This is a Pre-Solicitation Notice for Architectural and Engineering (A/E) services to replace unsupported switch gear and transformers at the Marion VA Medical Center in Marion, Illinois. The Department of Veterans Affairs is seeking qualified Service-Disabled Veteran-Owned Small Business (SDVOSB) firms to submit Standard Form 330 qualification packages for a project involving the replacement of eleven automatic transfer switches (ATS) and two aging transformers critical to the medical center's power distribution system.

The solicitation (36C25526R0040) has a response deadline of December 23, 2025, at 12:00 PM Central Time, with an anticipated contract award by February 28, 2026. The project is set aside exclusively for SDVOSBs under NAICS code 541330 (Engineering Services) with a small business size standard of $25.5 Million. The total construction budget is $2,041,200, and the A/E firm will be required to deliver final construction documents within 180 days of the contract award. The scope includes comprehensive design services, construction period services, and the incorporation of deductive alternate bid items that could reduce costs by up to 20%.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E CONTRACT SUPPLEMENT B

PROJECT NUMBER: 657-17-112JB

PROJECT TITLE: FCA-Renovate Nutrition and Food Services, JB Bldg 60

SUBJECT*
Replace Unsupported Switch Gear for Generators, 657A5-26-107

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
66048
SOLICITATION NUMBER*
36C25526R0040
RESPONSE DATE/TIME/ZONE
12-23-2025 12:00 PM CENTRAL TIME, CHICAGO, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
C1DA
NAICS CODE*
541330

PLACE OF PERFORMANCE

POSTAL CODE

COUNTRY

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway

Leavenworth KS 66048

POINT OF CONTACT*

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

Pre-Solicitation Notice: Request for Architectural and Engineer 330 submission Solicitation: 36C25526R0040, Replace Unsupported Switch Gear for Generators, Project No. 657A5-26-107.

CONTRACT INFORMATION

This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work.

This procurement is restricted to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. This requirement is being procured in accordance with the VAAM M836.6 implemented in FAR Subpart 36.6.

This is not a Request for Proposal, and an award will not be made with this announcement. This announcement is a request for SF 330’s from qualified Architectural and Engineer (A&E) contractors that meet the professional requirements.

The selection criteria for this acquisition will be in accordance with FAR 36.602-1, evaluation factors are listed below. The completed SF 330 will be evaluated by the Marion VAMC Evaluation Board in accordance with FAR 36.602-5(a) and the selection report shall serve as the final selection list, which will be provided directly to the Contracting Officer. Negotiations will be conducted beginning with the most highly qualified firm. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement.

The most highly rated firm must physically come to the site and review the project before submitting a price proposal and letter of understanding at no cost to the government.

The contract is anticipated to be awarded no later than February 28, 2026.

Award of any resultant contract is contingent upon the availability of funds.

Personal visits to discuss this announcement will not be allowed.

The NAICS Code for this procurement is 541330, Engineering Services and the small business size standard of 25.5 Million. Award of a Firm Fixed Price contract is anticipated and award time for completion of design of this project is approximately 180 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction period services if award of a construction project contract is made.

DATABASE REGISTRATION INFORMATION:

Verification of status of apparently successful offeror this acquisition is 100% set-aside for qualified service-disabled veteran owned small business A/E firm’s incompliance with VAAR 852.219-73. Only businesses listed as certified in the SBA certification database at https://veterans.certify.sba.gov/, shall be considered.

SYSTEM FOR AWARD MANAGEMENT (SAM.GOV):

Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM.GOV) database at https://sam.gov/content/ and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM.GOV prior to submitting their qualifications package.

THE EXCLUDED PARTIES LIST SYSTEM (EPLS):

To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at https://sam.gov/content/ for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.

E-VERIFY SYSTEM:

Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54)

Qualified A-E firms are required to respond if interested by submitting one (1) original completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486). Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be in pdf format and emailed. Email subject line shall clearly identify Solicitation number: 36C25526R0040 and project name, Replace Unsupported Switch Gear for Generators, Project No.657A5-26-107. Responses must be received by 12:00 PM Central on December 23, 2025 via e-mail to the Contracting Officer at maria.hoover@va.gov.

The 330 submissions must be a pdf document and must not exceed 10 MB.

The A/E Firm must provide Basic Professional Services as delineated in the Scope of Work. As part of the Basic Professional Services, Marion VAMC Engineering Service expects the following primary A/E disciplines to be included: Supervisory, Electrical engineer, Cost Estimator and Fire Protection.

Interested firms shall be required to respond to additional announcements separately from this announcement without further notice from the Government when posted to the Contract Opportunities website at https://sam.gov. The Contract Opportunities website is the only official site to obtain these documents. Additional information about this project will be issued on the System for Award Management website https://www.sam.gov/content/opportunities once available.

PROJECT INFORMATION

The Marion VA Medical Center is currently facing several infrastructure challenges related to its power distribution system. Specifically, there are eleven automatic transfer switches (ATS) that are critical for supplying emergency generator power to essential hospital functions. These ATS units are presently unsupported, which raises concerns about their reliability and the continuity of critical operations in the event of primary power failures. Therefore, it is imperative to replace these existing unsupported automatic transfer switches with modern, supported units to ensure the consistent and reliable delivery of emergency power to critical areas within the hospital.

Furthermore, the facility is experiencing issues with two aging transformers that provide electrical power to Building 13 and Building 43. These transformers have shown signs of deterioration and are at risk of failure, which could disrupt the operations and services housed within these buildings. Ensuring a stable and reliable power supply is imperative to maintain the functionality and safety of the Marion VA Medical Center.

As a result, addressing both the replacement of the unsupported automatic transfer switches and the failing transformers is critical to safeguarding the hospital's capability to deliver uninterrupted care and services to our veterans. Upgrading or replacing these components will require careful planning and resource allocation to mitigate any potential impact on the facility's daily operations.

EVALUATION FACTORS:

Selection criteria are in accordance with Federal Acquisition Regulation (FAR) Part 36.602-1 and VAAM 836.602-1. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as necessary. SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Each page cannot exceed 81/2 x 11 in size. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed fifty (50) pages. SF 330 must be submitted as a PDF and cannot exceed 10MB.

Qualifications (SF330) submitted by each firm for Project No. 657A5-5-107, “Relocate Endoscopy & Finish Upgrade Same Day Surgery” will be reviewed and evaluated based on the following evaluation criteria listed below:

Evaluation Criteria:

1. Professional Qualifications: the qualifications of the individuals will be examined for experience and education and their record of working together as a team that are necessary for satisfactory performance of required services. The architectural firm capable of preparing all design and construction documentation including, but not limited to advance planning, design, and construction oversite (including final as-built drawings) at the VA Medical Center in Marion, Illinois. A-E’s on staff representing the project or signing drawings in each discipline must be licensed to practice in one of the US States. Provide Professional License numbers and/or proof of licensure. The team shall have demonstrable expertise in their respective fields: Electrical Engineer, Fire Protection Engineer, Life Safety Engineer, and Cost Estimator with experience on projects of similar size and complexity.

2. Specialized Experience and Technical Competence: specific experience and technical skill in the type of work required for this project, including medical renovations to existing medical facilities, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials, VA safety and physical security design, experience in abatement of hazardous construction materials. Experience and qualification of personnel proposed for assignment and their record of working together as a team. The effectiveness of proposed project team (including management structure, coordination of disciplines, subcontractors, and prior working relationships) will be examined. The qualifications for Engineers shall include a summary of at least five similar projects that demonstrate technical capabilities and how well the proposal addresses technical capabilities in design quality management procedures, Computer-Aided Design and Drafting/Building Information Modeling, equipment resources, and laboratory requirements for the firm.

3. Capacity to Accomplish the Work: The prime contractor will be evaluated to determine if it has the general workload and staffing capacity within its design office which will be responsible for the design to accomplish the work in the required time. In accordance with VAAR 852.219-75 : In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. Prime contractor must include its certification of compliance with the limitations on subcontracting specified in 852.219-75 with its 330 submissions.

4. Past Performance: The past performance of projects that are complete (design and construction) that the firm has designed relevant in scope to the advertised project that were accomplished with the Department of Veterans Affairs, other Government agencies, and private industry in terms of cost control, quality of work, and compliance with performance schedules will be examined. Project past performances that are older than 5 years will receive a lesser rating than those references for projects accomplished within the past 5 years. Projects that are submitted and not constructed will not be considered.

5. Location of Design Firm: Knowledge of the locality of the project and the geographic proximity of each firm to the location of the VA Medical Center will be evaluated. This factor will apply to the office from which the prime contractor’s business office is established. Firms within 450 miles of the medical center will receive a more favorable rating than those more than 450 miles away. Firms may use Google Maps, MapQuest, Yahoo Maps, or Rand McNally to determine and report the distance of the office where the Prime Contractor is established. Prime contractors shall not use a subcontractor office, consultant office, or any office other than Prime Contractor’s physical location established prior to publication of this notice to determine distance to the Marion VA.

6. Reputation in A/E Community: Reputation and standing of the firm and its principal officers within the design community with respect to professional performance, general management and cooperativeness, including awards, merits and recommendations.

7. Claims and Terminations: Record of significant claims against the firm because of improper or incomplete architectural and engineering services.

8. The extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses (IAW VAAM M836.602-1).

9. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services (IAW VAAM M836.602-1).

852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction.

As prescribed in 819.7011(b), insert the following clause:

VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction (NOV 2022)

(a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that -

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: [Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.]

(i) X□ Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73 or VOSBs as set forth in 852.219-74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) □ General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73or VOSBs as set forth in 852.219-74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) □ Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73 or VOSBs as set forth in 852.219-74. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating section 1001 of title 18.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror's bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee:

Printed Title of Signee:

Signature:

Date:

Company Name and Address:

A.1 text goes here

Presolicitation Notice Presolicitation Notice

*=Required Field
Presolicitation Notice

Presolicitation Notice

SUPPLEMENT B (For Schematics, Design Development, Construction Documents, Construction Cost Estimate and Construction Period Services)

DESIGN TIMEFRAME: A/E shall deliver final construction documents No Later Than (NLT) 180 days after the Award/Notice to Proceed Letter.

CONSTRUCTION BUDGET/DESIGN LIMITATION: $ 2,041,200.00 The A/E will also be required to incorporate deductive alternate bid items into the construction documents that will allow for up to a 20% cost reduction.

B1 SCHEDULE OF SERVICES:

I. INTRODUCTION:

The mission of the Veterans Affairs Medical Center (VAMC) in Marion, Illinois is to provide the highest quality health care to our nation’s veterans. To accomplish this mission, Marion VAMC Engineering Service intends to partner with an A/E Firm to upgrade unsupported switch gear for generators and replace two failing transformers at the Marion VAMC Campus, 2401 West Main Street, Marion, IL 62959.

The A/E Firm must provide Basic Professional Services as delineated in the Scope of Work. As part of the Basic Professional Services, Marion VAMC Engineering Service expects the following primary A/E disciplines to be included: Supervisory, Electrical Engineers, Cost Estimator and Fire Protection.

II. SCOPE OF CONSTRUCTION PROJECT:

1. Existing Conditions: The Marion VA Medical Center is currently facing several infrastructure challenges related to its power distribution system. Specifically, there are eleven automatic transfer switches (ATS) that are critical for supplying emergency generator power to essential hospital functions. These ATS units are presently unsupported, which raises concerns about their reliability and the continuity of critical operations in the event of primary power failures. Therefore, it is imperative to replace these existing unsupported automatic transfer switches with modern, supported units to ensure the consistent and reliable delivery of emergency power to critical areas within the hospital.

Furthermore, the facility is experiencing issues with two aging transformers that provide electrical power to Building 13 and Building 43. These transformers have shown signs of deterioration and are at risk of failure, which could disrupt the operations and services housed within these buildings. Ensuring a stable and reliable power supply is imperative to maintain the functionality and safety of the Marion VA Medical Center.

As a result, addressing both the replacement of the unsupported automatic transfer switches and the failing transformers is critical to safeguarding the hospital's capability to deliver uninterrupted care and services to our veterans. Upgrading or replacing these components will require careful planning and resource allocation to mitigate any potential impact on the facility's daily operations.

2. Project Intent:

a. Survey/Site Investigation:

i. A survey/investigation shall be undertaken to fully assess site conditions and existing conditions of the proposed project area.

ii. Investigation into other potential system upgrades will occur concurrently. Upgrades could be driven by advances in technology, safety, energy savings or any other factors which would improve overall system performance within the limitations of the project intent.

iii. Investigation shall include documenting station utilities that may be affected during construction activity. These may be interior or exterior, above or below grade relative to the facility.

b. General Conditions:

i. The A/E shall investigate the impact of infection control and maintaining hospital mitigation of air quality requirements, vibration and noise pollution.

ii. The contractor will be responsible for field verification of existing utilities related to this project’s requirements. If any utilities are damaged during construction activity all mitigative repairs shall be the responsibility of the contractor.

iii. VA Engineering Service personnel will assist when site inspection procedures affect the operations of any of the building utility systems.

iv. All utilities are critical to facility operations. Any investigation or work impacting the facility or requiring a shutdown shall be scheduled twenty-one (21) days in advance with written notice. Work shall be performed at night and on weekends. The COR has the right to stop work after 8 hours of planned medical facility outages.

v. All proposed rework as well as the final, as-built conditions of the building shall be subject to comment, revision and approval by the Illinois State Historic Preservation Agency. All costs and labor incurred to achieve a design approved by the Historic Preservation Agency shall be the responsibility of the A/E.

vi. Design errors or omissions, which result in damage or additional cost to the Government will be evaluated for potential A/E liability. If the Government determines that the A/E is financially liable for a design deficiency, the Government will advise the A/E by official correspondence. The Department of Veterans Affairs actively pursues reimbursement of costs incurred by the Government as result of the A/E’s errors and/or negligent performance. The preferred method of settlement of A/E financial liability is for the A/E to negotiate directly with the Contractor and provide the result to the Department of Veterans Affairs for review and approval. Where the A/E cannot reach an agreement with the Construction Contractor or if the A/E declines to negotiate, The Department of Veterans Affairs will arrange settlement directly with the Contractor and will bill the A/E.

vii. All equipment and finishes to be included in the project design shall be in accordance with current Marion VAMC standards and existing maintenance contracts.

viii. The normal operating hours of this facility are 7 am to 4:30 pm, Monday through Friday, excluding recognized holidays. The construction documents shall require the contractor to reflect this in his proposed work schedule. Work outside the normal operating hours shall require prior authorization by the VAMC.

c. Demolition:

i. As determined during design, all existing materials removed during construction will be disposed of according to the direction of the construction documents and as directed by VA staff.

d. Industrial Hygiene:

i. Provide an abatement plan for any hazardous materials (asbestos, lead, etc.) which are known prior to or discovered during the investigation and construction phases.

e. Structural:

i. Determine capacity of existing building structure to accept the upgraded mechanical components proposed, if needed.

ii. If weaknesses or inability to accept the components are encountered, modifications to the structure to allow for the upgraded component would likewise be proposed as part of the project documents.

iii. Determine anchorage and bracing necessary to resist seismic loads for all material and components added by this project in accordance with the VA Structural Design Manual (PG-18-10).

f. Architectural:

i. The scope of architectural work shall include all work architectural work necessary to replace defined automatic transfer switches and transformers.

g. Mechanical:

i. The scope of mechanical work shall include updates to all existing mechanical systems that serve the proposed project area if required.

h. Electrical/IT/Telecom:

i. Provide construction period services for arc flash and protective device coordination. After new equipment selection, the A/E shall provide the aforementioned services in addition to typical design phase site investigation and construction phase site visits. Submit TCC’s to the COR for approval. Refer to the VA Electrical Design Manual (PG-18-10) section 1.10. Include VA Master Spec (PG-18-1) 26 05 73.

ii. Provide a design that coincides with the “Facility Master Plan” for future expansion and capacity. The infrastructure to support identified future loads shall not be constructed but planned in a manner that shows equipment and devices that support growth on plans.

i. Construction Phasing:

i. Construction contract will utilize critical path phasing as necessary to minimize interruption and disturbance to the building and its occupants.

ii. Phasing shall be determined through collaborative effort of both the A/E firm and the VAMC Engineering Service.

III. SCOPE OF WORK FOR A/E:

1. Design Development:

a. The A/E shall make investigations necessary to thoroughly evaluate the area. All designs shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, Program Guide PG-18-15, Volume C.

b. Upon completion of initial field survey and assessment, provide a comprehensive report of existing conditions and findings to Marion VAMC Engineering Service. Report will include initial cost estimate for all work included in the Upgrade Unsupported Switch Gear for Generators. This report will be considered the Design Narrative as referenced in ”B5 DESIGN REVIEW AND COMPLETION SCHEDULE” below.

c. Design shall comply with the most current version of the VA Physical Security & Resiliency Design Manual at time of award found on the VA technical Information Library:

https://www.cfm.va.gov/til/dManual.asp

d. General Statement: The A/E shall prepare plans and specifications for a construction contract to accomplish the following work:

I. Replace 11 unsupported Automatic transfer switches II. Replace Transformer supplying Building 43 with 480-volt transformer and additional 208-volt transformer.

III. Replace Transformer supplying building 13 with 480-volt transformers and additional 208-volt transformer.

IV. Design the Government’s Guiding Principles for Sustainable Federal Buildings standards with verification by a Professional Engineering stamp and completion of the Guiding Principles Checklist. Architect is responsible for verifying that the construction meets the Guiding Principles for Sustainable Federal Buildings.

V. Full commissioning by the VA Whole Building Commissioning Process Manual as applicable to this building is required. All associated costs and labor (Commissioning agent(s), inspections/witnessing, and documentation) shall be the responsibility of the Architect. Provide cost estimates associated with deduct alternates.

VI. Design multiple deductive bid alternates into the construction documents up to at least 20% of the total construction cost. The base design must be fully functional with or without the alternates. Provide an itemized cost estimate associated with each deduct alternate.

2. Construction Documents:

a. After the VAMC approves the A/E's conceptual design, the A/E shall prepare construction documents necessary to accomplish the approved conceptual design. These documents shall bear the seals and signatures of all licensed individuals responsible for the content of the construction documents. Application of the seals and signatures shall be considered verification that the design was conducted in accordance with all applicable code requirements, standards and best engineering practices.

b. As part of the 100% design submission, the A/E shall provide a written synopsis describing the overall scope of the construction project as well as any pertinent information about the project that would assist potential bidders in preparing a comprehensive bid package. This synopsis is intended to be a general description of the project not to exceed two written pages in length.

c. The final design documents from a resultant task order will be subject to review and approval (by signature) of all members of an Integrated Project Team (IPT) consisting of medical center personnel. These individuals will be identified by the COR at the first design review meeting.

3. Construction Period Service: The A/E shall perform construction period services as detailed later in this scope of work.

4. Functional Product:

a. It is important to emphasize that the A/E shall perform design development and detailed design work, and prepare detailed construction documents, keeping in mind that the end result is a completely functional and fully operational system.

b. VPIH Survey: The A/E Firm will complete a survey, to include testing, identifying any and all asbestos and lead containing materials within the project area. This project will remove all lead and asbestos in areas being renovated.

c. All spaces within the scope of work must be designed according to applicable codes and standards.

d. The A/E shall submit a design narrative (15%) and design plans (30%, 60%, 90%, 100% Contract Docs for Bidding, and Release for Construction Set) specifications, submittals schedule, estimates and other documentation in accordance with the “B4 DESIGN DELIVERABLES” section of this Supplement B. The construction work will be performed under a separate Firm-Fixed-Price contract awarded by the VA. As a result, the Construction Documents must conform to the estimated Total Construction Cost Price, not including any contingencies, and convey the entire construction work completely and clearly, such that any bidder can produce an accurate bid without surveying the work site.

e. The A/E will also participate in the Marion VAMC Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient safety, public safety, security controls for physical and logistical access, and environmental controls and limitations on vibrations, noise, and disruptions to operations and utilities. The results of these assessments will be included in documentation submitted by the A/E pursuant to, and inclusive of, the Construction Documents.

f. Prior to submittal of a response to this proposal the A/E shall meet with the Contracting Officer’s Representative (COR) at the proposed project site to review the scope of services and the project goals. The COR will provide A/E with a copy of the portions of the latest Facilities Condition Assessment (FCA) applicable to this project.

g. Overall site plans will be provided as a Reference Drawing with Buildings showing the areas within the project boundary.

h. The C&A requirements do not apply, and a Security Accreditation Package is not required.

5. Sustainability Requirements:

a. Design shall comply with the most current version of the VA Sustainable Design Manual at time of award found on the VA technical Information Library https://www.cfm.va.gov/til/sustain.asp

b. The following deviations are allowed: Not applicable.

c. GUIDING PRINCIPLES CHECKLIST: A/E shall complete and submit the appropriate Federal Energy Management Guiding Principles Checklist:

https://energy.gov/eere/femp/downloads/guiding-principles-checklists-new-construction-and-modernization-and-existing

IV. A/E FEE DETERMINATION:

The A/E is to present their fee proposal for evaluation and negotiation in the following format:

1. Submit completed Price Proposal on NCO 15 Form 10-6298. The spreadsheet is to have the work broken out in hours by position, by discipline and by design phase. Include a list of the number of drawings required for each design phase broken out by drawing type per discipline. Include a summary of the foregoing with the number of hours required for each drawing type and each major task. The spreadsheet will be used to facilitate review and comprehension of work effort and document fee. Include Part IV in cover letter and Part V (signed) as a separate attachment. Submit the electronic file of the spreadsheet upon request.

2. Include a letter of understanding with the price proposal that presents a detailed understanding of the Supplement B. The letter of understanding shall include an analysis of the fee included and excluded from 6% fee limitation as compared to the estimated Construction Budget.

3. Reproduction and delivery costs of Design Review Material and other direct costs, such as travel costs, are included in the costs for each design phase and are not reimbursable. The costs of Bidding reproduction, delivery and other direct costs in accordance with the “Milestone Submittal Requirements” are included in the CD Phase. Unused site visits will be deducted at the end of the contract.

4. Provide an outline of the Quality Assurance/Quality Control actions that your firm will take during the design process and construction period. Monthly QA/QC reports are required, including actions taken to maintain project quality, schedule and budget, and will be submitted with project invoices using the NCO 15 invoice format.

5. Correction of A/E’s Errors and Omissions, including required site visits to ascertain remedial action, is included in scope of services at no additional cost to the VA.

V. REPORTS, DRAWINGS, SPECIFICATIONS AND SCHEDULES:

1. Kick-Off Meeting:

a. An initial kickoff meeting will be held with the Contracting Officer and local staff. This meeting will be intended to provide an onsite familiarization with the project. The VA will provide workload data and as-built drawings.

b. A/E Design Submissions shall comply with the VA A/E Design Submission Requirements as found in the VA Technical Information Library (TIL). The VA will provide comments and guidance following each design review session. All meetings shall be held at Marion VAMC Campus, 2401 West Main Street, Marion, Illinois 62959.

2. Site Investigation:

a. The A/E firm shall conduct an onsite review of the existing locations of the various functions that will be affected to help understand the needs of the departments. They shall meet with the representatives of these departments to review and compare the VA design guides to the specific departmental needs. This will serve as an opportunity for the A/E to gain a further understanding of the direction the facility wants the project to go.

3. Schematic Design:

a. After meeting with the departments, the A/E shall prepare schematic layouts that will minimize effects to critical services.

b. At the Schematic Design Review Meeting, the A/E should be prepared to discuss the scope of the project, provide examples of shutdown times and durations during the construction. The A/E shall record the minutes of the meeting to document the thoughts and concerns of the facility.

4. Design Development:

a. The A/E firm shall make investigations necessary to thoroughly evaluate the conditions of the existing space. There will not be a systems redesign for this process. The design shall include any energy efficiency improvements available for the application. All designs shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, PG-18-15, Volume C.

b. Mechanical, plumbing, electrical, and fire and safety systems must meet current codes and standards, including VA Standards.

5. Construction Documents:

a. The A/E firm shall complete such further investigations to develop the accepted design development documents into working drawings and specifications for issuance through the competitive bid process.

b. The A/E firm shall provide a complete construction plan detailing all phases and sequencing of construction to minimize the impact on the facility.

c. In most instances, the VA Master Construction Specifications will be edited and incorporated in the project specifications. However, in those instances where corresponding VA Master Construction Specifications are not available, the A/E shall develop the specification for incorporation into the project specifications. It is required that the A/E design in accordance to VA guidelines as these guidelines supersede any other industry guidelines. It is important to note that all specification sections are to be thoroughly edited to maintain uniformity of formatting and structure. All spec writer notes must be remove.

d. Working drawings and specifications shall provide for construction within the National Fire Protection Association Code, VA Standards, and other applicable national codes.

e. The A/E firm shall provide a clause in the specifications indicating method by which a contractor will provide information to the firm to allow the firm to provide as-built drawings upon completion of construction.

6. As-Built Drawings:

a. The A/E firm shall submit one (1) complete set of drawings provided on disc using AutoCAD Release 2017 or later version and also .pdf format. Models should be provided in Revit 2017 or later. The A/E shall follow the VA Standard CAD format for layering in accordance with the “B3 DESIGN CRITERIA” section of this Supplement B.

b. The A/E firm shall submit said As-Built drawings within thirty (30) days of project acceptance.

7. Reproduction of Drawings and Specifications:

a. Shall be prepared in MS Word and drawings shall be prepared in AutoCad 2017 (or newer) and Revit and submitted to the VA in Revit formatted files in accordance with the “B4 DESIGN DELIVERABLES” section of this Supplement B.

b. The A/E is required to prepare architectural drawings in Revit. One DVD/CD-ROM computer disk containing all reports, specifications, documents and drawings will be required for each milestone submission. The final Construction Document submission shall include copies of the original digital files (in *.dwg and *.rvt) in addition to the .pdf format files. All necessary reports, cost estimates and other documents shall be prepared in accordance with all applicable portions of the A/E Submission Instructions, Program Guide PG-08-15, and Volume C. The VA reserves the right to require immediate delivery of the A/E’s digital files to the VA at any time.

c. Specifications should be provided in both hardcopy and electronic form.

d. One half size set of drawings and one set of specs shall be sent to the Contracting Officer at the 90% and 100% construction document review periods.

e. At the 90% and 100% construction document review periods, the specifications should have all revisions incorporated providing a “clean” set of specifications for review and approval.

VI. PROMOTION OF FULL AND OPEN COMPETITION:

1. A/E agrees to prepare specifications that are not competitively restrictive or proprietary. Specifications will be based on performance criteria when possible and will not use a product by a specific manufacturer, except as a basis of design.

2. If an occasion arises that use of a product by a specific manufacturer is necessary, the A/E will provide a justification including:

a. Why the particular manufacturer/product must be used or why a performance specification cannot be written (proprietary design, etc.).

b. The evaluation criteria of alternate manufacturer’s product that must be met to be considered equal. These evaluation criteria will be used to accept the alternate manufacturer’s product as equal to the specified product. These evaluation criteria shall be comprehensive to ensure an equal product is supplied meeting contract requirements.

c. In the event it is necessary to pre-qualify major components, the A/E will advise the Contracting Officer of such, so that the necessary action can be taken to establish a Qualified Products List.

d. In addition to requirements of these special provisions, a certification will be provided stating the specification solicitation is not restrictive; it has been written to provide full and open competition; and will list at least three manufacturers who can supply the specified major components or systems of the project.

VII. MISCELLANEOUS:

1. The existing drawings for campus within the limits of this project will be provided to the A/E consultant For Reference Only. As-Built and Record Drawings have been found to not show the actual location, quantity, etc., of all building features and should only be used as a general guide. The A/E shall verify the existing drawings to the extent necessary for completion of construction. Files in *.dwg or*.rvt format will be provided to the A/E if those files are available for distribution.

2. The VA COR will assist the A/E when site inspection procedures impact the functioning of any of the building utility systems, services or health care operations. Spaces with controlled access will require a member of the VA staff to continuously escort the A/E Consultant whilst accessing the space. As a result, the A/E must coordinate with Marion VAMC Engineering Service to identify where the A/E is intending to perform site visit surveys at least fourteen (14) days in advance of any site visit.

3. Some utility systems, services or health care operations are critical, and if a disruption is required, it must be executed outside of normal working hours. Normal working hours are Monday through Friday, 7:00 a.m. to 4:30 p.m. This schedule must be coordinated with the VA COR fourteen (14) days in advance.

4. The A/E is responsible for recording the minutes of all meetings with the VA. The format of the meeting minutes shall be subject to prior approval from the VA COR. The draft meeting minutes shall be distributed for review and comment within one working day following the meeting to the COR, who will in turn distribute the same to each invited VA-attendee as required. Meeting minutes are loaded to Submittal Exchange or equal web system. The VA shall have two working days upon receipt of the meeting draft documents to make any additional comments or corrections. The final meeting minutes shall be issued within three working days after the meeting to the VA CO and the COR.

5. Coordination of each submittal will be fully documented by the A/E. Using industry standard methods, the A/E will collect, document and resolve all comments and consolidate them into a usable format. The resolution of each comment requires the COR and commenter’s concurrence. For each design submittal, the A/E will conduct a comment review meeting where each comment received will be either:

a. Concurred as Written

b. Non-Concurred; Request Discussion

c. Requires Clarification

6. At the conclusion of the comment review meeting, the A/E will provide meeting minutes showing the status of each comment made. The resolution will be incorporated into the project documents (drawings, specifications, etc.) prior to the next submittal. Any comment resolutions not included in the project documents will be provided to the CO and COR with explanation as to why each was not included.

VIII. DESIGN FUNDING LIMITATION:

1. In accordance with FAR 52.236-22, Design within Funding Limitation (APR 1984), the estimated Total Construction Contract Price for this Project proceeding into CDs is not to exceed Construction budget listed above not including any Project Contingencies, VA Furnished/ Installed Medical Equipment, VA Furnished/Installed FFE or Professional Service Fees. The A/E is responsible for designing the Project within the estimated total Construction Contract Price for the Design Development and Construction Document phases of this Project. If, at any time, the A/E determines that the design’s construction cost (excluding contingencies) will exceed the Total Construction Contract Price (TCCP) the A/E shall immediately inform the Contracting Officer in writing. Such written notification shall include the reasons why the A/E believes the TCCP will probably be exceeded and shall offer proposed solutions to reduce the project cost to be within the TCCP.

2. Deductive alternates (acceptable to the VA) of 20% of the Total Construction Contract Price shall be included in the Contract Documents. These Deductive alternatives shall not be utilized to lower the estimated Total Construction Contract Price. The base design must be fully functional with or without selection of the alternates.

IX. PROBABLE CONSTRUCTION COST ESTIMATE:

1. The estimates shall be prepared using VA Form 10-6238, Estimate Worksheet and provide sufficient detail to identify the cost of project systems and components as appropriate for the stage of development of the design in the SD, DD and CD Phases. Update construction cost data with each submittal review milestone. Costs presented shall be broken down sufficiently to allow for direct comparison cost with the contractor’s proposed cost.

2. VA Form 10-6238, Estimate Worksheet: This form serves two purposes:

a. To show the division of cost between labor and material for each cost item; and

b. To extend the level of detail of an estimate beyond square foot cost summaries.

The estimated costs shall include all labor, materials, mobilization, overhead, insurance, and applicable contractor markup. A/E may utilize their estimate worksheets if approved in advance by the VA.

3. Electronic copy of estimate shall be provided with each submittal. Estimate detail shall include a breakdown by Project specification division number for labor and material broken out by quantity and unit cost for each type of material or equipment, including equipment rentals. General Division shall include costs associated with project duration. Include Summary of estimate by Division Number with each submittal.

4. Providing the estimates as "lump sum" or "allowance" figures in the Construction Documents will not be acceptable. For the Schematic estimate, a 15% total contingency allowance is allowable. For the Design Development estimate, a 10% total contingency allowance is allowable. Contingency allowances are not permitted in the final Construction Documents Estimate. Construction cost estimating shall correspond with the work shown in the drawings and be commensurate with the degree of detail shown in the drawings. Construction cost estimating shall also include all elements within the contractor’s bid; such as reasonable overhead and profit and fees across all tiers, insurance, taxes, bonds, hazardous abatement and any other such items. Costs will include itemization of the following:

a. Number of labor hours by trade (or crew1)

b. Labor dollars by trade (or crew1)

c. Material quantity

d. Material dollars

e. Equipment Rental and associated cost

f. Any other Direct cost not associated with work to be performed by a specific trade

1 When using a crew, instead of a trade, then use a crew code and include a schedule, or legend, of only the crew codes applied, showing each type of trade, each hourly rate, and each trade person quantity.

5. Some costs for General Conditions or General Requirements may also be required in the project estimate whenever these costs…