36C25619Q0058-0001000.docx
DOCX document 23 KB Posted
- Attached to
- Facility Generator Building 2 & 3 Repair & Replace Federal contract opportunity
- Solicitation number
- 36C25619Q0058
About this file
36C25619Q0058 0001 36C25619Q0058 0001.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25619Q0058-008.docx | DOCX document | |
| 36C25619Q0058-007.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) None Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 Department of Veterans Affairs Veterans Healthcare System of the Ozarks Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 To all Offerors/Bidders
36C25619Q0058
X x x November 5, 2018 3pm CST The purpose of this amendment is to answer questions that were submitted and to extend bid due date.
A. See continuation page for questions and answers.
B. The due date for bids is changed to November 5, 3PM CST.
C. All other terms and conditions remain unchanged.
CONTINUATION PAGE
Question 1. Per items A & C under General Requirements, are all parts and components to be provided by the OEM? No. Item A states to ensure all equipment is maintained to operate in a correct and safe manner as intended by the Original Equipment Manufacturer (OEM) only. A substitute may be used if meets OEM criteria.
Question 2. Are all repairs required to be completed on the VA premises? . No, some parts may have to be shipped to factory for repair
Question 3. Item L specifies that all personnel must be certified in the field of either/or radiator repair and generator repair. Do these certifications come from the OEMs ? VA requires mechanics and /or technicians installing all parts and components for this repair carry any certifications showing the parties in question are qualified in the appropriate fields of repair. This certification may come in form of a letter to COR stipulating said experience signed by contractor.
Question 4. Item M goes along with the aforementioned, but are there any specific state, Parish or municipal requirements for certifications that we should know of? Its specifically called out, so we as contractors must operate under the premise that there are some requirements which we're not aware of.
There are no state, parish. Or municipal laws in this regard.
SAFETY AND SECURITY
Question 5. Items F & G; parking on grass will not be an issue. However, potentially using a lift or crane may be necessary. Are these going to be accessible to the back of the building where the radiator is located? Setting up equipment is allowed to perform repair work. Parking contractor trucks to be off grass area where possible.
Question 6. Warranty. I see the warranty requirements changed from 30 days to one year. Is that for both the generator control panel and the radiators? In the event that the radiators are included in this requirement, we believe that a general design flaw exists that allows debris to enter into the radiator intake system(s) that will potentially allow for the recurrence of this similar problem in the future. Panel to have One (1) year warranty and the radiators to have One (1) year warranty for parts and labor. This warranty to cover repair for normal use and not due to intake of rock fragments.