SUBJECT*
Triennial Breaker Testing Biloxi, MS
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 39216 |
| SOLICITATION NUMBER* |
| 36C25622Q0522 |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| PRODUCT SERVICE CODE* |
| H935 |
| NAICS CODE* |
| 221122 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
G.V. (Sonny) Montgomery VAMC
1500 E. Woodrow Wilson Dr.
Jackson MS 39216
POINT OF CONTACT*
Contracting Officer Jennifer Adams jennifer.adams7@va.gov 601-206-6955
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
Special Notice Special Notice
DESCRIPTION
| *= Required Field |
| Special Notice |
Special Notice
NOTICE OF INTENT TO SOLE SOURCE
TRI-ANNUAL BREAKER TESTING
The Veterans Health Affairs, Network Contracting Office 16, is issuing this Notice of Intent to Sole Source to identify any potential sources that have the resources and capabilities to provide Tri-Annual Breaker Testing as described below in the statement of work.
The government is contemplating a Firm Fixed Price contract to satisfy this requirement and meet the needs of the patient population at the Gulf Coast Veterans Health Care System. Period of Performance is Date of Award thru 09-30-2022.
STATEMENT OF WORK (SOW)
Tri-Annual Breaker Testing
Statement of Work Tri-Annual Breaker Testing
1. INTRODUCTION:
1. This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and all its components at the Biloxi VA Medical Center. These work items are referenced as “Maintenance and Testing” in this document, hereafter.
1. This SOW describes the requirements for the Qualified Electrical Contract Professionals – known as “Contractors” in this document, hereafter. Contractors who are contracted by VA Medical Center to perform maintenance and testing of the Electrical Power Distribution System, and all its components shall meet all requirements stated in Section 3 of this SOW.
1. This SOW describes the requirements to establish maintenance and testing reports.
2. QUALIFICATION OF CONTRACTORS:
1. Contractors shall be licensed Journeyman and/or Master Electricians, having proper training and up-to-date licensing / Certifications to perform the specified work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor’s business. The qualified workers shall have current Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training.
1. Work shall be performed in accordance with ANSI/NETA MTS (American National Standards Institute / International Electrical Testing Association Standard for Maintenance and Testing Specifications) .
1. Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of ten (10) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical equipment.
1. Contractors shall have safety trainings – either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S – Electrical, and the NFPA 70E – Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor’ Employer shall certify that he/she has met this requirement in writing and submit it to the VA Contracting Officer prior to work.
1. Contractors shall have ready access to the latest versions of the following references:
1. NFPA 70, National Electrical Code.
1. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance.
1. NFPA 70E, Standard for Electrical Safety for the Workplace.
1. NFPA 110, Standard for Emergency and Standby Power System.
1. OSHA Standard 29 CFR 1910, Subparts I & S.
1. International Electrical Testing Association, Inc. (NETA) MTS – Maintenance and Testing Specifications.
1. Operating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.
1. VHA Directive 1028, Electrical Power Distribution System
1. Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools, and PPE as appropriate.
1. The Contractor shall have a minimum of ten (10) years of specialized continuous experience in testing, inspection, cleaning, adjusting, and appraising electrical distribution systems and apparatus to assure their reliable operations. Previous Biloxi VAMC Electrical Distribution Testing desirable.
0. The contractor shall demonstrate his ability to meet this requirement of the specifications by including his complete response to the technical evaluation criteria found in “Attachment A” of this specification and furnishing it with his bid.
0. Failure to provide a complete and clear response to the technical evaluation criteria found in “Attachment A” will result in the bid being found not responsive.
0. 55% weighting will be given to the technical evaluation criteria and 45% weighting will be given to the cost proposal in making the final selection of the successful offeror for these services.
0. All work performed shall be fully documented by the Contractor. Testing shall be performed in compliance with manufacturers’ recommendations and applicable NEMA, NEC, NFPA, ASTM, ASA, and VA standards. Energized work will be required on some of the equipment and all precautions must be made and documented. Multiple tests must be coordinated within a building as time constraints will only allow certain buildings to be without power for a minimal duration. Field work of testing, inspecting, and cleaning the identified equipment is to take no longer than 2 weekends. All outages shall be scheduled and approved in writing in at least two weeks in advance. Outages will be scheduled only on Friday nights after 6 PM, Saturday, and Sunday ending on Monday 4 AM, with inpatient area shutdowns to be scheduled from 11:00 pm to 4:00 am ONLY. This schedule is subject to Contracting Officer Representative (COR) approval and Medical Center staff who will provide coordination within buildings. The approved schedule must be adhered to minimizing the impact to patient care. Building required for Special Consideration are 1,3,14,15,19,25, and 30. Building 1 houses the VAMC Computer Server (2C-107 and Breakers to UPS in 1A-130) and the others that directly affect life support equipment are to be worked around.
0. In most VAMCs, VA staff are not available to assist the Contractor in accessing/opening electrical equipment; therefore, the Contractor must not assume such support will be available and, accordingly, shall hire a local electrician, have proper staffing, PPE, and equipment to perform such tasks without VA assistance. Most VAMCs will not provide more than two electricians to escort the survey unless coordinated with COR, so the Contractor shall plan accordingly unless alternate plans are coordinated.
0. A complete list of distribution system equipment and apparatus to be inspected, cleaned, tested, thermally tested, and adjusted is found in “Attachment B” of this specification. Contractor to identify and verify equipment requirements during Pre-Bid Inspection.
3. MAINTENANCE AND TESTING REQUIREMENTS:
7. In addition to complying with the general codes referenced in 1. B., the contractor shall pay special attention to compliance with VHA Directive 1028 (see Attachment C) and NFPA 70B.
7. Switchgear Equipment, Medium Voltage Circuit Breakers, and Protective Relays:
1. Record switchgear, breaker, and device nameplate information and compare with facility’s one-line diagram, when available. Identify and record discrepancies.
1. Inspect all electrical equipment, including each breaker, and report damaged, or malfunctioning equipment, loose connections or material or any contamination that must be corrected. Clean where appropriate.
1. Check equipment for level, security to foundation, and operation of doors. Report any unfavorable environmental conditions such as excessive moisture.
1. Visually inspect the equipment ground and record the number and size of ground bus and straps, Report deficiencies, and clean where appropriate.
1. Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter as applicable. Record values, report deficiencies, and clean where appropriate.
1. Draw or rack each breaker from its cell. Remove arc chutes, clean, inspect, and adjust all contacts as necessary. Measure and record contact resistance in micro-ohms and clean all insulating surfaces. Megger and record phase-to-phase and phase-to-ground. Lubricate as necessary.
1. Electrically close and trip each breaker with control switch. Manually close and trip each breaker. Trip each breaker with each of its protective devices. Tighten all connections. Record any discrepancies.
1. Remove each relay from its case. Clean, inspect, and tighten all connection. Apply three multiples of relay tap current to each relay to verify manufacturers’ time current characteristics. Test each relay for instantaneous pickup. Test all ground fault relays for proper calibration and operation. Report deficiencies and adjust where appropriate.
7. Primary Disconnects
0. De-energize entire substation where feasible, clean all insulating surfaces, and clean and dress all contacts.
0. Measure contact resistance in micro-ohms, Megger each phase-to-ground. Record any discrepancies.
0. Clean and inspect cubicle, tighten all untapped connections, and lubricate as necessary.
7. Transformer
1. Record transformer nameplate information and compare with the facility’s one-line diagram, when available. Record discrepancies.
1. Inspect transformer and accessories and report damage, loose connections or material, shipping blocks, or contaminations that must be corrected. Clean where appropriate, inspect for leaks and tighten all untapped connections. Clean insulating surfaces.
1. Sample all insulating liquids and test dielectric and water content. Add insulating fluid as needed to be “Topped Off”.
7. Low Voltage Circuit Breakers
1. Record switchgear, breaker, and device nameplate information and compare with the facility’s one-line diagram, when available. Record discrepancies. NOTE: Work includes all service equipment and power distribution panel boards but not branch-circuit panel boards that are used on the various floors in the buildings.
1. Inspect equipment and each breaker and report damage, loose connections or material, or contamination that must be corrected. Clean where appropriate.
1. Check equipment for level, security to foundations, and operation of doors. Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate.
1. Visually inspect the equipment ground and record the number and size of ground bus and straps. Report deficiencies.
1. Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter. Record values, report deficiencies and clean where appropriate. – Have to Shut everything down on both ends ensuring not to affect critical life support equipment.
1. Clean and inspect each breaker. Megger phase-to-phase, phase-to-ground, and measure contact resistance in micro-ohms. Test each series over current trip device for pickup at 200% and 300% of its rating for instantaneous pickup. Clean and dress all contact surfaces and lubricate as necessary.
7. Infra-Red Scanning/Thermographic Survey shall be performed on all electrical equipment.
1. Use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System. Objective of this work is to detect any loose, broken, or corroded connections in the system. Problem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers’ specifications.
1. Note that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during, and after scanning the system.
7. Batteries
1. Provide and replace batteries inside each micro-logic, size ½ AA 3.6 volts – Schneider Electric part number 33593. Approximately 100 batteries to be used and remaining batteries to be handed over to VA Electrician.
0. REPORTS:
1. Provide two copies of data, testing, and inspection results to the Maintenance and Operations (M&O) Engineer of all devices tested as required by the scope. Report shall be securely bound and in an 8 ½ x 11 format. Provide one electronic copy (CD) of the report as either a PDF file or Word document.
1. At a minimum, the report shall include the following:
1. Summary of project
1. Description of equipment tested
1. Description of tests
1. Test Data
1. Analysis and recommendations
1. Test data records shall include the following minimum requirements:
1. Identification of the testing organization
1. Equipment identification
1. Humidity, temperature, and other conditions that may affect the results of the tests/calibrations
1. Date of inspections, tests, maintenance and/or calibrations
1. Identification of the testing technician
1. Indication of inspections, tests, maintenance and/or calibration to be performed and recorded
1. Indication of expected results when calibrations are to be performed
1. Indication of “as-found” and “as-left” results, as applicable
1. Sufficient spaces to allow all results and comments to be indicated
1. Thermography pictures (ALL – Acceptable and Unacceptable) to be submitted on all equipment by Building and Location in accordance with previous test data records in a binder and electronically on CD.
0. ELECTRICAL GROUNDING SYSTEM TESTING CRITERIA:
1. Grounding Testing Procedures
1. This section describes grounding system testing procedures.
1. These tests should be performed when the site ground system can be safely disconnected from the power company neutral wire.
1. Overview Testing will be performed using one of the three methods which are described as follows:
1. Three-Point / Fall of Potential Testing
0. This method is the most widely accepted. However, performing the test may require access to areas that may be beyond the site property lines. When testing a grounding electrode system consisting of a multi-bonded/ multi-grounding electrode system, the distance required for testing is directly related to the effective diagonal distance of the buried grounding electrode system.
1. Clamp-on Ohmmeter
0. This method shall be used when access to necessary space needed for the Three-point/Fall of Potential test is not available. However, the clamp-on Ohmmeter test can only be performed after AC utilities have been connected to the site and various feed conductors are accessible.
1. Combined Soil Resistivity Testing with Clamp-on Ohmmeter Testing
1. This method shall only be used in special cases where three-point/fall of potential testing or clamp-on ohmmeter testing cannot directly provide a suitable evaluation. The data obtained from soil resistivity testing and clamp-on ohmmeter testing is then used by an engineering firm specializing in grounding electrode system design to make determinations regarding the grounding electrode system.
1. Limitations to Performance Testing
0. The following conditions must be met in order to perform grounding electrode system testing:
0. Three Point / Fall of Potential Test Procedure
1. The three point/fall of potential test is the most widely accepted and recommended test method. This procedure is described in detail in ANSI/IEEE STD 81.2.
1. In the three point/fall of potential test, two test rods are driven into the soil. These rods are placed in a straight line from an electrode in the grounding electrode system to be tested (referred to here as connection 'X'). One of the test rods (referred to here as rod 'Z') is placed at a known distance from the 'X' connection. The other test rod (referred to here as rod 'Y') is placed at various distances between the 'x' connection and rod 'Z', a potential difference (voltage drop) will exist between the 'x' connection and rod Y. The fall of potential tester measures the voltage drop between the 'X' connection and rod 'Y’ and converts the measurement to a resistance reading using Ohm's Law (R=E/I). In this manner, the resistance at any point between 'x' connection and rod 'z' can be measured. The multiple readings obtained during this test are entered and plotted as data points on a graph. From the graph, the resistance of the grounding electrode system can be determined.
1. This test requires disconnection of the site grounding electrode system from the power company grounded conductor, and the disconnection of all other grounds that may be connected to the site grounding system, such as telecommunications system grounds. This is required to allow testing that is limited only to the site grounding electrode system. Attempting to perform measurements while the site remains connected to the extensive ground/neutral system of the power company and telecommunications utilities artificially enhances the grounding electrode system reading, resulting in measurement error.
0. Clamp-On Ohmmeter Testing Procedure 1.
0. The clamp-on ohmmeter test can be performed on both single grounding electrode and multi-grounding electrode systems. However, the test can only be accurately performed on a site supplied by commercial power.
0. NOTE: if the electrical service provided by the power company does not contain a neutral wire that is bonded to the extensive power company ground system (such as a three-phase delta service), the clamp-on ohmmeter will not give an accurate reading. In these cases, this is because the neutral wire is locally derived at the transformer and is not part of the extensive power company grounding system; therefore, it cannot provide an effective low resistance return path.
0. The clamp-on ohmmeter works based on injecting a known voltage into the grounding electrode system to create a current flow whose value is a function of the grounding electrode system resistance. The test current flows from the grounding electrode system through the earth, returning to the grounding electrode system via the power company's multi-grounded neutral wire. The meter then measures this current and converts the measurement to a resistance reading using Ohm's Law (R=E/I). As such, the meter displays a resistance of the grounding electrode system in ohms. Since the power company's grounding system is so extensive, the meter considers it to be of negligible value and disregards its effect on the reading.
0. This test requires disconnection of the site utility power. This is required in order to allow testing that is limited only to site grounding system. Attempting to perform measurements while the site remains connected to the utility's extensive grounding/neutral system artificially enhances ground readings that result in measurement error.
1. Combined Soil Resistivity Testing with Clamp-On Ohmmeter
1. Providing site soil resistivity readings along with clamp-on ohmmeter readings is at times the only method available for grounding electrode system resistance verification.
1. This test can be performed in the energized state where the grounding connections are accessible. Once the external grounding electrode system has been verified, the internal system can then be tested.
1. This test will verify only the conductivity to the main ground buss of the commercial power system. This test will not confirm the status to the exterior grounding electrode system or fall of potential.
1. The internal system should be visually inspected and made free of defects prior to testing. Never disconnect any part of the grounding system while in operation. Once visual inspection has been made, a digital low resistance measurement will be made between all bolted/compressed connections and between bolted/compressed connections to enclosures. All bolted connections should be torque to NETA specifications, then retested with a digital low resistance meter. These readings should be documented in a format so that connectivity and conductivity of the grounding electrode system can be demonstrated.
1. External grounding electrode system test procedures are performed in the de-energized state.
1. Internal grounding electrode system test procedures can be performed in the de-energized or energized state.
1. Perform visual inspection for bonding conductor and equipment grounding conductor condition, continuity, and termination. Correct any defects.
1. Perform soil resistivity tests in several locations (if fall-of-potential test method is to be used).
1. After visual inspection and correction of defects is complete, use a digital low resistance meter to measure resistance between all bolted/compressed connections and between bolted/compressed connections to enclosures. All bolted connections will be torqued to NETA specifications, then retested. These readings shall be documented in a format so that connectivity and conductivity can be calculated as to the effectiveness of the grounding electrode system through-out the systems.
1. Ground resistance tests shall be performed using fall-of-potential method or calibrated clamp-on ground resistance tester.
Attachment A Factor #1:
Understanding of the Requirement
1) Provide a descriptive plan showing how work will be accomplished and when.
2) Identify specific testing equipment to be used.
Exceptional
Acceptable
Marginal
Unacceptable
Comments:
Factor #2:
Technical Ability to Provide requirements
1) Provide a list that includes the key personnel performing services and their responsibilities.
2) Provide proof that the personnel providing these services are “Qualified Persons” under NFPA 70B
Factor #3: Past Performance
1) How many similar installations has your company performed within the past 10 years? List ten most recent projects of similar scope.
2) List as least five references who can attest to your ability to perform this kind of service. Please include name, address, telephone number and point of contact.
ATTACHMENT B
| Location |
| Breakers / ATS / Transfers Switches / Transformer |
| Brand |
| Model # |
| Micrologic # |
| Size (Amps) |
| Building # 1 |
| Double Ended Switch Gear |
| #1a - 1-Main |
| GE Wave Pro |
| W11LSQSF1XBBXXX |
| #1b - 1-Main |
| GE Wave Pro |
| W11LSQSF1XBBXXX |
| #1c - 1-Tie-Breaker |
| GE Wave Pro |
| W11LSQSF1XBBXXX |
| #2 -5-CB's |
| GE Wave Pro |
| #3 - 4-CB's |
| GE Wave Pro |
| #4 - 1-CB |
| GE Wave Pro |
| Rm BC-111 |
| #5 - ATS 1-Normal |
| GE Wave Pro |
| W13DSQA11XAXXXX |
| #6 - ATS 2-Normal |
| GE Wave Pro |
| W13DSQA11XAXXXX |
| #7 - ATS4-Normal |
| GE Wave Pro |
| W13DSQA11XAXXXX |
| #8 - ATSD-Normal |
| GE Wave Pro |
| Panel EDP5 |
| #9 - 3-CB's |
| Square-D |
| #10 - 3-CB's |
| Square-D |
| #11 - 1-CB |
| Square-D |
| Panel EDP3 |
| #12 - 4-CB's |
| Square-D - In-Line |
| #13 - 2-CB's |
| Square-D - In-Line |
| #14 - 1-CB |
| Square-D - In-Line |
| #15 - 1-CB |
| Square-D - In-Line |
| Panel DP1 |
| #16 - 2-CB's |
| Square-D |
| #17 - 2-CB's |
| Square-D |
| #18 - 2-CB's |
| Square-D |
| Panel DP2 |
| #19 - 1-CB |
| Square-D - In-Line |
| #22 - 1-CB |
| Square-D - In-Line |
| #23 - 1-CB |
| Square-D - In-Line |
| #24 - 1-CB |
| Square-D - In-Line |
Building # 2
#1 - MV Disconnect Switch
#2 - MV 3P2T Switch
| Building # 3 |
| Rm 175 |
| #1 - 3-CB's |
| Siemens |
| Main & Tie Breaker |
| #2 - 1-CB |
| Siemens |
| #3 - 2-CB's |
| Siemens |
| ATS -CR "OR" |
| #4 - 5-CB's |
| Siemens |
| ATS -ER "OR" |
| #5 - 4-CB's |
| Siemens |
| Panel SWB |
| #6 - Chiller Starter #1 |
#7 - MCC 3
#8 - Main
| Panel MCC 3 |
| #9 - 1-CB |
| Siemens |
| Panel MPES 1 |
| #10 - 1-CB |
| Siemens |
| #11 - 1-CB |
| Siemens |
| #12 - 1-CB |
| Siemens |
| Rm 1A-117-3 |
| #13 - 2-CB's |
| Westinghouse |
| Panel HDPGNB |
| #14 - 2-CB's |
| Westinghouse |
| #15 - 3-CB's |
| Westinghouse |
| Panel HDPESGA |
| #16 - 1-CB |
| Eaton |
| #17 - 1-CB |
| Eaton |
| #18 - 4-CB's |
| Westinghouse |
| #19 - 1-CB |
| Eaton |
| ER 1F-110-3 |
| #20 - 1-CB |
| Spectra |
| Panel MDP |
| #21 - 7-CB's |
| Spectra |
| ER 1F-111-3 |
| #22 - 5-CB's |
| Spectra |
| Panel GMDP |
| #23 - 3-Onan Transfer Switches |
| Rm 4D-109 |
| #24 - Transfer Switch CS |
| Chiller Plant |
| #25 - 3-CB's |
| GE Power Break II |
| Double Ended Switch Gear |
| #26 - 4-CB's |
| GE Power Break II |
| Panel CPMSB |
| #27 - 4-CB's |
| Spectra |
| #28 - 4-CB's |
| Spectra |
| #29 - 4-CB's |
| Spectra |
| #30 - 1-CB |
| Spectra |
| #31 - 1-CB |
| Spectra |
| Boiler Plant |
| #32 - 2-Transfer Switches |
| ASCO |
| Rm 1A-184 |
| #33 - 1-CB |
| Power Break II |
| Panel MGDP |
| #34 - 1-CB |
| Spectra |
| Panel GDP |
| #35 - 4-CB's |
| Spectra |
| #36 - 1-CB |
| Spectra |
| #37 - 1-CB |
| Spectra |
| #38 - 1-CB |
| Spectra |
| #39 - 1-CB |
| Spectra Hi-Break |
| #40 - 2-CB's |
| Spectra Hi-Break |
| Panel GDP1 |
| #41 - ATS - CR GE "OR" |
| Rm 1A-178 |
| #42 - Transfer Switches ES-2 |
#43 - Transfer Switches ES-1 MCGA
#44 - Transfer Switches Chiller 1
#45 - Transfer Switches LS
| Panel HDPEQGB |
| #46 - 1-CB |
| Spectra |
| #47 - 2-CB's |
| Spectra |
| #48 - 2-CB's |
| Spectra |
| ATS-CR |
| #49 - 1 CB "OR" |
| ATS-EQ |
| #50 - 1-CB "OR" |
| Panel HDPESGB |
| #51 - 1-CB |
| Spectra |
| #52 - 2-CB |
| Spectra |
| #53 - 1-CB |
| Spectra |
| #54 - 1-CB |
| Spectra |
| Building # 14 |
| Panel MDP |
| #1 - 1-CB |
| Power Break II |
| #2 - 1-CB |
| Spectra |
| #3 - 1-CB |
| Spectra |
| #4 - 1-CB |
| Spectra |
| #5 - 2-CB |
| Spectra |
| #6 - 1-CB |
| Spectra |
| #7 - 1-CB |
| Spectra |
| Panel DPB |
| #8 - 1-CB Main Bolt-On |
| Spectra |
| #9 - 7-CB's Bolt-On |
| Spectra |
| #10 - 1 CB Bolt-On |
| Spectra |
| ATS-LS |
| ASCO |
| ATS-E |
| ASCO |
| Panel DPEA |
| #11 - 1-CB Bolt-On |
| Spectra RMS |
| SG: A36AT0600 |
| #12 - 2-CB's |
| Spectra |
| Panel DPEB |
| #13 - 1-CB |
| Spectra |
| ADF3362DBX |
| Panel DPCA |
| #14 - 1-CB |
| Spectra |
| AEF3361KBX |
| Panel DPA |
| #15 - 4-CB's |
| Spectra |
Transformer TX-A - Dry
| Panel RP1A-Sec 1 |
| #16 - 1-CB |
| GE |
| AF495P |
| Panel RP1B-Sec 1 |
| #17 - 1-CB |
| GE |
| AF495P |
| Panel LP1A |
| #18 - 1-CB |
| GE |
| AF435P |
| Panel RP1CA |
| #19 - 3-CB's |
| GE |
Transformer TX-LA - Dry
Transformer TX-CA - Dry
| Building # 15 |
| Panel MSB |
| #1 - 1-CB Main Bolt-On Digital |
| Power Pact |
| #2 - 1-CB Bolt-On Digital |
| Power Pact |
| #3 - 1-CB Bolt-On Digital |
| Power Pact |
| #4 - 12-CB's Bolt-On Digital |
| Power Pact |
#5 - ATS-LS
#6 - ATS-CR
| Panel EDP |
| #7 - 1-CB Bolt-On Digital |
| Power Pact |
| #8 - 3-CB's |
| Square D JG |
| #9 - 1-CB |
| Square D HG |
| #10 - 2-CB's |
| Square D HG |
Transformer (OUTSIDE) - Oil
| Building # 19 |
| Panel GED |
| #1 - 1-CB |
| Power Pact |
| #2 - 1-CB |
| Power Pact |
#3 - ATS-2-EDP
#4 - ATS-1-EMP
| MV Switch 1 |
| #5 - 1-CB |
| Square D |
| Panel MDP |
| #6 - 1-CB |
| Square D |
| #7 - 2-CB's |
| Square D |
| #8 - 4-CB's |
| Square D |
| #9 - 2-CB's |
| Square D |
| Building # 21 |
| Panel MB |
| #1 - 1-CB |
| Westinghouse |
| Panel BMD |
| #2 - 3-CB's |
| Power Pact |
| #3 - 1-CB |
| Power Pact |
| #4 - 2-CB |
| Power Pact |
| #5 - 1-CB |
| Power Pact |
| #6 - 1-CB |
| Power Pact |
| Building # 25 |
| Panel MDP |
| #1 - 1-CB |
| Power Pact |
| #2 - 1-CB |
| Power Pact |
| #3 - 12-CB's |
| Power Pact |
#4 - ATS-CR
#5 - ATS-LS
| Load Bank Panel GDP |
| #6 - 1-CB |
#7 - 1-CB
#8 - 2-CB's
| Building # 26 |
| Panel MDP |
| #1 - 1-CB |
| Hi - Break |
| #2 - 4-CB's |
| GE |
| #3 - 2-CB |
| GE |
| #4 - 2-CB |
| GE |
| Panel PV |
| #5 - 1-CB |
| Power Pact |
| Building # 28 |
| MDP |
| #1 - 1-CB |
| Spectra |
| #2 - 2-CB's |
| Spectra |
| #3 - 3-CB's |
| Spectra |
#4 - ATS 43 - EQ
#5 - ATS 43 - LS
| Building # 29 |
| Panel MDP |
| #1 - 1-CB |
| Spectra |
| #2 - 2-CB |
| Spectra |
| #3 - 13-CB - (11-GE-100A, 2-GE-200A) |
| Spectra |
| #4 - 2-ATS-29-1LS1 |
| Spectra |
| 29 Pool Panel |
| #5 - 1-MV-CB |
| 29 EDP Panel |
| #6 - 1-CB |
| Spectra |
| 29 1N1-R |
| #7 - 1-CB |
| Spectra |
| AQF3422ABX |
| AXT1B7 |
| 200 |
| #8 - 1-CB 1N12-R |
| Spectra |
| AQF3302ABX |
| AXT1B7 |
| 150 |
| 29 1N1-L |
| #9 - 1-CB 1N1-L |
| Spectra |
| AEF3301BBX |
| AXB7 |
| 100 |
| #10 - 2-Transfer Switches |
| Kohler |
#11 - 1-Transformer - Oil
| Building # 30 |
| Room 5G-104 Double Ended Switch Gear |
| #1 - 2-MV Disconnect Switch Gear |
#2 - 2-MV 3P2T Switches
| #3 - 2-CB's |
| Power Pact |
| #4 - 3-CB's |
| Power Pact |
| #5 - 3-CB's |
| Power Pact |
| #6 - 9-CB's |
| Power Pact |
| Panel 3HMDP |
| #7 - 1-CB |
| Square D LC |
| #8 - 2-CB's |
| Square D JG |
| Room 5G-103 |
| #9 - 1-CB |
| Square D HG |
| Panel 3ESWBD |
| #10 - 1-CB |
| Power Pact |
| #11 - 1-CB |
| Square D LX |
| #12 - 1-CB |
| Square D LX |
| #13 - 3-CB's |
| Square D LX |
| Panel 3EQDP1 Section 1 |
| #14 - 1-CB |
| Power Pact |
| #15 - 1-CB |
| Square D LC |
| #16 - 1-CB |
| Square D JG |
| #17 - 1-CB |
| Square D JJ |
| #18 - 2-CB's |
| Square D HG |
| Panel 3CRDP |
| #19 - 1-CB |
| Power Pact |
| #22 - 1-CB |
| Power Pact |
| #23 - 5-CB's |
| Power Pact |
| #24 - 5-Transfer Switches |
| ASCO |
| Building # 31 |
| Panel ESWBD |
| #1 - 1-CB |
| Power Break II |
| #2 - 1-CB |
| Spectra |
| #3 - 1-CB |
| Spectra |
| #4 - 1-CB |
| Spectra |
| #5 - 1-CB |
| Spectra |
| Feeder 9 / 10 |
| #6 - 2-MV-CB |
| GE |
| GE-SR750 |
| #7 - 2 MV Relays |
| GE |
| GE-SR750 |
| Panel MDP |
| #8 - 3-CB's |
| Power Break II |
| #9 - 1-CB |
| Power Break II |
| Panel DPL1 & DPL2 |
| #10 - 2-CB's |
#11 - 1-CB
#12 - 2-CB's
#13 - 1-CB
#14 - 1-CB
#15 - 4-CB's
#16 - Transformer - Dry
#17 - 2-HV-CB's
12.4 KVA
#18 - 3-MV-CB's
#19 - 1-CB
| Panel EDP1 Section 1 |
| #20 - 1-MCB |
| Spectra RMS |
| Panel EL1 |
| #21 - 1-CB |
| Spectra RMS |
| Panel EL3 |
| #22 - 1-CB |
| Spectra RMS |
| Panel L3 |
| #23 - 1-CB |
| Spectra RMS |
| Panel EDPK1 |
| #24 - 1-CB |
| Spectra RMS |
| #25 - 2-CB's |
| Spectra RMS |
| #26 - 2-CB's |
| Spectra RMS |
| #27 - 1-CB |
| Spectra RMS |
| #28 - 2-CB's |
| Spectra RMS |
| #29 - 3-Transfer Switches |
| ASCO |
| Building # 37 |
| Main |
| #1 - 1-CB |
| Square D |
Transfer Switch
| Panel 37EL1 |
| #2 - 1-CB |
| Square D |
| Panel 37EHMDP |
| #3 - 1-CB |
| Power Pact |
| #4 - 1-CB |
| Power Pact |
| #5 - 1-CB |
| Power Pact |
Building # 61
#1 - 11-CB's
| Feeder 1 |
| Bldgs. 9,10,12,16,26,50,52,82,88 |
| Schweitzer |
SEL-751A
| Feeder 2 |
| Bldgs. 2,5,6,7,8,17,19,21,51,58,69 |
| Schweitzer |
SEL-751A
| Feeder 3 |
| Bldgs. 2,14,15,25,28,30,57,58, Chiller |
| Schweitzer |
SEL-751A
| Feeder 4 |
| Bldgs. 1,3 |
| Schweitzer |
SEL-700G
| Feeder 5 |
| Bldgs. 1,3 |
| Schweitzer |
SEL-751A
| Feeder 6 |
| Spare |
| Schweitzer |
SEL-751A
| Feeder 7 |
| Bldgs. 29, 91, T-102 |
| Schweitzer |
SEL-751A
| Feeder 8 |
| Bldgs. 14,15,25,30,37, Chiller |
| Schweitzer |
SEL-751A
| Feeder 9 |
| Bldgs. 31 |
| Schweitzer |
SEL-751A
| Feeder 10 |
| Bldgs. 31 |
| Schweitzer |
SEL-751A
Building # 69
#1 - 1-CB TS-5
#2 - 1-CB TS-11
#3 - 1-CB TS-21
| Panel RL |
| #4 - 1-CB TS-5 |
#5 - 1-CB TS-11
#6 - 1-CB TS-21
| Panel EP |
| #7 - 1-CB TS-5 |
#8 - 1-CB TS-11
#9 - 1-CB SOLAR
#10 - 1 CB MAIN
Building # 74
#1 - ATS-1000-EDP3
| Panel EDPG |
| #2 - 4-CB's |
| Siemens |
| #3 - 1-CB Fire Pump |
| Eaton |
Building # 91
#1 - 10-CB's
| 52FA |
| 52FA-SWGR-A |
| Schweitzer |
| 0551003X531X |
| SEL-551 |
| 52FB |
| 52FB-SWGR-B |
| Schweitzer |
| 0551003X531X |
| SEL-551 |
| 52TA |
| TIE TA |
| Schweitzer |
| 0351A00323551XX |
| SEL-351A |
| 52TB |
| TIE TB |
| Schweitzer |
| 0351A00323551XX |
| SEL-351A |
| 52UA |
| UTILITY A 52UA |
| Schweitzer |
| 03517033551XXX |
| SEL-351 |
| 52UB |
| UTILITY A 52UB |
| Schweitzer |
| 03517033551XXX |
| SEL-351 |
| GEN.1 |
| G1_GPR |
| Schweitzer |
| 0300G303325XX12XX |
| SEL-300G |
| GEN.2 |
| G2_GPR |
| Schweitzer |
| 0300G303325XX12XX |
| SEL-300G |
| GEN.3 |
| G3_GPR |
| Schweitzer |
| 0300G303325XX12XX |
| SEL-300G |
| GEN.4 |
| G4_GPR |
| Schweitzer |
| 0300G303325XX12XX |
| SEL-300G |
| GEN.5 |
| G5_GPR |
| Schweitzer |
| 0300G303325XX12XX |
| SEL-300G |
| GEN.6 |
| G6_GPR |
| Schweitzer |
| 0300G303325XX12XX |
| SEL-300G |
ATTACHMENT C
| Department of Veterans Affairs | VHA DIRECTIVE 1028 | ||
| Veterans Health Administration | Transmittal Sheet | ||
| Washington, DC 20420 | February 24, 2020 |
FACILITY ELECTRICAL POWER SYSTEMS
1. REASON FOR ISSUE: This Veterans Health Administration (VHA) directive establishes policy regarding the installation, operation, testing, and maintenance of Facility Electrical Power Systems at VA medical facilities and affiliate sites.
1. SUMMARY OF MAJOR CHANGES: Major changes include updates to references (Paragraph 11) and responsibilities (Paragraph 5).
1. RELATED ISSUES: VHA Directive 7701, Comprehensive Occupational Safety and Health Program, dated May 5, 2017.
1. RESPONSIBLE OFFICE: The Office of Capital Asset Management, Engineering and Support (OCAMES) (10NA5E), is responsible for the of this directive. Questions can be submitted to the Healthcare Environment and Facilities Program SharePoint site at: https://vaww.vha.vaco.portal.va.gov/sites/DUSHOM/10NA/10NA5/HealthcareEngineerin g/waiver/Pages/Waiver%20Requests.aspx. NOTE: This is an internal VA Web site that is not available to the public.
1. RESCISSIONS: VHA Directive 1028, Electrical Power Distribution System, dated July 25, 2014, is rescinded.
1. RECERTIFICATION: This VHA directive is scheduled for recertification on or before the last working day of February 2025. This VHA directive will continue to serve as national VHA policy until it is recertified or rescinded.
BY THE DIRECTION OF THE UNDER SECRETARY FOR HEALTH:
/s/ Renee Oshinski Deputy Under Secretary for Health for Operations and Management
NOTE: All references herein to VA and VHA documents incorporate by reference subsequent VA and VHA documents on the same or similar subject matter.
DISTRIBUTION: Emailed to the VHA Publications Distribution List on February 27, 2020.
Page 1 of
CONTENTS
FACILITY ELECTRIC POWER SYSTEMS
| Requirement | 13 | |
| 1. | PURPOSE | 1 |
| 2. | BACKGROUND | 1 |
| 3. | DEFINITIONS | 1 |
| 4. | POLICY | 3 |
| 5. | RESPONSIBILITIES | 3 |
| 6. | APPLICABILITY OF THIS DIRECTIVE | 7 |
| 7. | SAFETY | 8 |
| 8. | IMPLEMENTATION | 9 |
| 9. | TRAINING | 18 |
| 10. | RECORDS MANAGEMENT | 19 |
| 11. | REFERENCES | 19 |
i
Page 1 of
FACILITY ELECTRICAL POWER SYSTEMS
1. PURPOSE
This Veterans Health Administration (VHA) directive provides policy regarding the installation, operation, testing, and maintenance of Facility Electrical Power Systems at Department of Veterans Affairs (VA) medical facilities. AUTHORITY: Executive Order 12196, dated February 26, 1980; Title 38 United States Code (U.S.C.) 7301(b); 40 U.S.C.
3312.
1. BACKGROUND
1. VHA and The Joint Commission have adopted the National Fire Protection Association (NFPA) codes and standards including the National Electrical Code (NFPA 70), Recommended Practice for Electrical Equipment Maintenance (NFPA 70B), Standard for Electrical Safety in the Workplace (NFPA 70E), Health Care Facilities Code (NFPA 99), Life Safety Code (NFPA 101) and Standard for Emergency and Standby Power Systems (NFPA 110) as the basis for the requirements of the design, installation, operation, testing, and maintenance of the Electrical Power System at VA medical facilities and affiliate sites. NOTE: VHA adopts national codes and standards upon issuance; in some cases, The Joint Commission may be using older editions of such standards which may cause discrepancies.
1. The Joint Commission’s Environment of Care (EC) standards require written Utility Management Plans. The Utility Management Plans must ensure reliability, control risks, reduce failures, and train users and operators of the Facility Electrical Power System. Non-compliance with this directive could lead to accreditation issues with The Joint Commission, impact patient care and increase the risk of harm to patients in critical care areas such as the Intensive Care Unit and Operating Rooms.
1. Working on energized electrical equipment is inherently dangerous to patients, staff, visitors, and VA property. Such actions, if unplanned or poorly executed, can result in disruption of operations, injuries, loss of life and loss of property. Occupational Safety and Health Requirements (OSHA) Title 29 Code of Federal Regulations (CFR) Part 1910 Subpart J, The Control of Hazardous Energy (lockout/tagout) (1910.147); Part 1910 Subpart S, Electrical (1910.301-1910.399); and Safety and Health Regulations for Construction Part 1926 Subpart K, Electrical (1926.400-1926.449) apply to work on this equipment.
1. DEFINITIONS
2. Electric Power Production and Distribution Network. The Electric Power Production and Distribution Network consists of power production, distribution, and utilization equipment and facilities, such as electric utility systems that deliver electric power to the connected loads, that are external to and not controlled by an interactive system.
Page 1 of
2. Emergency Power Supply. The Emergency Power Supply (EPS) is the source of electric power of the required capacity and quality for an emergency power supply system (EPSS).
2. Emergency Power Supply System. The Emergency Power Supply System (EPSS) as defined in NFPA 110 is a complete functioning EPS system coupled to a system of conductors, disconnecting means and overcurrent protective devices, transfer switches, and all control, supervisory, and support devices up to and including the load terminals of the transfer equipment needed for the system to operate as a safe and reliable source of electric power. Within health care facilities, the EPSS may be part of the Essential Electrical System (EES) (when serving loads allowed to be on the EES) or may be part of a standby power system when serving non-health care related loads.
2. Essential Electrical System. The Essential Electrical System (EES) as defined in NFPA 99, Health Care Facilities Code, is a system comprised of alternate sources of power and all connected distribution systems and ancillary equipment, designed to ensure continuity of electrical power to designated areas and functions of a health care facility during disruption of normal power sources, and also to minimize disruption within the internal wiring system.
2. Facility Electrical Power Systems. The Facility Electrical Power System includes the Premises Wiring and the portion of the Electrical Power Production and Distribution Network (both as defined in NFPA 70) owned by VHA.
2. Mission Critical VA Medical Facilities. Mission critical VA medical facilities are those VA medical facilities and affiliate sites that are required to continue operation during a natural or manmade extreme event or a national emergency. NOTE: Refer to Physical Security Design Manual (PSDM), latest edition, for the definition and list of Mission Critical facility types. The PSDM is available on the CFM Technical Information Library (TIL): https://www.cfm.va.gov/til/criteria.asp.
2. Premises Wiring. Premises Wiring consists of interior and exterior wiring, including power, lighting, control, and signal circuit wiring together with all their associated hardware, fittings, and wiring devices, both permanently and temporarily installed. This includes (a) wiring from the service point or power source to the outlets or (b) wiring from and including the power source to the outlets where there is no service point. Such wiring does not include wiring internal to appliances, luminaires, motors, controllers, motor control centers, and similar equipment.
2. Qualified Persons. Qualified persons, as defined in NFPA 70, Article 100, are those that have demonstrated skills and knowledge related to the construction and operation of electrical equipment and installations and received safety training to identify the hazards and reduce the associated risk. Training must be classroom, on-the-job or a combination of the two. The type and extent of training must be proportionate to the risk to the employee.
Page 1 of
2. Utility Management Plan. The Utility Management Plan is a written plan which includes processes for selection, maintenance, and training that are designed to promote safe and effective use of utility systems while minimizing risks to patients and staff. The Utility Systems Management Plan applies to hospital functions at each designated VA medical facility subject to inspection by The Joint Commission.
2. Wet Procedure Location. Wet Procedure Locations are the areas in a patient care space where a procedure is performed that is normally subject to wet conditions while patients are present, including standing fluids on the floor or drenching of the work area, either of which condition is intimate to the patient or staff.
1. POLICY
It is VHA policy that the Facility Electrical Power System must operate in a safe, reliable, and efficient manner, recognizing its importance and potential danger; and in compliance with The Joint Commission, OSHA, and NFPA electrical standards.
1. RESPONSIBILITIES
4. Under Secretary for Health. The Under Secretary for Health is responsible for ensuring overall compliance with this directive.
4. Deputy Under Secretary for Health for Operations and Management. The Deputy Under Secretary of Health for Operations and Management is the Authority Having Jurisdiction (AHJ) as it pertains to this directive and is responsible for:
1. Communicating the contents of this directive to each of the Veterans Integrated Services Networks (VISNs).
1. Ensuring that each VISN Director has the resources required to support the execution of this directive in all the VA medical facilities within the VISN.
1. Confirming that each VISN has and utilizes on an ongoing basis a means for ensuring the terms of this directive are fulfilled in all the VA medical facilities of the VISN. The annual survey of compliance, Annual Workplace Evaluations (AWE) and Joint Commissions can comprise the basis for ensuring compliance.
1. Approving variances or equivalencies to this directive. For example, approval of an alternative simulation if the utility connection cannot be opened during a test of the EES. See paragraph 8.j(4)(b).
4. Office of Capital Asset Management Engineering and Support Director. The Office of Capital Asset Management Engineering and Support (OCAMES) Director is responsible for:
1. Providing technical subject matter expertise regarding this directive, VA criteria, and related national codes and standards.
Page 1 of
1. Responding to questions from the field regarding technical issues and conducting site assessments related to this directive when requested or when otherwise determined to be required.
1. Reviewing requests for deviations or variances from this directive, VA criteria, and national codes and standards and making recommendations to the Deputy Under Secretary for Health for Operations and Management to approve or not approve such requests.
1. Reporting on results of annual survey of compliance with this directive as requested by VA leadership.
4. Veterans Integrated Service Network Director. The VISN Director is responsible for:
NOTE: For the purpose of this directive as it applies to non-medical facilities within VHA, the National Consolidated Mail Out Pharmacy (CMOP) Director or equal position is considered equivalent to the VISN Director and therefore responsible for the following:
1. Ensuring the installation, operation, testing, and maintenance of Facility Electrical Power Systems meet or exceed The Joint Commission, NFPA, and other applicable requirements.
1. Confirming that all work on the Facility Electrical Power Systems complies with OSHA and NFPA standards.
1. Reviewing and providing concurrence or non-concurrence on VA medical facility requests for deviation from this directive, VA criteria, or national standards and codes. Requests approved by the VISN Director must be submitted to the Deputy Under Secretary for Health for Operations and Management or designee for approval as the AHJ.
1. Ensuring that appropriate resources are provided to each VA medical facility in order to ensure compliance with this directive. To ensure each VA medical facility in the VISN is in compliance with this directive, the VISN Director:
3. Delegates review and interpretation of Facility Electrical Power System documentation to a qualified member of the VISN staff, including tracking of status reports regarding the installation, operation, testing, and maintenance of Facility Electrical Power Systems within the network.
3. Ensuring each VA medical facility within each VISN completes a status verification survey once a year on or before May 1 using the survey tool found on the VHA Center for Engineering and Occupational Safety and Health (CEOSH) Web site electrical page under VA Policy and Guidance at: http://vaww.ceosh.med.va.gov/01HE/Pages/ST_electrical_distribution.shtml#VAPolicy_ Guidance. NOTE: This is an internal VA Web site that is not available to the public.
Page 1 of
4. Veterans Integrated Service Network Staff. VISN staff designated by the VISN Director are responsible for reviewing and interpreting electrical power system documentation, including tracking of status reports regarding the installation, operation, testing, and maintenance of Facility Electrical Power Systems within the network. Such staff should review any requests for deviation from this and other standards on behalf of, and make recommendations to, the VISN Director.
4. VA Medical Facility Director. The VA medical facility Director is accountable to the respective regional or national Director (e.g., VISN or CMOP Director). The VA medical facility Director is responsible for:
NOTE: For the purpose of this directive as it applies to non-medical facilities within VHA, positions equivalent to the VA medical facility Director at affiliate sites are responsible for the following:
1. Ensuring that the design, installation, operation, testing, and maintenance of Facility Electrical Power Systems meet or exceed The Joint Commission, NFPA, VA and other applicable requirements, and that all work on this system complies with OSHA, NFPA, and VA standards.
1. Reviewing and providing concurrence or non-concurrence on deviations from VA and national standards requested by VA medical facility staff (typically requested by Engineering or Facilities Management). Approved deviation requests must be forwarded to the VISN Director for further review and concurrence.
1. Approving a Utility Systems Management Plan developed by Engineering or other appropriate office which meets, or exceeds The Joint Commission, OSHA, and NFPA requirements and is approved by the VA medical facility Director or designee. See paragraph 8.k.(1).
1. Approving exceptions for when electrical equipment that typically must be secured can remain unsecured.
1. Allocating the appropriate resources (funds, training, equipment, and qualified personnel) to achieve compliance.
1. Authorizing only qualified staff at the VA medical facility and qualified electrical contract professionals to execute any design, installation, operation, testing, and maintenance of the Facility Electrical Power System in accordance with The Joint Commission and NFPA requirements and that all work on these systems is compliant with OSHA standards.
1. Approving a management system, developed and implemented by Engineering and Safety staff, to ensure that work on energized equipment does not take place without the VA medical facility Director’s prior knowledge and written approval; ensuring this information is disseminated to VA medical facility Service Line Chiefs.
Page 1 of
1. Ensuring that electrical hazards (including arc flash and shock) are analyzed and identified per NFPA and OSHA requirements (see paragraph 7 for additional information on analysis requirements).
1. Ensuring that appropriate actions are taken to correct deficiencies found in the Facility Electrical Power System.
1. Overseeing the development and implementation of written procedures which prepare the VA medical facility for a planned electrical outage and ensuring that such procedures are communicated and disseminated to Service Line Chiefs.
1. Ensuring a testing plan for Ground Fault Circuit Interrupters (GFCI) by which each GFCI is in place. Where there are not enough staff to keep up with the volume of GFCI that need to be tested, the VA medical facility Director may approve testing at less frequent intervals in this circumstance. (See paragraph 8.j.(7).)
1. Certifying the survey which is a report of status indicating VA medical facilities are in compliance with the required maintenance and testing of the Facility Electrical Power System. See http://vaww.ceosh.med.va.gov/01HE/Pages/ST_electrical_distribution.shtml#VAPolicy_ Guidance. NOTE: This is an internal VA Web site that is not available to the public.
1. Delegating, in writing, authority for the VA medical facility Chief Engineer to approve an energized electrical work plan for non-patient care Branch Circuits (see paragraph 8.h.(5)(b)).
1. Ensuring that transformers and other electrical equipment, including all related components, are inspected, tested, and maintained every 36 months. (See paragraph 8.j.(5-6).)
4. VA Medical Facility Chief Engineer. The VA medical facility Chief Engineer is responsible for:
1. Ensuring the design, installation, operation, testing, and maintenance of Facility Electrical Power Systems meets or exceeds The Joint Commission, NFPA, VA and other applicable requirements and that all work on this system complies with OSHA, NFPA, and VA standards, as delegated from the VA medical facility Director. Ensures information related to electrical system maintenance, testing and operation is communicated to Service Line Chiefs.
1. Developing concurrence/non-concurrence documentation for any deviations from VA and national standards. This includes obtaining VA medical facility Director concurrence/non-concurrence for such deviance/variation requests, ensuring approved deviance requests are forwarded to the VISN for further review and concurrence and notifying OCAMES of pending deviance/variation requests.
1. Approving an energized electrical work plan for Branch Circuits when delegated from the VA medical facility Director or CMOP Director (see paragraph 8.h.(5)(a) for
Page 1 of work plan information), and completing a risk assessment that indicates energized electrical work will not affect patient care and the work qualifies for one of the three NFPA 70E/OSHA exceptions (see paragraph 8.h.(3)(a-c) for exception information).
1. Assigning a person as overwatch when energized work is being performed.
1. Conducting a risk assessment when a planned electrical outage cannot be accomplished to determine if the work qualifies as meeting one of the three exceptions in NFPA 70E and OSHA which allow energized work (see paragraph 8.h.(3)(a-c) for additional information on the exceptions).
1. Certifying the annual survey which is a report of status indicating that the VA medical facility is in compliance with this directive. The survey can be found here: http://vaww.ceosh.med.va.gov/01HE/Pages/ST_electrical_distribution.shtml#VAPo licy_Guidance. NOTE: This is an internal VA Web site that is not available to the public.
4. Service Line Chiefs. Service Line Chiefs located at the VA medical facility or other affiliate sites are responsible for:
1. Communicating regularly with the VA medical facility Director in order to receive the plans and any additional information pertaining to planned electrical outages and planned work on electrical equipment.
1. Working closely with the VA medical facility Chief Engineer to ensure information related to electrical system maintenance, testing and operation is communicated.
i. VA Medical Facility Engineering Staff. Engineering staff located at the VA medical facility or affiliate sites are responsible for:
1. Designing, installing, operating,…