Contractor Questions for RFP 36C25521Q0371 John J Pershing VA Medical Center - Response.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 36C25521Q0371
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| 36C25521Q0371 Camera Installation.pdf | ||
| Camera Placement Inside Facility.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
| Contractor Questions |
| 36C25521Q0371 John J Pershing VA Medical Center |
| Seq. # | Document and Section | Page | Item | Customer Response |
| 1 | SOW | Is there a requirment to add extra storage to the existing NVR? | No additional storage is required. | |
| 2 | SOW | What is the make, model, and version of the existing VMS? | Digifort | |
| 3 | SOW, 3rd and 4th Floor | 19 of 51 | What is the sailient characteristics of the cameras located at 3B Acute Care RM 3034, Endo 1 Specialty Clinic, Endo 2 Specialty Clinic, 4N CLC Rm 4069, and 4S CLC RM 4045? | Refer to the requirements of the camera model referenced in the SOW. The camera must at a minimum meet the requirements of that model. |
| 4 | SOW, Campus Entrance Coverage | 19 of 51 | Does the government require the purchase of the LPR module for Digifort or does the existing system already have that capability? | The government does not currenlty have the LPR module |
| 5 | SOW | Does the existing camera system reside on a government network or a stand-alone network? | The existing system is on a different subnet but shares switches | |
| 6 | SOW | Will there be a requiremnt to add PoE switches or is there PoE switches in place for the new cameras to connect to? | PoE switches are already in place. | |
| 7 | SOW, Campus Entrance Coverage | 19 of 51 | Is there a conduit path out to the Main, North, and South campus entrances for camera communication back to the NVR? | No |
| 8 | SOW, Campus Entrance Coverage | 19 of 51 | Will camera poles be required at the Main, North, and South campus entrances or is there aready a means to mount the new cameras? | Poles will be required |
| 9 | ||||
| 10 | ||||
| 11 | ||||
| 12 | ||||
| 13 | ||||
| 14 | ||||
| 15 | ||||
| 16 | ||||
| 17 | ||||
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 | ||||
| 37 | ||||
| 38 | ||||
| 39 | ||||
| 40 | ||||
| 41 | ||||
| 42 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 46 | ||||
| 47 | ||||
| 48 | ||||
| 49 | ||||
| 50 | ||||
| 51 | ||||
| 52 | ||||
| 53 |
&9Page &P / &N
File details come from the government source that posted it. Updated .