36C25526Q0178 0001.pdf
PDF 444 KB Posted
- Attached to
- H312--(MC)FIRE EXTINGUISHER SYSTEM INSPECTIONS & REPAIR STL(VA-26-00035827) 657-26-2-1537-0035
- Solicitation number
- 36C25526Q0178(0001)
About this file
This document is an Amendment No. 0001 to Solicitation 36C25526Q0178 issued by the Department of Veterans Affairs, Network Contracting Office (NCO) 15, Leavenworth, Kansas. The amendment is effective February 6, 2026, and provides answers to offeror questions and updates to the Performance Work Statement with revised photos of the Hood System at Hope Recovery Center. The quote submission deadline remains February 12, 2026, at 9:00 AM CST, with no extension granted. The Point of Contact is Contracting Officer Lisa A Buchanan (lisa.buchanan1@va.gov).
The underlying solicitation requests Fire Extinguisher Annual Inspection Services for the St. Louis Veterans Affairs Medical Center (STLVAHCS) and Community-Based Outpatient Clinics (CBOCs) at nine locations. The contractor must perform annual maintenance and inspection of approximately 900 portable fire extinguishers in January, including 6-year maintenance and hydrostatic testing per NFPA 10 standards, with certified technicians. Additional requirements include semi-annual exhaust hood inspection at Hope Recovery Center (a Pyrochem PCL-300 system) per NFPA 96 standards with 2 fusible links requiring replacement every 6 months. Deliverables include detailed inventory lists by location with serviceability status and completed service tickets. The contractor must provide spares/loaners during maintenance with original units returned within 60 days, provide new tags annually, service extinguishers in government vehicles, and complete final inventory within 30 days of completion. Work hours are Monday-Friday, 8:00 AM–4:30 PM, excluding federal holidays. The Q&A clarifies that kitchen hood service occurs every 6 months with full service and fusible link replacement; tagging occurs only during annual service; unscheduled maintenance (3-4 incidents annually) covers torn tags or recharged extinguishers; and swapping loaner extinguishers is acceptable if fire protection remains compliant per NFPA standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25526Q0178.pdf | ||
| PERFORMANCE WORK STATEMENT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 11
0001 02-06-2026
36C255
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
36C255
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
To all Offerors/Bidders
36C25526Q0178
X
X X
X one
Fire Extinguisher Annual Inspection Services for the St. Louis VAMC and COBC locations listed in the PWS.
The purpose of this amendment is to:
1. Provide answers to questions from offeors.
2. Update Performance Work Statement with updated photos of Hood System at Hope Recovery Center.
This amendment does not extend quote submission deadline. Quotes are due by 2/12/26 by 9:00amCST.
POC: Lisa A Buchanan/lisa.buchanan1@va.gov.
Buchanan, Lisa A Contracting Officer
CONTINUATION PAGE
QUESTIONS AND ANSWERS:
Please confirm number of kitchen hoods. The PWS lists only one kitchen hood at Hope Recovery Center. The attached pictures show two separate systems. The extinguisher list shows several K class extinguishers, which are used in kitchens, at both John Cochran and Jefferson Barracks. Wouldn’t that indicate the presence of kitchen hoods (likely multiple) at those locations too?
1 Hood located at Hope Recovery Center see revised photos below.
Can you provide the number of fusible links for each kitchen hood? (this is a line item on their pricing sheet). Are any of the hoods a type that require a cartridge to be replaced?
2 fusible links, no cartridge
Should kitchen hood inspections include a pipe blow out, cleaning or replacement of nozzle caps or o-rings?
Yes full 6 month service with assurance fusible links replaced
Can kitchen hoods be inspected in July and January to align with the extinguisher inspections?
Yes
There is mention of inspecting extinguishers located on some work vehicles. Will all these extinguishers be available for inspection at the locations listed during the annual service?
Yes, the vehicles are 5 police cars, 1 social worker, and 5 on various buses. When the schedule is prepared, I can notify those departments to turn over their extinguishers for inspection 2 days prior.
Where can we include a hazardous waste removal fee?
What Hazardous material is this regarding? A fee would need to be justified.
Is the replacement of any retired extinguishers included in the unscheduled maintenance line?
No, let us know if an extinguisher is beyond service life or unrepairable, we have spares in storage to replace or will purchase new as needed.
There is no way we can anticipate the unscheduled maintenance or number of service calls needed since we do not know the state of the systems/units. Are there some numbers they would like us to place on line items 0003AM, 0005, 1003AM, 1005, 2003AM, 2005, 3003AM, 3005, 4003AM and 4005?
This is if a new tag is needed if torn off, or is an extinguisher needs a recharge if discharged. Only occurs 3-4 times per year.
The SOW states: “Hang new tag for the current year on all bottles. Apply initials and date onto tag MM/YY on tag on month inspection is completed.” Does this requirement mean we need to quote for monthly fire extinguisher inspections, or is tagging only required during annual service?
Mark only the month that you are here.
9. Exhaust Hood Inspection We understand this task includes inspection and cleaning of the hood system. The Annual and Semi-Annual kitchen suppression system inspections appear to be separate requirements. Are we expected to quote for both the quarterly exhaust hood cleaning and the Annual/Semi-Annual kitchen suppression system IT&M? Service as usual every 6 months and fusible link replacement is required.
10. If so, since hood cleaning is typically performed quarterly per NFPA standards, should we include pricing for four (4) quarterly hood cleanings, in addition to the Annual and Semi-Annual suppression system inspections?
Service as usual every 6 months and fusible link replacement is required.
11. Spares/Loaners Requirement (Notes – Page 9) The notes state: “Spares/loaners to be provided if extinguishers are temporarily pulled for testing or maintenance.”
May we swap extinguishers with units we currently have available, leave replacements in place, and update the inventory sheet accordingly?
Yes, Please. Typically a vendor marks theirs with an “L” on the label and swaps when possible.
12. Or are we required to return the original units back to the location after testing/maintenance is completed?
Return originals and As long as an extinguisher is per NFPA available and there are no gaps in fire protection
B.2 PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
Fire Extinguisher Annual Inspection and Service
The contractor shall provide all resources necessary (labor, materials, and other items) to accomplish the tasks described in this PERFORMANCE WORK STATMENT (PWS), except as may otherwise be specified. The vendor must ensure all service technicians inspecting equipment included in the PWS at the St. Louis Veterans Affairs Health Care System (STLVAHCS) be in possession of the required certifications, In accordance with National Fire Prevention Association (NFPA) standards. Annual maintenance of portable fire extinguishers shall be performed in accordance with the manufacturers’ established operating standards applicable to NFPA 10 code requirements. Annual maintenance shall be performed in January, to include 6-year maintenance and/or hydrostatic testing.
Locations: (CBOC = Clinics)
1. John Cochran (JC) Division: 915 N Grand Blvd, St. Louis, MO 63106
2. Jefferson Barracks (JB) Division: #1 Jefferson Barracks Dr, St. Louis, MO 63125
3. Hope Recovery Center: 515 N Jefferson, St. Louis, MO 63103
4. St. Clair CBOC: 1190 Fortune Blvd, Shiloh, IL 62269
5. St. Charles CBOC: 844 Waterbury Falls Dr., O’Fallon, MO 63368
6. North County CBOC: 6854 Parker Rd, Florissant, MO 63033
7. Washington CBOC: 1627 A Roy Dr. Washington, MO 63090
8. Team #1 Primary Care Clinic: 4974 Manchester Ave, St. Louis MO 63110
9. Team #2 Primary Care Clinic: 2727 Washington Ave, St. Louis MO 63103
10. Additional Sites: Additional sites may be included during the performance period if several option years are created.
Period of Performance:
The contractor shall complete the work required under this PWS during January unless otherwise directed by the Contracting Officer (CO). Work at the Government sites shall not take place on Federal holidays or weekends unless directed by the CO.
Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables described below within the performance period January of each year.
1. Task One: Identify all portable fire extinguishers by VA inventory sheets, physical locations, Type of extinguisher and provide fire extinguisher data report to include serviceability and maintenance status. This data will be provided on an updated Excel sheet. This is to be accomplished during each January annual maintenance and inspection, as appropriate.
Deliverable One: Inventory List of portable fire extinguishers to include serviceability and maintenance status. This includes a separate inventory for each location, nine (9) locations at this time. These inventories can be generated by the vendor’s computer software, but must include: Separate Headers indication location (building, floor, room), Inspection date, inspection cycle, Class Type, Size, Manufacturer, Manufacture Year, Last Inspection, last Hydro Test, last 6th Year, Pass, Fail, Reason of failure such as required test or repair, and number tested with number failed. Vendor may place bar codes as needed for tracking. Previous Inventory information will be provided to vendor.
2. Task Two: Annual Maintenance and inspection of Portable Fire Extinguishers (approx. 900 total). Each individual fire extinguisher must have annual maintenance performed to include new tags. Leave previous recent year’s tag. A location inventory can/will be provided to vendor by the VASTLHCS OSH safety department. The annual maintenance shall include, at a minimum, the following items per NFPA requirements:
a. Location of each extinguisher in designated place (note on our inventory list which will be provided)
b. No obstruction to access or visibility were placed
c. Operating instructions on nameplate are legible and facing outward
d. Safety seals and tamper indicators are not broken or missing
e. Fullness determined by weighing or hefting
f. Examination for obvious physical damage, corrosion, leakage, or clogged nozzle
g. Pressure gauge reading or indicator in the operable range or position and tag replacement
h. While doing the inspection identify extinguishers that are due for 6 years and/or hydrostatic testing per NFPA 10 Standards.
i. Leave prior year tag in place on all bottles.
j. Hang new tag for the current year on all bottles “Apply initials and date onto tag MM/YY on tag on month inspection is completed”
k. Service all fire extinguishers in Government vehicles located in VHASTLMHC, all properties listed on provided inventory sheet.
l. Preform 6-year maintenance and/or hydrostatic testing as applicable.
3. Exhaust Hood Inspection: The contractor shall conduct the semi-annual (every 6 months) exhaust hood inspection in accordance with NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operation. The exhaust hood inspection shall be at the following location. The exhaust is a Pyrochem PCL-300 requires fuses every 6 months, not tied to buildings fire alarm. The fusible lines are temperature rating of 360°. The system is 15+ years old with 1 tank (3) gallons wall mounted.
- Jefferson Avenue VA Clinic (Hope Recover Center): 515 N. Jefferson Ave., St. Louis, MO 63103.
- The COR may add additional sites at any point during the performance period of the contract.
Deliverable Two: Upon completion of task two, the vendor’s service technician shall provide to the Safety Manager (or division Safety Specialists) a completed service ticket, which includes the following information:
a. Purchase order number
b. Number of fire extinguishers inspected, by location.
c. List of extinguishers due for service (i.e., 6-year maintenance, hydrostatic testing, etc.), this can be indicated on the inventory list.
Payment:
Vendor understands that purchase orders are to be submitted into the Tungsten web-based program and payment is submitted using appropriate purchase order number which will be provided by our contracting department.
Schedule for deliverables:
1. The contractor shall complete the Delivery for each deliverable specified per requirements and NFPA
2. Final inventory due 30 days after completion of annual inspection.
3. If for any reason any deliverable cannot be delivered within the scheduled time frame, the contractor is required to explain why in writing to the CO, including a firm commitment of when the work shall be completed.
This notice to the CO shall cite the reasons for the delay, and the impact on the overall project.
The CO will then review the facts and issue a response, in accordance with applicable regulations.
Notes:
1. Spares/loaners to be provided if extinguishers are temporarily pulled for testing or maintenance.
2. Property to be returned within 60 days of testing or maintenance.
3. Keys, campus maps and escorts can be provided to contractors upon request.
CONTRACT AWARD MEETING
The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kickoff meeting or has advised the contractor that a kickoff meeting is waived.
CONTRACT ADMINISTRATION DATA
a. CONTRACT ADMINISTRATION DATA.
All contract administration functions will be retained by the Department of Veterans Affairs. The Contracting Officer will be the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer will be authorized to make commitments or issue changes that affect price, or quality of performance of this contract. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered unauthorized and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
b. NON-PERSONAL SERVICES.
This is a non-personal services contract. Personnel rendering services under this contract are not subject either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the government and its employees. The Government shall not exercise any supervision or control over the contract service providers performing services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
c. HOURS OF OPERATIONS.
i. Business hours: Monday through Friday, 8:00 a.m. – 4:30 p.m.
ii. National Holidays: The holidays observed by the Federal Government are:
New Year’s Day;
Martin Luther King’s Birthday;
Presidents Day;
Memorial Day;
Juneteenth National Independence Day;
Independence Day;
Labor Day;
Columbus Day;
Veterans Day;
Thanksgiving;
Christmas; and Any other observed Federal holiday.
d. CONTRACT PERFORMANCE MONITORING.
The COR(s) and Subject Matter Experts (SMEs) may perform surveillance of services by any of the methods listed below:
i. Observing actual performance
ii. Inspecting the services to determine whether the performance meets the performance standards
iii. Review of any other appropriate records
iv. When unacceptable performance occurs, the POC shall inform the Contractor and the Contracting Officer. This will normally be in writing unless circumstances necessitate verbal communication. In any case, the POC shall document the discussion and place it in the POC file. When the POC determines that formal written communication is required, the POC shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor program manager. The Contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence.
The CDR will also state how long after receipt the Contractor must present this corrective action plan to the POC. The Government shall review the Contractor corrective action plan to determine acceptability. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the Contracting Officer.
v. Pursuant to VAAR Provision 852.270-1, Representatives of Contracting Officer representative(s); The Government shall periodically evaluate the Contractor performance by appointing a POC to monitor performance to ensure services are received. The Government representative(s) shall evaluate the Contractor performance through inspections of observations, inspection of services or any other form of documentation and all complaints from VA personnel. The Government may inspect as each task is completed or increase the number of quality assurance inspections if deemed appropriate because of repeated failures or because of repeated customer complaints. Likewise, the Government may decrease the number of quality assurance inspections if performance dictates. The Government Contracting Officer shall make final determination of the validity of customer complaint(s).
vi. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may require the
Contractor to take necessary action to ensure that future performance conforms to contract requirements at no additional cost to the Government.
vii. Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements at no additional cost to the Government.
B.2 PERFORMANCE WORK STATEMENT
File details come from the government source that posted it. Updated .