589A7-24-408 Drawings- 100 percent bid dwgs.pdf

PDF 931 KB Posted

Attached to
Z2DA--Renovate Building 61 for VEO and Patient Benefits P/N:589A7-24-408
Solicitation number
36C25524R0036
Issued by

About this file

This document package includes 100 percent design drawings and specifications for Project No. 589A7-24-408 to renovate Building 61 at the Robert J Dole VA Medical Center in Wichita, Kansas for Veteran Experience Office and patient benefits spaces. The drawings show existing conditions, demolition plans, new layouts, and mechanical, electrical and security system details. Renovations will update approximately 6,000 square feet, including converting existing exam rooms and offices into a computer lab, director's offices and conference rooms. Work includes installing new walls, doors, flooring, lighting, HVAC equipment, and connecting security card readers to the C-Cure access control system. Bidders must verify existing conditions and include pre- and post-construction testing. The related solicitation is for contract 36C25524R0036 to complete the renovations, with the Department of Veterans Affairs Veterans Health Administration as the contracting agency.

View the file

Other files

File Type Posted
36C25524R0036_2.docx DOCX document
589A7-24-408 SPECS Rev A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT 589A7-24-408

RENOVATE BUILDING 61 FOR VEO AND

PATIENT BENEFITS

DESIGN DRAWINGS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Title

AutoCAD SHX Text Sheet of

AutoCAD SHX Text File No.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text Description

AutoCAD SHX Text Job Class

AutoCAD SHX Text Date

AutoCAD SHX Text

ROBERT J DOLE VAMC

AutoCAD SHX Text

ENGINEERING - FOR OFFICIAL USE ONLY (FOUO/CUI)

AutoCAD SHX Text 5500 E Kellogg Ave

AutoCAD SHX Text Wichita, KS 67218

AutoCAD SHX Text 589A7-24-408

AutoCAD SHX Text

BUILDING 61 1ST FLOOR

AutoCAD SHX Text Jarod Rutliff

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Sheet Index 100 COVER SHEET 101 EXISTING FLOOR PLAN & PROJECT LOCATION 102 NEW FLOOR PLAN DESIGN 103 GENERAL DEMOLITION PLAN 104 NEW HVAC DESIGN PLAN - INDOOR 105 REFLECTED CEILING PLAN 106 NEW ELEC/POWER/COMM/PHYS SEC PLAN 107 FIRE SAFETY PLAN

1-ELEV-N

AutoCAD SHX Text

DIRECTOR'S

AutoCAD SHX Text 126D

AutoCAD SHX Text

DIRECTOR'S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 126E

AutoCAD SHX Text

DIRECTOR'S

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

COMPUTER LAB

AutoCAD SHX Text 129A

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 129B

AutoCAD SHX Text

VETERAN'S

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

DIRECTOR'S

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text H+S

AutoCAD SHX Text H+S

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Title

AutoCAD SHX Text Sheet of

AutoCAD SHX Text File No.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text Description

AutoCAD SHX Text Job Class

AutoCAD SHX Text Date

AutoCAD SHX Text

ROBERT J DOLE VAMC

AutoCAD SHX Text

ENGINEERING - FOR OFFICIAL USE ONLY (FOUO/CUI)

AutoCAD SHX Text 5500 E Kellogg Ave

AutoCAD SHX Text Wichita, KS 67218

AutoCAD SHX Text 589A7-24-408

AutoCAD SHX Text

BUILDING 61 1ST FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING FLOOR PLAN & PROJECT LOCATION General Notes: 1. Primary project scope is limited to old VBA area circled in orange. It includes the following rooms & areas: Primary project scope is limited to old VBA area circled in orange. It includes the following rooms & areas: 1.1. Veteran's Service Area (129), Office (129B), Computer Lab (129A), Director's Conference Room's (126E and 127), and adjacent corridors. Veteran's Service Area (129), Office (129B), Computer Lab (129A), Director's Conference Room's (126E and 127), and adjacent corridors. 2. Although project scope does not include significant work in the EHRM data closet or neighboring spaces such as the Director's Suite, these areas will be made Although project scope does not include significant work in the EHRM data closet or neighboring spaces such as the Director's Suite, these areas will be made accessible on an as-needed bases to support the work of the project. Contractor must plan for access to these spaces in advance and coordinate with COR. 3. Contractor must field verify all existing conditions compared to the drawings and notify VA/COR of discrepancies immediately. This is applicable for all drawings. Contractor must field verify all existing conditions compared to the drawings and notify VA/COR of discrepancies immediately. This is applicable for all drawings. 4. Any needed patching, painting, and repair of finishes in the work area caused by construction fall on the responsibility of the contractor.Any needed patching, painting, and repair of finishes in the work area caused by construction fall on the responsibility of the contractor.

DIRECTORS

AutoCAD SHX Text 126G

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 129C

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 129D

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 129E

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 129F

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 129G

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 129H

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 129A

AutoCAD SHX Text E&E

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 126E

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

ROI

AutoCAD SHX Text 129B

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text Print

AutoCAD SHX Text Shred

AutoCAD SHX Text Print

AutoCAD SHX Text Shred

AutoCAD SHX Text Print

AutoCAD SHX Text Print

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 126H

AutoCAD SHX Text

CR

AutoCAD SHX Text

CR

NEW FLOOR PLAN DESIGN General Notes: 1. 36" solid core wooden door with PIV/badge reader access as shown on sheet 106. 36" solid core wooden door with PIV/badge reader access as shown on sheet 106. 2. 36" solid core wooden doors with keyed access for office spaces and conference room. 36" solid core wooden doors with keyed access for office spaces and conference room. 3. 3-5/8" 20ga studs with " gypsum board. 3-5/8" 20ga studs with " gypsum board. 58" gypsum board. 4. Plastic Laminate countertops at all service windows and windowsills Plastic Laminate countertops at all service windows and windowsills 5. Carpet Tile flooring and resilient wall base.Carpet Tile flooring and resilient wall base.

H+S

AutoCAD SHX Text H+S

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Title

AutoCAD SHX Text Sheet of

AutoCAD SHX Text File No.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text Description

AutoCAD SHX Text Job Class

AutoCAD SHX Text Date

AutoCAD SHX Text

ROBERT J DOLE VAMC

AutoCAD SHX Text

ENGINEERING - FOR OFFICIAL USE ONLY (FOUO/CUI)

AutoCAD SHX Text 5500 E Kellogg Ave

AutoCAD SHX Text Wichita, KS 67218

AutoCAD SHX Text 589A7-24-408

AutoCAD SHX Text

BUILDING 61 1ST FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL DEMOLITION PLAN General Notes: 1. Demo all existing carpet and flooring from existing space. Demo all existing carpet and flooring from existing space. 2. Completely remove the walls and doors marked orange. Completely remove the walls and doors marked orange. 3. Remove walls for door opening in locations marked pink Remove walls for door opening in locations marked pink 4. VA retains right of first refusal for any furniture or equipment left in the space. Please coordinate with COR for removal. VA retains right of first refusal for any furniture or equipment left in the space. Please coordinate with COR for removal. 5. Remove existing LED & fluorescent lamps, ballasts, and troffers. Remove existing LED & fluorescent lamps, ballasts, and troffers. 6. Remove existing power receptacles, data junction boxes, and switchesRemove existing power receptacles, data junction boxes, and switches

S 175

AutoCAD SHX Text S 175

AutoCAD SHX Text S 175

AutoCAD SHX Text S 175

AutoCAD SHX Text S 175

AutoCAD SHX Text S 175

AutoCAD SHX Text S 175

AutoCAD SHX Text S 175

AutoCAD SHX Text S 50

AutoCAD SHX Text S 50

AutoCAD SHX Text S 100

AutoCAD SHX Text S 100

AutoCAD SHX Text S 100

AutoCAD SHX Text S 100

AutoCAD SHX Text S 100

AutoCAD SHX Text S 100

AutoCAD SHX Text S 100

AutoCAD SHX Text S 100

AutoCAD SHX Text S 100

AutoCAD SHX Text S 125

AutoCAD SHX Text S 125

AutoCAD SHX Text S 125

AutoCAD SHX Text S 125

AutoCAD SHX Text S 150

AutoCAD SHX Text S 150

AutoCAD SHX Text S 150

AutoCAD SHX Text S 150

AutoCAD SHX Text S 150

AutoCAD SHX Text S 150

AutoCAD SHX Text R 525

AutoCAD SHX Text R 100

AutoCAD SHX Text R 350

AutoCAD SHX Text R 100

AutoCAD SHX Text R 350

AutoCAD SHX Text R 125

AutoCAD SHX Text R 125

AutoCAD SHX Text R 350

AutoCAD SHX Text R 450

AutoCAD SHX Text R 450

AutoCAD SHX Text R 450

AutoCAD SHX Text R 200

AutoCAD SHX Text R 100

AutoCAD SHX Text R 125

AutoCAD SHX Text R 150

AutoCAD SHX Text

VAV

AutoCAD SHX Text

VAV

AutoCAD SHX Text

VAV

AutoCAD SHX Text

VAV

AutoCAD SHX Text

EXISTVAV

AutoCAD SHX Text

EXIST. VAV

AutoCAD SHX Text R 125

AutoCAD SHX Text R 150

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Title

AutoCAD SHX Text Sheet of

AutoCAD SHX Text File No.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text Description

AutoCAD SHX Text Job Class

AutoCAD SHX Text Date

AutoCAD SHX Text

ROBERT J DOLE VAMC

AutoCAD SHX Text

ENGINEERING - FOR OFFICIAL USE ONLY (FOUO/CUI)

AutoCAD SHX Text 5500 E Kellogg Ave

AutoCAD SHX Text Wichita, KS 67218

AutoCAD SHX Text 589A7-24-408

AutoCAD SHX Text

BUILDING 61 1ST FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NEW HVAC DESIGN PLAN - INDOOR Mechanical General Notes 1. Install new supply terminal units, ductwork, temperature controlles, and diffusers as shown. Install new supply terminal units, ductwork, temperature controlles, and diffusers as shown. 2. Final locations for each temperature controller placement will be coordinated with the Wichita VA/COR. Final locations for each temperature controller placement will be coordinated with the Wichita VA/COR. 3. Install new return ductwork as shown and tie into existing return. Install new return ductwork as shown and tie into existing return. 4. Relocate existing ductwork, piping, electrical conduits, and cabling as necessary to accomplish final installation as shown. Relocate existing ductwork, piping, electrical conduits, and cabling as necessary to accomplish final installation as shown. 5. Coordinate routing of plumbing and HVAC piping with ductwork, lights, architectural ceiling and structural elements. Piping shall rise and drop, jog or offset as required to avoid conflicts. Coordinate routing of plumbing and HVAC piping with ductwork, lights, architectural ceiling and structural elements. Piping shall rise and drop, jog or offset as required to avoid conflicts. Ductwork shall take precedence over all piping except where grade must be maintained for drainage. 6. All supply, return, and exhaust branches to grilles, registers, and diffusers shall have a manual balance damper. All supply, return, and exhaust branches to grilles, registers, and diffusers shall have a manual balance damper. 7. All controls to tie into existing building control system and report back to head end unit in the boiler plant. All controls to tie into existing building control system and report back to head end unit in the boiler plant. 8. Any insulating material that needs to be removed or is damaged shall be replaced to match existing. Any insulating material that needs to be removed or is damaged shall be replaced to match existing. 9. Field verify all conditions and include both a pre and post-construction TAB of the HVAC system. Field verify all conditions and include both a pre and post-construction TAB of the HVAC system. 10. Equipment startup, verification of operational safeties, and tuning per manufacturer's specifications shall be completed by the contractor.Equipment startup, verification of operational safeties, and tuning per manufacturer's specifications shall be completed by the contractor.

Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Title

AutoCAD SHX Text Sheet of

AutoCAD SHX Text File No.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text Description

AutoCAD SHX Text Job Class

AutoCAD SHX Text Date

AutoCAD SHX Text

ROBERT J DOLE VAMC

AutoCAD SHX Text

ENGINEERING - FOR OFFICIAL USE ONLY (FOUO/CUI)

AutoCAD SHX Text 5500 E Kellogg Ave

AutoCAD SHX Text Wichita, KS 67218

AutoCAD SHX Text 589A7-24-408

AutoCAD SHX Text

BUILDING 61 1ST FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REFLECTED CEILING PLAN General Notes: 1. Install new 2'x4' LED troffers in the locations shown. Install new 2'x4' LED troffers in the locations shown. 2. Lights will be wired to respective switch locations shown on drawing 106. Lights will be wired to respective switch locations shown on drawing 106. 3. Supply/return/exhaust diffuser and grille locations shown for reference alongside general 2'x2' suspended ceiling plan. Supply/return/exhaust diffuser and grille locations shown for reference alongside general 2'x2' suspended ceiling plan. 4. Sprinkler locations shown for reference, see dwg sht 107 for more detail.Sprinkler locations shown for reference, see dwg sht 107 for more detail.

s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text

CR

AutoCAD SHX Text

CR

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Title

AutoCAD SHX Text Sheet of

AutoCAD SHX Text File No.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text Description

AutoCAD SHX Text Job Class

AutoCAD SHX Text Date

AutoCAD SHX Text

ROBERT J DOLE VAMC

AutoCAD SHX Text

ENGINEERING - FOR OFFICIAL USE ONLY (FOUO/CUI)

AutoCAD SHX Text 5500 E Kellogg Ave

AutoCAD SHX Text Wichita, KS 67218

AutoCAD SHX Text 589A7-24-408

AutoCAD SHX Text

BUILDING 61 1ST FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text NEW ELEC/POWER/COMM/PHYSICAL SECURITY General Notes: 1. Install NEMA 5-20R receptacles, light switches, and data receptacles in areas shown. Install NEMA 5-20R receptacles, light switches, and data receptacles in areas shown. 1.1. Occupancy sensor switches can be installed in main waiting room, offices, and conference room. Occupancy sensor switches can be installed in main waiting room, offices, and conference room. 1.2. General purpose on/off switches can be installed in all other locations. General purpose on/off switches can be installed in all other locations. 2. PIV card reader / badge scanner for restricted access to be installed and tied to access doors via electric strike in locations shown. PIV card reader / badge scanner for restricted access to be installed and tied to access doors via electric strike in locations shown. 2.1. Contractor to utilize C-Cure system with installation of card reader. Contractor will be responsible for all necessary licenses. Contractor to utilize C-Cure system with installation of card reader. Contractor will be responsible for all necessary licenses. 2.2. Coordinate with VA/COR for IP address needs and to verify whether iSTAR Ultra SE door panel & associated supply is available to connect to. If not, contractor will need to Coordinate with VA/COR for IP address needs and to verify whether iSTAR Ultra SE door panel & associated supply is available to connect to. If not, contractor will need to furnish and install necessary equipment in nearby electrical closet. 2.3. Contractor to install 8-port multimode fiber switch if existing infrastructure referenced in note 2.2 isn't available. Contractor to run CAT6a cable from new panel to tie into Contractor to install 8-port multimode fiber switch if existing infrastructure referenced in note 2.2 isn't available. Contractor to run CAT6a cable from new panel to tie into said switch. 3. Main hallway/corridor finishes to be made to match existing where modifications take place. This includes but is not limited to patching, drywall, paint, textured surface finishes, Main hallway/corridor finishes to be made to match existing where modifications take place. This includes but is not limited to patching, drywall, paint, textured surface finishes, stainless steel panels, ceiling tiles, and vinyl cove base. 3.1. At a minimum this will be required for new wall finishes where previous doors were located.At a minimum this will be required for new wall finishes where previous doors were located.

AutoCAD SHX Text

H+S

AutoCAD SHX Text H+S

AutoCAD SHX Text H+S

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

CR

AutoCAD SHX Text

CR

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Title

AutoCAD SHX Text Sheet of

AutoCAD SHX Text File No.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text Description

AutoCAD SHX Text Job Class

AutoCAD SHX Text Date

AutoCAD SHX Text

ROBERT J DOLE VAMC

AutoCAD SHX Text

ENGINEERING - FOR OFFICIAL USE ONLY (FOUO/CUI)

AutoCAD SHX Text 5500 E Kellogg Ave

AutoCAD SHX Text Wichita, KS 67218

AutoCAD SHX Text 589A7-24-408

AutoCAD SHX Text

BUILDING 61 1ST FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FIRE SAFETY PLAN 1. Fire alarm horn & strobe combo to be mounted in shown locations alongside pull box. All other locations to have strobe-only alarm installed. Fire alarm horn & strobe combo to be mounted in shown locations alongside pull box. All other locations to have strobe-only alarm installed. 2. Contractor shall field verify fire suppression coverage and provide shop drawings for review prior to install. Contractor shall field verify fire suppression coverage and provide shop drawings for review prior to install. 3. Existing sprinklers in the space are marked in their approximate locations on the drawing with green & red circles. Existing sprinklers in the space are marked in their approximate locations on the drawing with green & red circles. 3.1. Green indicates where the existing location should work with the new floor plan with minimal changes. Green indicates where the existing location should work with the new floor plan with minimal changes. 3.2. Red indicates where the existing location interferes with planned HVAC, new walls or new lighting plans. Red indicates where the existing location interferes with planned HVAC, new walls or new lighting plans. 3.3. Orange indicates the proposed locations for new or relocated sprinklers Orange indicates the proposed locations for new or relocated sprinklers 4. Sprinkler piping, heads, and escutcheons will need to be modified to service the same general locations they're currently in. This includes coordinating around light fixtures and HVAC Sprinkler piping, heads, and escutcheons will need to be modified to service the same general locations they're currently in. This includes coordinating around light fixtures and HVAC plans. 5. Other adjustments to be coordinated with the COROther adjustments to be coordinated with the COR

Sheets and Views
WI-61-01ARr1 - Draft Floor Plan - 100 Percent-100
WI-61-01ARr1 - Draft Floor Plan - 100 Percent-101
WI-61-01ARr1 - Draft Floor Plan - 100 Percent-102
WI-61-01ARr1 - Draft Floor Plan - 100 Percent-103
WI-61-01ARr1 - Draft Floor Plan - 100 Percent-104
WI-61-01ARr1 - Draft Floor Plan - 100 Percent-105
WI-61-01ARr1 - Draft Floor Plan - 100 Percent-106
WI-61-01ARr1 - Draft Floor Plan - 100 Percent-107

File details come from the government source that posted it. Updated .