36C25525R0097.docx
DOCX document 18 KB Posted
- Attached to
- Z1DA--657-23-101JB FCA Replace Various Air Handling Units/Chillers Buildings 1, 24 and 51
- Solicitation number
- 36C25525R0097
About this file
This is a Presolicitation Notice for a Department of Veterans Affairs (VA) construction project at the Jefferson Barracks Division in St. Louis, Missouri. The solicitation (36C25525R0097) seeks a contractor to replace various mechanical systems in Buildings 1, 24, and 51, with a response deadline of June 4, 2025 at 10:00 AM Central Time. The project is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC) under NAICS code 238220 and product service code Z1DA.
The scope of work involves replacing obsolete air handling units, chillers, condensate pumps, exhaust fans, fan coil units, and related mechanical equipment that are currently rated D or F in facility condition assessments. Specific replacements include two 10-ton Trane AHUs in Building 1, a 20-ton AHU in Building 24, and approximately 130 fan coil units in Building 51. The project aims to improve infrastructure, reduce energy consumption, and enhance the patient environment, aligning with Executive Orders 13423 and 13514. The total project will address mechanical equipment that is 11-45 years past its useful life cycle, with the VA seeking to modernize critical infrastructure at the St. Louis VA Medical Center.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Presolicitation Notice Presolicitation Notice
| SUBJECT* |
| 657-23-101JB FCA Replace Various Air Handling Units/Chillers Buildings 1, 24 and 51 |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 66048 |
| SOLICITATION NUMBER* |
| 36C25525R0097 |
| RESPONSE DATE/TIME/ZONE |
| 06-04-2025 10:00 CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 30 DAYS AFTER THE RESPONSE DATE |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| Z1DA |
| NAICS CODE* |
| 238220 |
PLACE OF PERFORMANCE
St. Louis VAMC Jefferson Barracks
1 Jefferson Barracks Drive
St. Louis MO
| POSTAL CODE |
| 63125-4199 |
| COUNTRY |
| USA |
CONTACT INFORMATION
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
POINT OF CONTACT*
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
| AGENCY CONTACT’S EMAIL ADDRESS |
| Jennifer.Hill@va.gov |
EMAIL DESCRIPTION
DESCRIPTION
SUMMARY SCOPE OF WORK DESCRIPTION
Jefferson Barracks Division
PROJECT: 657-23-101JB
FCA Replace Various Air Handling Units/Chiller Buildings 1, 24, 51
(CONSTRUCTION)
SUMMARY SCOPE OF WORK:
1. The mission of the Veterans Affairs Saint Louis Health Care System (VASTLHCS) is to provide the highest quality health care to our nation’s veterans. In order to accomplish this mission, VASTLHCS’ Facility Engineering Service (FES) intends to partner with a Contractor on a project to Replace Various Air Handling Units/Chiller in Buildings 1, 24, & 51 at Jefferson Barracks (JB) Division, St. Louis, MO 63125. The renovation will address and correct poor Facility Condition Assessments (FCA’s).
2. The intent of this project is to correct various Mechanical Equipment rated at D or F at the Jefferson Barracks Division, in buildings 1, 24, and 51. This project will replace obsolete Air Handling Equipment, Ducts & Water Distribution Piping, Engineering Control System, Heating System Control Valves & Traps, Condensate Return Station, Fan Coil Units, and Ancillary Equipment which support buildings 1, 3, 24, and 51. The existing equipment is beyond its useful life cycle by approximately 11-45 years. The Facility Condition Assessment review identified the included mechanical equipment as being rated "D and F". By building and record number, the issues shown in attachment "657-23-101JB - FCA Report" will be addressed. Items listed below are priority items that need to be corrected. More items listed on the FCA Report will be included in the design. Replacement of this mechanical equipment will also allow VASTLHCS to reduce energy consumption and green-house gas emission pursuant to Executive Orders 13423 and 13514. Finally, approval of this project will provide improved patient Environment of Care regarding temperature and humidity control. We consider this to be critical infrastructure, fixing our usable/needed space, and therefore addresses one of the VHA Priorities for SCIP FY2023. The project includes, but is not limited to following scope:
a. Building 1:
i. (2) Trane Duplex AHUs serving 3rd Floor Offices & Corridors & (1) Trane Simplex AHU serving 3rd Floor (former Animal Research) need replacement due to failed compressor units. Each unit is approximately 10 tons.
ii. The Morgue Refrigeration Unit needs replacement.
iii. (1) 2 HP duplex condensate pump and (2) 5 HP duplex condensate pumps serving the building need to be replaced.
iv. Remove and replace Vertical R-22 AHU located in the Old Pharmacy Area in Building 1, West Wing, Ground Level Room GW04. AHU leaks refrigerant.
b. Building 24:
i. The 1999 air handling unit (AHU-01), serving the Canteen and Auditorium is in poor condition due to multiple chilled water and steam coil leaks. These coils have been cut and fused closed. This units need to be replaced. This unit provides approximately (20) tons of cooling.
ii. There is an old exhaust fan (1.5 HP) in the crawl space of the mechanical room that needs to be replaced.
c. Building 51:
i. AHU in B-105, serving the North side of the 1st Floor, is in poor condition and should be replaced.
ii. All of the FCU’s are reported to operate with hot water now, instead of steam. The 1st Floor FCU’s have been replaced, though the remaining FCU’s (approx. 130 units) need to be replaced. The 22 VAV boxes have hot water reheat coils that are in need of replacement.
iii. Both pumps are for hot water distribution. (1) pump has been replaced and is relatively new (good condition). (1) pump is old and is in need of replacement. Both pumps are 1 HP each.
iv. There are (2) steam to hot water converters that are in need of replacement, as they’re both at the end of their useful life. The VA recommends that these heat exchangers be replaced. 33 GPM @ 35' HX(2) Part# 5-260-08-072-002.
Replacement of this mechanical equipment will also allow VASTLHCS to reduce energy consumption and green-house gas emission pursuant to Executive Orders 13423 and 13514. Finally, approval of this project will provide improved patient Environment of Care regarding temperature and humidity control. We consider this to be critical infrastructure, fixing our usable/needed space, and therefore addresses one of the VHA Priorities for SCIP FY2023.
3. This is a summary scope of work, please see the specifications and drawings for the complete scope of work.
4. Project shall conform to all Records Management and Privacy Language policies.
| *=Required Field |
| Presolicitation Notice |
Presolicitation Notice
File details come from the government source that posted it. Updated .