Answered_RFIs_564-22-108_36C256-22-R-0064_FAY AR Site Prep Rm 1158.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C25622R0064
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0001 564-22-108_36C25622R0064 0001 (2).docx | DOCX document | |
| 564-22-3-659-0002 DR Turnkey 1158 SOW.docx | DOCX document | |
| Past and Present Performance Questionnaire 564-22-108.docx | DOCX document | |
| Attachment 2 Philips Site Drawing 1158 N-SOU190604.pdf | ||
| 36C25622R0064 RM 1158 Posted.docx | DOCX document | |
| Wage Determination AR20210035.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information
1. Will the sprinkler piping and materials in this area need to be of a none-metallic materials?
If so, will it need to have its own control valve, water flow and tamper switches to monitor the area? Or will the existing metal pipe be left as is?
Sprinklers and plumbing should be left as is; no plumbing work is to be included in this.
2. Could you provide the electrical specs for the equipment? Voltage and amperage.
Electrical Requirements
M-Cabinet CXA 80 Supply Configuration: 3 phase, 3 wire power, neutral and ground. Wye.
or 3 phase, 3 wire power, ground. Delta.
Nominal Line Voltage: 400, 440, 460 or 480 VAC, 60 Hz Branch Power Requirement: 112.5 kVA minimum Circuit Breaker: 3 pole, 50 Amps (@ 480V) (Slow Blow) Residual Current Device to be installed depending on local regulations.