36C25619Q1270-0001001.pdf
PDF 140 KB Posted
- Solicitation number
- 36C25619Q1270
About this file
36C25619Q1270 0001 36C25619Q1270 0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25619D0083-000.docx | DOCX document | |
| 36C25619Q1270-0001000.docx | DOCX document | |
| 36C25619Q1270-0001001.pdf | ||
| 36C25619Q1270-0001002.pdf | ||
| 36C25619Q1270-0001007.pdf | ||
| 36C25619Q1270-0001003.pdf | ||
| 36C25619Q1270-0001006.pdf | ||
| 36C25619Q1270-0001005.pdf | ||
| 36C25619Q1270-0001004.pdf | ||
| 36C25619Q1270-0001005.pdf | ||
| 36C25619Q1270-0001003.pdf | ||
| 36C25619Q1270-0001006.pdf | ||
| 36C25619Q1270-0001004.pdf | ||
| 36C25619Q1270-0001002.pdf | ||
| 36C25619Q1270-0001007.pdf | ||
| 36C25619Q1270-0001000.docx | DOCX document | |
| 36C25619Q1270-002.pdf | ||
| 36C25619Q1270-001.docx | DOCX document | |
| 36C25619Q1270-002.pdf | ||
| 36C25619Q1270-001.docx | DOCX document | |
| 36C25619Q1270-000.docx | DOCX document | |
| 36C25619Q1270-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0001 09-09-2019
36C256
Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 N. Keystone Crossing Fayetteville AR 72703
36C256
Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 N. Keystone Crossing Fayetteville AR 72703
To all Offerors/Bidders
36C25619Q1270
08-13-2019
X
X X
Response due date is extended to 9/18/19
THE SOLICITATION IDENTIFIED IN BLOCK 9A ABOVE IS HEREBY AMENDED. BY:
***** SEE CONTINUATION PAGE *****
This modification consists of 92 pages including 6 attached documents.
James Hunt Contracting Officer
NCO1615L2-4938
(CONTINUATION OF STANDARD FORM 30, BLOCK 14)
a. The response due date/time is extended to September 18, 2019, no later than 4:30PM Central Time.
b. Attached is a collection of questions submitted, with answers (if available). It is each prospective contractor’s responsibility to review these questions/answers prior to submission of final quotes.
c. Section C.9 is amended to include the following FAR clauses:
FAR 52.222-17 NONDISPLACEMENT OF QUALIFIED WORKERS (May 2014) FAR 52.237-3 CONTINUITY OF SERVICES (Jan 1991)
d. Section D is amended to include the following attachments (included as attachments to this amendment):
A-3 General Decision number LA20180006, dated 1/18/19 (10 pages) A-4 General Decision number LA20190023, dated 6/28/19 (8 pages) A-5 VA Ft. Polk Final Drawings, Pages 1-33, dated 12/2/2010 (33 pages) A-6 VA Ft. Polk Final Drawings, Pages 34-66, dated 12/2/2010 (33 pages) A-7 VA-As Built Model, dated 8/6/2011 (1 page)
e. POST-AWARD CONFERENCE (Identification of existing conditions): It is the contractor’s responsibility to coordinate a post-award conference with the COR, no later than ten (10) days after receiving a notice of award of a contract. This conference should include a thorough assessment of existing deficiencies (areas/items in need of repair/replacement) of the facilities, grounds, and parking areas. Those areas identified (in writing) by the contractor, within this 10-day period, shall not be the responsibility of the contractor.
However, the contractor may be required to correct such deficiencies by separate task order(s) issued against the contract utilizing contract line items (CLINs) 0004(a & b).
ALL OTHER TERMS AND CONDITIONS OF
THE SOLICITATION REMAIN UNCHANGED
File details come from the government source that posted it.