36C25622R0120_1.docx
DOCX document 28 KB Posted
- Attached to
- C1DA--Houston VA AE MATOC Federal contract opportunity
- Solicitation number
- 36C25622R0120
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF330.pdf | ||
| 36C25622R0120 Past Performance Questionnaire.docx | DOCX document | |
| 36C25622R0120.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Combined Solicitation
Amendment to a Previous Combined Solicitation
| SUBJECT* |
| Houston VA AE MATOC |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 77056-5643 |
| SOLICITATION NUMBER* |
| 36C25622R0120 |
| RESPONSE DATE/TIME/ZONE |
| 07-21-2022 13:00 CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 30 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| C1DA |
| NAICS CODE* |
| 541330 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office 16 5075 Westheimer Road, Suite 750
Houston TX 77056-5643
POINT OF CONTACT*
PLACE OF PERFORMANCE
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
Clarification:
Page 3 of the request for SF330, paragraph 7, the maximum single order shall not be greater than $1,200,000.
Requests for Information:
Question 1.
Reference: B Factor 2 – Past/Present Performance (middle of paragraph) the following states: Interested Firms must list on the SF 330 Part II, block 10, the type, amount, and dates of all fees for relevant AE Services awarded and negotiated with awards between 2017 and present.
The current SF 330 Form Block 10 is formatted in three columns:
· Block 10: Profile of Firm’s Experience and Annual Average Revenue for Last 5 Years
· Column A: Profile Code (applies to categories of project type/work
· Column B: Experience (text definition to correlate to Profile Code
· Column C: Revenue Index Number (correlates to range of average annual revenue over the past five years to each profile code/experience listed) Question: Is the completion of the Standard SF 330 Part II Block 10 form “as is” acceptable? If not, can you provide a template to show how Block 10 needs to be formatted to capture the requested information – specifically the dates of all fees for relevant AE Services.
Answer: Yes, the completion of SF330 Block 10 “as is” is acceptable.
Question 2.
Will previously completed PPQs and/or CPARS be accepted for Factor 2 - Past/Present Performance?
Answer: If there is a final CPARS report available for the past project, yes. Since the PPQ is required to be sent from the previous client directly to me, a previously completed PPQ sent from the AE firm is not acceptable. If the CPARS report is not available, a PPQ is required as described in the request for SF330s.
Question 3.
Can you please clarify what WWS stands for?
Indicate in Section C.11 if the prime has worked with the sub-contractors in the past five (5) years. (Use WWS to indicate you have worked with subcontractor in the last five years.)
Answer: WWS is “Worked with Subcontractor”
Question 4.
Factor 2: Past Performance Reference is made to a minimum of three and no more than five relevant and recent projects. Is Section F limited to 3-5 representative projects?
Answer: Example projects are limited to 3-5 projects per task group. There are four task groups.
Question 5.
A. Factor 1 – Technical Capabilities I) Key Personnel (b) Specialized and Technical Experience – does this refer to projects on the resumes, or should this be addressed in Section H?
Answer: On the resumes.
Question 6.
What is the maximum allowable number of projects in section F?
Answer: There are four task groups. You may submit between 3-5 projects for each task group. Maximum would be 20 projects.
Question 7.
B. Factor 2 – Past/Present Performance – does this refer to Section F Projects?
Answer: Yes. Section F should list 3-5 recent/relevant projects for each task group. PPQs are to be sent to these clients.
Question 8.
B. Factor 2 – Past/Present Performance states: Past performance questionnaire (attached) should be sent to clients provided under Factor 1. Technical Capabilities, II). Firm’s Professional Qualifications and III) Key Personnel (b) Specialized and Technical Experience. However, section III addresses construction period services, not key personnel. Please clarify for which projects the Government is requesting PPQs.
Answer: The PPQ should be sent to clients for each project your firm is listing as a relevant/recent project for each task group in Section F.
Question 9:
Is it acceptable for firms to submit additional resumes, such as multiple personnel per discipline, or will the VA only evaluate one resume per discipline in the RFQ?
Answer: You may submit as many resumes as you wish. The total page limitation for Part I is 65 pages.
Question 10.
What will determine the selection of an AE for a particular task order once the pool of AE’s is awarded? If it’s a separate qualification package for each task order is there a limit to pages for the package?
Answer: Each contract holder will be given the task order requirement’s SOW and evaluation factors and be required to submit their technical qualifications. The best qualified firm will be selected. There will be a page limit for the qualification package.
---END OF AMENDMENT---
| *= Required Field |
| Amendment to a Previous Combined Solicitation |
Page 1 of
Amendment to a Previous Combined Solicitation
File details come from the government source that posted it. Updated .