36C25522Q0300.docx

DOCX document 168 KB Posted

Attached to
H359--Wichita VAMC - 3 Year Electrical Inspection
Solicitation number
36C25522Q0300
Issued by

View the file

Other files

File Type Posted
Line 1 Schematics.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25522Q0300

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

589-22-3-7507-0048 36C25522Q0300 05-19-2022 Ballentos, Emilio emilio.ballentos@va.gov 913-946-1981 06-03-2022 11am

CDT

36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 X X 238210 $16.5 Million N/A X Department of Veterans Affairs Robert J. Dole VA Medical Center 5500 E. Kellogg Avenue Wichita KS 67218-1607 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048

36C255 Department of Veterans Affairs Financial Services Center http://www.fsc.va.gov/einvoice.asp Austin TX 877-353-9791 512-460-5429 See CONTINUATION Page Electrical Inspection - Wichita VAMC In Accordance with the Statement of Work ******** See Section B for details ******** This will result in a Firm Fixed Price, FOB Destination This solicitation is intended as Small Business Set Aside.

FAR 4.11 states that prospective contractors shall be registered in the System for Award Management (www.SAM.gov) database.

WD - 2015-53415, Rev. 2 applies – See Section D for Details See Offeror's Instruction in Section E.2 and attached Line 1 Schematics Site visit is available for May 24, 2022, at 10:00am - 12:00pm Central Time Zone. See Section E.2 See CONTINUATION Page X X Ballentos, Emilio Contracting Officer Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES1
SECTION B - CONTINUATION OF SF 1449 BLOCKS4
B.1 CONTRACT ADMINISTRATION DATA4
B.2. STATEMENT OF WORK5
B.3 PRICE/COST SCHEDULE33
ITEM INFORMATION33
B.4 DELIVERY SCHEDULE33
SECTION C - CONTRACT CLAUSES34
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)34
C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)40
C.3 SUPPLEMENTAL INSURANCE REQUIREMENTS40
C.4 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)41
C.5 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020)41
C.6 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)43
C.7 VAAR 852.219-75 SUBCONTRACTING COMMITMENTS MONITORING AND COMPLIANCE (JUL 2018)44
C.8 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)44
C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2021) (JUL 2020) (DEVIATION)45
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS53
D.1 LINE 1 SCHEMATICS53
D.2 WAGE DETERMINATIONS INCORPORATED BY REFERENCE53
D.3 VHA HANDBOOK 6500.06 APPENDIX C54
SECTION E - SOLICITATION PROVISIONS57
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)57
E.2 ADDENDUM TO 52.252-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS61
E.3 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)63
E.4 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)64
E.5 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)66
E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (FEB 2021) (JUL 2020) (DEVIATION)67

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

(Continuation from Standard Form 1449, block 18A.)

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR: NAME: ___________________________________

SAM UEI #: __________________________________

ADDRESS: ________________________________
City/State/Zip: _____________________________
POC: _____________________________________
CONTACT INFO: __________________________

b. GOVERNMENT: CONTRACTING OFFICER 36C255

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE (NCO) 15

3450 S 4th STREET

LEAVENWORTH, KS 66048

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System for Award Management

3. INVOICES: Invoices shall be submitted:

[X] Upon Completion of Service [ ] Other

a. Quarterly[ ]
b. Semi-Annually[ ]
c. Annually[ ]

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

Department of Veterans Affairs Financial Services Center http://www.fsc.va.gov/einvoice.asp

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

36C25522Q0300

Page 1 of Page 1 of

B.2. STATEMENT OF WORK

PROFESSIONAL TESTING AND MAINTENANCE OF ELECTRICAL SYSTEMS AND EQUIPMENT

GENERAL:

1.1The work under this contract shall be performed under supervision of a Registered Professional Engineer. The Registered Professional Engineer shall be on site initially to discuss with the Engineering Officer the procedures used to test, survey, report and service the equipment required to be serviced under this contract. The Registered Professional Engineer shall supervise the services personally, review the final report and discuss with the Engineering Officer the results of the services, any recommendations, future actions and professional opinions, which are contained in the report.
1.2Field service work shall be performed directly by Field Service Engineers who have successfully demonstrated their knowledge and experience in the Field of Electrical Power Distribution Systems Testing. The Field Service Engineer shall be capable of the following: (1) testing, assessing, evaluating, servicing and reconditioning components, (2) assuring that the equipment on which work has been performed is safe, reliable and acceptable for its intended purpose, and (3) identifying defective equipment and potential safety problems, environmental hazards or code violations.
1.3The Supervising Service Engineer must be accredited as a Certified Electrical Test Technologist by the NICET (National Institute for Certification of Engineering Technologists) or the NETA (National Electrical Testing Association) or similar certification and have a minimum of five (5) years of experience on similar major testing projects.
1.4All other testing technicians assigned to the project must be certified by NICET, NETA, or must have an equivalent qualification certification.
1.5Test assistants and apprentices may be assigned to the project as assistants to certified technicians at a ratio not to exceed two certified to one non-certified assistant or apprentice.
1.6The names and certification numbers of the Registered Professional Engineer supervising the work and signing the test reports and the Supervising Field Service Engineer must be provided by the Contractor and verified by the Contracting Officer before contract award. After contract award, similar data for all certified technicians who will be assigned to work on the project must also be submitted and approved before starting work on the contract.
1.7All work performed shall be fully documented by the Contractor. Testing shall be performed in compliance with manufacturers' recommendations and applicable NEMA, NETA, ANSI, ASTM, ASA and VA Standards and as specified for each section in specifications.
1.8Hours: The regular work hours for this facility is Monday through Friday, from 8:00 am to 4:30 pm (CST), excluding Federal Holidays. All maintenance shall be provided during the regular business hours of this facility.

Working Hours outages shall be scheduled and approved in writing at least two weeks in advance. Outages will be scheduled only at night and on weekends for certain facility such as Surgery, endoscopy, MRI, PET/CT, etc..

SCOPE 2.1 THREE YEAR ELECTRICAL SYSTEM MAINTENANCE AND TESTING.

2.2 Switchgear equipment. Medium Voltage Circuit Breakers and Protective Relays.

2.2.1 Record switchgear, breaker and device nameplate information and compare with the facility's one-line diagram, when available. Identify and record discrepancies.

2.2.2Inspect all electrical equipment, including each breaker, and report damage or malfunctioning equipment, loose connections or material or any contamination that must be corrected. Clean where appropriate.
2.2.3Check equipment for level, security to foundation and operation of doors. Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate.
2.2.4Visually inspect the equipment ground and record the number and size of ground bus and straps. Report deficiencies.
2.2.5Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter. Record values, report deficiencies, and clean where appropriate.
2.2.6Draw or rack each breaker from its cell. Remove arc chutes, clean, inspect and adjust all contacts as necessary. Measure and record contact resistance in micro-ohms and clean all insulating surfaces. Megger and record phase-to-phase and phase-to-ground. Lubricate as necessary.
2.2.7Electrically close and trip each breaker with control switch. Manually close and trip each breaker. Trip each breaker with each of its protective devices. Tighten all connections. Record any discrepancies.
2.2.8Remove each relay from its case. Clean, inspect and tighten all connections. Apply three multiples of relay tap current to each relay to verify manufacturer's time current characteristics. Test each relay for instantaneous pickup. Report deficiencies and adjust where appropriate.
2.3Primary Disconnects.
2.3.1De-energize entire substation clean all insulating surface and clean and dress all contacts.
2.3.2Activate each switch. Ensure switch completely disengages and closes clean switch and lubricate as required.
2.3.3Measure contact resistance in micro-ohms, Megger each phase-to-ground. Record any discrepancies.
2.3.4Clean and inspect cubicle, tighten all untapped connections, and lubricate as necessary.
2.4Transformers
2.4.1Record transformer nameplate information and compare with the facility's one-line diagram, when available. Record discrepancies.
2.4.2Inspect transformer and accessories and report damage, loose connections or material, shipping blocks, or contamination that must be corrected. Clean where appropriate. Inspect for leaks and tighten all untapped connections. Clean all insulating surfaces.
2.5Low Volta= Circuit Breakers
2.5.1Record switchgear, breaker and device nameplate information and compare with the facility's one line diagram, when available. Record discrepancies
2.5.2Inspect equipment and each breaker and report damage, loose connections or material, or contamination that must be corrected. Clean where appropriate.
2.5.3Check equipment for level, security to foundation, and operation of doors. Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate.
2.5.4Visually inspect the equipment ground and record the number and size of ground bus and straps. Report deficiencies.
2.5.5Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter. Record values, report deficiencies and clean where appropriate.
2.5.6Clean and inspect each breaker. Megger phase-to-phase and phase-to-ground and measure contact resistance in micro-ohms. Test each series over-current trip

device' for pickup at 200% and 300' of its rating and for instantaneous pickup. Clean and dress all contact surfaces and lubricate as necessary

2.6Generators
2.6.1Record nameplate data including manufacturer, age and capacity. List fuel type, KM load under load condition, number of hours of fuel tank capacity and number of hours of accumulated run time.
3.TEST EQUIPMENT
3.1Suitability of Test Equipment
3.1.1All test equipment shall be in good mechanical and electrical condition.
3.1.2Split-core current transformers and clamp-on or tong type ammeters require careful consideration of the following in regard to accuracy:
3.1.2.1Position of the conductor within the core. 3.1.2.2 Clean, tight fit of the core pole faces.

3.1.2.3 Presence of external fields.

3.1.2.4Accuracy of the current transformer ratio in addition to the accuracy of the secondarymeter.
3.1.3Selection of metering equipment should be based on a knowledge of the waveform of the variable being measured. Modern digital multimeters may be average or rms. sensing and may include or exclude the do component. When the variable contains harmonics or do offset and in general, any deviation from a pure sine wave, average sensing, rms. scaled meters may be misleading.
3.1.4Field test metering used to check power system meter calibration must have an accuracy higher than that of the instrument being checked.
3.1.5Accuracy of metering in test equipment shall be appropriate for the test being performed but not in excess of 2% of the scale used.
3.1.6Waveshape and frequency of test equipment output waveforms shall be appropriate for the test and tested equipment.
3.2Test Instrument Calibration
3.2.1The testing firm shall have a calibration program which assures that all applicable test instruments are maintained within rated accuracy.
3.2.2The accuracy shall be directly traceable to the National Institute of Standards and Technology.
3.2.3Instruments shall be calibrated in accordance with the following frequency schedule:

3.2.3.1 Field instruments: Analog-6 months maximum: Digital-12 months maximum. 3.2.3.2 Laboratory instruments: 12 months.

3.2.3.3 Leased specialty equipment: 12 months (Where accuracy is guaranteed by lessor).

3.2.4 Dated calibration labels shall be visible on all test equipment. -

3.2.5 Records, which show date and results of instruments calibrated or tested, must be kept up-to-date.

3.2.6 Up-to-date instrument calibration instructions and procedures shall be maintained for each test instrument.

3.2.7 Calibrating standard shall be of higher accuracy than that of the instrument tested.

3.3Test Resort
3.3.1The test report shall include the following:
3.3.1.1Summary of project.

3.3.1.2 Description of equipment tested.

3.3.1.3 Description of test.

3.3.1.4 Test results.

3.3.2Furnish a copy or copies of the complete report to the owner/user's representative as directed in the maintenance contract.
4.INSPECTION AND TEST PROCEDURES
4.1Switchgear and Switchboard Assemblies
4.1.1Visual and Mechanical Inspection
4.1.1.1Inspect for physical, electrical and mechanical condition.
4.1.1.2Compare equipment nameplate information with latest one line diagram when available and report discrepancies.
4.1.1.3Check for proper anchorage, required area clearances, physical damage, and proper alignment.
4.1.1.4Inspect all bus connections for high resistance. Use low resistance ohmmeter, or check tightness of bolted bus joints by calibrated torque wrench method. In lieu of above tonguing perform infrared survey in accordance with Section 9.
4.1.1.5Test all electrical and mechanical interlock systems for proper operation and sequencing.

4.1.1.5.1 Closure attempt shall be made on locked open devices. Opening attempt shall be made on locked closed devices.

4.1.1.5.2 Key exchange shall be made with devices operated in off-normal positions.

4.1.1.6Clean switchgear.
4.1.1.7Inspect accessible insulators for evidence of physical damage or contaminated surfaces.
4.1.1.8Verify proper barrier and shutter installation and operation. 4.1.1.9 Lubrication.
4.1.1.9Verify appropriate contact lubricant on moving current carrying parts.
4.1.1.10Verify appropriate lubrication on moving and sliding surfaces. 4.1.1.10Exercise all active components.
4.1.1.11 Inspect all mechanical indicating devices for proper operation. 4.1.2Electrical Tests

4.1.2.1 Perform ground resistance tests in accordance with Section 4.8.

4.1.2.2 Perform insulation resistance tests on each bus section, phase-to-phase and phase-to-ground for one (1) minute. Test voltages shall be in accordance with Table 4.1.1.
4.1.2.3Perform control wiring performance test. Use the elementary diagrams of the switchgear to identify each remote control and protective device. Conduct tests to verify satisfactory performance of each control feature.
4.1.2.4Perform overpotential tests on each bus section, phase-to-phase and phase-to-ground. Test voltages shall be in accordance with Table 4.1.2.
4.1.2.5Control Power Transformer - Dry Type

4.1.2.5.1 Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition.

4.1.2.5.2 Verify that primary and secondary fuse ratings or circuit breakers match drawings.

4.1.2.5.3 Perform insulation resistance test. Measurements shall be made from winding-to-winding and windings-to-ground. Test voltages and minimum resistances shall be in accordance with Table 4.2.1. Results to be temperature corrected in accordance with Table 4.2.2.

4.1.3 Test values

4.1.3.1Bolt torque levels shall be in accordance with Table 8.1, unless otherwise specified by manufacturer.
4.1.3.2Insulation resistance test shall be performed in accordance with Table 4.1.1. Values of insulation resistance less than his table or manufacturer's minimum should be investigated.
4.1.3.3Overpotential test voltages shall be applied in accordance with Table 4.1.2-(Derived from ANSI/IEEE C37.20.2). Test results are evaluated on a go, no-go basis by slowly raising the test voltage to the required value. The final test voltage shall be applied for one (1) minute.

TABLE 4.1.1

Switchgear Insulation Resistance Test Voltage

Voltage Rating
Minimum

dc Test Voltage Recommended Minimum Insulation Resistance In Megohms

0-250V
500V
50
251-600V
1000V
100
601-5000V
2500V
1000
5001-15000V
2500V
5000
15001-25000V
5000V
20000

TABLE 4.1.2

Field Overpotential Test Voltages* Maximum

Type of Switchgear
Rated TV
Test Voltage kV

ac de

MC
4.76
14.320.3
(Metal Clad
8.25
27.037.5
Switchgear)
15.0
27.037.5
38.0
60.0
SC
15.5
37.5+
(Station-type Cubicle
38.0
60.0+
Switchgear)
72.5
120.0+
MEI
4.76
14.320.3
(Metal-Enclosed
8.25
19.527.8
Interrupter
15.0
27.037.5
Switchgear)
15.5
37.552.5
25.8
45.0
38.0
60.0

+Consult Manufacturer Derived from ANSI/IEEE 037.20.2, Paragraph 5.5 and C37.20.3, paragraph 5.5

4.2 Transformers

4.2.1 Transformers-Dry Type

4.2.1.1 Visual and Mechanical Inspection

4.2.1.1.1 Inspect for physical damage, cracked insulators, lightness of connections, defective wiring and general mechanical and electrical conditions.

4.2.1.1.2 Verify proper auxiliary device operation such as fans and indicators.

4.2.1.1.3 Check tightness of accessible bolted electrical joints in accordance with Table 7.1.

4.2.1.1.4 Perform specific inspections and mechanical tests as recommended by manufacturer.

4.2.1.1.5 Make a close examination for shipping brackets or fixtures that may not have been removed during original installation. Ensure resilient mounts are free.

4.2.1.1.6 Verify proper core grounding. 4.2.1.1.7 Verify proper equipment grounding.

4.2.1.1.8 Thoroughly clean unit prior to testing unless "as found" and "as left" tests are required.

4.2.1.2 Electrical Tests

4.2.1.2.1 Perform insulation resistance tests, winding to-winding and windings-to-ground, utilizing a megohmmeter with test voltage output as shown in Table 4.2.3.

4.2.2.1 Visual and Mechanical Inspection.

4.2.1.2.1.1 Test duration shall be for 10 minutes with resistances tabulated at 30 seconds, 1 minute, and 10 minutes. Dielectric absorption ratio and polarization index will be calculated.

4.2.1.2.1.2 Perform tests and adjustments for fans, controls, and alarm functions.

4.2.1.2.1.3 Verify that tap-changer is set at specified ratio.

4.2.1.2.1.4 Verify proper secondary voltage phase-to-phase and phase-to-neutral after energization and prior to loading.

4.2.1.3 Test Values

4.2.1.3.1 Insulation resistance test values should not be less than values recommended in Table 4.2.3 Results shall be temperature corrected in accordance with Table 4.2.4.

4.2.1.3.2 The polarization index should be above 1.2 unless an extremely high value is obtainedinitially, which when doubled will not yield a meaningful value.
4.2.1.3.3 Turns ratio test results should not deviate more than one-half of the percent (0.5%)from either the adjacent coils or the calculated ratio.
4.2.1.3.4 CH and-CL power factor values will vary due to support insulators and bus work utilized ondry transformers. The following should be expected on CHL power factors. PowerTransformers: 3% or less Distribution Transformers: 5% or less
4.2.1.3.5 Winding resistance test results should compare within one percent (1%) ofadjacentwindings.
4.2.1.3.6 Excitation current test data pattern: Two similar current readings for outside coils and adissimilar current reading for the center coil of a three-phase unit.

4.2.2 Transformers - Liquid Filled

4.2.2.1 Visual and Mechanical Inspection

4.2.2.1.1 Inspect for physical damage, cracked insulators, leaks, tightness of connections, and general mechanical and electrical conditions.

4.2.2.1.2 Verify proper auxiliary device operation.

4.2.2.1.3 Check tightness of accessible bolted electrical connections in accordance with Table 7.1.

4.2.2.1.4 Verify proper liquid level in all tanks and bushings.

4.2.2.1.5 Perform specific inspections and mechanical tests as recommended by manufacturer.

4.2.2.1.6 Verify proper equipment grounding.

4.2.2.2 Electrical Tests

4.2.2.2.1 Perform insulation resistance tests, winding to-winding and windings-to-ground, utilizing amegohmmeter with test voltage output as shown in Table 4.2.3.
4.2.2.2.1.1 Test duration shall be for 10 minutes with resistance's tabulated at 30 seconds, 1 minute,and 10 minutes. Calculate dielectric absorption ratio and polarization index.
4.2.2.2.2 Perform a turns ratio test between windings at designated tap position. The tap setting isto be determined by the owner/user's electrical engineer and set by the testing laboratory.
4.2.2.2.3 Perform insulation power factor tests or dissipation factor tests on all windings andbushings. Overall dielectric-loss and power factor (CHI, CL, TEL) shall be determined. Testvoltages should be limited to the line to ground voltage rating of the transformer winding.
4.2.3Test Values

4.2.3.1 Insulation resistance and absorption test. Test voltages to be in accordance with Table 4.2.3. Resistance values to be temperature corrected in accordance with Table 4.2.4.

4.2.3.2 The polarization index should be above 1.2 unless an extremely high value is obtainedinitially, which when doubled will not yield a meaningful value.
4.2.3.3 Tummy ratio test results shall not deviate more than one half percent (0.5%) from either theadjacent coils or the calculated ratio.
4.2.3.4 Maximum power factor of liquid filled transformers corrected to 20 degrees Cshall be inaccordance with Table 4.2.1.

TABLE 4.2.1

OilsiliconeTetrachlorideHigh Fire ethylenePoint Hydrocarbon
Power Transformers
0.5%
0.5%
3.0%
0.5%

Distribution

Transformers
1.0%
0.5%
3.0%
1.0%
4.2.3.5 Bushing power factors and capacitances that vary from nameplate values by more than tenpercent (10%) should be investigated.
4.2.3.6 Excitation current test data pattern: Two similar current readings for outside coils and adissimilar current reading for the center coil of a three-phase unit.

4.2.3.7 Dielectric fluid should comply with Table 4.2.2.

4.2.3.8 Winding resistance test results should compare within one percent (1%) of adjacent windings.

TABLE 4.12

High MolecularTetrachord
OilWeightSiliconeethylene

Hydrocarbon Dielectric

Breakdown24 kV30 kV30 kV30 kV
ASTM D-877MinimumMinimumMinimumMinimum

Dielectric Breakdown ASTM D-1816 @0.04" gap

34.5 kV and

below20 kV26 kV
MinimumMinimum

above

34.5 kV25 kV
Neutralization0.36 mg KOH/g 0.03 mg KOH/g.01 mg KOH/g .25 mg KOH/g
#ASTM D-974MaximumMaximumMaximumMaximum
Interfacial21 dynes/cm 33 dynes/cm

Tension ASTM D-974 Minimum Minimum or D-2285

Color 3.03.0N/A0.05
ASTMMaximumMaximum
D-1500(D-2129)

Visual

ConditionCompare toN/ACrystalClear, Slight
ASTMPreviousClearPink Irre
D-1524Testsdescent

Power

Factor1.0%0.1%0.1%2%
ASTM D-924MaximumMaximumMaximumMaximum

Q25 degrees

Water Con tent ASTM

D-153335 PPM*35 PPM80 PPM25 PPM
15 kV &MaximumMaximumMaximumMaximum

below above 15

kV-below25 PPM*
115 kVMaximum
115 kV-20 PPM*
230 kVMaximum
above15 PPM
230 kVMaximum

*Or in accordance with manufacturer's requirements. Some manufacturers recommend 15 PAM maximum for all transformers.

Note: The values for oil are taken from ANSI C57.106 (IEEE Std. 64). The remaining values are acceptance test values and should be modified for service aged fluid as recommended by the manufacturer.

4.2.4 Small Transformers - Dry Type, Air Cooled (600 Volt and Below) (less than 100kVA single-phase or 300 kVA three phase).
4.2.4.1 Inspect for physical damage, broken insulation, tightness of connections, defective wiring, andgeneral condition.

4.2.4.2 Thoroughly clean unit prior to making any tests.

4.2.4.3 Perform insulation resistance test. Calculate dielectric absorption ratio and polarization index. Measurements shall be made from winding-to-winding and windings-to-ground. Test voltages and minimum resistance shall be in accordance with Table 4.2.3. Results to be temperature corrected in accordance with Table 4.2.4.

TABLE 4.2.3

Transformer Insulation Resistance Test Voltage Recommended

Minimum
Minimum Insulation
Transformer Coil
de
Resistance in Megohms
Rating Type
Test Voltage
Liquid Filled
Dry
0 - 600 Volts
1000 Volts
100
500
601 - 5000 Volts
2500 Volts
1000
5000
5001 - 15000 Volts
5000 Volts
5000
25000

TABLE 4.2.4

•C
Transformer Insulation Resistance Temperature

Correction Factors to 20 degrees C

TEMPERATURE

FOIL
TRANSFORMER

DRY

0
32
.25
.40
5
41
.36
.45
10
50
.50
.50
15
59
.75
.75
20
68
1.00
1.00
25
77
1.40
1.30
30
86
1.98
1.60
35
95
2.80
2.05
40
104
3.95
2.50
45
113
5.60
3.25
50
122
7.85
4.00
55
131
11.20
5.20
60
140
15.85
6.40
65
149
22.40
8.70
70
158
31.75
10.00
75
167
44.70
13.00
80
176
63.50
16.00

4.3 Cables

4.3.1 Cables - Low Voltage - 600V Maximum

4.3.1.1 Visual and Mechanical Inspection

4.3.1.1.1 Inspect exposed sections of cables for physical damage.

4.3.1.1.2 Test cable mechanical connections to manufacturer's recommended values with a calibrated torque wrench. In lieu of above torquing, perform infrared survey in accordance with Section 6.

4.3.1.2 Electrical Tests

4.3.1.2.1 Perform insulation resistance test on each conductor with respect to ground and adjacent conductors. Applied potential to be 1000 volts do for 1 minute.

4.3.1.3 Test Values

4.3.1.3.1 Minimum insulation resistance values shall be not less than two megohms.

4.3.2 Cables - Medium Voltage - 69 kV Maximum

4.3.2.1 Visual and Mechanical Inspection

4.3.2.1.1 Inspect exposed sections for physical damage.

4.3.2.1.2 Inspect for shield grounding, cable support and termination. 4.3.2.1.3 Inspect fireproofing incommon cable areas.
4.3.2.1.4 If cables are terminated through window type CT's, make an inspection to verify thatneutrals and grounds are properly terminated for proper operation of protective devices.

4.3.2.2 Electrical Tests

4.3.2.2.1 Perform a shield continuity test on each power cable. Ohmic value shall be recorded.

4.3.2.2.2 Perform a do high potential test on all cables. Adhere to all precautions and limitsasspecified in the applicable NEMA/ICEA Standard for the specific cable. Perform testsinaccordance with ANSI/IEEE Std. 400. Test procedure shall be as follows, and the results foreach cable test shall be recorded as specified herein. Test voltages shall notexceed 60% ofcable manufacturer's factory test value or the maximum test voltage in table 4.3.1.
4.3.2.2.2.1 Current sensing circuits in test equipment shall measure only the leakage currentassociated with the cable under test and shall not include internal leakage of the testequipment.

4.3.2.2.2.2 Record wet and dry bulb temperatures of relative humidify end temperature.

4.3.2.2.2.3 Test each section of cable individually.

4.3.2.2.2.4 Individually test each conductor with all other conductors grounded. Ground all shields.

4.3.2.2.2.5 Terminations shall be, property corona suppressed by guard ring, field reduction sphere, orother suitable methods.
4.3.2.2.2.6 Ensure that the maximum test voltage does not exceed the limits for terminators specified inIEEE Standard 48 or manufacturer's specifications.
4.3.2.2.2.7 Apply a do high potential test in at least five equal increment shall exceed the voltage ratingof the cable. Record do leakage current at each step after a constant stabilization timeconsistent with system changing current.
4.3.2.2.2.8 Raise the conductor to the Specified maximum test voltage and hold for a minimum of fiveminutes. Record readings of leakage current at 30 seconds and one minute and at one-minute intervals thereafter.
4.3.2.2.2.9 Reduce the conductor test potential to zero and measure residual voltage at discreteintervals.
4.3.2.2.2.10 Apply grounds for a time period adequate to drain all insulation stored charge. Propernotification must be made to all concerned parties if grounds are left in place.

TABLE 4.3.1

Maximum Maintenance Test Voltages (kV,dc) 1968 and Later Cable Rated

InsulationCable
Test Voltage
Insulation Type
Level
Voltage
kV.dc

Elastomeric:

Butyl and
100%
5kV
19
Oil Base
100%
15kV
41
100%
25kV
60
133%
5kV
19
133%
15kV
49

Elastomeric:

EPR
100%
kV
19
100%
5kV
41
100%
25kV
60
100%
35kV
75
133%
5kV
19
133%
15kV
49
133%
25kV
75
Polyethylene
100%
5kV
19
100%
15kV
41
100%
25kV
60
100%
35kV
75
133%
5kV
19
133%
15kV
49
133%
25kV
75

Derived from ANSI/IEEE std. 141-1986 Table 82 Note: Selection of test voltage for in-service cables depends on many factors. The owner should be consulted and/or informed of the intended test voltage prior to performing the test. The above tables are consistent with ILEA recommendations. AE1C C55 and C56, and ANSI/WEE Std. 400 specify higher voltages. It the cable fails during the test it will require repair or replacement prior to re-energizing.

4.3.2.3 Test Values

4.3.2.3.1 Shielding must exhibit continuity. Investigate resistance values in excess of 10 ohms per1000 feet of cable.
*4.3.2.3.2 A graphic plot may be made with leakage current (X axis) versus voltage (Y axis) at eachincrement.

4.3.2.3.2.1 The step voltage slope should be reasonably linear.

4.3.2.3.2.2 Absorption slope should be flat or negative. In no case should slope exhibit a positive characteristic.

4.3.2.3.2.3 compare test results to previously obtained results.

4.4 Metal Enclosed Busways

4.4.1 Visual and Mechanical Inspection

4.4.1.1 Inspect bus for physical damage.

4.4.1.2 Inspect for proper bracing, suspension alignment, and enclosure ground.

4.4.1.3 Check tightness of bolted joints by calibrated torque wrench method in accordance withmanufacturer's published data or Table 7.1 In lieu of above torquing perform infrared survey inaccordance with Section 6.
4.4.1.4 Check outdoor busway for removal of "weephole" plugs, if applicable, and the properinstallation of joint shield.

4.4.2 Electrical Tests

4.4.2.1 Measure insulation resistance of each bus run phase-to-ground for one (1) minute.

4.4.3 Test Values

4.4.3.1 Bus bolt torque values shall be in accordance with manufacturer's recommendations or Table 8.1.

4.4.3.2 Insulation resistance test voltages and resistance values shall be in

accordance with manufacturer's specifications or Table 7.2.
4.5Air Switches - Medium Voltage - Metal Enclosed

4.5.1 Visual and Mechanical Inspection

4.5.1.1 Inspect for physical and mechanical condition.

4.5.1.2 Check for proper anchorage and required area clearances. 4.5.1.3 Verify thatfuse sizes andtypes correspond to drawings.
4.5.1.4 Perform mechanical operator tests in accordance with manufacturer'sinstructions.

4.5.1.5 Check blade alignment and arc interrupter operation.

4.5.1.6 Verify that expulsion limiting devices are in place on all holders having expulsion type elements.

4.5.1.7 Check each fuse holder for adequate mechanical support for each fuse.

4.5.1.8 Inspect all bus connections for tightness of bolted bus joints by calibrated torque wrench method. Refer to manufacturer's instructions or Table 8.1 for proper torque levels. In lieu of above torque tests, perform infrared survey in accordance with Section 6.

4.5.1.9 Test all electrical and mechanical interlock systems for proper operation and sequencing.

4.5.1.10 Clean entire switch using approved methods and materials. 4.5.1.11 Verify proper phase barrier materials and installation.

4.5.1.12 Lubricate as required.

4.5.1.13 Check switch blade clearances with manufacturer's published data. 4.5.1.14 Inspect all indicating devices for proper operation.

4.5.2 Electrical Tests

4.5.2.1 Perform insulation resistance tests on each pole, phase-to-phase and phase-to- ground for one (1) minute. Test voltage and minimum resistances should be in accordance with Table 8.2. In lieu of this test, perform appropriate insulation tests in conjunction with medium voltage cable insulation tests and/or power transformer primary winding tests.

4.5.2.2 Perform contact resistance test across each switch blade and fuse holder.

4.5.3 Test Values

4.5.3.1 Bolt torque levels shall be in accordance with Table 8.1 unless otherwise specified bymanufacturer.
4.5.3.2 Perform insulation resistance test in accordance with Table 4.1.1. Investigate values ofinsulation resistance less than this table or manufacturer's minimum.
4.5.3.3 Determine contact resistance in microohm’s. Investigate any value exceeding 100microohm’s or any values which deviate from adjacent poles or similarswitches by more thanfifty percent (50%).
4.5.4 Air Switches-High and Medium Voltage-Open 4.5.4.1 Visual and MechanicalInspection
4.5.4.1.1 Inspect for physical damage and compare nameplate data with plans andspecifications.
4.5.4.1.2 Perform mechanical operator tests in accordance with manufacturer'sinstructions.

4.5.4.1.3 Check blade alignment and arc interrupter operation.

4.5.4.1.4 Check fuse link or element and holder for proper current rating.

4.5.4.2 Electrical Tests

4.5.4.2.1 Perform ac or do overpotential test on each

pole-to-ground and pole-to-pole.

4.5.4.2.2 Perform contact resistance teat across each switch blade.

4.5.4.3 Test Values

4.5.4.3.1 Apply overpotential test voltages in accordance with Table 4.1.6.

4.5.4.3.2 Contact resistance shall be determined in microohm’s. Investigate any valueexceeding500 microohm’s or any values which deviate from adjacent poles orsimilar switches bymore than fifty percent (50%).
4.6Circuit Breakers

4.6.1 Circuit Breakers-Low Voltage

4.6.1.1 Circuit Breakers-Low Voltage-Insulated Case

4.6.1.1.1 Visual and Mechanical Inspection

4.6.1.1.1.1 Check circuit breaker for proper mounting.

4.6.1.1.1.2 Operate circuit breaker to ensure smooth operation.

4.6.1.1.1.3 Inspect case for cracks or other defects .

4.6.1.1.1.4 Check tightness of connections with calibrated torque wrench. Refer to manufacturer's instructions or Table 8.1 for proper torque levels. In lieu of this test, perform infrared survey in accordance with Section 6.

4.6.1.1.1.5 Check internals on unsealed units. 4.6.1.1.2 Electrical Tests

4.6.1.1.2.1 Perform a contact resistance test.

4.6.1.1.2.2 Perform an insulation resistance test at 1000 volts do from pole to-pole and from eachpole-to ground with breaker closed and across open contacts of each phase.
4.6.1.1.2.3 Perform long time delay time current characteristic tests by passing three hundredpercent(300%) rated current through each pole separately. Record trip time. Make externaladjustments as required to meet time current curves.

4.6.1.1.2.4 Determine short time pickup and delay by primary current injection.

4.6.1.1.2.5 Determine ground fault pickup and time delay by primary current injection.

4.6.1.1.2.6 Determine instantaneous pickup current by primary injection using run-up or pulsemethod.
4.6.1.1.2.7 Perform adjustments for final settings in accordance with breaker setting sheet whenapplicable.

4.6.1.1.3 Test Values

4.6.1.1.3.1 Compare contact resistance or millivolt drop values to adjacent poles and similar breakers. Investigate deviations of more than fifty (50%). Investigate any value exceeding manufacturer's recommendations.

4.6.1.1.3.2 Insulation resistance shall not be less than 100 megohms.

Investigate values less than 100 megohms.
4.6.1.1.3.3 Trip characteristic of breakers shall fall within manufacturer's published time-currentcharacteristic tolerance band, including adjustment factors.
4.6.1.1.3.4 All trip times shall fall within Table 4.6.1.1. Circuit breaker" exceeding specified triptime at three hundred percent (300%) of pickup shall be tagged defective.

4.6.1.1.3.5 Instantaneous pickup values shall be within values shown on Table 4.6.1.2.

TABLE 4.6. 1.1

Values for Overcurrent Trip Test (At 300% of Rated Continuous Current of Circuit Breaker)

Breaker Voltage Volta
Range of Related

Continuous Current Amperes Maximum Trip Time in seconds*

240
15-45
50
240
50-100
70
600
15-45
70
600
50-100
125
240
110-225
200
240
250-400
300
600
110-225
250
600
50_400
300
600
450-600
350
600
700-1200
500
600
1400-2500
600
600
3000-5000
650

*For integrally-fused circuit breakers, trip times may be substantially longer if tested with the fuses replaced by solid links (shorting bars)

TABLE 4.6.1.2

Instantaneous Trip Setting Tolerances Tolerances of High and Low Settings

Frame Size, AmperesHighLow
<250
FIELD
+40%
+40%
-25%
-30%
400
FIELD
+25%
+30%

4.7 Circuit Breakers-Medium Voltage

4.7.1 Circuit Breakers-Medium Voltage-Air

4.7.1.1 Visual and Mechanical Inspection

4.7.1.1.1 Inspect for physical damage, cleanliness, and adequate lubrication.

4.7.1.1.2 Inspect anchorage, alignment, and grounding.

4.7.1.1.3 Perform all mechanical operator and contact alignment tests on both the breaker and itsoperating mechanism.
4.7.1.1.4 Check -tightness of bolted bus joints by calibrated torque wrench method. Refer tomanufacturer's instructions or Table 8.1 for proper torque levels.

4.7.1.1.5 Check cell fit and element alignment. 4.7.1.1.6 Check racking mechanism.

4.7.1.1.7 Verify that primary and secondary contact wipe and other dimensions vital to satisfactory operation of the breaker are correct.

4.7.1.1.8 Ensure that all maintenance devices are available for servicing and operating the breaker.

4.7.1.1.9 Lubricate all moving current carrying parts.

4.7.1.1.10 Check for proper operation of the cubicle shutter. 4.7.1.2 Electrical Tests

4.7.1.2.1 Measure contact resistance.

4.7.1.2.2 Measure insulation resistance pole-to-pole, pole-to-wound, and across open poles. Use a minimum test voltage of 2500 volts.

*4.7.1.2.3 Perform insulation resistance test at 1000 volt. do on all control wiring. (Do not perform the test on wiring connected to solid state components).

4.7.1.2.4 With breaker in the test position, make the following tests: 4.7.1.2.4.1 Trip and close breaker with the control switch.

4.7.1.2.4.2 Trip each breaker by operating manually each of its protective relays.

4.7.1.3 Test Values

4.7.1.3.1 Determine contact resistance in microohm’s. Investigate deviations of more than 50%.

4.7.1.3.2 Minimum insulation resistance should comply with Table 4.1.1.

4.7.1.3.3 Power factor and arc chute watts lost should be compared with results from previous tests of similar breakers, or referred to manufacturer's published data.

4.7.2 Circuit Breakers-Medium Voltage-Oil

4.7.2.1 Visual and Mechanical Inspection

4.7.2.1.1 Inspect for physical damage.

4.7.2.1.2 Inspect anchorage, alignment, and grounding.

4.7.2.1.3 Perform all mechanical operation and contact alignment tests on both the circuit breaker and its operating mechanism.

4..8 Metering and Instrumentation

4.8.1 Visual and Mechanical Inspection

4.8.1.1 Examine all devices for broken parts and wire connection tightness. 4.8.2 Electrical Tests

4.8.2.1 Check calibration of meters at all cardinal points.

4.8.2.2 Calibrate watt hour meters to one half of one percent (0.5%).

4.8.2.3 Verify all instrument multiplier-.

4.9 Grounding Systems

4.9.1 Visual and Mechanical Inspection

4.9.1.1 Inspect ground system for compliance with drawings.

4.9.2 Electrical Tests

4.9.2.1 Perform three (3) point fall-of-potential test per IEEE Standard No.

81, Section 9.04 on the main grounding electrode or system.
4.9.2.2 Perform the two (2) point method test per IEEE No. 81, Section 9.03 to determine theground resistance between the main grounding system and all major electrical equipmentframes, system neutral, and/or derived neutral points.

4.9.2.3 Alternate Method to 4.8.2.2:

Perform ground continuity test between main ground system and equipment frame, systemneutral, and/or derived neutral point.
This test shall be made by passing a minimum of one (1) ampere do current between groundreference system and the ground point to be tested. Voltage drop shall be measured, andresistance calculated by voltage drop method.

4.9.3 Test Values

4.9.3.1 The main ground electrode system resistance to ground should be no greater than five(5)ohms for commercial or industrial systems and one (1) ohm or 1QB— for generating ortransmission station grounds unless otherwise specified by the owner/user's electricalengineer.
4.10Direct Current Systems

4.10.1 Batteries

4.10.1.1 Visual and Mechanical Inspection

4.10.1.1.1 Inspect for physical damage and evidence of corrosion. 4.10.1.1.2 Check intercell buslink integrity.
4.10.1.2 Electrical Tests - Refer to ANSI/IEEE Standard 450 (lead) or ANSI/IEEE Standard 1106 (Nickel-Cadmium).

4.10.1.2.1 Measure bank charging voltage and each individual cell voltage.

4.10.1.2.2 Measure electrolyte specific gravity and visually check fill level.

4.10.1.2.3 Perform contact integrity tests across all connections between adjacent terminals.

4.10.1.2.4 Perform an integrity load test.

4.10.1.2.5 Perform a capacity load test at five year intervals.

4.10.1.2.6 Verify proper changing rates from charger during recharge mode.

4.10.1.2.7 Verify individual cell acceptance of charge during recharge mode.

4.11 Emergency Systems

4.11.1 Engine Generator-(Prime Mover is not addressed in this Specification).

4.11.1.1 Visual and Mechanical Inspection

4.11.1.1.1 Inspect for physical damage.

4.11.1.1.2 Inspect for proper anchorage and grounding. 4.11.1.2 Electrical and Mechanical Tests

4.11.1.2.1 Perform a dielectric absorption test on generator winding with respect to ground.Determine polarization index.
4.11.1.2.2 Test protective relay devices in accordance with applicable sections of thesespecifications.
4.11.1.2.3 Functionally tests engine shutdown for low oil pressure, overtemperature, over speed, andother features as applicable.

4.11.1.3 Test Values

4.11.1.3.1 Perform dielectric absorption at test voltage listed in Table 10.2. Polarization index values shall be in accordance with IEEE Standard 43.

4.11.2 Automatic Transfer Switches

4.11.2.1 Visual and Mechanical Inspection 4.11.2.1.1 Inspect for physical damage.

4.11.2.1.2 Check switch to ensure positive interlock between normal and alternate sources. Mechanical and Electrical.

4.11.2.1.3 Check tightness of all control and power connections.

4.11.2.1.4 Perform manual transfer operation with no connected load.

4.11.2.1.5 Ensure manual transfer warnings are attached and visible to operator.

4.11.2.2 Electrical Tests

4.11.2.2.1 Perform insulation resistance tests phase to-ground with switch in both source positions, where possible.

4.11.2.2.2 Perform a contact resistance test or measure millivolt drop across all main contacts.

4.11.2.2.3 Verify settings and operation of control devices in accordance with the owner/user's electrical engineer's specifications.

4.11.2.2.3.1 Voltage and frequency sensing relays.

4.11.2.2.3.2 All time delay relays.

4.11.2.2.3.3 Engine start and shutdown relays.

4.11.2.2.4 Perform automatic transfer tests:

4.11.2.2.4.1 Simulate loss of normal power.

4.11.2.2.4.2 Return to normal power.

4.11.2.2.4.3 Simulate loss of emergency power.

4.11.2.2.4.4 Simulate all forms of single-phase conditions.

4.11.2.2.5 Monitor and verify correct operation and timing.

4.11.2.2.5.1 Normal voltage sensing relays.

4.11.2.2.5.2 Engine start sequence.

4.11.2.2.5.3 Time delay upon transfer.

4.11.2.2.5.4 Alternate voltage sensing relays.

4.11.2.2.5.5 Automatic transfer operation.

4.11.2.2.5.6 Interlocks and limit switch function.

4.11.2.2.5.7 Time delay and retransfer upon normal power restoration.

4.11.2.2.5.8 Engine cool down and shutdown feature. 4.11.2.3Test Values

4.11.2.3.1 Insulation resistance test voltages and minimum values to be in accordance with Table 10.2.

4.11.2.3.2 Determine contact resistance in microfilm.

Investigate any value exceeding 500 microohm’s or any values which deviate from adjacent poles by more than fifty percent (50—)

SYSTEM FUNCTION TESTS

5.1 General

5.1.1 Perform system Function Tests upon completion of equipment tests as defined in Section 4. It is the purpose of System Function Tests to prove the proper interaction of all sensing, processing and action devices.

5.1.2 Implementation

5.1.2.1 The testing firm shall develop test parameters for the purpose of evaluating performance of all integral components and their functioning as a complete unit within design requirements.

5.1.2.2 The testing firm shall test all interlock safety devices for fail safe functions in addition to design function.

5.1.2.3 The testing firm shall propose methods to initiate the sensing devices.

5.1.2.4 The testing firm shall note the operation of alarms and indicating devices.

HERMOGRAPHIC SURVEY

6.1Visual and Mechanical Inspection
6.1.1Inspect for physical, electrical and mechanical condition.
6.1.2Visually inspect for bus alignment.
6.1.3Remove all necessary covers prior to scanning.
6.2Equipment to be Scanned
6.2.1Switches, busway, open buses, switchgear, cables, cable and bus connections, circuitbreakers, rotating equipment and load tap changer or current carrying devices.
6.3Provide Report Indicating the Following:
6.3.1Problem area (location of "hot spot").
6.3.2Temperature rise between "hot spot" and normal or reference area.

6.3.3 Cause of heat rise.

6.3.4 Phase unbalance, if present. 6.3.5 Areas scanned.

6.4Test Parameters
6.4.1 Scanning distribution systems with ability to detect 1.0 rise between subject area andreference at 30.C.

6.4.2 Equipment shall detect emitted radiation and convert detected radiation to visual signal.

6.4.3 Infrared surveys should be performed during periods of maximum possible loading but notless than ten percent (10%) of rated load of the electrical equipment being inspected.
6.5Test Results

6.5.1 Temperature gradients of 1.0 to 3.0 indicate possible deficiency and warrant investigation.

6.5.2 Temperature gradients of 4.0 to 15.0 indicate deficiency; repair as time permits.

6.5.3 Temperature gradients of 16 C and above indicate major deficiency: repair immediately.

*6.5.4 Provide photographs and/or thermograms of the deficient area as seen on the imagingsystem. *Optional
7.REPORTS
7.1Provide three copies of report to the facility's Engineering Officer of all devices tested asrequired by the scope. Notification to the facility's Engineering Officer shall be submittedon conditions of equipment and system, including recommendations for corrective actionas applicable.

TABLE 7.t U.8. standard Bolt Torques for Bus Connections Beat Treated 8tee1-Ca-mium or Zina Plated

GRADE
SAE
SAE
SAE
AE
1&2
5
6
8

MINIMUM

TENSILE
64K
105K
133K
150K

(P.S.I.)

BOLT

Togue (Foot Pounds)

DIAMETER

1/4
4.0
5.6
8.0
8.4
5/16
7.2
11.2
15.2
17.6
3/8
12.0
20.0
27.2
29.6
7/16
19.2
32.0
44.0
48.0
1/2
29.6
48.0
68.0
73.6
9/16
42.4
70.4
96.0
105.6
5/8
59.2
96.0
133.6
144.0
3/4
96.0
160.0
224.0
236.8
7/8
152.0
241.6
352.0
378.4
1.0
225.6
372.8
528.0
571.2

Silicon Bronze Fasteners* Torque (Foot Pounds)

DiameterNon-LubricatedLubricated
5/16151C
3/82014
1/24025
5/8554C
3/4706C

*Bronze alloy…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .