36C25621Q0639_1.docx

DOCX document 13 KB Posted

Attached to
K048--Installation of 4 inch Oxygen Control Valve, Testing, and Inspection
Solicitation number
36C25621Q0639
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Presolicitation Notice

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Presolicitation Notice K048 Installation of 4 inch Oxygen Control Valve, Testing, and Inspection 71306-9004 36C25621Q0639 04-15-2021 3:00

CENTRAL TIME, CHICAGO, USA

N

SDVOSBC

238220

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

PO BOX 69004

ALEXANDRIA LA 71306-9004

Contract Specialist James D Rasco james.rasco@va.gov Southeast Louisiana Veterans HCS 2400 Canal Street New Orleans

Louisiana 70119

USA

Description

The bulk oxygen system at SLVHCS is designed to deliver oxygen through a series of piping, manifolds, and various fixtures throughout the SLVHCS campus. The system currently does not have the Main Line Control Valve as required by NFPA 99-15 5.1.4.3. The contractor shall procure and install one (1) 4-inch Oxygen Control valve on the first floor of the Central Energy Plant (CEP) building. The contractor shall conduct a full pressure test on the existing EOSC system and the four connections present at the Diagnostic and Treatment building. The contractor shall test to ensure there are no leaks in the system and all valves from the EOSCs to the building entry points are secured with no issues. In order to test, the contractor shall utilize contractor provided oxygen to test the system.

File details come from the government source that posted it. Updated .