36C25618B0677-009.pdf
PDF 169 KB Posted
- Solicitation number
- 36C25618B0677
About this file
36C25618B0677 502-18-203 Doc 13 ICRA Medical Vacuum Replacement and Medical Gas Alarm Installation Project.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25618C0175-000.docx | DOCX document | |
| 36C25618B0677-0002000.docx | DOCX document | |
| 36C25618B0677-0001001.pdf | ||
| 36C25618B0677-0001002.pdf | ||
| 36C25618B0677-0001000.docx | DOCX document | |
| 36C25618B0677-002.docx | DOCX document | |
| 36C25618B0677-007.pdf | ||
| 36C25618B0677-003.pdf | ||
| 36C25618B0677-004.pdf | ||
| 36C25618B0677-011.pdf | ||
| 36C25618B0677-006.pdf | ||
| 36C25618B0677-005.pdf | ||
| 36C25618B0677-008.pdf | ||
| 36C25618B0677-001.docx | DOCX document | |
| 36C25618B0677-010.pdf | ||
| 36C25618B0677-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INFECTION CONTROL RISK ASSESSMENT
Step 1:
Using the following table, identify the type of construction activity (Type A–D).
TYPE A
Inspection and noninvasive activities:
Including, but not limited to:
Removal of ceiling tiles for visual inspection, limited to one tile per 50 square feet; painting (but not sanding); wall covering; electrical trim work; minor plumbing; activities that do not generate dust or require cutting of walls or ceiling access, except for visual inspection.
X
TYPE B
Small-scale activities of short duration that create minimal dust:
Including, but not limited to:
Installation of telephone and computer cable; access to chase spaces; and cutting of walls or ceilings where dust spread can be controlled.
TYPE C
Work that produces a moderate to high amount of dust or requires demolition or removal of any fixed building components or assemblies:
Including, but not limited to:
Sanding of walls for painting or wall covering; removal of floor covering, ceiling tiles or casework; construction of new walls; minor duct work or electrical work above the ceiling;
major cabling work; or any activity that cannot be completed within a single work shift.
TYPE D
Major demolition and construction projects:
Including, but not limited to:
Activities that require consecutive work shifts; heavy demolition or removal of a complete cabling system; new construction.
Step 2:
Using the following table, identify the patient risk groups that will be affected. If more than one risk group will be affected, select the highest risk group.
Low Risk (X ) Medium Risk ( ) High Risk ( ) Highest Risk ( ) Office areas
Lobbies / Corridors Mechanical Rooms
Cardiology Echocardiography
Endoscopy Physical Therapy
Imaging/MRI Respiratory Therapy
Outpatient Exam Rooms Patient Rooms
Evaluation & Treatment Unit Laboratory (specimen)
Outpatient Surgery Pharmacy Recovery
Surgical units
Any area caring for immunocompromised patients
Central Sterile Supply
ICU
Medical Unit Negative Pressure Isolation
Rooms Oncology
Operating Rooms
Step 3: Match the
Patient Risk Group (low, medium, high, or highest), with the planned… Construction Project Type (A, B, C, D) on the following matrix, to find the… Class of Precautions (I, II, III, IV) or the level of infection-control activities needed.
Date: 5/31/2018 Project No.: 502-18-203 Project Title: Medical Vacuum Replacement and
Medical Gas Alarm Installation Project Location of Construction: Alexandria Contractor:
Project Coordinator: Kenneth Dillard Project Start Date:
Estimated Duration: 60 Days ICRA Needed: Yes
Ouida Gibson RN, Infection Control Nurse
Date_________________ Ken Dillard PE, General Engineer/COR
Date_________________
5/31/2018
Class I–IV Coded precautions are delineated below:
IC Matrix = Class of Precautions: Construction Project by Patient Risk
Construction Project Type Patient Risk Group Type A Type B Type C LOW-Risk Group I II II MEDIUM-Risk Group I II X HIGH-Risk Group I II III/IV HIGHEST-Risk Group II III/IV III/IV
• Note: Infection Control approval is required when the Construction Activity and Risk Level indicate that
Class III or Class IV control procedures are necessary.
Description of Required Infection Control Precautions by Class
During Construction Project Upon Project Completion
CLASS I
X
1. Execute work by methods that minimize creating dust from construction work
2. Safety barriers to be constructed and maintained.
3. Monitor and re-route traffic, including foot traffic
4. Contain construction waste before transport In appropriate containers.
5. Remove construction waste routinely to prevent overfilled bins
1. Do not remove barriers from the work area until completed project is inspected by the owner's Safety department and Infection Control department and thoroughly cleaned by the owner's Environmental Services department or Construction Crew, Grounds, ETC.
CLASS II
1. Provide active means to prevent airborne dust from dispersing from the area
2. Water-mist work surfaces to control dust while cutting
3. Seal unused doors with duct tape
4. Block off and seal air vents
5. Place dust mats at the entrance and exit door(s) of work areas
6. Remove or isolate HVAC system in areas where work is being performed
1. Wipe work surfaces with disinfectant
2. Contain construction waste before transport in tightly covered containers
3. Wet-mop and/or vacuum with HEPA-filtered vacuum before leaving the area
4. Remove isolation of HVAC system in areas where work was performed
CLASS III
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of the duct system.
2. Complete all critical barriers—sheetrock, plywood, plastic—to seal the area from non–work areas or implement control-cube method* before construction begins.
3. Maintain negative air pressure within the work site, utilizing HEPA-equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport containers or carts. Tape covering unless the lid is solid.
1. Do not remove barriers from work area until completed project is inspected by the Infection Control and Safety departments, and is thoroughly cleaned by Housekeeping.
2. Remove barrier materials carefully to minimize risk of spreading dust and debris associated with construction
3. Vacuum work area with HEPA-filtered vacuums
4. Wet-mop area with disinfectant.
5. Remove isolation of HVAC system in area(s) where work was performed
CLASS IV
1. Isolate the HVAC system in an area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers—sheetrock, plywood, plastic—to seal area from non–work area or implement control-cube method* before construction begins.
3. Maintain negative air pressure within work site, utilizing HEPA-equipped air filtration units.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through it so that they can be vacuumed using a HEPA vacuum cleaner before leaving work site; or they can wear cloth or paper coveralls, removing them each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from the work area until completed project is inspected by the owner's Safety department and Infection Control department and thoroughly cleaned by the owner's Environmental Services department.
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transporting in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA-filtered vacuums.
5. Wet-mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work was performed.
Step 4. Identify the areas surrounding the project area, assessing potential impact:
Unit below Unit above Lateral Lateral Behind Front
Low Low Medium Staff Offices
High Sterile Supplies
High Decon High Clean /Sterile Supplies
Risk group Risk group Risk group Risk group Risk group Risk group
Step 5 Identify specific site of activity: Medical Vacuum Replacement and
Medical Gas Alarm Installation Project
Step 6 Identify issues related to ventilation, plumbing and electrical (in the event of probable outages).
Step 7 Identify containment measures:
What type of barriers needed:
Is HEPA filtration required? No
Step 8 Consider potential risk of water damage. If rain is in the Vicinity, contractor to seal off area from water damage
Step 9 Work Hours: Can or will the work be done outside of patient care hours?
Regular Business Hours.
Design Considerations
Do plans allow for an adequate number of isolation/negative airflow rooms?
NA
Do plans allow for the required number and type of hand washing sinks or dispensers?
NA
Plans relative to clean and soiled utility rooms? NA
Containment Issues
Traffic Flow N/A
Housekeeping Yes
Debris Removal Yes, every day and will be covered
Steps 1–3 Adapted from V. Kennedy & B. Barnard, St. Luke Episcopal Hospital, Houston, TX; C. Fine, CA.
Steps 4–14 Adapted from Fairview University Medical Center, Minneapolis, MN, by ECSI Inc., 2001.
Forms modified and provided courtesy of J. Barley, ECSI Inc., 2002
| INFECTION CONTROL RISK ASSESSMENT |
| TYPE A |
| TYPE B |
| TYPE C |
| TYPE D |
| Cardiology |
| Patient Risk Group |
| IC Matrix = Class of Precautions: Construction Project by Patient Risk |
| Type C |
| Type B |
| Type A |
| Description of Required Infection Control |
| Precautions by Class |
| Upon Project Completion |
| During Construction Project |
| CLASS I |
| CLASS II |
| CLASS III |
| 2018-05-31T11:19:26-0500 | |
| Ouida Gibson Hawkins 191827 |
File details come from the government source that posted it.