETA) and have at least 5 years of experience in electrical system maintenance and testing in healthcare, industrial, educational, and commercial facilities. The contractor will be required to submit a detailed written report within 7 calendar days of each site visit. The period of performance is not specified. Responses are due by June 12, 2024 at 4:00pm Central Time. This requirement is set aside for Veteran-Owned Small Businesses (VOSB).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

667-24-4-501-0361, TRI-ANNUAL SWITCHGEAR TESTING (VA-25-00000261) (VA-24-00065050) 36C256-24-AP-2658

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
72703
SOLICITATION NUMBER*
36C25624Q1008
RESPONSE DATE/TIME/ZONE
06-12-2024 4:00pm CENTRAL TIME, CHICAGO, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
VSA
PRODUCT SERVICE CODE*
Z1JZ
NAICS CODE*
541330
PLACE OF PERFORMANCE
Overton Brooks Veteran Affairs

510 E. Stoner Ave

Shreveport LA

POSTAL CODE
71101

COUNTRY

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703

POINT OF CONTACT*

Dena Young, Contracting Officer Dena.Young@va.gov

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

Presolicitation Notice Presolicitation Notice

DESCRIPTION

*=Required Field
Presolicitation Notice

Presolicitation Notice

STATEMENT OF WORK

Maintenance, Inspection, and Testing Electrical Power Distribution System

TRI-ANNUAL SWITCHGEAR TESTING

The contractor shall furnish all necessary labor, parts, transportation and equipment to provide a preventive maintenance inspection (PMI), clean and service and test electrical switch gear and Ground testing verification that resistance between your grounding system and earth meets the specifications of the National Electrical Code (NEC) and other pertinent guidelines listed below, located at the Overton Brooks VA Medical Center, 510 E. Stoner Avenue, Shreveport, LA 71101 in accordance with all terms, conditions, provisions, schedules and specifications of this statement of work.

The contractor will coordinate all maintenance visits through the Contracting Officer’s Representative (COR). All work shall be accomplished during normal duty hours 8:00 am to 4:30 pm, Monday through Friday, excluding federal holidays. Any testing requiring disruption of utilities shall be accomplished between the hours of 4:00 p.m. and 10:00 p.m. on consecutive nights until such work is completed. Contractor shall work the entire period during these outages to reduce the number of nights required to accomplish such work at a minimum. Specific scheduling and phasing shall be coordinated with VA representative at least seven workdays prior to first night time outage.

The following are federal holidays:

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
President’s DayVeteran’s Day
Memorial DayThanksgiving Day
Juneteenth DayJuneteenth Day
Independence DayChristmas Day

Scope of Work:

It is the intent of these tests to assure that all electrical equipment is operational within industry and manufacturer’s tolerances, (including oil sample testing for transformers). Work items, definitions, and references shall comply with the latest edition of the NETA – Maintenance Testing Specifications.

Upon completion of the tests, a label shall be attached to all service devices. These labels shall indicate date of service and the service company responsible. The tests shall determine suitability for continued operation. The testing company shall thoroughly clean all equipment tested and serviced. Such cleaning shall include removal of all dust, dirt, debris, oil film, etc. Cleaning is subject to Contracting Officer’s Representative inspection and acceptance. Ground testing verification that resistance between your grounding system and earth meets the specifications of the National Electrical Code (NEC) and other pertinent guidelines. Any item/equipment that fails the initial test shall be retested in the presence of the COTR.

Testing and inspecting must be done while the Electrical Power Distribution System is energized; contractor must ensure all appropriate safety precautions are taken before, during and after scanning the system. An infra-red scanning camera will be used to detect hot spots; loose, broken, or corroded connections within the Electrical Power Distribution System. Problem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers’ specifications. The C&A requirements do not apply, and that a Security Accreditation Package is not required.

Locations of Testing:

Transformer DGE

Behind Bldg 6
300 KVA/3PH/12470 Primary SN# P015757, Oil
Breaker (7ea.)
G.E.
Behind Bldg 6
3 Pole/600V/THJ
Transformer A-1
G.E.
B-E-96
1000 KVA/3PH/12470 Primary SN#M157525A, Oil
Transformer A-2
G.E.
B-E-96
1000 KVA/3PH/12470 Primary SN#M157525C, Oil
Transformer B-1
G.E.
B-E-96
1000 KVA/3PH/12470 Primary SN#M157525D, Oil
Transformer B-2
G.E.
B-E-96
1000 KVA/3PH/12470 Primary SN#M157525B, Oil
Transformer C-1
G.E.
B-E-96
750 KVA/3PH/12470 Primary, SN#M157526, Oil
Transformer C-2
G.E.
B-E-96
500 KVA/3PH/12470 Primary, Oil
Transformer C-3
G.E.
B-E-96
501 KVA/3PH/12470 Primary, Oil
Breakers (15 ea) Sub A
G.E.
B-E-96
Sensor Ratings 800/3200 Amps
Breakers (15 ea) Sub B
G.E.
B-E-96
Sensor Ratings 800/3200 Amps
Breakers (13 ea) Sub C
G.E.
B-E-96
Sensor Ratings 400/1600 Amps
Load Interrupter Switch (5 ea.)
G.E.
B-E-96
Transformer D-1
G.E.
1-E-39
500 KVA/3PH/12470 Primary, SN#M157527, Oil
Load Interrupter Switch
G.E.
B-E-39
Breaker (9 ea.)
G.E.
B-E-39
Sensor Ratings 300/2000 Amps
Breaker (11 ea.)
G.E.
Main Gen. Room
3 Pole/600 Volts
Emergency Generator
Cat
Boiler Plant
210KW
Emergency Generator (2 ea.)
Cats
Main Gen. Room
600KW600KW
Emergency Generator
Cat
North Side Bldg3
1000KW
Emergency Generator
Allis
Bldg 31
125 KW
Emergency Generator
Onan
East Side Bldg 6
80 KW
Auto Transfer Switch (8 ea.)
Zenith
Bldg 1
208/3 Phase
Auto Transfer Switch (1 ea.)
Cuttler
Bldg 1
208/3 Phase
Auto Transfer Switch (1 ea.)
Asco
Bldg 3
208/3 Phase
Auto Transfer Switch (1 ea.)
Zenith
Bldg 6
208/3 Phase

Auto Transfer Switch (1 ea.)

Bldg 40
208/3 Phase

Auto Transfer Switch (1 ea.)

Bldg 3
208/3 Phase

Auto Transfer Switch (1 ea.)

North Side Bldg3
480/3 Phase
Breaker (14 ea.)
G.E.
B-E-97
3 Pole/600 Volts
Breaker (12 ea.)
G.E.
B-E-5
3 Pole/600 Volts
Breaker (12 ea.)
G.E.
B-W-14
3 Pole/600 Volts
Breaker (21 ea.)
G.E.
Sub Basement
3 Pole/600 Volts
Transformer Dry
G.E.
Sub Basement
480/208/3 Phase
Transformer
G.E.
North Side Bldg 2
1600KVA/3PH/12470, Oil
Transformer
G.E.
North Side Bldg 2
800KVA/3PH/12470, Oil
Transformer
G.E.
Back Of Bldg. 4
500KVA/3PH/12470 Primary, Oil

Transformer

Mental Health
1500KVA/3PH/12470

Transformer

Bldg 55
500KVA/3PH/12470

Transformer

Bldg 57
500KVA/3PH/12470
Breaker (5 ea.)
G.E.
Back Of Bldg. 4
3 Pole/600V

Cleaning Interior Of MCC

Bldg. 2

Protect Relay
G.E.
Bldg. 40
Type *121AV53 *Varies
Breaker (9 ea.)
Siemens
Bldg. 40
15000V/1200 Amp Main Incoming Feeds
Protect Relay
G.E.
Bldg. 40
Type *121AV53 *Varies

Facility Grounding

Campus
Testing Facility Grounding System

Note: Failure to having verified all quantities and locations prior to offer and contract award does not relieve the contractor of the responsibility to conduct all tests required by specifications within locations identified herein the SOW.

Contractor Qualifications:

Contractor shall be certified by the InterNational Electrical Testing Association (NETA) as NETA Certified Technician, and completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training.

Contractor shall have technical trainings, and track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution System and its components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years.

Contractor shall have safety trainings, either on-the-job or class-room type, in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S – Electrical, and the NFPA 70E – Standard for Electrical Safety in the Workplace for employees and subcontractors performing duties outlined in this SOW. Training certifications shall be submitted to the VA Contracting Officer prior to the performance start date. If no training certifications are available, the contractor shall certify and submit, in writing, the employees and subcontractors have met the training requirement prior to the performance start date.

Contractors shall have ready access to the latest versions of the following references:

a. NFPA 70, National Electrical Code.

b. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance.

c. NFPA 70E, Standard for Electrical Safety for the Workplace.

d. NFPA 110, Standard for Emergency and Standby Power System.

e. OSHA Standard 29 CFR 1910, Subparts I & S.

f. InterNational Electrical Testing Association, Inc. (NETA) – Maintenance and Testing Specifications.

g. Operating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.

Reporting and Deliverables:

Contractor shall provide a complete written report of the work accomplished in accordance with this SOW. Information shown in the report shall be as following:

a. Company’s name, address, telephone & FAX numbers.

b. Name and signature of contractors who perform the maintenance and testing.

c. VA Work Contract Number, name and number of VA Contracting Officer.

d. Date and Time of work.

e. Copies of contractors’ valid licenses, professional and training certificates.

f. Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera.

g. Location, Type, Name, and nameplate information of electrical equipment to be maintained and tested.

h. Descriptions of work items.

i. Test data.

j. Reference materials such as equipment manufacturer’s specifications, coordination study, etc.

k. Remarks on conditions of electrical equipment. List all deficiencies, if any.

l. Recommended corrective actions, if any.

Submit six (6) hard copies of the completed written report and one (1) CD Rom/DVD report, in Microsoft Word, to the government within seven (7) calendar days of visit. All reference materials shall be included in the electronic Word version of the report.

Contractor shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer or to the COR for immediate action.

The use of cellular phones is prohibited inside the medical center.

The Overton Brooks VA Medical Center is a smoke free facility. Smoking is prohibited inside any building except the smoking shelter on the facility grounds. Smokers are allowed to smoke outside the 25 foot boundaries from every entrance/exit. Violators shall be removed from the premises permanently.

Service Delivery Summary:

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Desired Outcome
Performance Standard
Monitoring Method
Incentive/Disincentive
All tests, repairs, inspections, cleanings and reports are completed per SOW.
100% compliance is

required for customer satisfaction, performance, and utility.

100% inspection.
Full payment shall be

made for 100% compliance.

Contract Monitoring Procedures:

Contracting Officer’s Technical Representative (COTR) to assist with the contract monitoring requirements. The COTR will monitor such items as quality of service, timeliness of performance, customer service, cost control, and business relations supporting documentation. In accordance with FAR 1.601 (a) “Contracts may be entered into and signed on behalf of the Government only by contracting officers.” A COTR may not modify the stated terms of the contract, including extending the length of the contract period.

File details come from the government source that posted it. Updated .