ASBESTOS SURVEY1.pdf
PDF 11 MB Posted
- Solicitation number
- 36C25524R0008
About this file
This document outlines a federal contract opportunity for asbestos survey services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is soliciting bids for contract number 36C25524R0008 to demolish Buildings 3, 4, and 10 at VA-24-00016834. Bids are due under Solicitation Number Z2DA--657A4-23-750, which requires an asbestos survey of the three buildings prior to their demolition. The 11MB PDF file attached provides additional details on the scope of asbestos survey services needed and specifications contractors must meet to be awarded this contract. The opportunity closing date and planned award date are not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 657A4-23-750 Pre-Bid Attendance.pdf | ||
| IMG_0185.pdf | ||
| IMG_0184.pdf | ||
| 25-09-A1.pdf | ||
| IMG_0183.pdf | ||
| 25-09-s1.pdf | ||
| 25-09-A1 A.pdf | ||
| 25-09-A2.pdf | ||
| 657A4-23-750 Questions_RFIs.docx | DOCX document | |
| IMG_0181.pdf | ||
| IMG_0182.pdf | ||
| 25-09-A3.pdf | ||
| P09 Demo Bldgs 3-4-10 PB Final Construction Specs.pdf | ||
| 36C25524R0008_1.docx | DOCX document | |
| P09 Demo Bldgs 3-4-10 PB Final Construction Drawings.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Demolish Buildings 3, 4 & 10
Project Number: 657A4-23-750
John J. Pershing VA Medical Center 1500 N. Westwood Blvd.
Poplar Bluff, Mo. 63901
Design Narrative
5 August 2023
2707 Rand Road, Indianapolis, IN 46241 317 464 9090
Demolish Buildings 3, 4, 10 John J. Pershing VA Medical Center 1500 N. Westwood Blvd.
Poplar Bluff, Mo. 63901
VA Project No. 657A4-23-750
35% SCHEMATIC DESIGN SUBMITTAL NARRATIVE
Project Overview:
This project will result in demolishing three current buildings on the VA campus. This scope includes the disposal of hazardous materials (including but not limited to asbestos and lead-containing paint) from the buildings. There will be NO deductive alternates for this project.
Once abatement and the removal of hazardous materials have been completed, all designated buildings shall be demolished. Their existing foundation walls shall be demolished to a depth of 24" below the final finished grade as needed for new sitework.
PROJECT SCOPE BUILDINGS
Building Number
Year Built
Gross SF Status Number of Stories Construction Type
3 1947
(Basement = 2989, First Floor=3005)
Vacant Basement
& 1st
Concrete Foundation & Slab, Masonry Walls &
Wood Frame Roof
4 1947
(Basement = 3050, First Floor=3020) Vacant
Basement & 1st
Concrete Foundation & Slab, Masonry Walls &
Wood Frame Roof
10 1947 1022 Vacant Single Story Concrete Slab, Masonry
Walls & Wood Frame Roof
Construction Phasing:
The construction of the project will be completed in two phases. The abatement of the buildings will be a phase and then the building demolitions will be another phase.
Hazardous Material Abatement:
Testing and survey has been completed and the abatement report is attached with the 35% submittal.
Civil / Site:
All site amenities around the buildings will be removed, which include but are not limited to signage, concrete housekeeping pad, etc. Portions of the existing concrete sidewall, steps, ramps, and area wells shall be removed around the buildings. Designated vegetation (trees & bushes) shall be removed from the site.
All demolition activities shall be conducted with minimal disruption to the community. Dust will be controlled by wet demo methods. Water will be supplied by an on-site water supply/source. Noise will be controlled by working within the allowed hours of operations for the Medical Center. Normal working hours are 7am to 4pm M-F.
Underground utilities (e.g., electrical, water, steam lines, etc.) shall be removed around the perimeter of the building to the main line, where it will be cut and capped. Prior to demolition, disconnect all utility lines (including electrical, gas, water, and sewer) at / to construction limits and remove universal waste stream (i.e., light bulbs and ballast) from buildings. Any overhead power lines shall be de-energized or protected according to VA and utility procedures. Contractor shall give the VA a minimum of three (3) weeks written notice in advance of any need to shut off existing utility services or to affect equipment interruptions. The VA COR will set the exact time and duration for shutdown and will assist Contractor with shutdown. Work required to reestablish utility services shall be performed by the Contractor.
After building demolition is complete with the proper backfill and compaction of the original building footprint, each building site shall become a green space with the proper site drainage.
Exterior and Interior Renovations:
None.
Fire Protection:
None.
Plumbing:
Exposed domestic water piping, plumbing fixtures and sanitary piping will be demolished inside the building.
Mechanical:
Boiler, pump(s) and piping will be demolished inside of building. Prior to demolition, the AC units will be removed and Freon from these units will be collected by a licensed company. The collection of Freon will be documented, and a close-out report will be provided to the COR.
Electrical:
The Electrical scope for this project includes the removal of the services to Buildings 3, 4, and 10. Buildings 3 and 4 are fed from transformer T-4.
Transformer T-4 will be relocated as shown on VA project #657-403 for the construction of the new Outpatient Mental Health, RRTP Facility for Whole Health Integration. Relocating this transformer will also impact the Gas House, Property Line Lighting Circuits, Building 2, Building 5, and the feed to Building 1 thru Manhole MH-1.
All circuits will be modified as required for the relocated transformer.
The minor feed for building 10 will be removed back to the source.
Technology:
The Technology scope for this project includes disconnecting the services to Buildings 3 and 4. We understand there is no technology service to building 10.
Cabling will be removed back to the sources feeding the buildings. Provisions will be taken to ensure no disruption of services to other buildings will take place during the demolition and everything works in the remaining buildings after buildings 3 and 4 are demolished.
End of Narrative.
35% SCHEMATIC DESIGN SUBMISSION
ASBESTOS & HAZMAT MATERIALS SUMMARY
JOHN PERSHING VA MEDICAL CENTER – POPLAR BLUFF, MO
DEMOLISH BUILDINGS 3, 4, AND 10
Date: July 21, 2023
Items: Summary Results of Asbestos & HazMat, Site Visit, Visual Inspection, Lab Results
Site Visit: July 14, 2023
Inspectors: Brett Brumbaugh, Castle Hill Associates
Findings: Asbestos containing materials are present in the buildings
Universal Wastes are present in the buildings
Asbestos Materials Summary
Building 3
Asbestos Containing Material Locations Quantity
Pipe insulation on runs and fittings Basement, crawl space, and restroom pipe chase 1,030 lf
Aircell board inside boiler metal jacket Basement 80 sf
Transite sheets on exterior soffits Exterior soffits 140 sf
Textured hard plaster ceiling Front entry 60 sf 9” floor tile and black mastic (under carpet, linoleum, and kitchen cabinets
Kitchens, rear entry/porches, and stairwell landings 740 sf
Exterior door frame caulking Front entry doors 36 lf
Foundation tar coating Exterior foundation (below grade) 2,272 sf
Universal Waste Materials Summary
Hazardous Materials Locations Quantity Fluorescent tubes & CFL Bulbs First floor & basement 24 fixtures
35% SCHEMATIC DESIGN SUBMISSION
ASBESTOS & HAZMAT MATERIALS SUMMARY
JOHN PERSHING VA MEDICAL CENTER – POPLAR BLUFF, MO
DEMOLISH BUILDINGS 3, 4, AND 10
Building 4 restroom pipe chase 1,030 lf
Transite sheets on exterior soffits Exterior soffits 140 sf
Textured hard plaster ceiling Front entry 60 sf 9” floor tile and black mastic (under carpet, linoleum, and kitchen cabinets
Kitchens, rear entry/porches, and stairwell landings 740 sf
Exterior door frame caulking Front entry doors (2) 36 lf
Universal Waste Materials Summary
Fluorescent tubes & CFL Bulbs First floor & basement 24 fixtures
Building 10 (garage)
Transite sheets on exterior soffits Exterior soffits 140 sf
Exterior window frame caulking Wood windows (3) 48 lf
Exterior garage door frame caulking on brick Garage doors (4) 98 lf
JOHN PERSHING VA MEDICAL CENTER
ASBESTOS & HAZMAT SURVEY REPORT
DEMOLISH BUILDINGS 3, 4, & 10
ASBESTOS NESHAP & HAZMAT SURVEY REPORT
for
POPLAR BLUFF, MO
PROJECT:
DEMO OF BUILDINGS 3, 4, & 10
657A4-23-750
INSPECTION DATE:
JULY 14, 2023
ENVIRONMENTAL CONSULTANT:
CASTLE HILL ASSOCIATES, LLC
1197 FARNSWORTH RD., UNIT E
WATERVILLE, OH 43566
567-952-0212 www.CASTLEHILLASSOCIATES.com
TABLE OF CONTENTS
• ASBESTOS SAMPLING SUMMARY
• ABESTOS BULK SAMPLING DESCRIPTIONS AND LAB RESULTS
• ASBESTOS LABORATORY REPORT
• ASBESTOS LABORATORY CERTIFICATIONS
• INSPECTOR CERTIFICATIONS
APPENDIX A – PREVIOUS ASBESTOS INSPECTION REPORTS FOR BUILDINGS 3, 4, & 10
ASBESTOS INSPECTION SUMMARY
On July 14, 2023, Brett Brumbaugh of Castle Hill Associates performed an EPA NESHAP asbestos survey in Buildings 3, 4, & 10 prior to the demolition of the 3 buildings on the John Pershing VA Medical Center Campus in Poplar Bluff, MO. Bulk samples were collected of suspect asbestos containing materials that had not been previously sampled during previous asbestos surveys in the building. There were 17 bulk samples taken as part of this survey with the materials identified in the report included in this submission.
The asbestos bulk sampling conducted as part of this project was based upon the appearance, texture, and location of the suspect materials. All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by Eurofins Laboratory in Naperville, IL. Eurofins is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
Prior to this sampling, Castle Hill was provided with previous sampling results conducted by the VA including the most recent asbestos survey completed in 2018 which is included in Appendix A.
Lead paint testing was conducted on all painted surfaces in the renovation areas using a Viken Detection Pb200i direct read XRF analyzer. Painted components that were tested in the areas are considered to be “lead-based” paint as defined by the US EPA (greater than 1.0 mg/cm2).
The inspection was conducted and the report was prepared by Brett Brumbaugh who is licensed by the State of Missouri as an Asbestos Inspector and is also an EPA Licensed Lead Risk Assessor. Mr. Brumbaugh has been conducting asbestos surveys and lead sampling since 1987, and is a registered environmental property assessor (REPA) and certified environmental and safety officer (CESCO) through the NREP (National Registry of Environmental Professionals)
Asbestos Materials Findings As a result of the bulk sampling conducted during this inspection and previous testing, the following asbestos containing materials were identified in the buildings:
Building 3 restroom pipe chase 1,030 lf
Aircell board inside boiler metal jacket Basement 80 sf Transite sheets on exterior soffits Exterior soffits 140 sf Textured hard plaster ceiling Front entry 60 sf 9” floor tile and black mastic (under carpet, linoleum, and kitchen cabinets
Kitchens, rear entry/porches, and stairwell landings 740 sf
Exterior door frame caulking Front entry doors 36 lf
Building 4 restroom pipe chase 1,030 lf
Transite sheets on exterior soffits Exterior soffits 140 sf Textured hard plaster ceiling Front entry 60 sf 9” floor tile and black mastic (under carpet, linoleum, and kitchen cabinets
Kitchens, rear entry/porches, and stairwell landings 740 sf
Exterior door frame caulking Front entry doors (2) 36 lf
Building 10 (garage)
Transite sheets on exterior soffits Exterior soffits 140 sf Exterior window frame caulking Wood windows (3) 48 lf Exterior garage door frame caulking on brick Garage doors (4) 98 lf
UNIVERSAL WASTES FINDINGS
As a result of this inspection, the following Universal Wastes were identified in the buildings:
Fluorescent tubes & CFL Bulbs First floor & basement 48 fixtures
COINLUSIONS/RECOMMENDATIONS
ASBESTOS: The asbestos containing materials identified in the buildings must be removed prior to demolition in accordance with VA, EPA, and State of Missouri regulations. All removal must be conducted by a Missouri licensed Asbestos Contractor with licensed workers.
UNIVERSAL WASTES: The identified Universal Wastes must be removed and disposed of prior to demolition. They must be handled, transported, and disposed/recycled in an EPA approved facility by persons with proper training in the handling of Universal Wastes.
Inspector Signature, Brett L. Brumbaugh, REPA, CESCO Licensed Missouri Asbestos Inspector License # 7136041420MOII21053
ASBESTOS SAMPLING PROTOCOL
The bulk samples were collected from locations that were selected to be representative of the building materials. Sampling was accomplished using the simplified sampling scheme referred in the AHERA regulations and found in the “Pink Book”. Locations of individual samples are referred on this report.
The samples were either collected with a coring tool designed for asbestos sampling or placed into a plastic bag for laboratory analysis. The samples were analyzed via polarized light microscopy with dispersion staining, using the “Interim method for the Determination of Asbestos in Bulk Insulation Samples” found in Appendix A to Subpart F in 40 CFR Part 763.
The regulations require specific numbers of samples be obtained per homogeneous area. For example, when sampling for joint compound or asbestos in hard plaster (sprayed-on or troweled-on surfacing materials) samples are to be taken based on the following increments: 0 to 1000 square feet of material, 3 samples are necessary. From 1001 to 5000 square feet, 5 samples are necessary, over 5000 square feet 7 samples are required. If during analysis any samples are found to contain asbestos, the entire homogeneous area is delineated as asbestos containing material. In the case of pipe insulation or other types of manufactured materials, the regulations require only enough samples to ascertain whether asbestos is present. In this case, the minimum number of samples to collect and analyze is usually three.
The sampling performed in this inspection followed these sampling guidelines.
ASBESTOS GLOSSARY OF TERMS
Friable asbestos material: means any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763 section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Category I Non-friable Asbestos Containing Material (ACM) means asbestos containing packings, gaskets, resilient floor coverings, and asphalt roofing products containing more that 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, Section 1, Polarized Light Microscopy.
Category II Non-friable ACM means any material, excluding Category I non-friable ACM, containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Regulated Asbestos Containing Material (RACM): means (a) Friable asbestos material, (b) Category I non-friable ACM that has become friable, (c) category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material expected in the course of demolition or renovation operations regulated by this subpart.
ASBESTOS BULK SAMPLE DESCRIPTIONS & RESULTS
Facility: John Pershing VA Medical Center – Poplar Bluff, MO Buildings: Buildings 3, 4, & 10 Sampling Date: July 14, 2023 Analysis Date: July 20, 2023 Laboratory: Eurofins – Naperville, IL Accreditation: NVLAP Asbestos Bulk Accredited Laboratory Sampler: Brett Brumbaugh - MO Asbestos Inspector # 7136041420MOII21053
SAMPLE
# MATERIAL DESCRIPTION SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
1 Red asphalt shingles and tar paper Building 3 No Asbestos Detected 2 Red asphalt shingles and tar paper Building 3 No Asbestos Detected 3 Red asphalt shingles and tar paper Building 4 No Asbestos Detected 4 Red asphalt shingles and tar paper Building 4 No Asbestos Detected 5 Red asphalt shingles and tar paper Building 10 No Asbestos Detected 6 Red asphalt shingles and tar paper Building 10 No Asbestos Detected 7 Window frame caulking Building 10 4% Chrysotile Asbestos 8 Window frame caulking Building 10 4% Chrysotile Asbestos 9 Garage door caulking on brick Building 10 5% Chrysotile Asbestos
10 Foundation tar coating Building 3 3% Chrysotile Asbestos 11 Foundation tar coating Building 4 3% Chrysotile Asbestos 12 Aircell board inside boiler metal jacket Building 3 40% Chrysotile Asbestos 13 Transite board on soffit Building 3 20% Chrysotile Asbestos 14 9” green floor tile and black mastic Building 4 8% Chrysotile (tile)
3% Chrysotile (mastic) 15 9” green floor tile and black mastic Building 3 (E. kitchen) 8% Chrysotile (tile)
3% Chrysotile (mastic) 16 Tan mastic under wood flooring Building 3 – S.E. office No Asbestos Detected 17 Tan mastic under wood flooring Building 4 – S.E. office No Asbestos Detected
Notes:
• Asbestos containing materials are defined by containing greater than 1% asbestos.
• Previously tested Asbestos materials were not re-sampled as part of this project.
PHOTOGRAPHS OF ASBESTOS MATERIALS
Photo A-1 Pipe insulation on runs and fittings in basements of B3 & B4
Photo A-2 and fittings in basements of B3 & B4
Photo A-3 and fittings in crawl spce of B3
Photo A-4 and fittings in walkable crawl spce of B4
Photo A-5 and fittings in restroom pipe chases of B3 and
B4
Photo A-6
Aircell board inside boiler metal jacket in B3 basement
Photo A-7 Transite sheets on exterior soffits
Photo A-8
Photo A-9
Photo A-10
Plaster ceilings on entries of B3 and B4
Photo A-11 Exterior door frame caulking on B3 and B4
Photo A-12
Exterior window caulk on B10 (garage)
Photo A-13 Exterior garage door frame caulking on B10
Photo A-14
9” floor tile and black mastic
Photo A-15 mastic (under linoleum)
Photo A-16 mastic (under kitchen cabinets)
Photo A-17 Exterior foundation tar coating on Buldings 3 and
Photo A-18
Exterior foundation tar coating on Buldings 3 and
ASBESTOS LABORATORY REPORT
Approved by:
Cluster Leader Dr. Kamash Pillai
Report for:
Mr. Brett Brumbaugh, REPA Castle Hill Associates PO Box 283 Waterville, OH 43566
Regarding:
Eurofins EPK Built Environment Testing, LLC Project: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo
EML ID: 3322122
All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the samples as received and tested. The results include an inherent uncertainty of measurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data for sample results with >1% asbestos concentration can be provided when requested.
Eurofins EPK Built Environment Testing, LLC ("the Company"), a member of the Eurofins Built Environment Testing group of companies, shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the client's customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor.
Dates of Analysis:
Asbestos PLM: 07-18-2023
Service SOPs: Asbestos PLM (EPA 40CFR App E to Sub E of Part 763 & EPA METHOD 600/R-93-116, SOP EM-AS-S-1267) NVLAP Lab Code 600194-0
EMLab ID: 3322122, Page 1 of 6Eurofins EPK Built Environment Testing, LLC
Eurofins EPK Built Environment Testing, LLC 1815 West Diehl Road, Suite 800, Naperville, IL 60563
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo
Date of Receipt: 07-18-2023 Date of Report: 07-21-2023
ASBESTOS PLM REPORT
Total Samples Submitted: 17 Total Samples Analyzed: 17
Total Samples with Layer Asbestos Content > 1%: 9
Location: 1, Red shingles and tar paper Lab ID-Version‡: 16138004-1
Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND
Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate
Location: 2, Red shingles and tar paper Lab ID-Version‡: 16138005-1
Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND
Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate
Location: 3, Red shingles and tar paper Lab ID-Version‡: 16138006-1
Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND
Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate
Location: 4, Red shingles and tar paper Lab ID-Version‡: 16138007-1
Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND
Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate
EMLab ID: 3322122, Page 2 of 6Eurofins EPK Built Environment Testing, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo
Date of Receipt: 07-18-2023 Date of Report: 07-21-2023
ASBESTOS PLM REPORT
Location: 5, Red shingles and tar paper Lab ID-Version‡: 16138008-1
Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND
Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate
EMLab ID: 3322122, Page 3 of 6Eurofins EPK Built Environment Testing, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo
Date of Receipt: 07-18-2023 Date of Report: 07-21-2023
ASBESTOS PLM REPORT
Location: 6, Red shingles and tar paper Lab ID-Version‡: 16138009-1
Sample Layers Asbestos Content Black Roofing Shingle with Red Pebbles ND
Black Roofing Tar and Felt ND Composite Non-Asbestos Content: 10% Glass Fibers Sample Composite Homogeneity: Moderate
Location: 7, Window caulk Lab ID-Version‡: 16138010-1
Sample Layers Asbestos Content Gray Caulk 4% Chrysotile
Tan Adhesive ND Sample Composite Homogeneity: Moderate
Location: 8, Window caulk Lab ID-Version‡: 16138011-1
Sample Layers Asbestos Content Gray Caulk 4% Chrysotile
Tan Adhesive ND Sample Composite Homogeneity: Moderate
Location: 9, Garage door caulk Lab ID-Version‡: 16138012-1
Sample Layers Asbestos Content Light Gray Caulk 5% Chrysotile
Sample Composite Homogeneity: Moderate
EMLab ID: 3322122, Page 4 of 6Eurofins EPK Built Environment Testing, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo
Date of Receipt: 07-18-2023 Date of Report: 07-21-2023
ASBESTOS PLM REPORT
Location: 10, Foundation tar Lab ID-Version‡: 16138013-1
Sample Layers Asbestos Content Black Tar 3% Chrysotile
Sample Composite Homogeneity: Good
Location: 11, Foundation tar Lab ID-Version‡: 16138014-1
Sample Layers Asbestos Content Black Tar 3% Chrysotile
Sample Composite Homogeneity: Good
Location: 12, Aircell boiler insul Lab ID-Version‡: 16138015-1
Sample Layers Asbestos Content Gray Insulation 40% Chrysotile
Sample Composite Homogeneity: Moderate
Location: 13, Transite soffit Lab ID-Version‡: 16138016-1
Sample Layers Asbestos Content Gray Transite 20% Chrysotile Black Mastic 4% Chrysotile
Sample Composite Homogeneity: Moderate
EMLab ID: 3322122, Page 5 of 6Eurofins EPK Built Environment Testing, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Poplar Bluff VAMC; Bldgs 3, 4, and 10 Demo
Date of Receipt: 07-18-2023 Date of Report: 07-21-2023
ASBESTOS PLM REPORT
Location: 14, Transite soffit Lab ID-Version‡: 16138017-1
Sample Layers Asbestos Content Green Floor Tile 8% Chrysotile
Black Mastic 3% Chrysotile Sample Composite Homogeneity: Moderate
Location: 15, 9 green ft and linoleum Lab ID-Version‡: 16138018-1
Sample Layers Asbestos Content Green Floor Tile 8% Chrysotile
Black Mastic 3% Chrysotile Sample Composite Homogeneity: Moderate
Location: 16, Wood flooring mastic Lab ID-Version‡: 16138019-1
Sample Layers Asbestos Content Brown Mastic ND
Sample Composite Homogeneity: Moderate
Location: 17, Wood flooring mastic Lab ID-Version‡: 16138020-1
Sample Layers Asbestos Content Brown Mastic ND
Sample Composite Homogeneity: Moderate
EMLab ID: 3322122, Page 6 of 6Eurofins EPK Built Environment Testing, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
LABORATORY CERTIFICATIONS
DEMOLISH BUILDINGS 3, 4, & 10
INSPECTOR CERTIFICATIONS
APPENDIX A
PREVIOUS INSPECTION REPORT
1139 Olive Street, Suite 300 – Saint Louis, MO 63101 ph 314-436-9492 – fx 314-436-9733 RiverfrontEnvironmental.com
2018 ASBESTOS & LEAD INSPECTION REPORT
BUILDING 3
JOHN J. PERSHING V.A.M.C
1500 WESTWOOD BLVD
POPLAR BLUFF, MO. 63901
PREPARED FOR
VA Heartland Network 15
Department of Veterans Affairs 3450 S. 4th Street Trafficway Leavenworth, KS 66048-5055
RIVERFRONT PROJECT NO. SH1457
November 19, 2018
ENVIRONMENTAL, HEALTH AND
SAFETY CONSULTANTS
General Industrial Hygiene Exposure Assessment and Risk Management
Indoor Air Quality Investigations
Asbestos & Lead-Based Paint Inspection and Risk Management
Hazard Communication Programs
Hazardous Noise & Hearing Conservation Programs
OSHA Compliance Program Development
Phase I & II ESA— Due Diligence
Brownfields Redevelopment
Environmental Risk Assessment
Underground Storage Tank Management
Subsurface Investigation/Remediation
Remediation Oversight
CERCLA / RCRA
and more…
JOHN J. PERSHING V.A.M.C
POPLAR BLUFF, MISSOURI
2018 CAMPUS-WIDE ACM AND LBP INSPECTION
ACM HOMOGENOUS AREAS SUMMARY TABLE
Building 3- Basement Floor Flooring materials Surfacing Materials TSI Materials Miscellaneous
Materials
Basement None None
33: White TSI water pipe insulation (aircell) 34: White TSI water hanger/joint insulation 35: White TSI steam joint insulation 36: White TSI heater line insulation
17: Steam convector unit (heat shields presumed)
Building 3- 1st Floor Floor Flooring materials Surfacing Materials TSI Materials Miscellaneous
Materials
21: Green 9x9 floor tile w/black mastic (under
HMA4)
22: Tan 9x9 floor tile w/black mastic (under HMA5)
None None
17: Steam convector unit (heat shields presumed)
Building 3- Exterior Floor Flooring materials Surfacing Materials TSI Materials Miscellaneous
Materials
Exterior None None None
27: Brown exterior door caulking 31: White exterior plaster soffit (entry)
1994 Historical Asbestos Bulk Sampling Summary
Sample No.
HMA Number and Material Description
Location
Category
Asbestos Content
T-03A-BS-
2” steam pipe
Basement
Thermal 60% Chrysotile
T-03A·BS-
2” steam pipe Joint
Basement
Thermal 80% Chrysotile
1” steam pipe elbow Basement
Thermal 80% Chrysotile
T-03A-BS-
1” steam pipe
Thermal 60% Chrysotile
3/4” water pipe
Basement
Thermal 60% Chrysotile
T-03A-BS-
2” steam pipe elbow Basement
Thermal 80% Chrysotile
T-038-BS-
Heater valve control Basement
Thermal 40% Chrysotile
T-038-BS-
2” steam pipe
Basement
Thermal 60% Chrysotile
T-038-BS-
3/4” water pipe
Basement
Thermal 60% Chrysotile
T-038-BS-
2” steam pipe elbow Basement
Thermal 80% Chrysotile
T-038-BS-
1 1/2” heater line
Basement
Thermal 5% Chrysotile 40% Amosite
T-038-BS-
3/4” water line pipe hangar Basement
Thermal 80% Chrysotile
F-3-1-016 Kitchen floor Tile First Floor Linoleum None Detected
F-3-1-017 Hallway floor Tile First Floor Linoleum None Detected
F-3-1-018 Bedroom floor Tile First Floor Linoleum None Detected
F-3-1-019 Kitchen floor Tile First Floor Linoleum None Detected
F-3-1-020 Hallway floor Tile First Floor Linoleum 10% (M) Chrysotile
HMA Number and Material
S-3-1-021 Bedroom ceiling tile First Floor
Tile None Detected
S-3-1-022 Bedroom ceiling tile First Floor
Tile None Detected
S-3-1-023 Hallway closet ceiling First Floor
Plaster None Detected
S-3-1-024 Living room celling First Floor
Plaster None Detected
S-036-1-25 Closet ceiling First Floor Plaster None Detected
S-036-1-26 Bedroom closet wall First Floor
Plaster None Detected
S-036-1-27 Bedroom closet wall First Floor
Plaster None Detected
S-3-1-028 Hallway closet wall First Floor Plaster None Detected
S-3-1-029 Closet wall First Floor Plaster None Detected
M-3-1-030 Bedroom baseboard (Skirting) First Floor
Baseboard None Detected
M-3-1-031 Exterior caulking material First Floor
Caulk 20% Chrysotile
2018 Asbestos Bulk Sampling Summary
Sample No. HMA Number and
Material
4: Beige linoleum floor sheeting 1007
CAT 1 Non- Friable (FT/M) None detected
2018 Asbestos Bulk Sampling Summary
No. HMA Number and
Material
4: Beige linoleum floor sheeting 1007
CAT 1 Non- Friable (FT/M) None detected
4: Beige linoleum floor sheeting 1007
CAT 1 Non- Friable (FT/M) None detected
5: Beige 12x12 floor tile with tan streaks w/yellow glue 1003
CAT 1 Non- Friable (FT/M) None detected
6: Green ceramic floor tile 1005
CAT 1 Non- Friable (FT/M) None detected
7: Red 6x6 ceramic floor tile Entrance
CAT 1 Non- Friable (FT/M) None detected
8: White 1'x1' accoustical ceiling tile with wormholes (splined) 1006 Friable None detected
10: Brown interior window caulk 1003
CAT 1 Non- Friable (FT/M) None detected
10: Brown interior window caulk 1003
CAT 1 Non- Friable (FT/M) None detected
10: Brown interior window caulk 1003
CAT 1 Non- Friable (FT/M) None detected
11: Grey 4" covebase with tan mastic 1002A
CAT 1 Non- Friable (FT/M) None detected
11: Grey 4" covebase with tan mastic 1002A
CAT 1 Non- Friable
No. HMA Number and
Material
11: Grey 4" covebase with tan mastic 1002A
CAT 1 Non- Friable (FT/M) None detected
12: Brown 4" covebase with tan mastic 1007
CAT 1 Non- Friable (FT/M) None detected
12: Brown 4" covebase with tan mastic 1007
CAT 1 Non- Friable (FT/M) None detected
12: Brown 4" covebase with tan mastic 1007
CAT 1 Non- Friable (FT/M) None detected
18: Green 4x4 ceramic wall tile with white grout 1005
CAT 1 Non- Friable (FT/M) None detected
19: Yellow 4x4 ceramic wall tile with white grout 1007
CAT 1 Non- Friable (FT/M) None detected
20: Tan HVAC duct canvass 1004 Friable None detected
20: Tan HVAC duct canvass 1004 Friable None detected
20: Tan HVAC duct canvass 1004 Friable None detected
21: Green 9x9 floor tile w/black mastic
(under HMA4) 1007
CAT 1 Non- Friable (FT/M) 10% Chrysotile / 5% Chrysotile
21: Green 9x9 floor tile w/black mastic
(under HMA4) 1007
CAT 1 Non- Friable (FT/M) None detected
21: Green 9x9 floor tile w/black mastic
(under HMA4) 1007
CAT 1 Non- Friable (FT/M) None detected
22: Tan 9x9 floor tile w/black mastic
(under HMA5) 1003
CAT 1 Non- Friable (FT/M) 4% Chrysotile / 10% Chrysotile
No. HMA Number and
Material
22: Tan 9x9 floor tile w/black mastic
(under HMA5) 1003
CAT 1 Non- Friable (FT/M) None detected
22: Tan 9x9 floor tile w/black mastic
(under HMA5) 1003
CAT 1 Non- Friable (FT/M) None detected
23: Drywall w/joint compound 1008 Friable None detected
27: Brown exterior door caulking Exterior
CAT 1 Non- Friable (FT/M) 4% Chrysotile
27: Brown exterior door caulking Exterior
CAT 1 Non- Friable (FT/M) None detected
27: Brown exterior door caulking Exterior
CAT 1 Non- Friable (FT/M) None detected
28: Brown exterior window caulking Exterior
CAT 1 Non- Friable (FT/M) None detected
28: Brown exterior window caulking Exterior
CAT 1 Non- Friable (FT/M) None detected
28: Brown exterior window caulking Exterior
CAT 1 Non- Friable (FT/M) None detected
31: White exterior plaster soffit (entry) Exterior
CAT 2 Non- Friable
(transite) 10% Chrysotile
21: Green 9x9 floor tile w/black mastic
(under HMA4) 1007
CAT 1 Non- Friable (FT/M) 8% Chrysotile
10: Brown interior window caulk 1003
CAT 1 Non- Friable
No. HMA Number and
Material
4: Beige linoleum floor sheeting 1007
CAT 1 Non- Friable
1139 Olive Street, Suite 300 – Saint Louis, MO 63101 ph 314-436-9492 – fx 314-436-9733
BUILDING 4
JOHN J. PERSHING V.A.M.C
Department of Veterans Affairs
General Industrial Hygiene Exposure Assessment and Risk Management
Indoor Air Quality Investigations
Asbestos & Lead-Based Paint Inspection and Risk Management
Hazard Communication Programs
Hazardous Noise & Hearing Conservation Programs
OSHA Compliance Program Development
Phase I & II ESA— Due Diligence
Brownfields Redevelopment
Environmental Risk Assessment
Underground Storage Tank Management
Subsurface Investigation/Remediation
Remediation Oversight
CERCLA / RCRA
and more…
2018 CAMPUS-WIDE ACM AND LBP INSPECTION
ACM HOMOGENOUS AREAS SUMMARY TABLE
Building 4- Basement Floor Flooring materials Surfacing Materials TSI Materials Miscellaneous Materials
None
33: White TSI water pipe insulation (aircell) 34: White TSI water hanger/joint insulation 35: White TSI steam joint insulation 36: White TSI heater line insulation
17: Steam convector unit (heat shield presumed)
Building 4- 1st Floor
22: Tan 9x9 floor tile w/black mastic (under HMA4) 38: Gray 9x9 floor tile with black mastic 40: Green 9x9 floor tile w/black mastic 41: Tan/brown 9x9 floor tile w/black mastic
17: Steam convector unit (heat shield presumed)
Building 4- Exterior
Exterior None None None 27: Brown exterior door caulking
POPLAR BLUFF V.A.M.C.
JOHN J. PERSHING DIVISION
2018 ASBESTOS INSPECTION
CONDITION AND REMOVAL PRIORITY
TABLE FOR BUILDING 4
Area No.
Bldg
Floor
Material Description Yes/No
Restricted
Current Condition 1
Potential for
Disturbance 2 Removal
Priority 3
Rating Based On Rating Based On
Building 4 - Basement
HMA-17 Steam convector unit (heat shield presumed)
No Yes Good Intact Maintenance
HMA-33 White TSI water pipe insulation
Yes No Good Intact Maintenance
HMA-34 White TSI water hanger/joint insulation
Yes No Good Intact Maintenance
HMA-35 White TSI steam joint insulation
Yes No Good Intact Maintenance
HMA-36 White TSI heater line insulation
Yes No Good Intact Maintenance
Building 4 - 1st Floor
HMA-17 Steam convector unit (heat shield presumed)
No Yes Good Intact Maintenance
HMA-22 Tan 9x9 floor tile w/ black mastic (under HMA-4)
No Yes Good Intact Maintenance
HMA-38 Gray 9x9 floor tile w/ black mastic
No No Good Intact Maintenance
HMA-40 Green 9x9 floor tile w/ black mastic
No No Good Intact Maintenance
HMA-41 Tan/brown 9x9 floor tile w/ black mastic
No No Good Intact Maintenance
Building 4 - Exterior
HMA-27 Exterior door caulk - brown No No Good Intact Maintenance
No.
HMA Number and Material
T-4-BS-
2” steam pipe (crawl space) Basement
Thermal 80% Chrysotile
T-4-BS-
1/2” water pipe (crawl space) Basement
Thermal 20% Chrysotile
T-4-BS-
2” steam pipe Joint (crawl space) Basement
Thermal 80% Chrysotile
T-4-BS-
1/2” water line (crawl space) Basement
Thermal 2% Chrysotile
T-4-BS-
1” steam pipe elbow (crawl space) Basement
Thermal 80% Chrysotile
T-4-BS-
2: steam line patch material Basement
Thermal 40% Chrysotile
20% Amosite
T-4-BS-
2” steam pipe Joint
Basement Thermal
80% Chrysotile
T-4-BS-
2” steam pipe Joint Basement
Thermal 80% Chrysotile
T-4-BS-
1/2” water line Basement
Thermal 10% Chrysotile
T-4-BS-
1/2” water line elbow Basement
Thermal 80% Chrysotile
T-4-BS-
2” steam pipe Joint Basement
Thermal 80% Chrysotile
T-4-BS-
2” steam pipe Basement
Thermal 5% Chrysotile
S-4-BS-1 Closet wall (basement) First Floor
Plaster None detected
F-4·1·2 Floor tile from Personnel Mgmt.
Office First Floor
Linoleum 2% Chrysotile
F-4-1-3 Kitchen floor tile First Floor
Linoleum 15% Chrysotile
F-4-1-4 Kitchen floor tile
First Floor
Linoleum 15% (T) 5%(M) Chrysotile
S-4-1-5 Hallway closet celling First Floor
Plaster None detected
S-4-1-6 1004 closet wall First Floor
Plaster None detected
S-4-1-7 Hallway closet ceiling First Floor
Plaster None detected
S-4-1-8 1005 bathroom First Floor
Plaster None detected
F-4·1·9 Kitchen floor Ille First Floor
Linoleum None detected
No.
HMA Number and Material
F-4-1-10 Basement entry way tile First Floor
Linoleum 2% Chrysotile
S-4-1-11 Hallway closet wall First Floor
Plaster None detected
S-4-1-12 Entry way wall
First Floor
Plaster None detected
S-4-1·13 Bedroom wall First Floor
Plaster None detected
S-4-1-14 Bedroom celling Tile First Floor
Tile None detected
S-4-1-15 Hallway closet celling First Floor
Plaster None detected
2018 Asbestos Bulk Sampling Summary
Sample No.
HMA Number and Material
4: Beige linoleum floor sheeting 1003
CAT 1 Non- Friable (FT/M) None detected
4: Beige linoleum floor sheeting 1003
CAT 1 Non- Friable (FT/M) None detected
4: Beige linoleum floor sheeting 1003
CAT 1 Non- Friable (FT/M) None detected
5: Beige 12x12 floor tile with tan streaks w/yellow glue Entrance
CAT 1 Non- Friable (FT/M) None detected
5: Beige 12x12 floor tile with tan streaks w/yellow glue Entrance
CAT 1 Non- Friable (FT/M) None detected
5: Beige 12x12 floor tile with tan streaks w/yellow glue Entrance
CAT 1 Non- Friable (FT/M) None detected
6: Green ceramic floor tile Restroom
CAT 1 Non- Friable
No.
HMA Number and Material
8: White 1'x1' accoustical ceiling tile with divots and pinholes (splined) 1003 Friable None detected
8: White 1'x1' accoustical ceiling tile with divots and pinholes (splined) 1003 Friable None detected
10: Brown interior window caulk 1003
CAT 1 Non- Friable (FT/M) None detected
10: Brown interior window caulk 1003
CAT 1 Non- Friable (FT/M) None detected
10: Brown interior window caulk 1003
CAT 1 Non- Friable (FT/M) None detected
11: Grey 6" covebase with tan mastic 1008
CAT 1 Non- Friable (FT/M) None detected
11: Grey 6" covebase with tan mastic 1008
CAT 1 Non- Friable (FT/M) None detected
11: Grey 6" covebase with tan mastic 1008
CAT 1 Non- Friable (FT/M) None detected
12: Tan 6" covebase with tan mastic 1007
CAT 1 Non- Friable (FT/M) None detected
12: Tan 6" covebase with tan mastic 1007
CAT 1 Non- Friable (FT/M) None detected
12: Tan 6" covebase with tan mastic 1007
CAT 1 Non- Friable (FT/M) None detected
18: Green 4x4 ceramic wall tile with white grout Restroom
CAT 1 Non- Friable (FT/M) None detected
19: Yellow 4x4 ceramic wall tile with white grout 1007
CAT 1 Non- Friable (FT/M) None detected
20: Tan HVAC duct canvass Restroom Friable None detected
20: Tan HVAC duct canvass Restroom Friable None detected
20: Tan HVAC duct canvass Restroom Friable None detected
No.
HMA Number and Material
21: Blue 9x9 floor tile w/yellow mastic
(under HMA1) 1007
CAT 1 Non- Friable (FT/M) None detected
21: Blue 9x9 floor tile w/yellow mastic
(under HMA1) 1007
CAT 1 Non- Friable (FT/M) None detected
21: Blue 9x9 floor tile w/yellow mastic
(under HMA1) 1007
CAT 1 Non- Friable (FT/M) None detected
22: Tan 9x9 floor tile w/black mastic
(under HMA4) 1003
CAT 1 Non- Friable (FT/M) 4% Chrysotile / 5% Chrysotile
22: Tan 9x9 floor tile w/black mastic
(under HMA4) 1003
CAT 1 Non- Friable (FT/M) positive stop rule
22: Tan 9x9 floor tile w/black mastic
(under HMA4) 1003
CAT 1 Non- Friable (FT/M) positive stop rule
27: Brown exterior door caulking Exterior
CAT 1 Non- Friable (FT/M) 5% Chrysotile
27: Brown exterior door caulking Exterior
CAT 1 Non- Friable (FT/M) positive stop rule
27: Brown exterior door caulking Exterior
CAT 1 Non- Friable (FT/M) positive stop rule
28: Brown exterior window caulking Exterior
CAT 1 Non- Friable (FT/M) None detected
28: Brown exterior window caulking Exterior
CAT 1 Non- Friable (FT/M) None detected
28: Brown exterior window caulking Exterior
CAT 1 Non- Friable (FT/M) None detected
37: Gray 12x12 floor tile with gray and white marbled design w/yellow glue Exterior
CAT 1 Non- Friable (FT/M) None detected
37: Gray 12x12 floor tile with gray and white marbled design w/yellow glue Entrance
CAT 1 Non- Friable
No.
HMA Number and Material
37: Gray 12x12 floor tile with gray and white marbled design w/yellow glue Entrance
CAT 1 Non- Friable (FT/M) None detected
38: Gray 9x9 floor tile with black mastic 1007
CAT 1 Non- Friable (FT/M) 8% Chrysotile
38: Gray 9x9 floor tile with black mastic 1007
CAT 1 Non- Friable (FT/M) positive stop rule
38: Gray 9x9 floor tile with black mastic 1007
CAT 1 Non- Friable (FT/M) positive stop rule
23: Drywall w/joint compound 1001 Friable None detected
31: White exterior plaster soffit (entry) Exterior
CAT 2 Non- Friable
(transite) None detected
39: Dark tan linoleum sheet flooring w/paper backing 1007 Friable None detected
39: Dark tan linoleum sheet flooring w/paper backing 1007 Friable None detected
39: Dark tan linoleum sheet flooring w/paper backing 1007 Friable None detected
40: Green 9x9 floor tile w/black mastic 1007
CAT 1 Non- Friable (FT/M) 8% Chrysotile / 4% Chrysotile
40: Green 9x9 floor tile w/black mastic 1007
CAT 1 Non- Friable (FT/M) positive stop rule
40: Green 9x9 floor tile w/black mastic 1007
CAT 1 Non- Friable (FT/M) positive stop rule
41: Tan/brown 9x9 floor tile w/black mastic 1003
CAT 1 Non- Friable (FT/M) 7% Chrysotile
41: Tan/brown 9x9 floor tile w/black mastic 1003
CAT 1 Non- Friable (FT/M) positive stop rule
No.
HMA Number and Material
41: Tan/brown 9x9 floor tile w/black mastic 1003
CAT 1 Non- Friable (FT/M) positive stop rule
42: White 12x12 floor tile w/yellow glue 1003
CAT 1 Non- Friable (FT/M) None detected
5: Beige 12x12 floor tile with tan streaks w/yellow glue Entrance
CAT 1 Non- Friable (FT/M) None detected
22: Tan 9x9 floor tile w/black mastic
(under HMA4) 1003
CAT 1 Non- Friable (FT/M) 6% Chrysotile in both tile and mastic
39: Dark tan linoleum sheet flooring w/paper backing 1007 Friable None detected
1139 Olive Street, Suite 300 Saint Louis, MO 63101 ph 314-436-9492 fx 314-436-9733
BUILDING 10
Department of Veterans Affairs
General Industrial Hygiene Exposure Assessment and Risk Management
Indoor Air Quality Investigations
Asbestos & Lead-Based Paint Inspection and Risk Management
Hazard Communication Programs
Hazardous Noise & Hearing Conservation Programs
OSHA Compliance Program Development
Phase I & II ESA Due Diligence
Brownfields Redevelopment
Environmental Risk Assessment
Underground Storage Tank Management
Subsurface Investigation/Remediation
Remediation Oversight
CERCLA / RCRA
2018 CAMPUS-WIDE ACM AND LBP INSPECTION
ACM HOMOGENOUS AREAS SUMMARY TABLE
Building 10- 1st Floor
1 None None None
8: Interior Floor/Wall Caulk
Building 10- Exterior
Exterior None None None
4: Bay Door Caulk 5: Exterior Window Caulk
MANAGEMENT PLAN REMOVAL PRIORITY ASSESSMENT
CHARTS
Qualitative (Descriptive) Rankings for Current Condition of ACM
Qualitative Ranking Example Descriptions of Current Condition Good Surfacing material has no visible damage; covering on TSI is intact; miscellaneous materials are intact; no visible debris.
Fair Surfacing material has moderate but not extensive visible damage; covering on TSI is cut or torn, exposing small but not extensive amounts of insulation; miscellaneous materials have moderate but not extensive damage; moderate but not extensive amounts of visible debris
Poor Extensive damage to surfacing material; covering on TSI is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile is extensively damaged and underlying mastic exposed;
extensive amounts of dust and debris.
Note: Damage is considered “extensive” when the total area of distributed damage exceeds 10%, or 25% localized damage.
Qualitative Rankings for Potential for Disturbance of ACM Level of Potential Disturbance Frequency of Potential
Contact Influence of Vibration Potential for Air Erosion
HIGH
(potential for significant damage)
High Any Value Any Value Any Value High Any Value Any Value Any Value High
MODERATE
(potential for damage)
Moderate Moderate or Low Moderate or Low Moderate or Low Moderate Moderate or Low Moderate or Low Moderate or Low Moderate
LOW Low Low Low
Qualitative Rankings and Numerical Ratings for Removal Priority of ACM Hazard Rank/
Removal Priority
ACBM
Condition ACBM Disturbance
Potential Recommended Response Actions
1 Significantly Damaged
Any Evacuate or isolate area. Remove ACBM. O&M Required for all friable ACBM.
2 Damaged High Evacuate or isolate area. Remove, enclose, encapsulate or repair ACBM to correct. Reduce potential for disturbance. O&M Required for all friable ACBM.
3 Damaged Moderate Remove, enclose, encapsulate, or repair to correct damage. O&M Required for all friable ACBM.
4 Damaged Low Same as Category 3.
5 Good High Take steps to reduce potential for disturbance. O&M Required for all friable
ACBM.
6 Good Moderate O&M Required for all friable ACBM.
7 Good Low O&M Required for all friable ACBM, but measures need not be as extensive as
Category 6.
POPLAR BLUFF V.A.M.C.
JOHN J. PERSHING DIVISION
2018 ASBESTOS INSPECTION
CONDITION AND REMOVAL PRIORITY
TABLE FOR BUILDING 10
Area No.
Bldg
Floor
Material Description
Restricted
Current Condition 1
Potential for
Disturbance 2 Removal
Priority 3
Rating Based On Rating Based On
Building 10 - 1st Floor
HMA-8 Interior floor/wall caulk Yes No Fair Damaged Physical disturbance
Building 10 - Exterior
HMA-4 Exterior bay door caulk Yes No Poor Significantly Damaged
Mod Vibration
HMA-5 Exterior window caulk No No Good Intact Vibration
HMA Number and Material
No historical samples exist for this building
3: Drywall w/ Joint
Compound 1 Friable None detected
3: Drywall w/ Joint
Compound 1 Friable None detected
3: Drywall w/ Joint
Compound 1 Friable None detected
448 4: Bay Door Caulk Exterior Friable None detected
449 4: Bay Door Caulk Exterior Friable 3% Chrysotile
450 4: Bay Door Caulk Exterior Friable positive stop rule
5: Exterior Window
Caulk Exterior
CAT 1 Non- Friable (FT/M) 3% Chrysotile
5: Exterior Window
Caulk Exterior
CAT 1 Non- Friable (FT/M) positive stop rule
5: Exterior Window
Caulk Exterior
CAT 1 Non- Friable (FT/M) positive stop rule
6: Exterior Window Glazing Exterior
CAT 1 Non- Friable (FT/M) None detected
6: Exterior Window Glazing Exterior
CAT 1 Non- Friable (FT/M) None detected
6: Exterior Window
Glazing Exterior
CAT 1 Non- Friable (FT/M) None detected
8: Interior
Floor/Wall Caulk 1 Friable 10% Chrysotile
8: Interior Floor/Wall Caulk 1 Friable positive stop rule
8: Interior Floor/Wall Caulk 1 Friable positive stop rule
458A
8: Interior Floor/Wall Caulk 1 Friable None detected
This is the start of the file's text. The full file is on GovTribe.