36C25618Q0181-004.docx
DOCX document 23 KB Posted
- Solicitation number
- 36C25618Q0181
About this file
36C25618Q0181 36C25618Q0181_5.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25618C0049-000.docx | DOCX document | |
| 36C25618Q0181-003.docx | DOCX document | |
| 36C25618Q0181-002.docx | DOCX document | |
| 36C25618Q0181-001.docx | DOCX document | |
| 36C25618Q0181-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Amendment to a Previous Combined Solicitation
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 Veterinary Medical Unit Equipment 02 (VMU) Southeast Louisiana Veterans Healthcare System 2400 Canal Street New Orleans, LA 70112 70112 36C25618Q0181
COMBINE
01-11-2018 N 334516 Department of Veterans Affairs Southeast Louisiana Veterans HCS Network Contracting Office 16 1555 Poydras Street STE New Orleans LA 70112 C. Robert Oravetz Department of Veterans Affairs Network Contracting Office 16 1555 Poydras Street Suite 1308 New Orleans, LA 70112 Department of Veterans Affairs Southeast Louisiana Veterans Healthcare System 2400 Canal Street New Orleans, LA 70119 70119 christopher.oravetz@va.gov christopher.oravetz@va.gov This is a notice to all offerors that FedBizOpps Combined Synopsis Solicitation 36C25618Q0181 is being amended to add/change the following:
1). Change Section 2.7 in the Statement of Work to read the following (changes are highlighted in yellow).
2). Add Item #11 to Master List-Responses to Vendor Questions that was omitted and not included in the previous amendment.
| 2.7 | DELIVERY AND CONFIGURATION/INSTALLATION |
| 2.7.1 | DELIVERY |
| 2.7.1.1 | Contractor shall deliver all equipment to the Southeast Louisiana Veterans Health Care System (SLVHCS), Research Building, “P”, 2400 Canal St, New Orleans, LA 70119 beginning on May 1st, 2018. |
| 2.7.1.2 | Deliver materials to job in manufacturer's original sealed containers with brand name marked thereon. |
| 2.7.1.3 | Package to prevent damage or deterioration during shipment, handling, storage and installation. Maintain protective covering in place and in good repair until removal is necessary. |
| 2.7.1.4 | Deliver specified items only when the site is ready for installation work to proceed. |
| 2.7.1.5 | Store products in dry condition inside enclosed facilities. |
| 2.7.1.6 | Any government requested delayed delivery up to 90 days after initial award delivery date, shall be at no additional cost to the Government. |
| 2.7.1.7 | A pre-delivery meeting will be conducted 60 days prior to initial award delivery date for verification of delivery and installation dates. If a meeting is not held delivery and installation dates may be established through e-mail communication between authorized government and contractual representatives. |
| 2.7.1.8 | Delivery and Configuration/Installation will be coordinated through the COR. |
| 2.7.2 | CONFIGURATION/INSTALLATION |
| 2.7.2.1 | All equipment shall be floor mounted by contractor upon delivery unless otherwise noted above. |
| 2.7.2.2 | Install/Configure all equipment to manufacturer’s specifications maintaining Federal, and Local safety standards |
| 2.7.2.3 | Installation/Configuration must be completed by June 15th, 2018. All work shall be completed between 8:00 a.m. and 4:30 p.m. Monday – Friday. All federal holidays, excluded. Federal holidays are available at the Federal Holiday OPM Site. |
| 2.7.2.4 | If there is an operational conflict night or weekend work may be required. Government will provide a 72 hours' notice of change of configuration/installation hours. |
| 2.7.2.5 | The contractor shall coordinate all deliveries, staging areas, installations, and parking arrangements with the COR. |
| 2.7.2.6 | The Contractor shall remove all related shipping debris and cleanup any construction associated with delivery and configuration/installation of the specified items. Contractor shall remove all packaging from the SLVHCS premises. The Contractor shall be responsible for any damage to the building that occurs due to Contractor error or neglect. |
Addition to Master List – Responses to Vendor Questions Veterinary Medical Unit Equipment 02 (VMU) Solicitation 36C25618Q0181
| # |
| SOW Reference |
| Question |
| Answer |
| 11. |
| Price/Cost Schedule and SOW Sections 2.5.1 thru 2.5.7 |
| Will the government pay any required manufacturing deposits for the items identified in the Schedule of Values? |
Manufacturing deposits incurred or expected by the contractor shall be included/incorporated as part of the contractor’s total offer/bid price. As contractors are required to prepare offer pricing in accordance with the Price/Cost Schedule manufacturing deposits should be included as part of the cost for line items within the Price/Cost Schedule. Per Section E.4, Clause 52.216-1 a firm, fixed price contract is contemplated for this requirement.