S06 36C25525R0096 0001.docx
DOCX document 123 KB Posted
- Attached to
- 589A5-22-107 Renovate Post Anesthesia Care Unit
- Solicitation number
- 36C25525R0096
About this file
This document is an Amendment (SF 30) for Solicitation 36C25525R0096, issued by the Department of Veterans Affairs Network Contracting Office for a renovation project at the Topeka VA Medical Center. The project involves renovating the Post Anesthesia Care Unit (PACU), with specific details including removing and installing four headwalls, coordinating work in an active hospital environment, and managing construction activities with minimal disruption to medical staff and patients.
The amendment includes 14 questions and answers addressing critical project details such as material movement, elevator usage, utility shutdowns, fire alarm and security system ownership, and construction logistics. Key specifications include using Hospital Systems Inc (HSI) headwalls as the basis of design, working with an Infection Control Risk Assessment (ICRA) plan, and submitting proposals via hand delivery, FedEx, or UPS by the specified due date. The project requires careful coordination with VA medical personnel and adherence to specified technical and procedural requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
07-11-2025
589A5-22-107 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048 To all Offerors/Bidders
36C25525R0096 06-04-2025
X
The purpose of this amendment is to add Questions and Answers and Pre-Bid Attendance Roster.
See attached Pre-Bid Attendance Roster.
Cedric Graham Contracting Officer
589A5-22-107 Renovate PACU - Topeka VAMC - Q&A's
1. Is the contractor responsible for moving government property outside of the workspace? Only equipment in the workspaces identified in the plans.
2. Is the contractor allowed to utilize the elevators for moving construction materials? Contractor may us the Building 1 south elevator.
3. Will all offices and procedure rooms from the west of the workspace be occupied by the VA medical staff? Contractor will be working in an active hospital. Refer to the ICRA details, phasing plans, and specifications. There will be VA personnel/patients in different areas of the floor.
4. Will the VA provide a shutdown schedule for the plumbing work on the 2nd floor? Contractor will be providing a schedule in which should be the proper notice for wanting to shut down any utilities and it shall be coordinated with the VA COR.
5. Will ICRA contaminants be required on the 2nd floor procedure room and offices for the plumbing work on 1-PL-101? See plan sheet 1-GJ-100.
6. Will there be requirements for temporary heating or cooling in the project workspace? See Specs for temperature requirements.
7. Is there glycol in the chilled water system? No
8. Who owns the proprietary rights to the fire alarm system? Simplex per Specification Section 28 31 00.
9. Who owns the proprietary rights to the security system? Cam-Dex per Specification Section 28 13 00. Cahoon & Associates has the Station’s maintenance contract,
10. Is there sole source justification for headwalls? This is a basis of design, does not need to be sole sourced.
11. How many headwalls need to be removed and replaced? Existing 3 headwalls are to be removed and 4 new ones are being installed, as indicated on the drawings.
12. Is a hand delivered proposal required? No, options are hand delivered, FED EX, or UPS to address on the solicitation by the due date and time.
13. On drawing page 1 AE 401, Headwall Elevation 1: it calls out HSI Proxima.
I assume this will be room 326 Post Anesthesia Room/Recovery. What is the quantity of Headwalls for that room, or other rooms. Four (4) headwalls total for the whole project.
14. What would be the TOTAL Quantity Headwalls.
SPEC SECTION 10 25 16 – PAGE 548 Patient Bed Panel Service Walls Page 552 on the Specification page, 2.1: it calls out Headwall Manufacturer: Hospital Systems Inc (HSI). It does not list a substitute or an ALT. Is this a single source or will the VA except alternates?
This is the basis of design.
See attached document: PRE-BID Site Visit Attendance Roster 36C25525R0096.