ASBESTOS SURVEY1.pdf

PDF 11 MB Posted

Attached to
Z2DA--657A4-23-750, Demolish Buildings 3, 4 & 10 (VA-24-00016834)
Solicitation number
36C25524R0008
Issued by

About this file

This document outlines a federal contract opportunity for asbestos survey services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is soliciting bids for contract number 36C25524R0008 to demolish Buildings 3, 4, and 10 at VA-24-00016834. Bids are due under Solicitation Number Z2DA--657A4-23-750, which requires an asbestos survey of the three buildings prior to their demolition. The 11MB PDF file attached provides additional details on the scope of asbestos survey services needed and specifications contractors must meet to be awarded this contract. The opportunity closing date and planned award date are not specified.

View the file

Other files

File Type Posted
657A4-23-750 Pre-Bid Attendance.pdf PDF
IMG_0185.pdf PDF
IMG_0184.pdf PDF
25-09-A1.pdf PDF
IMG_0183.pdf PDF
25-09-s1.pdf PDF
25-09-A1 A.pdf PDF
25-09-A2.pdf PDF
657A4-23-750 Questions_RFIs.docx DOCX document
IMG_0181.pdf PDF
IMG_0182.pdf PDF
25-09-A3.pdf PDF
P09 Demo Bldgs 3-4-10 PB Final Construction Specs.pdf PDF
36C25524R0008_1.docx DOCX document
P09 Demo Bldgs 3-4-10 PB Final Construction Drawings.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Demolish Buildings 3, 4 & 10

Project Number: 657A4-23-750

John J. Pershing VA Medical Center 1500 N. Westwood Blvd.

Poplar Bluff, Mo. 63901

Design Narrative

5 August 2023

2707 Rand Road, Indianapolis, IN 46241 317 464 9090

Demolish Buildings 3, 4, 10 John J. Pershing VA Medical Center 1500 N. Westwood Blvd.

Poplar Bluff, Mo. 63901

VA Project No. 657A4-23-750

35% SCHEMATIC DESIGN SUBMITTAL NARRATIVE

Project Overview:

This project will result in demolishing three current buildings on the VA campus. This scope includes the disposal of hazardous materials (including but not limited to asbestos and lead-containing paint) from the buildings. There will be NO deductive alternates for this project.

Once abatement and the removal of hazardous materials have been completed, all designated buildings shall be demolished. Their existing foundation walls shall be demolished to a depth of 24" below the final finished grade as needed for new sitework.

PROJECT SCOPE BUILDINGS

Building Number

Year Built

Gross SF Status Number of Stories Construction Type

3 1947

(Basement = 2989, First Floor=3005)

Vacant Basement

& 1st

Concrete Foundation & Slab, Masonry Walls &

Wood Frame Roof

4 1947

(Basement = 3050, First Floor=3020) Vacant

Basement & 1st

Concrete Foundation & Slab, Masonry Walls &

Wood Frame Roof

10 1947 1022 Vacant Single Story Concrete Slab, Masonry

Walls & Wood Frame Roof

Construction Phasing:

The construction of the project will be completed in two phases. The abatement of the buildings will be a phase and then the building demolitions will be another phase.

Hazardous Material Abatement:

Testing and survey has been completed and the abatement report is attached with the 35% submittal.

Civil / Site:

All site amenities around the buildings will be removed, which include but are not limited to signage, concrete housekeeping pad, etc. Portions of the existing concrete sidewall, steps, ramps, and area wells shall be removed around the buildings. Designated vegetation (trees & bushes) shall be removed from the site.

All demolition activities shall be conducted with minimal disruption to the community. Dust will be controlled by wet demo methods. Water will be supplied by an on-site water supply/source. Noise will be controlled by working within the allowed hours of operations for the Medical Center. Normal working hours are 7am to 4pm M-F.

Underground utilities (e.g., electrical, water, steam lines, etc.) shall be removed around the perimeter of the building to the main line, where it will be cut and capped. Prior to demolition, disconnect all utility lines (including electrical, gas, water, and sewer) at / to construction limits and remove universal waste stream (i.e., light bulbs and ballast) from buildings. Any overhead power lines shall be de-energized or protected according to VA and utility procedures. Contractor shall give the VA a minimum of three (3) weeks written notice in advance of any need to shut off existing utility services or to affect equipment interruptions. The VA COR will set the exact time and duration for shutdown and will assist Contractor with shutdown. Work required to reestablish utility services shall be performed by the Contractor.

After building demolition is complete with the proper backfill and compaction of the original building footprint, each building site shall become a green space with the proper site drainage.

Exterior and Interior Renovations:

None.

Fire Protection:

None.

Plumbing:

Exposed domestic water piping, plumbing fixtures and sanitary piping will be demolished inside the building.

Mechanical:

Boiler, pump(s) and piping will be demolished inside of building. Prior to demolition, the AC units will be removed and Freon from these units will be collected by a licensed company. The collection of Freon will be documented, and a close-out report will be provided to the COR.

Electrical:

The Electrical scope for this project includes the removal of the services to Buildings 3, 4, and 10. Buildings 3 and 4 are fed from transformer T-4.

Transformer T-4 will be relocated as shown on VA project #657-403 for the construction of the new Outpatient Mental Health, RRTP Facility for Whole Health Integration. Relocating this transformer will also impact the Gas House, Property Line Lighting Circuits, Building 2, Building 5, and the feed to Building 1 thru Manhole MH-1.

All circuits will be modified as required for the relocated transformer.

The minor feed for building 10 will be removed back to the source.

Technology:

The Technology scope for this project includes disconnecting the services to Buildings 3 and 4. We understand there is no technology service to building 10.

Cabling will be removed back to the sources feeding the buildings. Provisions will be taken to ensure no disruption of services to other buildings will take place during the demolition and everything works in the remaining buildings after buildings 3 and 4 are demolished.

End of Narrative.

35% SCHEMATIC DESIGN SUBMISSION

ASBESTOS & HAZMAT MATERIALS SUMMARY

JOHN PERSHING VA MEDICAL CENTER – POPLAR BLUFF, MO

DEMOLISH BUILDINGS 3, 4, AND 10

Date: July 21, 2023

Items: Summary Results of Asbestos & HazMat, Site Visit, Visual Inspection, Lab Results

Site Visit: July 14, 2023

Inspectors: Brett Brumbaugh, Castle Hill Associates

Findings: Asbestos containing materials are present in the buildings

Universal Wastes are present in the buildings

Asbestos Materials Summary

Building 3

Asbestos Containing Material Locations Quantity

Pipe insulation on runs and fittings Basement, crawl space, and restroom pipe chase 1,030 lf

Aircell board inside boiler metal jacket Basement 80 sf

Transite sheets on exterior soffits Exterior soffits 140 sf

Textured hard plaster ceiling Front entry 60 sf 9” floor tile and black mastic (under carpet, linoleum, and kitchen cabinets

Kitchens, rear entry/porches, and stairwell landings 740 sf

Exterior door frame caulking Front entry doors 36 lf

Foundation tar coating Exterior foundation (below grade) 2,272 sf

Universal Waste Materials Summary

Hazardous Materials Locations Quantity Fluorescent tubes & CFL Bulbs First floor & basement 24 fixtures

35% SCHEMATIC DESIGN SUBMISSION

ASBESTOS & HAZMAT MATERIALS SUMMARY

JOHN PERSHING VA MEDICAL CENTER – POPLAR BLUFF, MO

DEMOLISH BUILDINGS 3, 4, AND 10

Building 4 restroom pipe chase 1,030 lf

Transite sheets on exterior soffits Exterior soffits 140 sf

Textured hard plaster ceiling Front entry 60 sf 9” floor tile and black mastic (under carpet, linoleum, and kitchen cabinets

Kitchens, rear entry/porches, and stairwell landings 740 sf

Exterior door frame caulking Front entry doors (2) 36 lf

Universal Waste Materials Summary

Fluorescent tubes & CFL Bulbs First floor & basement 24 fixtures

Building 10 (garage)

Transite sheets on exterior soffits Exterior soffits 140 sf

Exterior window frame caulking Wood windows (3) 48 lf

Exterior garage door frame caulking on brick Garage doors (4) 98 lf

JOHN PERSHING VA MEDICAL CENTER

ASBESTOS & HAZMAT SURVEY REPORT

DEMOLISH BUILDINGS 3, 4, & 10

ASBESTOS NESHAP & HAZMAT SURVEY REPORT

for

POPLAR BLUFF, MO

PROJECT:

DEMO OF BUILDINGS 3, 4, & 10

657A4-23-750

INSPECTION DATE:

JULY 14, 2023

ENVIRONMENTAL CONSULTANT:

CASTLE HILL ASSOCIATES, LLC

1197 FARNSWORTH RD., UNIT E

WATERVILLE, OH 43566

567-952-0212 www.CASTLEHILLASSOCIATES.com

TABLE OF CONTENTS

• ASBESTOS SAMPLING SUMMARY

• ABESTOS BULK SAMPLING DESCRIPTIONS AND LAB RESULTS

• ASBESTOS LABORATORY REPORT

• ASBESTOS LABORATORY CERTIFICATIONS

• INSPECTOR CERTIFICATIONS

APPENDIX A – PREVIOUS ASBESTOS INSPECTION REPORTS FOR BUILDINGS 3, 4, & 10

ASBESTOS INSPECTION SUMMARY

On July 14, 2023, Brett Brumbaugh of Castle Hill Associates performed an EPA NESHAP asbestos survey in Buildings 3, 4, & 10 prior to the demolition of the 3 buildings on the John Pershing VA Medical Center Campus in Poplar Bluff, MO. Bulk samples were collected of suspect asbestos containing materials that had not been previously sampled during previous asbestos surveys in the building. There were 17 bulk samples taken as part of this survey with the materials identified in the report included in this submission.

The asbestos bulk sampling conducted as part of this project was based upon the appearance, texture, and location of the suspect materials. All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by Eurofins Laboratory in Naperville, IL. Eurofins is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.

Prior to this sampling, Castle Hill was provided with previous sampling results conducted by the VA including the most recent asbestos survey completed in 2018 which is included in Appendix A.

Lead paint testing was conducted on all painted surfaces in the renovation areas using a Viken Detection Pb200i direct read XRF analyzer. Painted components that were tested in the areas are considered to be “lead-based” paint as defined by the US EPA (greater than 1.0 mg/cm2).

The inspection was conducted and the report was prepared by Brett Brumbaugh who is licensed by the State of Missouri as an Asbestos Inspector and is also an EPA Licensed Lead Risk Assessor. Mr. Brumbaugh has been conducting asbestos surveys and lead sampling since 1987, and is a registered environmental property assessor (REPA) and certified environmental and safety officer (CESCO) through the NREP (National Registry of Environmental Professionals)

Asbestos Materials Findings As a result of the bulk sampling conducted during this inspection and previous testing, the following asbestos containing materials were identified in the buildings:

Building 3 restroom pipe chase 1,030 lf

Aircell board inside boiler metal jacket Basement 80 sf Transite sheets on exterior soffits Exterior soffits 140 sf Textured hard plaster ceiling Front entry 60 sf 9” floor tile and black mastic (under carpet, linoleum, and kitchen cabinets

Kitchens, rear entry/porches, and stairwell landings 740 sf

Exterior door frame caulking Front entry doors 36 lf

Building 4 restroom pipe chase 1,030 lf

Transite sheets on exterior soffits Exterior soffits 140 sf Textured hard plaster ceiling Front entry 60 sf 9” floor tile and black mastic (under carpet, linoleum, and kitchen cabinets

Kitchens, rear entry/porches, and stairwell landings 740 sf

Exterior door frame caulking Front entry doors (2) 36 lf

Building 10 (garage)

Transite sheets on exterior soffits Exterior soffits 140 sf Exterior window frame caulking Wood windows (3) 48 lf Exterior garage door frame caulking on brick Garage doors (4) 98 lf

UNIVERSAL WASTES FINDINGS

As a result of this inspection, the following Universal Wastes were identified in the buildings:

Fluorescent tubes & CFL Bulbs First floor & basement 48 fixtures

COINLUSIONS/RECOMMENDATIONS

ASBESTOS: The asbestos containing materials identified in the buildings must be removed prior to demolition in accordance with VA, EPA, and State of Missouri regulations. All removal must be conducted by a Missouri licensed Asbestos Contractor with licensed workers.

UNIVERSAL WASTES: The identified Universal Wastes must be removed and disposed of prior to demolition. They must be handled, transported, and disposed/recycled in an EPA approved facility by persons with proper training in the handling of Universal Wastes.

Inspector Signature, Brett L. Brumbaugh, REPA, CESCO Licensed Missouri Asbestos Inspector License # 7136041420MOII21053

ASBESTOS SAMPLING PROTOCOL

The bulk samples were collected from locations that were selected to be representative of the building materials. Sampling was accomplished using the simplified sampling scheme referred in the AHERA regulations and found in the “Pink Book”. Locations of individual samples are referred on this report.

The samples were either collected with a coring tool designed for asbestos sampling or placed into a plastic bag for laboratory analysis. The samples were analyzed via polarized light microscopy with dispersion staining, using the “Interim method for the Determination of Asbestos in Bulk Insulation Samples” found in Appendix A to Subpart F in 40 CFR Part 763.

The regulations require specific numbers of samples be obtained per homogeneous area. For example, when sampling for joint compound or asbestos in hard plaster (sprayed-on or troweled-on surfacing materials) samples are to be taken based on the following increments: 0 to 1000 square feet of material, 3 samples are necessary. From 1001 to 5000 square feet, 5 samples are necessary, over 5000 square feet 7 samples are required. If during analysis any samples are found to contain asbestos, the entire homogeneous area is delineated as asbestos containing material. In the case of pipe insulation or other types of manufactured materials, the regulations require only enough samples to ascertain whether asbestos is present. In this case, the minimum number of samples to collect and analyze is usually three.

The sampling performed in this inspection followed these sampling guidelines.

ASBESTOS GLOSSARY OF TERMS

Friable asbestos material: means any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763 section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

Category I Non-friable Asbestos Containing Material (ACM) means asbestos containing packings, gaskets, resilient floor coverings, and asphalt roofing products containing more that 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, Section 1, Polarized Light Microscopy.

Category II Non-friable ACM means any material, excluding Category I non-friable ACM, containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

Regulated Asbestos Containing Material (RACM): means (a) Friable asbestos material, (b) Category I non-friable ACM that has become friable, (c) category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material expected in the course of demolition or renovation operations regulated by this subpart.

ASBESTOS BULK SAMPLE DESCRIPTIONS & RESULTS

Facility: John Pershing VA Medical Center – Poplar Bluff, MO Buildings: Buildings 3, 4, & 10 Sampling Date: July 14, 2023 Analysis Date: July 20, 2023 Laboratory: Eurofins – Naperville, IL Accreditation: NVLAP Asbestos Bulk Accredited Laboratory Sampler: Brett Brumbaugh - MO Asbestos Inspector # 7136041420MOII21053

SAMPLE

# MATERIAL DESCRIPTION SAMPLE LOCATION LABORATORY ANALYSIS

RESULT

1 Red asphalt shingles and tar paper Building 3 No Asbestos Detected 2 Red asphalt shingles and tar paper Building 3 No Asbestos Detected 3 Red asphalt shingles and tar paper Building 4 No Asbestos Detected 4 Red asphalt shingles and tar paper Building 4 No Asbestos Detected 5 Red asphalt shingles and tar paper Building 10 No Asbestos Detected 6 Red asphalt shingles and tar paper Building 10 No Asbestos Detected 7 Window frame caulking Building 10 4% Chrysotile Asbestos 8 Window frame caulking Building 10 4% Chrysotile Asbestos 9 Garage door caulking on brick Building 10 5% Chrysotile Asbestos

10 Foundation tar coating Building 3 3% Chrysotile Asbestos 11 Foundation tar coating Building 4 3% Chrysotile Asbestos 12 Aircell board inside boiler metal jacket Building 3 40% Chrysotile Asbestos 13 Transite board on soffit Building 3 20% Chrysotile Asbestos 14 9” green floor tile and black mastic Building 4 8% Chrysotile (tile)

3% Chrysotile (mastic) 15 9” green floor tile and black mastic Building 3 (E. kitchen) 8% Chrysotile (tile)

3% Chrysotile (mastic) 16 Tan mastic under wood flooring Building 3 – S.E. office No Asbestos Detected 17 Tan mastic under wood flooring Building 4 – S.E. office No Asbestos Detected

Notes:

• Asbestos containing materials are defined by containing greater than 1% asbestos.

• Previously tested Asbestos materials were not re-sampled as part of this project.

PHOTOGRAPHS OF ASBESTOS MATERIALS

Photo A-1 Pipe insulation on runs and fittings in basements of B3 & B4

Photo A-2 and fittings in basements of B3 & B4

Photo A-3 and fittings in crawl spce of B3

Photo A-4 and fittings in walkable crawl spce of B4

Photo A-5 and fittings in restroom pipe chases of B3 and

B4

Photo A-6

Aircell board inside boiler metal jacket in B3 basement

Photo A-7 Transite sheets on exterior soffits

Photo A-8

Photo A-9

Photo A-10

Plaster ceilings on entries of B3 and B4

Photo A-11 Exterior door frame caulking on B3 and B4

Photo A-12

Exterior window caulk on B10 (garage)

Photo A-13 Exterior garage door frame caulking on B10

Photo A-14

9” floor tile and black mastic

Photo A-15 mastic (under linoleum)

Photo A-16 mastic (under kitchen cabinets)

Photo A-17 Exterior foundation tar coating on Buldings 3 and

Photo A-18

Exterior foundation tar coating on Buldings 3 and

ASBESTOS LABORATORY REPORT

Approved by:

Cluster Leader Dr. Kamash Pillai

Report for:

Mr. Brett Brumbaugh, REPA Castle Hill Associates PO Box 283 Waterville, OH 43566

Regarding:

Eurofins EPK Built Environment Testing, LLC Project: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo

EML ID: 3322122

All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the samples as received and tested. The results include an inherent uncertainty of measurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data for sample results with >1% asbestos concentration can be provided when requested.

Eurofins EPK Built Environment Testing, LLC ("the Company"), a member of the Eurofins Built Environment Testing group of companies, shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the client's customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor.

Dates of Analysis:

Asbestos PLM: 07-18-2023

Service SOPs: Asbestos PLM (EPA 40CFR App E to Sub E of Part 763 & EPA METHOD 600/R-93-116, SOP EM-AS-S-1267) NVLAP Lab Code 600194-0

EMLab ID: 3322122, Page 1 of 6Eurofins EPK Built Environment Testing, LLC

Eurofins EPK Built Environment Testing, LLC 1815 West Diehl Road, Suite 800, Naperville, IL 60563

(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo

Date of Receipt: 07-18-2023 Date of Report: 07-21-2023

ASBESTOS PLM REPORT

Total Samples Submitted: 17 Total Samples Analyzed: 17

Total Samples with Layer Asbestos Content > 1%: 9

Location: 1, Red shingles and tar paper Lab ID-Version‡: 16138004-1

Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND

Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate

Location: 2, Red shingles and tar paper Lab ID-Version‡: 16138005-1

Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND

Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate

Location: 3, Red shingles and tar paper Lab ID-Version‡: 16138006-1

Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND

Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate

Location: 4, Red shingles and tar paper Lab ID-Version‡: 16138007-1

Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND

Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate

EMLab ID: 3322122, Page 2 of 6Eurofins EPK Built Environment Testing, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".

(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo

Date of Receipt: 07-18-2023 Date of Report: 07-21-2023

ASBESTOS PLM REPORT

Location: 5, Red shingles and tar paper Lab ID-Version‡: 16138008-1

Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND

Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate

EMLab ID: 3322122, Page 3 of 6Eurofins EPK Built Environment Testing, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo

Date of Receipt: 07-18-2023 Date of Report: 07-21-2023

ASBESTOS PLM REPORT

Location: 6, Red shingles and tar paper Lab ID-Version‡: 16138009-1

Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND

Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate

Location: 7, Window caulk Lab ID-Version‡: 16138010-1

Sample Layers Asbestos Content Gray Caulk 4% Chrysotile

Tan Adhesive ND Sample Composite Homogeneity: Moderate

Location: 8, Window caulk Lab ID-Version‡: 16138011-1

Sample Layers Asbestos Content Gray Caulk 4% Chrysotile

Tan Adhesive ND Sample Composite Homogeneity: Moderate

Location: 9, Garage door caulk Lab ID-Version‡: 16138012-1

Sample Layers Asbestos Content Light Gray Caulk 5% Chrysotile

Sample Composite Homogeneity: Moderate

EMLab ID: 3322122, Page 4 of 6Eurofins EPK Built Environment Testing, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo

Date of Receipt: 07-18-2023 Date of Report: 07-21-2023

ASBESTOS PLM REPORT

Location: 10, Foundation tar Lab ID-Version‡: 16138013-1

Sample Layers Asbestos Content Black Tar 3% Chrysotile

Sample Composite Homogeneity: Good

Location: 11, Foundation tar Lab ID-Version‡: 16138014-1

Sample Layers Asbestos Content Black Tar 3% Chrysotile

Sample Composite Homogeneity: Good

Location: 12, Aircell boiler insul Lab ID-Version‡: 16138015-1

Sample Layers Asbestos Content Gray Insulation 40% Chrysotile

Sample Composite Homogeneity: Moderate

Location: 13, Transite soffit Lab ID-Version‡: 16138016-1

Sample Layers Asbestos Content Gray Transite 20% Chrysotile Black Mastic 4% Chrysotile

Sample Composite Homogeneity: Moderate

EMLab ID: 3322122, Page 5 of 6Eurofins EPK Built Environment Testing, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo

Date of Receipt: 07-18-2023 Date of Report: 07-21-2023

ASBESTOS PLM REPORT

Location: 14, Transite soffit Lab ID-Version‡: 16138017-1

Sample Layers Asbestos Content Green Floor Tile 8% Chrysotile

Black Mastic 3% Chrysotile Sample Composite Homogeneity: Moderate

Location: 15, 9 green ft and linoleum Lab ID-Version‡: 16138018-1

Sample Layers Asbestos Content Green Floor Tile 8% Chrysotile

Black Mastic 3% Chrysotile Sample Composite Homogeneity: Moderate

Location: 16, Wood flooring mastic Lab ID-Version‡: 16138019-1

Sample Layers Asbestos Content Brown Mastic ND

Sample Composite Homogeneity: Moderate

Location: 17, Wood flooring mastic Lab ID-Version‡: 16138020-1

Sample Layers Asbestos Content Brown Mastic ND

Sample Composite Homogeneity: Moderate

EMLab ID: 3322122, Page 6 of 6Eurofins EPK Built Environment Testing, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

LABORATORY CERTIFICATIONS

DEMOLISH BUILDINGS 3, 4, & 10

INSPECTOR CERTIFICATIONS

APPENDIX A

PREVIOUS INSPECTION REPORT

1139 Olive Street, Suite 300 – Saint Louis, MO 63101 ph 314-436-9492 – fx 314-436-9733 RiverfrontEnvironmental.com

2018 ASBESTOS & LEAD INSPECTION REPORT

BUILDING 3

JOHN J. PERSHING V.A.M.C

1500 WESTWOOD BLVD

POPLAR BLUFF, MO. 63901

PREPARED FOR

VA Heartland Network 15

Department of Veterans Affairs 3450 S. 4th Street Trafficway Leavenworth, KS 66048-5055

RIVERFRONT PROJECT NO. SH1457

November 19, 2018

ENVIRONMENTAL, HEALTH AND

SAFETY CONSULTANTS

General Industrial Hygiene Exposure Assessment and Risk Management

Indoor Air Quality Investigations

Asbestos & Lead-Based Paint Inspection and Risk Management

Hazard Communication Programs

Hazardous Noise & Hearing Conservation Programs

OSHA Compliance Program Development

Phase I & II ESA— Due Diligence

Brownfields Redevelopment

Environmental Risk Assessment

Underground Storage Tank Management

Subsurface Investigation/Remediation

Remediation Oversight

CERCLA / RCRA

and more…

JOHN J. PERSHING V.A.M.C

POPLAR BLUFF, MISSOURI

2018 CAMPUS-WIDE ACM AND LBP INSPECTION

ACM HOMOGENOUS AREAS SUMMARY TABLE

Building 3- Basement Floor Flooring materials Surfacing Materials TSI Materials Miscellaneous

Materials

Basement None None

33: White TSI water pipe insulation (aircell) 34: White TSI water hanger/joint insulation 35: White TSI steam joint insulation 36: White TSI heater line insulation

17: Steam convector unit (heat shields presumed)

Building 3- 1st Floor Floor Flooring materials Surfacing Materials TSI Materials Miscellaneous

Materials

21: Green 9x9 floor tile w/black mastic (under

HMA4)

22: Tan 9x9 floor tile w/black mastic (under HMA5)

None None

17: Steam convector unit (heat shields presumed)

Building 3- Exterior Floor Flooring materials Surfacing Materials TSI Materials Miscellaneous

Materials

Exterior None None None

27: Brown exterior door caulking 31: White exterior plaster soffit (entry)

1994 Historical Asbestos Bulk Sampling Summary

Sample No.

HMA Number and Material Description

Location

Category

Asbestos Content

T-03A-BS-

2” steam pipe

Basement

Thermal 60% Chrysotile

T-03A·BS-

2” steam pipe Joint

Basement

Thermal 80% Chrysotile

1” steam pipe elbow Basement

Thermal 80% Chrysotile

T-03A-BS-

1” steam pipe

Thermal 60% Chrysotile

3/4” water pipe

Basement

Thermal 60% Chrysotile

T-03A-BS-

2” steam pipe elbow Basement

Thermal 80% Chrysotile

T-038-BS-

Heater valve control Basement

Thermal 40% Chrysotile

T-038-BS-

2” steam pipe

Basement

Thermal 60% Chrysotile

T-038-BS-

3/4” water pipe

Basement

Thermal 60% Chrysotile

T-038-BS-

2” steam pipe elbow Basement

Thermal 80% Chrysotile

T-038-BS-

1 1/2” heater line

Basement

Thermal 5% Chrysotile 40% Amosite

T-038-BS-

3/4” water line pipe hangar Basement

Thermal 80% Chrysotile

F-3-1-016 Kitchen floor Tile First Floor Linoleum None Detected

F-3-1-017 Hallway floor Tile First Floor Linoleum None Detected

F-3-1-018 Bedroom floor Tile First Floor Linoleum None Detected

F-3-1-019 Kitchen floor Tile First Floor Linoleum None Detected

F-3-1-020 Hallway floor Tile First Floor Linoleum 10% (M) Chrysotile

HMA Number and Material

S-3-1-021 Bedroom ceiling tile First Floor

Tile None Detected

S-3-1-022 Bedroom ceiling tile First Floor

Tile None Detected

S-3-1-023 Hallway closet ceiling First Floor

Plaster None Detected

S-3-1-024 Living room celling First Floor

Plaster None Detected

S-036-1-25 Closet ceiling First Floor Plaster None Detected

S-036-1-26 Bedroom closet wall First Floor

Plaster None Detected

S-036-1-27 Bedroom closet wall First Floor

Plaster None Detected

S-3-1-028 Hallway closet wall First Floor Plaster None Detected

S-3-1-029 Closet wall First Floor Plaster None Detected

M-3-1-030 Bedroom baseboard (Skirting) First Floor

Baseboard None Detected

M-3-1-031 Exterior caulking material First Floor

Caulk 20% Chrysotile

2018 Asbestos Bulk Sampling Summary

Sample No. HMA Number and

Material

4: Beige linoleum floor sheeting 1007

CAT 1 Non- Friable (FT/M) None detected

2018 Asbestos Bulk Sampling Summary

No. HMA Number and

Material

4: Beige linoleum floor sheeting 1007

CAT 1 Non- Friable (FT/M) None detected

4: Beige linoleum floor sheeting 1007

CAT 1 Non- Friable (FT/M) None detected

5: Beige 12x12 floor tile with tan streaks w/yellow glue 1003

CAT 1 Non- Friable (FT/M) None detected

6: Green ceramic floor tile 1005

CAT 1 Non- Friable (FT/M) None detected

7: Red 6x6 ceramic floor tile Entrance

CAT 1 Non- Friable (FT/M) None detected

8: White 1'x1' accoustical ceiling tile with wormholes (splined) 1006 Friable None detected

10: Brown interior window caulk 1003

CAT 1 Non- Friable (FT/M) None detected

10: Brown interior window caulk 1003

CAT 1 Non- Friable (FT/M) None detected

10: Brown interior window caulk 1003

CAT 1 Non- Friable (FT/M) None detected

11: Grey 4" covebase with tan mastic 1002A

CAT 1 Non- Friable (FT/M) None detected

11: Grey 4" covebase with tan mastic 1002A

CAT 1 Non- Friable

No. HMA Number and

Material

11: Grey 4" covebase with tan mastic 1002A

CAT 1 Non- Friable (FT/M) None detected

12: Brown 4" covebase with tan mastic 1007

CAT 1 Non- Friable (FT/M) None detected

12: Brown 4" covebase with tan mastic 1007

CAT 1 Non- Friable (FT/M) None detected

12: Brown 4" covebase with tan mastic 1007

CAT 1 Non- Friable (FT/M) None detected

18: Green 4x4 ceramic wall tile with white grout 1005

CAT 1 Non- Friable (FT/M) None detected

19: Yellow 4x4 ceramic wall tile with white grout 1007

CAT 1 Non- Friable (FT/M) None detected

20: Tan HVAC duct canvass 1004 Friable None detected

20: Tan HVAC duct canvass 1004 Friable None detected

20: Tan HVAC duct canvass 1004 Friable None detected

21: Green 9x9 floor tile w/black mastic

(under HMA4) 1007

CAT 1 Non- Friable (FT/M) 10% Chrysotile / 5% Chrysotile

21: Green 9x9 floor tile w/black mastic

(under HMA4) 1007

CAT 1 Non- Friable (FT/M) None detected

21: Green 9x9 floor tile w/black mastic

(under HMA4) 1007

CAT 1 Non- Friable (FT/M) None detected

22: Tan 9x9 floor tile w/black mastic

(under HMA5) 1003

CAT 1 Non- Friable (FT/M) 4% Chrysotile / 10% Chrysotile

No. HMA Number and

Material

22: Tan 9x9 floor tile w/black mastic

(under HMA5) 1003

CAT 1 Non- Friable (FT/M) None detected

22: Tan 9x9 floor tile w/black mastic

(under HMA5) 1003

CAT 1 Non- Friable (FT/M) None detected

23: Drywall w/joint compound 1008 Friable None detected

27: Brown exterior door caulking Exterior

CAT 1 Non- Friable (FT/M) 4% Chrysotile

27: Brown exterior door caulking Exterior

CAT 1 Non- Friable (FT/M) None detected

27: Brown exterior door caulking Exterior

CAT 1 Non- Friable (FT/M) None detected

28: Brown exterior window caulking Exterior

CAT 1 Non- Friable (FT/M) None detected

28: Brown exterior window caulking Exterior

CAT 1 Non- Friable (FT/M) None detected

28: Brown exterior window caulking Exterior

CAT 1 Non- Friable (FT/M) None detected

31: White exterior plaster soffit (entry) Exterior

CAT 2 Non- Friable

(transite) 10% Chrysotile

21: Green 9x9 floor tile w/black mastic

(under HMA4) 1007

CAT 1 Non- Friable (FT/M) 8% Chrysotile

10: Brown interior window caulk 1003

CAT 1 Non- Friable

No. HMA Number and

Material

4: Beige linoleum floor sheeting 1007

CAT 1 Non- Friable

1139 Olive Street, Suite 300 – Saint Louis, MO 63101 ph 314-436-9492 – fx 314-436-9733

BUILDING 4

JOHN J. PERSHING V.A.M.C

Department of Veterans Affairs

General Industrial Hygiene Exposure Assessment and Risk Management

Indoor Air Quality Investigations

Asbestos & Lead-Based Paint Inspection and Risk Management

Hazard Communication Programs

Hazardous Noise & Hearing Conservation Programs

OSHA Compliance Program Development

Phase I & II ESA— Due Diligence

Brownfields Redevelopment

Environmental Risk Assessment

Underground Storage Tank Management

Subsurface Investigation/Remediation

Remediation Oversight

CERCLA / RCRA

and more…

2018 CAMPUS-WIDE ACM AND LBP INSPECTION

ACM HOMOGENOUS AREAS SUMMARY TABLE

Building 4- Basement Floor Flooring materials Surfacing Materials TSI Materials Miscellaneous Materials

None

33: White TSI water pipe insulation (aircell) 34: White TSI water hanger/joint insulation 35: White TSI steam joint insulation 36: White TSI heater line insulation

17: Steam convector unit (heat shield presumed)

Building 4- 1st Floor

22: Tan 9x9 floor tile w/black mastic (under HMA4) 38: Gray 9x9 floor tile with black mastic 40: Green 9x9 floor tile w/black mastic 41: Tan/brown 9x9 floor tile w/black mastic

17: Steam convector unit (heat shield presumed)

Building 4- Exterior

Exterior None None None 27: Brown exterior door caulking

POPLAR BLUFF V.A.M.C.

JOHN J. PERSHING DIVISION

2018 ASBESTOS INSPECTION

CONDITION AND REMOVAL PRIORITY

TABLE FOR BUILDING 4

Area No.

Bldg

Floor

Material Description Yes/No

Restricted

Current Condition 1

Potential for

Disturbance 2 Removal

Priority 3

Rating Based On Rating Based On

Building 4 - Basement

HMA-17 Steam convector unit (heat shield presumed)

No Yes Good Intact Maintenance

HMA-33 White TSI water pipe insulation

Yes No Good Intact Maintenance

HMA-34 White TSI water hanger/joint insulation

Yes No Good Intact Maintenance

HMA-35 White TSI steam joint insulation

Yes No Good Intact Maintenance

HMA-36 White TSI heater line insulation

Yes No Good Intact Maintenance

Building 4 - 1st Floor

HMA-17 Steam convector unit (heat shield presumed)

No Yes Good Intact Maintenance

HMA-22 Tan 9x9 floor tile w/ black mastic (under HMA-4)

No Yes Good Intact Maintenance

HMA-38 Gray 9x9 floor tile w/ black mastic

No No Good Intact Maintenance

HMA-40 Green 9x9 floor tile w/ black mastic

No No Good Intact Maintenance

HMA-41 Tan/brown 9x9 floor tile w/ black mastic

No No Good Intact Maintenance

Building 4 - Exterior

HMA-27 Exterior door caulk - brown No No Good Intact Maintenance

No.

HMA Number and Material

T-4-BS-

2” steam pipe (crawl space) Basement

Thermal 80% Chrysotile

T-4-BS-

1/2” water pipe (crawl space) Basement

Thermal 20% Chrysotile

T-4-BS-

2” steam pipe Joint (crawl space) Basement

Thermal 80% Chrysotile

T-4-BS-

1/2” water line (crawl space) Basement

Thermal 2% Chrysotile

T-4-BS-

1” steam pipe elbow (crawl space) Basement

Thermal 80% Chrysotile

T-4-BS-

2: steam line patch material Basement

Thermal 40% Chrysotile

20% Amosite

T-4-BS-

2” steam pipe Joint

Basement Thermal

80% Chrysotile

T-4-BS-

2” steam pipe Joint Basement

Thermal 80% Chrysotile

T-4-BS-

1/2” water line Basement

Thermal 10% Chrysotile

T-4-BS-

1/2” water line elbow Basement

Thermal 80% Chrysotile

T-4-BS-

2” steam pipe Joint Basement

Thermal 80% Chrysotile

T-4-BS-

2” steam pipe Basement

Thermal 5% Chrysotile

S-4-BS-1 Closet wall (basement) First Floor

Plaster None detected

F-4·1·2 Floor tile from Personnel Mgmt.

Office First Floor

Linoleum 2% Chrysotile

F-4-1-3 Kitchen floor tile First Floor

Linoleum 15% Chrysotile

F-4-1-4 Kitchen floor tile

First Floor

Linoleum 15% (T) 5%(M) Chrysotile

S-4-1-5 Hallway closet celling First Floor

Plaster None detected

S-4-1-6 1004 closet wall First Floor

Plaster None detected

S-4-1-7 Hallway closet ceiling First Floor

Plaster None detected

S-4-1-8 1005 bathroom First Floor

Plaster None detected

F-4·1·9 Kitchen floor Ille First Floor

Linoleum None detected

No.

HMA Number and Material

F-4-1-10 Basement entry way tile First Floor

Linoleum 2% Chrysotile

S-4-1-11 Hallway closet wall First Floor

Plaster None detected

S-4-1-12 Entry way wall

First Floor

Plaster None detected

S-4-1·13 Bedroom wall First Floor

Plaster None detected

S-4-1-14 Bedroom celling Tile First Floor

Tile None detected

S-4-1-15 Hallway closet celling First Floor

Plaster None detected

2018 Asbestos Bulk Sampling Summary

Sample No.

HMA Number and Material

4: Beige linoleum floor sheeting 1003

CAT 1 Non- Friable (FT/M) None detected

4: Beige linoleum floor sheeting 1003

CAT 1 Non- Friable (FT/M) None detected

4: Beige linoleum floor sheeting 1003

CAT 1 Non- Friable (FT/M) None detected

5: Beige 12x12 floor tile with tan streaks w/yellow glue Entrance

CAT 1 Non- Friable (FT/M) None detected

5: Beige 12x12 floor tile with tan streaks w/yellow glue Entrance

CAT 1 Non- Friable (FT/M) None detected

5: Beige 12x12 floor tile with tan streaks w/yellow glue Entrance

CAT 1 Non- Friable (FT/M) None detected

6: Green ceramic floor tile Restroom

CAT 1 Non- Friable

No.

HMA Number and Material

8: White 1'x1' accoustical ceiling tile with divots and pinholes (splined) 1003 Friable None detected

8: White 1'x1' accoustical ceiling tile with divots and pinholes (splined) 1003 Friable None detected

10: Brown interior window caulk 1003

CAT 1 Non- Friable (FT/M) None detected

10: Brown interior window caulk 1003

CAT 1 Non- Friable (FT/M) None detected

10: Brown interior window caulk 1003

CAT 1 Non- Friable (FT/M) None detected

11: Grey 6" covebase with tan mastic 1008

CAT 1 Non- Friable (FT/M) None detected

11: Grey 6" covebase with tan mastic 1008

CAT 1 Non- Friable (FT/M) None detected

11: Grey 6" covebase with tan mastic 1008

CAT 1 Non- Friable (FT/M) None detected

12: Tan 6" covebase with tan mastic 1007

CAT 1 Non- Friable (FT/M) None detected

12: Tan 6" covebase with tan mastic 1007

CAT 1 Non- Friable (FT/M) None detected

12: Tan 6" covebase with tan mastic 1007

CAT 1 Non- Friable (FT/M) None detected

18: Green 4x4 ceramic wall tile with white grout Restroom

CAT 1 Non- Friable (FT/M) None detected

19: Yellow 4x4 ceramic wall tile with white grout 1007

CAT 1 Non- Friable (FT/M) None detected

20: Tan HVAC duct canvass Restroom Friable None detected

20: Tan HVAC duct canvass Restroom Friable None detected

20: Tan HVAC duct canvass Restroom Friable None detected

No.

HMA Number and Material

21: Blue 9x9 floor tile w/yellow mastic

(under HMA1) 1007

CAT 1 Non- Friable (FT/M) None detected

21: Blue 9x9 floor tile w/yellow mastic

(under HMA1) 1007

CAT 1 Non- Friable (FT/M) None detected

21: Blue 9x9 floor tile w/yellow mastic

(under HMA1) 1007

CAT 1 Non- Friable (FT/M) None detected

22: Tan 9x9 floor tile w/black mastic

(under HMA4) 1003

CAT 1 Non- Friable (FT/M) 4% Chrysotile / 5% Chrysotile

22: Tan 9x9 floor tile w/black mastic

(under HMA4) 1003

CAT 1 Non- Friable (FT/M) positive stop rule

22: Tan 9x9 floor tile w/black mastic

(under HMA4) 1003

CAT 1 Non- Friable (FT/M) positive stop rule

27: Brown exterior door caulking Exterior

CAT 1 Non- Friable (FT/M) 5% Chrysotile

27: Brown exterior door caulking Exterior

CAT 1 Non- Friable (FT/M) positive stop rule

27: Brown exterior door caulking Exterior

CAT 1 Non- Friable (FT/M) positive stop rule

28: Brown exterior window caulking Exterior

CAT 1 Non- Friable (FT/M) None detected

28: Brown exterior window caulking Exterior

CAT 1 Non- Friable (FT/M) None detected

28: Brown exterior window caulking Exterior

CAT 1 Non- Friable (FT/M) None detected

37: Gray 12x12 floor tile with gray and white marbled design w/yellow glue Exterior

CAT 1 Non- Friable (FT/M) None detected

37: Gray 12x12 floor tile with gray and white marbled design w/yellow glue Entrance

CAT 1 Non- Friable

No.

HMA Number and Material

37: Gray 12x12 floor tile with gray and white marbled design w/yellow glue Entrance

CAT 1 Non- Friable (FT/M) None detected

38: Gray 9x9 floor tile with black mastic 1007

CAT 1 Non- Friable (FT/M) 8% Chrysotile

38: Gray 9x9 floor tile with black mastic 1007

CAT 1 Non- Friable (FT/M) positive stop rule

38: Gray 9x9 floor tile with black mastic 1007

CAT 1 Non- Friable (FT/M) positive stop rule

23: Drywall w/joint compound 1001 Friable None detected

31: White exterior plaster soffit (entry) Exterior

CAT 2 Non- Friable

(transite) None detected

39: Dark tan linoleum sheet flooring w/paper backing 1007 Friable None detected

39: Dark tan linoleum sheet flooring w/paper backing 1007 Friable None detected

39: Dark tan linoleum sheet flooring w/paper backing 1007 Friable None detected

40: Green 9x9 floor tile w/black mastic 1007

CAT 1 Non- Friable (FT/M) 8% Chrysotile / 4% Chrysotile

40: Green 9x9 floor tile w/black mastic 1007

CAT 1 Non- Friable (FT/M) positive stop rule

40: Green 9x9 floor tile w/black mastic 1007

CAT 1 Non- Friable (FT/M) positive stop rule

41: Tan/brown 9x9 floor tile w/black mastic 1003

CAT 1 Non- Friable (FT/M) 7% Chrysotile

41: Tan/brown 9x9 floor tile w/black mastic 1003

CAT 1 Non- Friable (FT/M) positive stop rule

No.

HMA Number and Material

41: Tan/brown 9x9 floor tile w/black mastic 1003

CAT 1 Non- Friable (FT/M) positive stop rule

42: White 12x12 floor tile w/yellow glue 1003

CAT 1 Non- Friable (FT/M) None detected

5: Beige 12x12 floor tile with tan streaks w/yellow glue Entrance

CAT 1 Non- Friable (FT/M) None detected

22: Tan 9x9 floor tile w/black mastic

(under HMA4) 1003

CAT 1 Non- Friable (FT/M) 6% Chrysotile in both tile and mastic

39: Dark tan linoleum sheet flooring w/paper backing 1007 Friable None detected

1139 Olive Street, Suite 300 Saint Louis, MO 63101 ph 314-436-9492 fx 314-436-9733

BUILDING 10

Department of Veterans Affairs

General Industrial Hygiene Exposure Assessment and Risk Management

Indoor Air Quality Investigations

Asbestos & Lead-Based Paint Inspection and Risk Management

Hazard Communication Programs

Hazardous Noise & Hearing Conservation Programs

OSHA Compliance Program Development

Phase I & II ESA Due Diligence

Brownfields Redevelopment

Environmental Risk Assessment

Underground Storage Tank Management

Subsurface Investigation/Remediation

Remediation Oversight

CERCLA / RCRA

2018 CAMPUS-WIDE ACM AND LBP INSPECTION

ACM HOMOGENOUS AREAS SUMMARY TABLE

Building 10- 1st Floor

1 None None None

8: Interior Floor/Wall Caulk

Building 10- Exterior

Exterior None None None

4: Bay Door Caulk 5: Exterior Window Caulk

MANAGEMENT PLAN REMOVAL PRIORITY ASSESSMENT

CHARTS

Qualitative (Descriptive) Rankings for Current Condition of ACM

Qualitative Ranking Example Descriptions of Current Condition Good Surfacing material has no visible damage; covering on TSI is intact; miscellaneous materials are intact; no visible debris.

Fair Surfacing material has moderate but not extensive visible damage; covering on TSI is cut or torn, exposing small but not extensive amounts of insulation; miscellaneous materials have moderate but not extensive damage; moderate but not extensive amounts of visible debris

Poor Extensive damage to surfacing material; covering on TSI is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile is extensively damaged and underlying mastic exposed;

extensive amounts of dust and debris.

Note: Damage is considered “extensive” when the total area of distributed damage exceeds 10%, or 25% localized damage.

Qualitative Rankings for Potential for Disturbance of ACM Level of Potential Disturbance Frequency of Potential

Contact Influence of Vibration Potential for Air Erosion

HIGH

(potential for significant damage)

High Any Value Any Value Any Value High Any Value Any Value Any Value High

MODERATE

(potential for damage)

Moderate Moderate or Low Moderate or Low Moderate or Low Moderate Moderate or Low Moderate or Low Moderate or Low Moderate

LOW Low Low Low

Qualitative Rankings and Numerical Ratings for Removal Priority of ACM Hazard Rank/

Removal Priority

ACBM

Condition ACBM Disturbance

Potential Recommended Response Actions

1 Significantly Damaged

Any Evacuate or isolate area. Remove ACBM. O&M Required for all friable ACBM.

2 Damaged High Evacuate or isolate area. Remove, enclose, encapsulate or repair ACBM to correct. Reduce potential for disturbance. O&M Required for all friable ACBM.

3 Damaged Moderate Remove, enclose, encapsulate, or repair to correct damage. O&M Required for all friable ACBM.

4 Damaged Low Same as Category 3.

5 Good High Take steps to reduce potential for disturbance. O&M Required for all friable

ACBM.

6 Good Moderate O&M Required for all friable ACBM.

7 Good Low O&M Required for all friable ACBM, but measures need not be as extensive as

Category 6.

POPLAR BLUFF V.A.M.C.

JOHN J. PERSHING DIVISION

2018 ASBESTOS INSPECTION

CONDITION AND REMOVAL PRIORITY

TABLE FOR BUILDING 10

Area No.

Bldg

Floor

Material Description

Restricted

Current Condition 1

Potential for

Disturbance 2 Removal

Priority 3

Rating Based On Rating Based On

Building 10 - 1st Floor

HMA-8 Interior floor/wall caulk Yes No Fair Damaged Physical disturbance

Building 10 - Exterior

HMA-4 Exterior bay door caulk Yes No Poor Significantly Damaged

Mod Vibration

HMA-5 Exterior window caulk No No Good Intact Vibration

HMA Number and Material

No historical samples exist for this building

3: Drywall w/ Joint

Compound 1 Friable None detected

3: Drywall w/ Joint

Compound 1 Friable None detected

3: Drywall w/ Joint

Compound 1 Friable None detected

448 4: Bay Door Caulk Exterior Friable None detected

449 4: Bay Door Caulk Exterior Friable 3% Chrysotile

450 4: Bay Door Caulk Exterior Friable positive stop rule

5: Exterior Window

Caulk Exterior

CAT 1 Non- Friable (FT/M) 3% Chrysotile

5: Exterior Window

Caulk Exterior

CAT 1 Non- Friable (FT/M) positive stop rule

5: Exterior Window

Caulk Exterior

CAT 1 Non- Friable (FT/M) positive stop rule

6: Exterior Window Glazing Exterior

CAT 1 Non- Friable (FT/M) None detected

6: Exterior Window Glazing Exterior

CAT 1 Non- Friable (FT/M) None detected

6: Exterior Window

Glazing Exterior

CAT 1 Non- Friable (FT/M) None detected

8: Interior

Floor/Wall Caulk 1 Friable 10% Chrysotile

8: Interior Floor/Wall Caulk 1 Friable positive stop rule

8: Interior Floor/Wall Caulk 1 Friable positive stop rule

458A

8: Interior Floor/Wall Caulk 1 Friable None detected

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .