MICHAEL E. DEBAKEY VA MEDICAL CENTER
HOUSTON, TEXAS
Project Number: 580-14-101 Project Title: Upgrade HVAC System Animal Lab
1. Contractor shall provide all labor, supervision, transportation, materials, apparatus, tools, and equipment necessary to upgrade the heating, ventilation, and air conditioning (HVAC) system serving the basement animal lab as per described in this statement of work. All work shall be done in Building 109 at the Michael E DeBakey Medical Center (MEDVAMC) located at 2002 Holcombe Boulevard, Houston, Texas 77030.
2. General Requirements:
a. Contractor shall perform the work while animal lab still operational. The project will be divided into phases to allow continuous operation of the animal lab. Animal specimens in the lab are very sensitive to sound and vibrations which can affect the outcome of ongoing research investigations. Contractor is required to isolate working area in each phase from the rest of the animal lab with a 1-hour fire proof wall along with soundproofing insulation to minimize sound and vibrations dispersion. In addition, contractor is required to use low noise and low vibration tools during all project phases.
b. See attached AHU 3 Replacement Existing and New Schedules
3. Air Handling Unit Replacement
a. Current VA policy for air handling units (AHU) serving the animal lab requires redundancy. Animal Lab is currently serve by AHU-4 with AHU-3 as a back-up. Both units share outdoor air intake louvers. These louvers will serve as rigging access of the new AHU and equipment. Contractor shall provide a temporary screen barrier on AHU-4 during AHU-3 replacement.
b. Contractor shall remove existing AHU-3 through the intake louvers or as directed by the Contracting Officer Representative (COR). Removal shall include all associated materials; i.e.: pipe, valves, actuators, etc. AHUs and associated material shall be discarded per VA Master Specs http://www.cfm.va.gov/til/spec.asp.
c. Contractor shall provide a new AHU and shall be manufactured by Johnson Control or equal (units shall comply with VA master specs attached). Control components shall be Direct Digital Control (DDC) and manufactured by Johnson Controls or equal (shall be compatible with existing building control infrastructure). The new AHU and control components shall interface and communicate with existing Johnson Controls Metasys building control system. All existing control points shall be transferred to the new AHU. There will be additional control points that will need to be added and programed by contractor. The AHU unit will be programmed as a constant volume unit, but the installation of new variable frequency drives will be required to allow fine adjustment of the supply air.
d. Provide AHU with plenum fans wall as per specifications.
e. Contractor shall clean existing intake and outlet louvers and plenums.
f. Contractor shall prime intake plenum.
g. Contractor shall design, fabricate, and install new ductwork transitions to fit new AHU dimensions. Ductwork shall be in accordance of VA Master Specs and SMACNA standards.
h. Ductwork to be externally insulated in accordance with the VA Master Specs.
i. Contractor shall modify existing housekeeping pads to accept new AHU footprint.
j. AHU dimension shall be selected to allow rigging thru existing access on the penthouse. It is the contractor’s responsibility to properly rig AHU in place.
k. Contractor shall demo existing electrical connections to AHU.
l. Contractor shall provide new electrical connections to new AHU, depending on AHU selection electrical connection may need upsizing.
m. Contractor shall replace all existing control devices with DDC Johnson Controls equipment or equal. Devices shall be integrated to existing building automation system. They shall be programmed as needed to comply with control sequence.
n. Contractor shall remove and discard all existing pneumatic control devices and permanently cap pneumatic tubing back to source.
o. Replace all existing volume dampers and fire dampers of the AHU’s and exhaust fans. Dampers shall be in accordance with VA Master Specs and NFPA Life Safety Code.
p. Replace existing duct smoke detectors with new duct detectors and program them to existing Building Automation System (BAS). Provide necessary control programming to use these to shut supply and exhaust fans down as well as report alarms to the BAS. This work shall be performed by a certified fire alarm contractor.
q. Contractor shall provide digital and analog filter pressure differential gauges and shall be connected to BAS. Provide necessary programming to report this alarm to BAS for filter replacement.
r. Install new DDC Chilled Water and Hot Water Control Valves per VA Specs.
s. Provide new chilled water, heating water and condensate piping to new AHU’s per VA Specs. New pipe shall be installed downstream of new cut off valves.
t. Replace existing chilled water and hot water cut off valves per VA Specs. This may require freezing of the existing pipes.
u. Preparation for the installation, start-up and re-commissioning of the unit can be accomplished during normal working hours.
v. Contractor shall provide updated control sequence diagrams, drawings, specifications and operation manual for all equipment and control programming performed on the job. Shall be provided in three hard copies and one data CD.
w. Contractor shall provide programing to modify existing graphics, control sequence, control points, control blocks and any other programming needed for the unit to comply with control sequence operation. See attached.
x. Contractor shall provide a control point checklist and verify proper functioning of all new controls devices. This includes verifying proper functioning of all DDC control devices.
y. Contractor shall provide new air flows stations on the supply of ductwork per VA Specs and shall be compatible with BAS.
z. Contractor shall provide new air flows stations on the exhaust of ductwork per VA Specs and shall be compatible with BAS. This for all exhaust fans.
aa. Contractor shall provide and install new variable frequency drives for new AHU, VFD shall be ABB or equal compatible with existing BAS infrastructure. Drive shall be properly sized for the motors. Drive shall comply with VA Specifications and provide bypass capability.
ab. Contractor shall provide an air handling unit with high efficiency totally enclosed motors as per specifications.
ac. Contractor shall provide a new steam humidifier to be installed in the new AHU-3. The humidifier shall be a jacketed type designed to attain full dispersion of steam in the airstream.
i. Location: AHU preferred location of the humidifier is between the pre-heat and cooling coils. Duct-mounted steam humidifiers are permitted, where space conditions are limited and after-filters are not required on the downstream side of the cooling coil and supply air fan. Provide drainable stainless-steel duct sections 36 in [91 cm] in length on the upstream sides of duct-mounted humidifiers and 36 in [91 cm] in length downstream sides of duct-mounted humidifiers.
ii. Humidifier Controls: Provide a modulating steam control valve to control and maintain humidity. Locate the relative humidity sensor in the exhaust air duct to control set point. This will require installation of three humidity sensors for main exhaust fans. Provide a high-limit humidity sensor in the supply air duct to disable humidification if the discharge humidity exceeds 80% (adjustable). Ensure full integration of the humidifier controls with the BAS, including remote alarm capability.
iii. Contractor shall provide new steam line piping to serve humidifiers. Contractor shall tie into existing steam main piping. This may require a steam shutdown. If so, contractor shall coordinate with the COR before piping installation and at no additional cost.
iv. Contractor is responsible for determining a proper rigging route for demolition and installation of new AHU and all its components. This will include temporary relocation of utilities, louvers, windows and doors to allow rigging new equipment. Any damages to the property shall be corrected by contractor.
4. Exhaust Fan Replacement
a. Contractor shall demo and properly dispose of the existing exhaust fans EF3, EF4, EF5, EF6, EF7, EF9 and EF10 serving the animal lab.
b. Dedicated Exhaust Fans Existing Exhaust Fan Schedule
| Fan No. |
| Location |
| Function |
| CFM |
| Max TSP |
| Fan Type |
| Arrangement, Inlet, Rotation & Discharge |
| Wheel |
| Max RPM |
| Drive |
| Motor |
| Remarks |
| 211-EF5 |
| B109 Roof |
| Cage Wash Hood Exhaust |
| 1600 |
| 1.6 |
| Vent Set |
| Up-Blast |
| BI |
| 15" |
| 1661 |
| Belt |
| 1E |
| 480/3 |
| 211-EF6 |
| B109 Roof |
| Autoclave Hood Exhaust |
| 410 |
| 0.25 |
| Cent |
| In-Line |
| BI |
| 10" |
| 1140 |
| Direct |
| 1/20 E |
| 115/1 |
| 211-EF7 |
| B109 Roof |
| Bottle Wash Exhaust |
| 500 |
| 0.3 |
| Cent |
| In-Line |
| BI |
| 10" |
| 1415 |
| Direct |
| 1/12 E |
| 115/1 |
| 211-EF9 |
| B109 Roof |
| Biontainment Exhaust |
| 3900 |
| 3.1 |
| Vent Set |
| Up-Blast |
| AF |
| 19-1/2" |
| 1520 |
| Belt |
| 3 E |
| 480/3 |
| HEPA Filter before Exhaust |
| 211-EF10 |
| B109 Roof |
| Necropsy Exhaust |
| 900 |
| 3.1 |
| Vent Set |
| Up-Blast |
| AF |
| 12" |
| 2549 |
| Belt |
| 1 E |
| 480/3 |
| HEPA Filter Before exhaust |
New Exhaust Fan Schedule
| Fan No. |
| Location |
| Function |
| CFM |
| Max TSP |
| Fan Type |
| Arrangement, Inlet, Rotation & Discharge |
| Max RPM |
| Drive |
| Motor |
| Remarks |
| 211-EF5 |
| B109 Roof |
| Cage Wash Hood Exhaust |
| 1600 |
| 2.5 |
| Strobic Mono Stack |
| Up-Blast |
| TBD |
| Direct |
| TBD |
| 480/3 |
| Single Fan Arrangement |
| 211-EF6 |
| B109 Roof |
| Autoclave Hood Exhaust |
| 410 |
| 0.5 |
| Strobic Mono Stack |
| Up-Blast |
| TBD |
| Direct |
| TBD |
| 115/1 |
| Single Fan Arrangement |
| 211-EF7 |
| B109 Roof |
| Bottle Wash Exhaust |
| 500 |
| 0.3 |
| Strobic Mono Stack |
| Up-Blast |
| TBD |
| Direct |
| TBD |
| 115/1 |
| Single Fan Arrangement |
| 211-EF9 |
| B109 Roof |
| Biontainment Exhaust |
| 3900 |
| 3.1 |
| Strobic Mono Stack |
| Up-Blast |
| TBD |
| Direct |
| TBD |
| 480/3 |
| Single Fan Arrangement |
HEPA Filter before Exhaust
| 211-EF10 |
| B109 Roof |
| Necropsy Exhaust |
| 900 |
| 3.1 |
| Strobic Mono Stack |
| Up-Blast |
| TBD |
| Direct |
| TBD |
| 480/3 |
| Single Fan Arrangement |
HEPA Filter Before exhaust
c. For dedicated exhaust fans EF5, EF6, EF7, EF, 9 and EF10 contractor, shall replace them with new strobic air mono-stack exhaust fans or approved equal. Fans shall be sized by manufacturers based on cubic feet per minute (CFM) and external static pressure on schedule. The discharge velocity at the nozzle shall be 3,500 fpm. Fan shall be properly sized to match existing fans as per attached schedule.
d. Contract shall modify existing ductwork per manufacturers recommendations and VA specifications to properly connect to the new fans.
e. Contractor shall provide engineered anchoring system to all fans, that do not cause any roof damage. In case of any water leaks, contractor shall provide repairs to the roofing system. There is currently no roof warranty for Building 109.
f. Fans and related ductwork shall be outdoor rated.
g. Contractor shall provide outdoor rated (NEMA 4X) for all electrical equipment for dedicated fans.
h. Contractor shall provide new outdoor rated variable frequency drives (VFD) for all new fans. VFD shall be comply with VA master specifications.
i. Contractor shall provide new supports for all new disconnects and VFD’s.
j. Contractor shall provide new electrical connections to all new fans. Reuse of existing conduit through building penetrations is allowed.
k. Contractor shall upgrade existing breakers on Motor Control Center (MCC) to match new fan horsepower (HP), as necessary.
l. Contractor shall integrate new fans into BAS system, including new programming on sequence of operations and new graphics.
5. Main In-line exhaust fans EF-3 and EF-4 Existing Exhaust Fan Schedule
| Fan No. |
| Location |
| Function |
| CFM |
| Max TSP |
| Fan Type |
| Arrangement, Inlet, Rotation & Discharge |
| Wheel |
| Max RPM |
| Drive |
| Motor |
| Remarks |
| 211-EF3 |
| B109 PH |
| 109 Basement Exhaust North |
| 12280 |
| 0.8 |
| Cent |
| In-Line |
| BI |
| 30" |
| 1010 |
| Belt |
| 5E |
| 480/3 |
| 211-EF4 |
| B109 PH |
| 110 Basement Exhaust South |
| 13820 |
| 1.1 |
| Cent |
| In-Line |
| BI |
| 30" |
| 1127 |
| Belt |
| 7-1/2 E |
| 480/3 |
New Exhaust Fan Schedule
| Fan No. |
| Location |
| Function |
| CFM |
| Max TSP |
| Fan Type |
| Arrangement, Inlet, Rotation & Discharge |
| Wheel |
| Max RPM |
| Drive |
| Motor |
| Remarks |
| 211-EF3 |
| B109 PH |
| 109 Basement Exhaust North |
| 12280 |
| 1.00 |
| Cent |
| In-Line |
| BI |
| 30" |
| 1010 |
| Belt |
| TBD |
| 480/3 |
| 211-EF4 |
| B109 PH |
| 110 Basement Exhaust South |
| 13820 |
| 1.1 |
| Cent |
| In-Line |
| BI |
| 30" |
| 1127 |
| Belt |
| TBD |
| 480/3 |
a. Contractor shall provide new inline centrifugal fan to match existing exhaust fan per schedule. New fans shall match existing configuration.
b. Housing: Low carbon steel, arc welded throughout, braced and supported by structural channel or angle iron to prevent vibration or pulsation, flanged outlet, inlet fully streamlined. Provide lifting clips and casing drain. Provide manufacturer's standard access door. Provide 12.5 mm (1/2 inches) wire mesh screens for fan inlets without duct connections.
c. Wheel: Steel plate with die formed blades welded or riveted in place, factory balanced statically and dynamically.
d. Shaft: Designed to operate at no more than 70 percent of the first critical speed at the top of the speed range of the fans class.
e. Bearings: Heavy duty ball or roller type sized to produce a Bl0 life of not less than 50,000 hours, and an average fatigue life of 200,000 hours. Extend filled lubrication tubes for interior bearings or ducted units to outside of housing.
f. Belts: Oil resistant, non-sparking and non-static.
g. Belt Drives: Factory installed with final alignment belt adjustment made after installation.
h. Motor, adjustable motor base, drive and guard: Furnish from factory with fan. Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION for specifications. Provide protective sheet metal enclosure for fans located outdoors.
i. In line Centrifugal Fans provide minimum 18 Gauge galvanized steel housing with inlet and outlet flanges, backward inclined aluminum centrifugal fan wheel, bolted access door and supports as required. Motors shall be factory pre-wired to an external junction box. Provide factory wired disconnect switch.
j. Contractor shall install new indoor rated VFD properly sized for fan HP.
k. Contractor shall provide new electrical connection, start up and balancing for all new fans. Reuse of existing conduit will be allowed only thru wall/roof penetrations.
l. Contractor shall integrate new fans in the BAS. This will include the addition of new control points, graphics and sequence of operations.
m. Contractor shall modify existing ductwork to accept new fans. Ductwork shall comply with VA specifications.
n. Contractor shall provide new duct mounted humidity sensors, air flow stations and pressure differential gauges (digital and analog). Integrations with BAS is required.
6. TAB and Commissioning
a. Contractor shall provide a before and after certified Test Adjustment and Balancing (TAB) reports for each AHU’s and exhaust fans. Report shall include volumetric flow, static pressure readings along the system, electrical readings, rpm, fan details, chilled water and heating water flow and pressure losses, etc.
b. Contractor shall provide TAB for each room in the basement. TAB will be required after each phase completion, and a final for the entire space after project completion. Contractor is required to provide reports and the reports to be approved by the COR before proceeding to the next phase.
c. TAB for the project shall be performed by a third-party contractor, contracted by the prime contractor, and reports shall be certified by an NEBB technician.
d. Contractor shall commission the new equipment installation to provide performance per specifications and be compliant with applicable control sequence. Contract shall take any corrective action to assure these conditions. Commissioning will be performed with the assistance of VA personnel.
7. Animal Lab HVAC System
a. Existing and New Animal Lab HVAC System Schedules Existing HVAC Schedule
| Room No. |
| Room Designation |
| Design Supply CFM |
| Exhaust CFM |
| Square Footage |
| Volume Cu Ft |
| Design ACH |
| Design Pressurization |
| Terminal Unit Size Letter |
| Terminal Unit Number |
| Terminal Unit Size |
| Exhaust Fan |
| B1 |
| Elevator Lobby 1 |
| 300 |
| 0 |
| 121 |
| 1189 |
| 15 |
| + |
| F |
| 109-B1 |
| 10 ᴓ |
| Exhaust North EF-3 |
| B2 |
| Elevator Machine Room 1 |
| 0 |
| 290 |
| 318 |
| 3126 |
| 0 |
| - |
| N/A |
| B3 |
| Prep Room |
| 330 |
| 330 |
| 96 |
| 944 |
| 21 |
| N |
| E |
| 109-B2 |
| 9 ᴓ |
| Exhaust North EF-3 |
| B3A |
| Prep Room |
| 330 |
| 330 |
| 186 |
| 1828 |
| 11 |
| N |
| B4 |
| Operating Room |
| 1120 |
| 1120 |
| 497 |
| 4680 |
| 14 |
| + |
| D |
| 109-B3 |
| 8 ᴓ |
| Exhaust North EF-3 |
| B5 |
| Operating Room |
| 1140 |
| 1160 |
| 431 |
| 4059 |
| 17 |
| + |
| D |
| 109-B4 |
| 8 ᴓ |
| Exhaust North EF-3 |
| B6 |
| Scrub |
| 640 |
| 460 |
| 221 |
| 2172 |
| 18 |
| + |
| D |
| 109-B5 |
| 8 ᴓ |
| Exhaust North EF-3 |
| B7 |
| Supply & Sterilization |
| 1080 |
| 1080 |
| 431 |
| 4237 |
| 15 |
| + |
| F |
| 109-B6 |
| 10 ᴓ |
| Exhaust North EF-3 |
| B8 |
| Operating Room |
| 1300 |
| 1300 |
| 553 |
| 5207 |
| 15 |
| 0 |
| E |
| 109-B7 |
| 9 ᴓ |
| Exhaust North EF-3 |
| B9 |
| Men Restroom 1 |
| 0 |
| 370 |
| 213 |
| 2094 |
| 11 |
| - |
| N/A |
Exhaust North EF-3
| B10 |
| Women Restroom 1 |
| 0 |
| 340 |
| 213 |
| 2094 |
| 10 |
| - |
| N/A |
Exhaust South EF-4
| B11 |
| Clean Side Sterilization |
| 940 |
| 308 |
| 3028 |
| 19 |
| + |
| F |
| 109-B8 |
| 10 ᴓ |
| Bottle Washer Exhaust EF-7 & Cage Washer Exhaust EF-5 |
| B12 |
| Dietary Kitchen |
| 570 |
| 570 |
| 138 |
| 1357 |
| 25 |
| N |
| D |
| 109-B9 |
| 8 ᴓ |
| Exhaust South EF-4 |
| B13 |
| Clean Cage Storage |
| 1650 |
| 1650 |
| 750 |
| 7373 |
| 13 |
| N |
| H |
| 109-B10 |
| 14 ᴓ |
| Exhaust South EF-4 |
| B13A |
| Feed Storage |
| 75 |
| 75 |
| 75 |
| 737 |
| 6 |
| N |
| A |
| 109-B11 |
| 5 ᴓ |
| Exhaust South EF-4 |
| B13B |
| Feed Storage |
| 45 |
| 45 |
| 47 |
| 462 |
| 6 |
| N |
| B14 |
| Quarantine Ward |
| 860 |
| 930 |
| 350 |
| 3441 |
| 15 |
| - |
| E |
| 109-B12 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B15 |
| Quarantine Ward |
| 860 |
| 930 |
| 350 |
| 3441 |
| 15 |
| - |
| E |
| 109-B13 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B16 |
| Quarantine Ward Mixed Species |
| 660 |
| 960 |
| 365 |
| 3588 |
| 11 |
| - |
| E |
| 109-B14 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B16-6 |
| Quarantine Ward |
| - |
| - |
| - |
| - |
| - |
| - |
| - |
| - |
Exhaust South EF-4
| B17 |
| Arf Office |
| 170 |
| 170 |
| 220 |
| 2163 |
| 5 |
| N |
| B |
| 109-B15 |
| 6 ᴓ |
| Exhaust South EF-4 |
| B17A |
| Private Office |
| 100 |
| 100 |
| 130 |
| 1278 |
| 5 |
| N |
Exhaust South EF-4
| Electrical West |
| Electrical Rm West Side |
| - |
| 20 |
| 36 |
| 354 |
| 3 |
| - |
| N/A |
Exhaust South EF-4
| B18 |
| Former Radiation |
| 320 |
| 360 |
| 358 |
| 3519 |
| 5 |
| B20 |
| Elevator Lobby 2 |
| 190 |
| - |
| 141 |
| 1386 |
| 8 |
| + |
| E |
| 109-B17 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B21 |
| Elevator Machine Room 2 |
| - |
| 290 |
| 264 |
| 2595 |
| 7 |
| - |
| N/A |
Exhaust South EF-4
| B22 |
| Quarantine Ward |
| 860 |
| 960 |
| 365 |
| 3588 |
| 14 |
| - |
| E |
| 109-B18 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B23 |
| Animal Ward |
| 750 |
| 830 |
| 290 |
| 2851 |
| 16 |
| - |
| E |
| 109-B19 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B24 |
| Quarantine Ward |
| 860 |
| 930 |
| 350 |
| 3441 |
| 15 |
| - |
| E |
| 109-B20 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B25 |
| Animal Ward |
| 750 |
| 830 |
| 290 |
| 2851 |
| 16 |
| - |
| E |
| 109-B21 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B26 |
| Animal Ward |
| 750 |
| 830 |
| 290 |
| 2851 |
| 16 |
| - |
| E |
| 109-B22 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B27 |
| Quarantine Ward |
| 860 |
| 930 |
| 350 |
| 3441 |
| 15 |
| - |
| E |
| 109-B23 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B28 |
| Animal Ward |
| 750 |
| 830 |
| 290 |
| 2851 |
| 16 |
| - |
| E |
| 109-B24 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B29 |
| Animal Ward |
| 750 |
| 830 |
| 290 |
| 2851 |
| 16 |
| - |
| E |
| 109-B25 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B29A |
| Cage Washer Dirty Area |
| 940 |
| 2100 |
| 327 |
| 3214 |
| 18 |
| -- |
| F |
| 109-B26 |
| 10 ᴓ |
| Bottle Washer Exhaust EF-7 & Cage Washer Exhaust EF-5 |
| 470 |
| 270 |
| 2654 |
| 11 |
| - |
| N/A |
| N/A |
Exhaust North EF-3
| 350 |
| 216 |
| 2123 |
| 10 |
| - |
| N/A |
| N/A |
Exhaust South EF-4
| B32 |
| Necropsy |
| 600 |
| 1500 |
| 270 |
| 2654 |
| 14 |
| - |
| D |
| 109-B27 |
| 8 ᴓ |
| Exhaust North EF-3 & EF-10 Necropsy |
| B33 |
| Animal Ward |
| 750 |
| 830 |
| 290 |
| 2851 |
| 16 |
| - |
| E |
| 109-B28 |
| 9 ᴓ |
| Biocontainment Exhaust EF-9 |
| B34 |
| Lab |
| 600 |
| 600 |
| 258 |
| 2536 |
| 14 |
| N |
| D |
| 109-B29 |
| 8 ᴓ |
| Exhaust North EF-4 |
| B35 |
| Infectious Animal Ward Hallway |
| 190 |
| 0 |
| 90 |
| 885 |
| 13 |
| + |
| D |
| 109-B30 |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B35A |
| Infectious Animal Ward |
| 220 |
| 310 |
| 90 |
| 885 |
| 15 |
| - |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B35B |
| Infectious Animal Ward |
| 220 |
| 310 |
| 90 |
| 885 |
| 15 |
| - |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B36 |
| Lab |
| 600 |
| 700 |
| 250 |
| 2458 |
| 15 |
| - |
| D |
| 109-B31 |
| 8 ᴓ |
| Exhaust North EF-3 |
| B37 |
| Biocontainment Workroom |
| 1000 |
| 1150 |
| 290 |
| 2851 |
| 21 |
| - |
| E |
| 109-B32 |
| 9 ᴓ |
| Biocontainment Exhaust EF-9 & Exhuast North EF-3 |
| B38 |
| Surgical Prep |
| 660 |
| 650 |
| 275 |
| 2703 |
| 15 |
| + |
| E |
| 109-B33 |
| 9 ᴓ |
| Exhaust North EF-3 |
| B39 |
| Hallway |
| 190 |
| 0 |
| 90 |
| 885 |
| 13 |
| + |
| D |
| 109-B34 |
| 8 ᴓ |
| N/A |
| B39A |
| Animal Ward |
| 310 |
| 310 |
| 90 |
| 885 |
| 21 |
| N |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B39B |
| Animal Ward |
| 310 |
| 310 |
| 93 |
| 914 |
| 20 |
| N |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B40 |
| Radiology/ Procedure Room |
| 920 |
| 920 |
| 490 |
| 4817 |
| 11 |
| N |
| F |
| 109-B35 |
| 10 ᴓ |
| Exhaust North EF-3 |
| B41 |
| Animal Ward |
| 750 |
| 830 |
| 288 |
| 2831 |
| 16 |
| - |
| E |
| 109-B36 |
| 9 ᴓ |
| Biocontainment Exhaust EF-9 |
| Electrical East |
| Electrical Rm East Side |
| 0 |
| 20 |
| 36 |
| 354 |
| 3 |
| - |
| N/A |
| N/A |
Biocontainment Exhaust EF-9
| B42 |
| Sewage Ejection Room |
| 0 |
| 60 |
| 168 |
| 1651 |
| 2 |
| - |
| N/A |
| N/A |
Exahust North EF-3
| B43 |
| Telecominication |
| 0 |
| 65 |
| 90 |
| 885 |
| 4 |
| - |
| N/A |
| N/A |
Exhaust North EF-3
| B44 |
| House Keeping Closet |
| 0 |
| 50 |
| 35 |
| 344 |
| 9 |
| - |
| N/A |
| N/A |
Exhaust North EF-3
| B45 |
| Storage |
| 0 |
| 35 |
| 43 |
| 423 |
| 5 |
| - |
| N/A |
| N/A |
Exhaust North EF-3
| B46 |
| Work Room |
| 340 |
| 0 |
| 177 |
| 1740 |
| 12 |
| + |
| G |
| 109-B37 |
Exhaust North EF-3
| B46A |
| Animal Ward |
| 680 |
| 680 |
| 190 |
| 1868 |
| 22 |
| N |
Exhaust North EF-3
| B46B |
| Animal Ward |
| 340 |
| 680 |
| 200 |
| 1966 |
| 10 |
| - |
| CB-6 |
| Hallway North |
| 600 |
| 0 |
| 456 |
| 4482.48 |
| 8 |
| + |
| F |
| 109-B1 |
| 10 ᴓ |
| N/A |
| CB-1 |
| Hallway East-North |
| 360 |
| 0 |
| 360 |
| 3539 |
| 6 |
| + |
| C |
| 109-B38 |
| 6 ᴓ |
| N/A |
| CB-2 |
| Hallway South- East |
| 360 |
| 0 |
| 404 |
| 3971 |
| 5 |
| + |
| C |
| 109-B39 |
| 6 ᴓ |
| N/A |
| CB-3 |
| Hallway South |
| 640 |
| 0 |
| 394 |
| 3873 |
| 10 |
| + |
| D |
| 109-B40 |
| 8 ᴓ |
| N/A |
| CB-4 |
| Hallway North-West |
| 570 |
| 0 |
| 454 |
| 4463 |
| 8 |
| + |
| E |
| 109-B17 |
| 9 ᴓ |
| N/A |
| CB-5 |
| Hallway North-East |
| 1110 |
| 0 |
| 451 |
| 4433 |
| 15 |
| + |
| F |
| 109-B41 |
| 10 ᴓ |
| N/A |
New HVAC Schedule
| Room No. |
| Room Designation |
| Design ACH |
| Design Supply CFM |
| Exhaust CFM |
| Square Footage |
| Volume Cu Ft |
| Design Pressurization |
| Pressurization Reversal Capability |
| Terminal Unit Number |
| Existing Terminal Unit Size |
| Exhaust Fan Number |
| B1 |
| Elevator Lobby 1 |
| 4 |
| 80 |
| 0 |
| 121 |
| 1189 |
| + |
| 109-B1 |
| N/A |
| Exhaust North EF-3 |
| B2 |
| Elevator Machine Room 1 |
| 4 |
| 0 |
| 290 |
| 318 |
| 3126 |
| - |
| B3 |
| Pre Room Ante Room |
| 15 |
| 240 |
| 210 |
| 96 |
| 944 |
| + |
| 109-B2 |
| 9 ᴓ |
| Exhaust North EF-3 |
| B3A |
| Prep Room |
| 15 |
| 460 |
| 400 |
| 186 |
| 1828 |
| + |
| B4 |
| Operating Room |
| 15 |
| 1180 |
| 1010 |
| 497 |
| 4680 |
| + |
| 109-B3 |
| 8 ᴓ |
| Exhaust North EF-3 |
| B5 |
| Operating Room |
| 15 |
| 1020 |
| 870 |
| 431 |
| 4059 |
| + |
| 109-B4 |
| 8 ᴓ |
| Exhaust North EF-3 |
| B6 |
| Scrub |
| 10 |
| 370 |
| 320 |
| 221 |
| 2172 |
| + |
| 109-B5 |
| 8 ᴓ |
| Exhaust North EF-3 |
| B7 |
| Supply & Sterilization |
| 4 |
| 290 |
| 290 |
| 431 |
| 4237 |
| N |
| 109-B6 |
| 10 ᴓ |
| Exhaust North EF-3 |
| B8 |
| Operating Room |
| 15 |
| 1310 |
| 1120 |
| 553 |
| 5207 |
| + |
| 109-B7 |
| 9 ᴓ |
| Exhaust North EF-3 |
| B9 |
| Men Restroom 1 |
| 4 |
| 0 |
| 140 |
| 213 |
| 2094 |
| - |
| B10 |
| Women Restroom 1 |
| 4 |
| 0 |
| 140 |
| 213 |
| 2094 |
| - |
| B11 |
| Clean Side Sterilization |
| 15 |
| 760 |
| 525 |
| 308 |
| 3028 |
| ++ |
| 109-B8 |
| 10 ᴓ |
| Bottle Washer Exhaust EF-7 & Cage Washer Exhaust EF-5 |
| B12 |
| Dietary Kitchen |
| 6 |
| 140 |
| 170 |
| 138 |
| 1357 |
| - |
| 109-B9 |
| 8 ᴓ |
| Exhaust South EF-4 |
| B13 |
| Storage |
| 4 |
| 500 |
| 500 |
| 750 |
| 7373 |
| N |
| 109-B10 |
| 14 ᴓ |
| Exhaust South EF-4 |
| B13A |
| Feed Storage |
| 10 |
| 130 |
| 120 |
| 75 |
| 737 |
| + |
| 109-B11 |
| 5 ᴓ |
| Exhaust South EF-4 |
| B13B |
| Feed Storage |
| 10 |
| 80 |
| 70 |
| 47 |
| 462 |
| + |
| B14 |
| Quarantine Ward |
| 15 |
| 870 |
| 740 |
| 350 |
| 3441 |
| + |
| X |
| 109-B12 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B15 |
| Quarantine Ward |
| 15 |
| 870 |
| 740 |
| 350 |
| 3441 |
| + |
| X |
| 109-B13 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B16 |
| Quarantine Ward Mixed Species |
| 15 |
| 900 |
| 770 |
| 365 |
| 3588 |
| + |
| 109-B14 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B17 |
| Office |
| 4 |
| 150 |
| 150 |
| 220 |
| 2163 |
| N |
| 109-B15 |
| 6 ᴓ |
| Exhaust South EF-4 |
| B17A |
| Private Office |
| 4 |
| 90 |
| 90 |
| 130 |
| 1278 |
| N |
Exhaust South EF-4
| Electrical West |
| Electrical Rm West Side |
| 4 |
| 0 |
| 30 |
| 36 |
| 354 |
| - |
| N/A |
| N/A |
| Exhaust South EF-4 |
| B18 |
| Former Radiation |
| 15 |
| 880 |
| 750 |
| 358 |
| 3519 |
| + |
| B20 |
| Elevator Lobby 2 |
| 4 |
| 100 |
| 0 |
| 141 |
| 1386 |
| + |
| 109-B17 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B21 |
| Elevator Machine Room 2 |
| 4 |
| 0 |
| 290 |
| 264 |
| 2595 |
| - |
| N/A |
| N/A |
| Exhaust South EF-4 |
| B22 |
| Animal Ward |
| 15 |
| 900 |
| 770 |
| 365 |
| 3588 |
| + |
| 109-B18 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B23 |
| Animal Ward |
| 15 |
| 720 |
| 620 |
| 290 |
| 2851 |
| + |
| X |
| 109-B19 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B24 |
| Animal Ward |
| 15 |
| 870 |
| 740 |
| 350 |
| 3441 |
| + |
| X |
| 109-B20 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B25 |
| Animal Ward |
| 15 |
| 720 |
| 620 |
| 290 |
| 2851 |
| + |
| X |
| 109-B21 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B26 |
| Animal Ward |
| 15 |
| 720 |
| 620 |
| 290 |
| 2851 |
| + |
| X |
| 109-B22 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B27 |
| Animal Ward |
| 15 |
| 870 |
| 740 |
| 350 |
| 3441 |
| + |
| X |
| 109-B23 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B28 |
| Animal Ward |
| 15 |
| 720 |
| 620 |
| 290 |
| 2851 |
| + |
| X |
| 109-B24 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B29 |
| Animal Ward |
| 15 |
| 720 |
| 620 |
| 290 |
| 2851 |
| + |
| X |
| 109-B25 |
| 9 ᴓ |
| Exhaust South EF-4 |
| B29A |
| Cage Washer Dirty Area |
| 15 |
| 810 |
| 1575 |
| 327 |
| 3214 |
| -- |
| 109-B26 |
| 10 ᴓ |
| Bottle Washer Exhaust EF-7 & Cage Washer Exhaust EF-5 |
| B30 |
| Men Restroom 2 |
| 4 |
| 0 |
| 180 |
| 270 |
| 2654 |
| - |
| N/A |
| N/A |
| Exhaust North EF-3 |
| B31 |
| Women Restroom 2 |
| 4 |
| 0 |
| 150 |
| 216 |
| 2123 |
| - |
| N/A |
| N/A |
| Exhaust South EF-4 |
| B32 |
| Necropsy |
| 15 |
| 670 |
| 1500 |
| 270 |
| 2654 |
| - |
| 109-B27 |
| 8 ᴓ |
| Exhaust North EF-3 & EF-10 Necropsy |
| B33 |
| Infectious Animal Ward |
| 15 |
| 720 |
| 620 |
| 290 |
| 2851 |
| + |
| X |
| 109-B28 |
| 9 ᴓ |
| Biocontainment Exhaust EF-9 |
| B34 |
| Lab |
| 15 |
| 640 |
| 740 |
| 258 |
| 2536 |
| - |
| 109-B29 |
| 8 ᴓ |
| Exhaust North EF-4 |
| B35 |
| Hallway |
| 4 |
| 60 |
| 0 |
| 90 |
| 885 |
| + |
| B35A |
| Infectious Animal Ward |
| 15 |
| 230 |
| 200 |
| 90 |
| 885 |
| + |
| X |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B35B |
| Infectious Animal Ward |
| 15 |
| 230 |
| 200 |
| 90 |
| 885 |
| + |
| X |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B36 |
| Lab |
| 15 |
| 620 |
| 720 |
| 250 |
| 2458 |
| - |
| 109-B31 |
| 8 ᴓ |
| Exhaust North EF-3 |
| B37 |
| Biocontainment Workroom |
| 10 |
| 480 |
| 410 |
| 290 |
| 2851 |
| + |
| 109-B32 |
| 9 ᴓ |
| Biocontainment Exhaust EF-9 & Exhuast North EF-3 |
| B38 |
| Pre Op |
| 15 |
| 680 |
| 580 |
| 275 |
| 2703 |
| + |
| 109-B33 |
| 9 ᴓ |
| Exhaust North EF-3 |
| B39 |
| Hallway |
| 4 |
| 60 |
| 0 |
| 90 |
| 885 |
| + |
| B39A |
| Infectious Animal Ward |
| 15 |
| 230 |
| 200 |
| 90 |
| 885 |
| + |
| X |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B39B |
| Infectious Animal Ward |
| 15 |
| 230 |
| 200 |
| 93 |
| 914 |
| + |
| X |
| 8 ᴓ |
| Biocontainment Exhaust EF-9 |
| B40 |
| Radiology/ Procedure Room |
| 15 |
| 1210 |
| 1030 |
| 490 |
| 4817 |
| + |
| 109-B35 |
| 10 ᴓ |
| Exhaust North EF-3 |
| B41 |
| Infectious Animal Ward |
| 15 |
| 710 |
| 610 |
| 288 |
| 2831 |
| + |
| X |
| 109-B36 |
| 9 ᴓ |
| Biocontainment Exhaust EF-9 |
| Electrical East |
| Electrical Rm East Side |
| 4 |
| 0 |
| 30 |
| 36 |
| 354 |
| - |
| N/A |
| N/A |
| Biocontainment Exhaust EF-9 |
| B42 |
| Sewage Ejection Room |
| 4 |
| 0 |
| 120 |
| 168 |
| 1651 |
| - |
| N/A |
| N/A |
| Exahust North EF-3 |
| B43 |
| Telecominication |
| 4 |
| 0 |
| 60 |
| 90 |
| 885 |
| - |
| N/A |
| N/A |
| Exhaust North EF-3 |
| B44 |
| House Keeping Closet |
| 4 |
| 0 |
| 30 |
| 35 |
| 344 |
| - |
| N/A |
| N/A |
| Exhaust North EF-3 |
| B45 |
| Storage |
| 4 |
| 0 |
| 30 |
| 43 |
| 423 |
| - |
| N/A |
| N/A |
| Exhaust North EF-3 |
| B46 |
| Work Room |
| 4 |
| 120 |
| 110 |
| 177 |
| 1740 |
| + |
Exhaust North EF-3
| B46A |
| Animal Ward |
| 15 |
| 470 |
| 400 |
| 190 |
| 1868 |
| + |
Exhaust North EF-3
| B46B |
| Animal Ward |
| 15 |
| 500 |
| 430 |
| 200 |
| 1966 |
| + |
Exhaust North EF-3
| CB-6 |
| Hallway North |
| 4 |
| 300 |
| 0 |
| 456 |
| 4482 |
| + |
| CB-1 |
| Hallway East-North |
| 4 |
| 270 |
| 0 |
| 404 |
| 3971 |
| + |
| CB-2 |
| Hallway South- East |
| 4 |
| 260 |
| 0 |
| 394 |
| 3873 |
| + |
| CB-3 |
| Hallway South |
| 4 |
| 300 |
| 0 |
| 454 |
| 4463 |
| + |
| CB-4 |
| Hallway North-West |
| 4 |
| 300 |
| 0 |
| 451 |
| 4433 |
| + |
| CB-5 |
| Hallway North-East |
| 4 |
| 270 |
| 0 |
| 407 |
| 4001 |
| + |
8. Terminal Unit Replacement
a. Contractor shall replace all dual duct terminal unit serving animal lab in the basement of B109. Terminal unit details are in above new schedule, contract shall provide terminal unit size for the maximum CFM per schedule.
Existing Air Terminal Units, Dual Duct
| Unit Symbol |
| Inlet Connec Dia |
| CFM Max/Min |
| Min SP In WG |
| Space NC |
| Remarks |
b. All new TU boxes shall be dual duct, low pressure loss with sound attenuators and mixing chamber. Boxes rated sound criteria shall not exceed NC 35 at require air flow. Terminal units shall have integrated flow meter.
c. Provide new DDC actuators for each TU box, compatible with existing BAS system.
d. Provide new Metasys graphics that show dampers position, temperature of mixed air, airflow, room set points temperature, room actual temperature, relative humidity. In addition, this graphic shall show details on exhaust air dampers on room with motorize dampers.
e. Provide new programming for new terminal unit control sequence to ensure room meet design environmental conditions per VA HVAC design manual. The sequence shall keep temperature, humidity and pressure relationship. Provide a software tab that allows for changing room pressurization relationship.
f. Removal of existing terminal unit will require partial ceiling demolition.
g. During demolition phase contractor shall cover existing equipment and watering system on rooms to avoid contact with any debris. Upon completion of work, contractor shall clean all rooms.
h. Contractor shall install new 24” x 36” access door on each room ceiling by each terminal unit on the room. Access door shall be stainless steel, gasketed and have a minimum 18 gage door and frame.
i. Contractor shall patch and repair ceiling to a level 5 finish. Prime and paint the entire ceiling of each room with two coats Pre-Catalyzed Acrylic Epoxy Coating. Color to match existing.
j. Contract shall provide new branch ductwork (Hot and Cold sides) for TU 109-B16 serving Room B16, since it will require significant upgrade in size.
9. Exhaust Damper Installation
a. Contractor shall install new motorize airfoil type control dampers with blade and edge seals. Contractor shall field verify duct sizing before installation. Contractor may install these as part of an exhaust grille/damper combination.
b. Contractor shall install new DDC actuators on new exhaust duct dampers. This will include the installation of new wiring and required equipment to integrate them BAS.
c. Provide new Metasys graphics for each damper, these graphics shall be shown in conjunction of TU box graphics for each room.
d. Contractor shall install new 24” x 24” access door on each room ceiling mounted exhaust dampers for servicing. Access door shall be stainless steel, gasketed and have a minimum 18 gage door and frame.
10. Room environmental control devices
a. Provide new thermostat with integrated relative humidity sensor all rooms. Thermostat shall provide a visual display of current temperature and humidity for logging purposes.
b. Each thermostat shall be controlling the terminal unit serving each room.
c. Contractor can reuse existing conduit to rerun new wiring for the sensors.
d. Contractor shall install new pressure differential monitor with visual display on each room. Differential pressure monitor shall be BAcnet compatible and shall be integrated to the existing BAS system. Differential pressure monitor must be capable to read in to air flow reading from TU box. Control programmer shall include a calculation of ACH for each room and make it display on differential pressure monitor. Monitor shall be programed to display a local visual alarms and remote alarm on Metasys. Please note local sound alarm on the monitor are not allowed due to animal sensitivity to noise. Pressure differential monitor shall be TSI Pressura Pressure Monitor RPM20-CC or approved equal.
e. Contractor shall provide and install new analog pressure differential monitors. Monitor shall be Airflow Direction Incorporated Model ADI-69-V-N or approved equal. Monitor shall provide visual confirmation of air direction from outside of each room.
f. Contractor shall remove and dispose existing differential monitors pressure monitor on all the rooms.
g. Contractor shall provide new graphics on the Metasys system for the basement and for each room. The main graphic for the basement floorplan shall show a bird’s eye view showing temperature, humidity, pressure differential relationship and air changes per hour.
11. Removal of existing direct expansion fan coil units
a. Contractor shall properly remove and discard three direct expansion fan coil units located in rooms B35, B39 and B26. Contractor shall dispose the units, related ductwork, piping, electrical wiring, electrical conduit, refrigerant and controls back to the source. Please remove any label on electrical boxes, breaker, etc.
b. Contractor shall patch, finish and paint all penetrations and disturbed wall, ceiling and flooring. All repairs shall match existing terminations.
12. Air Distribution Equipment.
a. Replace existing supply diffuser for Titus TDCA-AA lain in type or approved equal, all diffusers shall have a 35 NC level or less for the design CFM. Match existing duct neck size.
b. Replace existing exhaust grilles by TITUS FLF1/1”filter or approved equal, all grille shall keep a NC of 35 of less. Size to match existing. Contractor may consider including a combination of exhaust grille with 1” filter plus exhaust damper if there is enough clearance for installation.
Existing Air Distribution Device Schedule
| Type |
| CFM |
| Function |
| Neck Size |
| Face Size |
| Face Type |
| NC |
| Remarks |
| D1 |
| 40-90 |
| SA Diffuser |
| 5 ᴓ |
| 24" x 24" |
| Sqr. Cones |
| 40 |
| Ceiling Mounted |
| D2 |
| 100-150 |
| SA Diffuser |
| 6 ᴓ |
| 24" x 24" |
| Sqr. Cones |
| 40 |
| Ceiling Mounted |
| D3 |
| 160-300 |
| SA Diffuser |
| 7 ᴓ |
| 24" x 24" |
| Sqr. Cones |
| 40 |
| Ceiling Mounted |
| D4 |
| 310-400 |
| SA Diffuser |
| 8 ᴓ |
| 24" x 24" |
| Sqr. Cones |
| 40 |
| Ceiling Mounted |
| D5 |
| 410-500 |
| SA Diffuser |
| 9 ᴓ |
| 24" x 24" |
| Sqr. Cones |
| 40 |
| Ceiling Mounted |
| D6 |
| 510-700 |
| SA Diffuser |
| 10 ᴓ |
| 24" x 24" |
| Sqr. Cones |
| 40 |
| Ceiling Mounted |
| D7 |
| 710-900 |
| SA Diffuser |
| 11 ᴓ |
| 24" x 24" |
| Sqr. Cones |
| 40 |
| Ceiling Mounted |
| E1 |
| 40-150 |
| Exh. Reg. |
| 8" x 8" |
| 8" x 8" |
| 1/2" x 1/2" Grid |
| 40 |
| Ceiling Mounted |
| E2 |
| 160-400 |
| Exh. Reg. |
| 12" x 12" |
| 12" x 12" |
| 1/2" x 1/2" Grid |
| 40 |
| Ceiling Mounted |
| E3 |
| 410-400 |
| Exh. Reg. |
| 24" x 12" |
| 24" x 12" |
| 1/2" x 1/2" Grid |
| 40 |
| Ceiling Mounted |
| E4 |
| 810-1600 |
| Exh. Reg. |
| 24" x 24" |
| 24" x 24" |
| 1/2" x 1/2" Grid |
| 40 |
| Ceiling Mounted |
| E5 |
| 50-200 |
| Exh. Reg. |
| 12" x 4" |
| 12" x 4" |
| Louvered |
| 40 |
| Wall Mounted |
| E6 |
| 50-200 |
| Exh. Reg. |
| 14" x 14" |
| 14" x 14" |
| Louvered |
| 40 |
| Wall Mounted w/ Filter |
| E7 |
| 160-400 |
| Exh. Reg. |
| 12" x 12" |
| 12" x 12" |
| 1/2" x 1/2" Grid |
| 40 |
| Ceiling Mounted w/ Filter |
| E8 |
| 300-360 |
| Exh. Reg. |
| 30" x 6" |
| 30" x 6" |
| Louvered |
| 40 |
| Wall Mounted |
13. Phasing Plan
a. Project will be divided into four phases to allow continuing operation of the animal lab.
b. During each phase contractor shall provide 1-hour rated physical barrier between work area and animal lab. The barrier shall be insulated with sound attenuation material to isolate noise as much as possible.
c. Contractor will be assigned an access route to the work site that will vary depending on the phase they are working in. This will be the only entrance/exit to the worksite.
d. Contractor shall isolate the HVAC of the room they are working by installing temporary duct blanks or rerouting flow within working area. It must take into account that the air handling unit cannot be turned off during any phase of the project since animal lab will be operational.
e. Contractor shall provide a TAB for each phase at room level. The report shall provide proper flow and air pressurizations for each room. In additional, there shall be a control sequence for each terminal unit to control temperature, humidity and air pressurizations.
14. Exhaust Duct Manifold for Animal Caging Exhaust
a. General
i. Research department recently acquired a new caging system for animal that provide an environmental control for animals and provide direct exhaust capabilities which reduce the smell in rooms.
b. Manifolds Manufacturing
i. Contractor shall manufacture a new manifold per attached drawings. Ductwork shall comply with VA specifications.
ii. Contractor shall install manifolds above finish ceiling with penetrations of each branch crossing into room. Contractor shall repair and patch ceiling to keep an airtight seal between ceiling and rooms.
iii. Contractor shall provide permanent removal caps on each branch nipple.
iv. Contractor shall install the duct manifold to the existing exhaust ductwork. Contractor shall provide a class A seal. For more details refer to project drawings.
v. Contractor shall repair and patch any damage portion of ceiling disturbed during installation.
15. HEPA Filters Replacement
a. Contractor shall have a certified contractor to decontaminate two existing HEPA filters housing and filter cartridges located in the penthouse of B-109. These filters serve the biocontainment unit exhaust EF-9 and necropsy table EF-10.
b. After decontamination, contractor shall remove and replace filter cartridges as per schedule. Contractor shall field verify dimensions before installing the filters.
Air Filters (HEPA)
| Filter No. |
| System |
| CFM |
| Max SP Drop |
| Cartridges |
| Service |
| Initial |
| Final |
| No. |
| Size |
| Arrangement |
| Access |
| 211-HF1 |
| 211-EF9 |
| 3900 |
| 1.00 |
| 2.00 |
| 4 |
| 24" x 24 " x 24" |
| 2W x 2H |
| Side |
| Biocontainment Exhaust |
| 211-HF2 |
| 211-EF10 |
| 900 |
| 1.00 |
| 2.00 |
| 1 |
| 24" x 24 " x 24" |
| 1W x 1H |
| Side |
| Necropsy Table Exhaust |
16. Submittals
a. Within 10 calendar days of the notice to proceed receipt, the Contractor shall submit to the CO and COR the following:
b. Quality Control Plan. Contractor shall establish a quality control plan for all work, including that of his subcontractors, to assure compliance with the contract provisions. Contractor shall submit a copy of his quality control plan concurrently with the quote and schematic submission. Quality control measures shall include, but not be limited to:
i. Obtaining payment and performance bonds, permits, licenses and insurance.
ii. Performing all required inspections and tests.
iii. Listing all subcontractors and services they will perform.
iv. Submittal approval.
v. Inspection schedule.
vi. Compliance with applicable Federal, state and local codes and regulations related to executing the contract.
vii. Correction of unsatisfactory work.
c. Prior to construction the contractor shall submit all plans including, but not limited to:
i. Environmental Protection Plan
ii. Waste Management Plan
d. The VA will verify the contractor's shop drawings, detailed drawings, schedules, descriptive literature and samples, testing labor-laboratory reports, field test data and review the color, texture and suitability of materials for conformity with the RFP Documents and construction documents. All submittals shall be in electronic format and include a VACT Submittal Cover sheet for return as annotated. Submittals may be sent via email or a VA approved SharePoint website. Please note, VA’s email size is limited to 5MB.
17. Code Requirements:
a. The VA will obtain the necessary local agency approvals, as required.
b. All work performed under this contract shall be in accordance with the VA Master Specifications (http://www.cfm.va.gov/til/spec.asp).
c. All work shall comply with all local, state, and federal rules and regulations. In the event of a code discrepancy the stricter of the ordinances shall prevail.
18. PROPOSED SCHEDULE:
a. Mobilization will only occur after all plans, submittals, phasing and equipment are approved by the COR. The project is intendent to be completed during normal work hours. Contractor shall plan as necessary to ensure all parts and equipment is readily available to maintain the approved schedule.
b. When no longer needed, the temporary materials shall be removed and any disturbances to the grounds shall be restored to their prior condition.
c. Work shall commence upon receipt of a Notice to Proceed from the CO.
19. Parking:
a. Parking is rigidly controlled throughout the Medical Center. Contractor parking is only allowed in authorized areas. Contractor shall abide by all VA police requirements. Parking in designated patient parking areas is strictly prohibited. Parking for equipment necessary to perform the work will be authorized in advance of starting the project and must be coordinated with the COR.
20. Storage of equipment & materials:
a. The contractor shall coordinate with the COR for allocation of required workspace and for the storage of equipment and material to be used for this project. Storage space is very limited. There are no exclusive areas within the campus that can be given to the contractor for their storage/dumpster/office trailer needs.
21. Debris Removal:
a. The Contractor is required to remove waste materials and debris daily from the campus. All waste material and debris shall be removed off site by the contractor and shall be disposed of in accordance with applicable State and Federal regulations. All recyclable materials shall be recycled and weight tickets provided to the COR.
22. Site Utilities:
a. The Contractor should note this scope of work does not detail all existing structures, utilities, or components that may potentially interfere with the contract work required or require modifications. The contractor shall field verify any obstruction, utility, or condition that may hinder or interfere with their work prior to award. All proposed utility relocations, reallocations, and shutdowns shall be approved by the COR prior to commencing such work. The contractor shall field verify all existing utility installations and take appropriate action prior to working around any potential utility installation.
b. In the event a shutdown, restriction, or interruption of any utility services is required, a written request must be submitted (at least two weeks in advance) and approved by the COR. All utility shutdowns must be reviewed and approved by the VA.
23. Project Safety:
a. Contractor shall comply with the following and keep a copy on site at all times:
b. OSHA
c. Interim Life Safety Measure Assessment
d. Infection Control Risk Assessment
e. Hot work Permits required as needed
f. Confined Space Permits required as needed
24. Penetrations of fire and smoke barriers:
a. Prior to any installation of equipment, cables, power connections, conduit, piping or other work that penetrates a smoke or fire barrier, all such work must be approved by the COR. A penetration permit must be secured prior to disturbing the integrity of the barrier. The permit must be available for inspection at the project location. After the work is complete, the penetration must be repaired (sealed) according to accepted practice and utilizing materials (including UL/FM-listed through penetration fire stopping materials) that meet the original barrier construction requirements in order to restore the designed specifications for smoke and fire compartmentalization. All penetrations and miscellaneous openings must be protected according to NFPA 101, Chapter 8. Upon completion of any penetration repair, a visual inspection for approval must be requested from, and completed by the COR.
25. Interim life safety and infection control protection measures:
a. Contractor shall comply with SECTION 01 35 26 SAFETY REQUIREMENTS of VA Master Specifications including following requirements of an interim life safety measures and fire protection plan
b. Maintain the construction area to minimize the potential for fire or safety hazards resulting from storage of construction material, construction waste and debris during construction operations.
c. Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas, the areas that are described in phasing requirements, and adjoining areas. Construct partitions of gypsum board or treated plywood (flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire retardant treated wood or metal steel studs. Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install Class C, ¾ hour fire/smoke rated doors with self-closing devices.
26. Prevention Of False Fire Alarms:
a. Contractor shall comply with the requirements to prevent false fire alarms. Contractor shall provide a fire watch when impairment of the fire alarm system exceeds four hours in a 24-hour period.
27. Material & Workmanship Quality:
a. All materials and workmanship shall comply with all codes, standards, and recommendations of all Authorities Having Jurisdiction (AHJ). All work shall be done in a first-class manner according to the best trade practices and to the satisfaction of the COR.
b. The Contractor shall provide VA personnel with the necessary training to properly operate all provided equipment and systems. Additionally, the Contractor shall provide complete maintenance service support during the warranty period. All maintenance service shall be performed by factory trained, English speaking, technically qualified servicemen and shall be responsible for recording all work actions in the customer’s maintenance log book. Contractor’s warranty maintenance service support shall include all parts, service, labor, travel time, and expense to perform both preventive and corrective maintenance on the new turnkey installation.
28. Security:
a. All contractor personnel shall obtain a short-term identification badge issued by the VA. Such badge shall be worn by the individual and prominently displayed at all times while on VA property. No employee of the contractor shall enter the project site without a valid identification badge issued by the VA. In order to obtain a short-term identification badge, contractor personnel shall present to the COR two valid (non-expired) photo identification issued by a US federal, state or local government agency. Badges will be issued by the VA at no cost to the contractor.
b. All contract personnel are subject to inspection of personal affects when entering or leaving the project site.