S02- AMEND2_36C25620Q0056 0002_Added Tests_Date Extended.pdf
PDF 477 KB Posted
- Attached to
- Quarterly Water Testing for Legionella
- Solicitation number
- 36C25620Q0056
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02- AMEND1_36C25620Q0056 0001_QA Date Extended.pdf | ||
| 36C25620Q0056-007.pdf | ||
| 36C25620Q0056-005.pdf | ||
| 36C25620Q0056-004.pdf | ||
| 36C25620Q0056-006.pdf | ||
| 36C25620Q0056-002.docx | DOCX document | |
| 36C25620Q0056-003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
0002 12-20-2019
598-20-1-504-0001
None
Y
Department of Veterans Affairs
Network Contracting Office 16
Michael E. DeBakey VA Medical Center
2002 Holcombe BLVD
Houston TX 77030 4298
36C256
Department of Veterans Affairs
Network Contracting Office 16
Michael E. DeBakey VA Medical Center
2002 Holcombe BLVD
Houston TX 77030 4298
To all Offerors/Bidders
36C25620Q0056
11-06-2019
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: December 23, 2019 at 11:00am (CT)
X one (1)
The purpose of this amendment is to provide information to all interested vendors of the following:
1) Corrected Questions and Answers in reference to services requested, see attachment below.
2) Extended solicitation close date pushed to: December 23,2019 at 11:00am (CT)
3) Added additional water testing for cooling towers; see below, corrected cost/price schedule and SOW.
All submissions to be sent to Shasta Britt, Contract Specialist at shasta.britt@va.gov
Nothing else follows.
Jeneice McClinton
Contracting Officer
36C25620Q0056 AMENDMENT 2
SECTION B - CONTINUATION OF COMBINED SYNOPSIS/SOLICITATION FOR
COMMERCIAL ITEMS
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM # DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT
AMOUNT
4.00 QTR
Contractor shall provide quarterly for water testing for Legionella 110 each per quarter.
Unit Price $_________ (x) 110ea (=) $__________ Total per QTR Contract Period: Base POP Begin: 12-31-2019 POP End: 12-30-2020
Contractor shall provide the following quarterly:
# per QTR Unit Price Total per QTR
• water temperature measurement 100 $________ $_________
• free chlorine measurement 100 $________ $_________
• pH measurement 100 $________ $_________
• sampling labor cost (cost per sample) 100 $________ $_________
TOTAL: $_________
Contract Period: Base
Contractor shall provide shipping and reporting costs by 12 hours per quarter.
Unit Price $_________ (x) 12hrs ea (=) $__________ Total per QTR Contract Period: Base
0004 4.00 QTR $__________________
Contractor shall provide quarterly for water testing for Cooling Towers 18 each per quarter.
Unit Price $_________ (x) 18ea (=) $__________ Total per QTR Contract Period: Base
BASE YEAR TOTAL:
Unit Price $_________ (x) 110ea (=) $__________ Total per QTR Contract Period: Option 1 POP Begin: 12-31-2020 POP End: 12-30-2021
# per QTR Unit Price Total per QTR
• water temperature measurement 100 $________ $_________
• free chlorine measurement 100 $________ $_________
• pH measurement 100 $________ $_________
• sampling labor cost (cost per sample) 100 $________ $_________
TOTAL: $_________
Contract Period: Option 1 POP Begin: 12-31-2020
Unit Price $_________ (x) 12hrs ea (=) $__________ Total per QTR Contract Period: Option 1
1004 4.00 QTR $__________________
Unit Price $_________ (x) 18ea (=) $__________ Total per QTR Contract Period: Option 1
OPTION YEAR ONE TOTAL:
Unit Price $_________ (x) 110ea (=) $__________ Total per QTR Contract Period: Option 2 POP Begin: 12-31-2021 POP End: 12-30-2022
# per QTR Unit Price Total per QTR
• water temperature measurement 100 $________ $_________
• free chlorine measurement 100 $________ $_________
• pH measurement 100 $________ $_________
• sampling labor cost (cost per sample) 100 $________ $_________
TOTAL: $_________
Contract Period: Option 2
Unit Price $_________ (x) 12hrs ea (=) $__________ Total per QTR Contract Period: Option 2
2004 4.00 QTR $__________________
Unit Price $_________ (x) 18ea (=) $__________ Total per QTR Contract Period: Option 2
OPTION YEAR TWO TOTAL:
Unit Price $_________ (x) 110ea (=) $__________ Total per QTR Contract Period: Option 3 POP Begin: 12-31-2022 POP End: 12-30-2023
# per QTR Unit Price Total per QTR
• water temperature measurement 100 $________ $_________
• free chlorine measurement 100 $________ $_________
• pH measurement 100 $________ $_________
• sampling labor cost (cost per sample) 100 $________ $_________
TOTAL: $_________
Contract Period: Option 3
Unit Price $_________ (x) 12hrs ea (=) $__________ Total per QTR Contract Period: Option 3
3004 4.00 QTR $__________________
Unit Price $_________ (x) 18ea (=) $__________ Total per QTR Contract Period: Option 3
OPTION YEAR THREE TOTAL:
Unit Price $_________ (x) 110ea (=) $__________ Total per QTR Contract Period: Option 4 POP Begin: 12-31-2023 POP End: 12-30-2024
# per QTR Unit Price Total per QTR
• water temperature measurement 100 $________ $_________
• free chlorine measurement 100 $________ $_________
• pH measurement 100 $________ $_________
• sampling labor cost (cost per sample) 100 $________ $_________
TOTAL: $_________
Contract Period: Option 4
Contractor shall provide shipping and reporting costs by 12 hours per quarter.
Unit Price $_________ (x) 12hrs ea (=) $__________ Total per QTR Contract Period: Option 4 POP Begin: 12-31-2023 POP End: 12-30-2024
4004 4.00 QTR $__________________
Contractor shall provide quarterly for water testing for Cooling Towers 18 each per quarter.
Unit Price $_________ (x) 18ea (=) $__________ Total per QTR Contract Period: Option 4
OPTION YEAR FOUR TOTAL:
GRAND TOTAL
Plus, all remaining options, exercisable at the Government’s discretion.
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the
Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. This includes options under FAR 52.217-8, Option to Extend Services, which applies to this solicitation. Evaluation of options under FAR 52.217-8 will be accomplished by using the prices offered for the last option period to determine the price for a 6-month option period, which will be added to the base and other option years to arrive at the total price. Evaluation of options will not obligate the Government to exercise the option(s).”
(End of Price/Cost Schedule)
B.3 STATEMENT OF WORK (SOW)
a) GENERAL REQUIREMENTS
(1) The contractor shall provide services to collect and culture water samples for Legionella pneumophila at the
Michael E. DeBakey VA Medical Center (MEDVAMC) on a quarterly basis. This includes collecting the samples, completing chain of custody forms/records, preparing samples for shipment, shipping the samples to a certified laboratory as described in paragraph F below and reporting laboratory results to the Contracting Officer’s Representative (COR).
(2) At each sampling site the contractor shall concurrently measure and record the water temperature in degrees Fahrenheit, the level of free chlorine, and the pH. These results shall also be provided to the COR.
b) SPECIFIC CONTRACT WORK REQUIREMENTS
(1) Culture of Legionella pneumophila from potable water.
i. Contractor shall make arrangements with the COR on a day and time for water sampling.
ii. Prior to water sampling, contractor shall obtain from the certified laboratory all materials needed for sampling. This includes sample bottles, shipping boxes, instructions and chain of custody forms.
iii. On the day of the sample collection contractor shall collect water samples in bottles with chemical neutralizer pellets supplied by the laboratory using the specific instructions supplied by the laboratory.
Contractor shall also complete chain of custody forms/records required by the laboratory.
iv. Contractor shall then package samples in a laboratory-supplied box to be taken to the lab the same day they are completed.
v. Contractor shall be responsible for all shipping and analysis charges.
vi. Contractor shall provide the COR with the analysis report from the laboratory and shall make arrangements to conduct any resampling that may be necessary.
https://www.acquisition.gov/?q=/browse/far/17 https://www.acquisition.gov/?q=/browse/far/17
(2) Analysis of other water parameters.
i. At each water sampling site contractor shall concurrently measure and record the water temperature in degrees Fahrenheit, the level of free chlorine, and the pH. Contractor shall record the foregoing parameters as well as the time and date of collection, building, room number, room function, fixture type, whether hot or cold, meter type or measurement method, model number, calibration, and S/N. The choice of fixture types is: shower, bathtub, bathroom sink, room sink, water fountain, ice machine or cooling tower. The individual making these measurements shall also sign the data sheet.
ii. Contractor shall provide a copy of the signed data sheet with all the required information on the day the sampling and testing is completed.
(3) Frequency, quantity and locations of sampling.
i. Water sampling and parameter measurements shall be accomplished once each quarter beginning with the
January – December quarter each year. Contractor shall coordinate mutually acceptable sample collection times with the COR. Quarterly sampling shall be accomplished regardless of any resampling that is required due to positive results.
ii. Minimum numbers and general locations of quarterly samples are listed in the table below. These numbers may increase due to the needs of MEDVAMC and the necessity of repeating any samples positive for Legionella.
Quarterly Water Sampling
Location Minimum number of hot water samples
Minimum number of cold-water samples
Estimated additional water samples (hot or cold)
Estimated repeat samples
Estimated quarterly totals
Building 100 (Main Hospital)
25 25 20 5 75
CLC Units 10 10 5 3 28
Fisher House 1 10 10 1 1 22
Fisher House 2 10 10 0 1 21
Fisher House 3 10 10 0 1 21
Totals 65 65 26 11 110
Location Cooling Towers
Minimum number of cold-water samples
Estimated additional water samples
Estimated repeat samples
Estimated quarterly totals
Building 104 (chiller plant)
4 1 1 6
Building 104-A (chiller plant)
4 1 1 6
Building 109 (chiller plant)
4 1 1 6
Totals 12 3 3 18
iii. The contractor shall obtain from the COR the exact number and locations of water outlets to be tested at least two weeks before conducting sampling. Water outlets may include showers, bathtubs, bathroom sinks, room sinks, drinking fountains, ice machines or cooling towers.
(4) Sample results shall be emailed to the COR only, within two business days of receipt, including laboratory analysis and chain of custody forms.
(5) Qualifications of contractor: Contractor shall be certified by the state certifying body for the collection and analysis of water samples for environmental pollutants and shall be knowledgeable in measuring temperature, pH and free chlorine. State certification shall be of: direct certification; reciprocal certification; and/or National Environmental Laboratories Accreditation Program (NELAP).
(6) Qualifications of the Legionella testing laboratory. Once collected, samples are to be processed by a testing laboratory with experience in microbial testing of potable water and meeting the following criteria:
i. Laboratories that process the water samples for Legionella shall be certified by the Centers for Disease
Control and Prevention (CDC) Environmental Legionella Isolation Techniques Evaluation (ELITE) program or the Public Health England (PHE) External Quality Assessment (EQA) scheme as proficient at performing the culture of Legionella species from environmental samples. NOTE: Per CDC guidance, rapid testing methods, such as polymerase chain reaction (PCR) and direct fluorescent antibody (DFA), are not recommended for the detection of Legionella in environmental water samples. Therefore, laboratories using rapid testing methods are not acceptable for this contract.
ii. In addition to the requirement for current CDC ELITE or PHE Legionella EQA certification, the laboratory shall also have environmental microbiology accreditation by a recognized accrediting program.
iii. The laboratory shall be capable of concentrating water samples prior to plating the samples on selective media to increase the sensitivity of the assay.
iv. If there is a possibility that the facility shall use molecular typing to characterize environmental Legionella isolates, the laboratory shall have facilities for storage of the environmental isolate(s) at least temporarily.
v. The laboratory shall provide detailed instructions for water collection including any provisions for the building’s water containing biocides (e.g. chlorine).
c) SAFETY REQUIREMENTS: In the performance of this contract, the Contractor shall take such safety precautions as the Contracting Officer, or his/her designee, may determine to be reasonably necessary to protect the lives and health of occupants of the building. The Contractor shall have one supervisory employee, who shall disseminate requirements to those who work at our facility, report to the Safety Manager’s office for a one-time training class before working on-site. The Contracting Officer or his/her designee shall notify the Contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his representative at the site of work, shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly with such notice, the contracting Officer may issue an order stopping all or any part of the work and hold the Contractor in default.
d) PRE-PERFORMANCE CONFERENCE: If the Contracting Officer decides to conduct a pre-performance conference, the successful offeror shall be notified and shall be required to attend. The Contracting Officer’s notification shall include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
e) INVOICE AND PAYMENT: Please submit all invoices in accordance with VAAR Part 852.232-72., invoice shall be billed in arrears, and payment shall be processed upon the receipt of a properly prepared invoice. Payments shall be made monthly via EFT (Electronic Fund Transfer) from the VA Financial Service Center. All invoices shall reference both contract number and purchase order number which shall be issued by the Contracting Officer. Contractor shall be responsible for ensuring to have a correct purchase order number on the invoices. Invoices without purchase order number or with incorrect purchase order number shall be rejected. Bill for only for service provided.
f) SIGNING IN AND OUT: For each visit to the facility, the Contractor shall report to the office below, both upon arrival and prior to departure.
Office Location Phone
Safety, Room 4B-330 Building 100, 4th Floor Facilities Management Service
713-791-1414, ext. 27782 or 27678
g) HOURS OF OPERATIONS:
(1) The Contractor is responsible for conducting business during normal business hours, Monday through Friday from 0700 to 1530, during the times that the COR is available, except for federal holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
(2) If a holiday falls on a Sunday, the following Monday shall be observed as the National Holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National Holiday by U.S. Government agencies. Also, included would be any day specifically declared by the President of the United States. Contractor is not required to provide any service(s) on nationally recognized U.S. Government holidays, nor shall the contractor be paid for these holidays.
(3) The Contractor shall always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this solicitation when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
(4) The healthcare systems operations are 24/7, 365 days a year, therefore on occasions; the Government may process orders for Veterans outside of normal business hours. The Contractor shall be required to provide services under these circumstances.
h) OVERTIME AND HOLIDAYS:
(1) Any overtime and/or holiday pay that may be entitled to the Contractor’s employee(s) shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government. National Holidays:
- Listed below are the ten (10) national holidays:
i. New Year's Day January 1
ii. Martin Luther King's Birthday Third Monday in January
iii. President's Birthday Third Monday in February
iv. Memorial Day Last Monday in May
v. Independence Day July 4
vi. Labor Day First Monday in September
vii. Columbus Day Second Monday in October
viii. Veterans Day November 11
ix. Thanksgiving Day Fourth Thursday in November
x. Christmas December 25
(2) In addition to the days designated as holidays, the Government observes the following days:
i. Any other day designated by Federal Statute
ii. Any other day designated by Executive Order
iii. Any other day designated by the President’s Proclamation
(3) It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor's personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation shall be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked.
(End of Statement of Work)
Questions Regarding Solicitation 36C25620Q0056
1. Who is the incumbent contractor currently performing this work? A & B Environmental Services under IDIQ contract VA256-15-D-0021 with a ceiling amount of $198,000.00
2. What is the value of the current contract? Four-year contract that ended 9/30/2019 with the following orders against IDIQ contract VA256-15-D-0021: (below are all actions that reflecting funding against IDIQ, all other action was administrative only)
a. VA256-15-J-2417 $39,600.00
i. MOD P00001 $18,600.00
b. VA256-15-J-0328 $39,600.00
i. MOD P00002 $39,600.00
ii. MOD P00004 $39,600.00
iii. MOD P00005 $5,913.00
iv. MOD P00007 -$20,556.50 decrease in funds not utilized
v. MOD P00008 -$15.66 decrease in funds not utilized
vi. MOD P00010 -$197.00 decrease in funds not utilized
vii. MOD P00011 $9,700.00
c. 36C25619N0150 $58,200.00
3. Awarded Contract will be an IDIQ with orders place against when services are requested each quarter for the awarded year January thru December.
Response Date Extended (NLT): December 23, 2019 at 11:00am (CT) to Shasta Britt, Contract Specialist at shasta.britt@va.gov mailto:shasta.britt@va.gov
File details come from the government source that posted it. Updated .