About this file

This statement of work describes a requirement to replace four Patterson Kelley domestic hot water heaters at the Veterans Health Care System of the Ozarks facility in Fayetteville, Arkansas. The contractor must demolish the existing heaters and associated piping in four specified mechanical rooms, then furnish and install replacement PK Compact Water Heaters along with new insulation, controls integration into the building automation system, and demonstration of proper operation. The period of performance is 75 calendar days. The solicitation number is 36C25620B0002 for project number 564-20-1-619-0001 to replace the domestic water heaters under contract number 36C25618D0103.

36C25620B0002 0005 SOW 564-20-51 Replace four PK Domestic Water HeatersFINAL.docx

View the file

Other files

File Type Posted
36C25620B0002-0005017.pdf PDF
36C25620B0002-0005015.docx DOCX document
36C25620B0002-0004001.pdf PDF
36C25620B0002-0004000.docx DOCX document
36C25620B0002-0003000.docx DOCX document
36C25620B0002-0002001.pdf PDF
36C25620B0002-0002000.docx DOCX document
36C25620B0002-0001000.docx DOCX document
36C25620B0002-0001001.docx DOCX document
36C25620B0002-002.pdf PDF
36C25620B0002-001.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

January 29, 2020

Statement of Work (SOW) PK Domestic Hot Water Heaters 564-20-516 Veterans Health Care System of the Ozarks (VHSO) Fayetteville, Arkansas The Contractor must furnish all management, supervision, labor, equipment, tools, supplies, parts, and related services, in accordance with the SOW and other contract documents, to replace four Patterson Kelley (PK) Domestic Hot Water Heaters – one in Mechanical 1127-02, one in Mechanical PC 105, one in Mechanical PC 043, and one in Mechanical Steam L220A-21.

1. General

0. Any provision or partial provision of the Contract drawings, documents or requirements that is not consistent with this SOW is null and void only to the extent of the inconsistency. All other provisions or partial provisions of the Contract documents or requirements must remain in full force and effect.

0. Information Technology (IT) security requirements Certification and Accreditation (authorization) (C&A) of the Contractor system: The C & A requirements do not apply and a Security Accreditation Package is not required.

0. Safety must be the Contractor’s highest priority.

0. This project must be a turn-key operation for the work as described in this SOW to be a complete and working system.

0. Period of Performance: SEVENTY-FIVE (75) Calendar days.

0. Schedule job site work with written authorization for date and time with COR. All utility outages must be coordinated and approved by the COR. Any work outside of normal working hours will be provided by the Contractor with no additional cost to the government.

1. Scope of Work:

The Contractor must furnish all management, supervision, labor, equipment, tools, supplies, parts, and related services, for the items listed below:

1. Demo and properly dispose of the four existing PK Domestic Hot Water Heaters and associated piping to be replaced in Mechanical 1127-02, Mechanical PC 105, Mechanical PC 043, and Mechanical Steam L220A-21. Demolition must minimize utility outages for patients and staff.

1. Furnish and install four PK Compact Water Heater, model number PK08D, with standard options including CuNi tubes, added to go to electronic steam valve, including a F&T trap, pressure relief valve, and a thermal relief valve. Design: Heat 22 GPM, 40 to 140, using 45 lb. steam. Bac-Net Protocol. Model number LPD0200 Low Pressure Drop Y Strainer Cast Iron, 125 lb. Flanged Import. Model Number HS404308-B1075A 5-inch Bucket Trap.

1. Furnish and install new insulation with labels for the sections of pipe reworked during this exchange.

1. Connect BacNet communication to existing building automation system, develop graphical displays for existing building automation system to show information available from PK Domestic Hot Water Heaters, and verify operation of controls.

1. Final test of PK Domestic Hot Water Heaters, associated equipment, and controls; demonstrating proper operation to COR and VA Engineering staff.

SOW 564-20-51 Replace four PK Domestic Water Heaters 1 of 2