36C25618R0160-00001003.docx
DOCX document 18 KB Posted
- Attached to
- Amendment to 36C256-18-R-0160 CT Statistician
- Solicitation number
- 36C25618R0160
About this file
36C25618R0160 00001 36C25618R0160 00001_1.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25618R0160-00001004.pdf | ||
| 36C25618R0160-00001000.docx | DOCX document | |
| 36C25618R0160-00001002.pdf | ||
| 36C25618R0160-00001001.pdf | ||
| 36C25618R0160-003.docx | DOCX document | |
| 36C25618R0160-000.docx | DOCX document | |
| 36C25618R0160-004.docx | DOCX document | |
| 36C25618R0160-002.docx | DOCX document | |
| 36C25618R0160-001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00001 11-30-2017 None Department of Veterans Affairs Acquisition & Materiel Management Michael E. DeBakey VA Medical Center 2002 Holcombe BLVD Houston
TX
77030 4298 Department of Veterans Affairs Acquisition & Materiel Management Michael E. DeBakey VA Medical Center 2002 Holcombe BLVD Houston
TX
77030 4298 To all Offerors/Bidders
36C25618R0160
X X X X The purpose of this amendment to the combined synopsis and solicitation is to:
1) attach FAR Part 52.212-2 Evaluation -- Commercial Items page 43
2) correct item listed in Sub Factor - 2. Technical/Management Approach page 43
3) attach updated Attachment B - Past Performance document
All other terms and conditions remain unchanged.
Jeneice McClinton Contracting Officer
CONTINUATION PAGE
52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
“Since this solicitation is Lowest Priced Technically Acceptable (LPTA) the source selection evaluation board will begin by reviewing the lowest priced proposal. If the board determines that this proposal is technically acceptable no other proposals will be reviewed. This proposal will have been deemed technically acceptable with the lowest price, so for this reason the award will be made based on FAR guidance.”
The following factors shall be used to evaluate offers:
PRICE
TECHNICAL
NOTE: PAST PERFORMANCE
b)Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of Provision)
SUB FACTOR -2. Technical/Management Approach – (page 43) The Contractor shall demonstrate the following, relevant to the subject procurement.
(A) Contractor shall submit with proposal a detailed technical and management plan describing their proposed capability and methods to manage the performance of all work and requirements in Statement of Work. The plan shall be organized, specific and complete in detail, realistic, and provide a straightforward delineation of the proposed method to provide all labor, license, certification, personnel, material, transportation, management, and supervision to perform statistical support.
(B)Contractor shall submit with Technical Proposal a copy of company Liability Insurance.
(C)Contractor shall submit resources and documentation necessary that together demonstrate an adequate technical approach that will satisfy the government requirements.
See Attached updated Past Performance document.
See attached document: Attachment B Past performance updated.