36C25520R0063-015.pdf
PDF Posted
- Solicitation number
- 36C25520R0063
About this file
This pre-solicitation notice describes a competitive total set-aside solicitation for service-disabled veteran-owned small businesses to replace mechanical systems in Buildings 18 and 60 at the Jefferson Barracks Division of the VA Saint Louis Health Care System. The contractor must provide all labor, materials, tools, equipment, supervision and site preparation for project 657-19-103JB. Offices of Valhalla Engineering will provide technical services during construction in an advisory role to the government. The project cost range is $2,000,000 to $5,000,000 under NAICS code 238220 with a small business size standard of $16.5 million. The duration is estimated at 426 calendar days after notice to proceed. Award will be made using best value lowest price technically acceptable procedures. The solicitation will be posted to FedBizOpps on April 7, 2020. Responses are due as specified in the solicitation. The Department of Veterans Affairs and Veterans Health Administration are agencies involved.
36C25520R0063 657-19-103JB - Combined Specifications 100PCT_Part9.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25520R0063-014.pdf | ||
| 36C25520R0063-016.pdf | ||
| 36C25520R0063-011.pdf | ||
| 36C25520R0063-006.pdf | ||
| 36C25520R0063-008.pdf | ||
| 36C25520R0063-004.pdf | ||
| 36C25520R0063-009.pdf | ||
| 36C25520R0063-002.docx | DOCX document | |
| 36C25520R0063-013.pdf | ||
| 36C25520R0063-007.pdf | ||
| 36C25520R0063-003.pdf | ||
| 36C25520R0063-010.pdf | ||
| 36C25520R0063-012.pdf | ||
| 36C25520R0063-005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
TES Personnel and Corporate Certifications
Project Number 657-19-103JB (VEG 19.07) Replace Mechanical Systems October 1, 2019
Building 18 & 60 - St. Louis VAMC
1 Jefferson Barracks Dr., St. Louis, MO 63125
SECTION 02 83 33.13
LEAD-BASED PAINT REMOVAL AND DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Removing and disposal of lead-based paint at interior locations
2. Assume all painted surfaces are lead-based paint. It is not anticipated that any painted surfaces should be disturbed by this project. However, should there be any need to remove any paint this specification will apply.
3. The following data is provided for reference along with drawings:
SAMP
BUILDING LOCATION COMPONENT SUBSTRATE COLOR COND.
XRF Reading
(mgcm2)
6 Bldg. 60 Kitchen Wall Tile Ceramic Cream Intact 2.3
13 Bldg. 60 Kitchen - Roof MUA1 Vent Pipe Metal Gray Intact 1.4
Bldg. 60 Kitchen - Roof MUA1 Vent Pipe
Flashing Metal Gray Intact 20.6
Bldg. 60 Kitchen - Roof MUA2 Exhaust Pipe
Flashing Metal Gray Intact 1.4
Bldg. 60 Kitchen - Roof MUA2 Exhaust Pipe
Base Metal Gray Intact 71.0
21 Bldg. 60 Kitchen - Roof Window Sill Metal Cream Poor 1.3
22 Bldg. 60 Kitchen - Roof Window Sill Metal Cream Poor 1.4
33 Bldg. 18 - Stairway 2 Stair Riser Metal Cream Intact 2.1
34 Bldg. 18 - Stairway 2 Rail Metal Cream Intact 3.5
35 Bldg. 18 - Stairway 2 Stair Stringer Metal Cream Intact 3.1
37 Bldg. 18 - H001 Door Jamb Metal Cream Intact 1.3
44 Bldg. 18 - H002 Door Jamb Metal White Intact 1.3
56 Bldg. 18 - 002 Rail Metal Black Intact 3.9
57 Bldg. 18 - 002 Stair Stringer Metal Black Intact 3.6
62 Bldg. 18 - 002 Stair Tread Metal Black Intact 4.2
63 Bldg. 18 - 001 Wall Brick Cream Intact 1.3
64 Bldg. 18 - 001 Wall Concrete Gray Poor 1.7
65 Bldg. 18 - 001 Door Jamb Metal Cream Intact 1.4
66 Bldg. 18 - 001 Floor Concrete Gray Poor 2.6
146 Bldg. 18 - H101 Door Jamb Metal White Intact 1.4
147 Bldg. 18 - H101 Door Jamb Metal White Intact 1.3
148 Bldg. 18 - 120 Door Jamb Metal Cream Intact 1.4
157 Bldg. 18 - 119 Floor Sink Metal White Intact 35.0
237 Bldg. 18 - 131 Window Case Wood Cream Intact 1.3
247 Bldg. 18 - H105 Door Jamb Metal Cream Intact 1.2
293 Bldg. 18 - 113 Door Jamb Metal Cream Intact 1.3
313 Bldg. 18 - 114A Window Case Wood White Intact 1.4
329 Bldg. 18 - Stairs 3 Stair Stringer Metal Black Intact 2.1
453 Bldg. 18 - 210 Window Case Wood Cream Intact 1.5
460 Bldg. 18 - 207B Window Sill Wood Cream Intact 2.1
474 Bldg. 18 - Stairs 1 Stair Stringer Metal Black Intact 1.3
498 Bldg. 18 - 305 Wall Plaster White Intact 1.3
02 83 33.13 - 2
1.2 RELATED REQUIREMENTS
A. Should any asbestos containing materials need to be disturbed coordinate with glove bag asbestos removal specification.
1.3 DEFINITIONS
A. Action Level: Employee exposure, without regard to use of respirator, to lead airborne concentration of 30 micrograms per cubic meter
(0.03 parts per million) of air averaged over 8-hour period. As used in this section, ”30 micrograms per cubic meter of air (0.03 parts per million)" refers to action level.
B. Area Monitoring: Sampling of lead concentrations within lead control area and inside physical boundaries which are representative of airborne lead concentrations which may reach breathing zone of personnel potentially exposed to lead.
C. Breathing Zone: Area within hemisphere, forward of shoulders, with 150 mm to 225 mm (6 to 9 inches) radius and center at nose or mouth of employee.
D. Certified Industrial Hygienist (CIH): As used in this section, refers to an Industrial Hygienist employed by Contractor.
E. Change Rooms and Shower Facilities: Rooms within designated physical boundary around lead control area equipped with separate storage facilities for clean protective work clothing and equipment and for street clothes which prevent cross- contamination.
F. Competent Person: Person capable of identifying lead hazards in work area and authorized by contractor to take corrective action.
G. Decontamination Room: Room for removal of contaminated personal protective equipment (PPE).
H. Eight-Hour Time Weighted Average (TWA): Airborne concentration of lead averaged over 8-hour workday to which an employee is exposed.
I. High Efficiency Particulate Air (HEPA) Filter Equipment:
HEPA filtered vacuuming equipment with UL 586 filter system capable of collecting and retaining lead-contaminated paint dust. HEPA filter means 99.97 percent efficient against 0.3 micron (0.012 mil) size particles.
J. Lead: Metallic lead, inorganic lead compounds, and organic lead soaps.
Excluded from this definition are other organic lead compounds.
K. Lead Control Area: Enclosed area or structure with full containment to prevent spreading lead dust, paint chips, and debris from lead-based
02 83 33.13 - 3 paint removal operations. Lead control area is isolated by physical boundaries to prevent unauthorized entry of personnel.
L. Lead Permissible Exposure Limit (PEL): Fifty micrograms per cubic meter
(0.05 parts per million) of air as 8-hour time weighted average as determined by 29 CFR Part 1910.1025. When employee is exposed for more than 8 hours per work day, determine PEL by following formula. PEL micrograms/cubic meter (parts per million) of air = 400/No. of hrs.
worked per day.
M. Personnel Monitoring: Sampling of lead concentrations within employee breathing zone to determine 8-hour time weighted average concentration according to 29 CFR Part 1910.1025. Take samples representative of employee's work tasks.
N. Physical Boundary: Area physically roped or partitioned off around enclosed lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" shall mean same as "outside lead control area."
1.4 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American National Standards Institute (ANSI):
1. Z9.2-12 - Fundamentals Governing the Design & Operation of Local
Exhaust Ventilation Systems.
C. Code of Federal Regulations (CFR):
1. 29 CFR Part 1910 - Occupational Safety and Health Standards.
2. 29 CFR Part 1926 - Safety and Health Regulations for Construction.
3. 40 CFR Part 260 - Hazardous Waste Management System: General.
4. 40 CFR Part 261 - Identification and Listing of Hazardous Waste.
5. 40 CFR Part 262 - Standards Applicable to Generators of Hazardous
Waste.
6. 40 CFR Part 263 - Standards Applicable to Transporters of Hazardous
Waste.
7. 40 CFR Part 264 - Standards for Owners and Operations of Hazardous
Waste Treatment, Storage, and Disposal Facilities.
8. 40 CFR Part 265 - Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.
9. 40 CFR Part 268 - Land Disposal Restrictions.
02 83 33.13 - 4
10. 49 CFR Part 172 - Hazardous Material Table, Special Provisions, Hazardous Material Communications, Emergency Response Information, and Training Requirements, and Security Plans.
11. 49 CFR Part 178 - Specifications for Packaging’s.
D. Underwriters Laboratories (UL):
1. 586-09 - High-Efficiency, Particulate, Air Filter Units.
1.5 PRE-REMOVAL MEETINGS
A. Conduct pre-removal meeting at project site minimum 10 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Certified Industrial Hygienist.
c. VPIH
d. Lead Safe Contractor
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Respiratory protection program.
b. Hazard communication program.
c. Hazardous waste management plan.
d. Safety and health regulation compliance.
e. Employee training.
f. Removal schedule.
g. Removal sequence.
h. Preparatory work.
i. Protection before, during, and after removal.
j. Removal.
k. Inspecting and testing.
l. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.6 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
a. Paint removal products.
b. Vacuum filters.
02 83 33.13 - 5
c. Respirators.
2. Safety data sheet for each paint removal product.
3. Installation instructions.
a. Paint removal products.
C. Test Reports: Submit testing laboratory reports.
1. Submit air monitoring results within three working days, signed by testing laboratory employee performing air monitoring, employee analyzing sample, and CIH.
D. Certificates: Certify completed training.
1. Submit certificate for each employee signed and dated by CIH and employee stating employee was trained.
E. Qualifications: Substantiate qualifications comply with specifications.
1. Lead Safe contractor.
2. Testing laboratory.
a. Name, address, and telephone number.
b. Current evidence of participation in NIOSH PAT Program.
c. Copy of current AIHA accreditation certificate.
3. Industrial hygienist.
a. Name, address, and telephone number.
b. Resume showing previous experience.
c. Copy of current ABIH CIH certification.
4. Paint disposal facility.
a. Name, address, and telephone number.
b. Current license or authorization to receive and dispose lead contaminated waste.
F. Record Documents:
1. Completed and signed hazardous waste manifest from waste transporter.
2. Paint disposal facility receipts and disposition reports.
3. Certification of medical examinations.
4. Employee training certification.
1.7 QUALITY ASSURANCE
A. Safety and Health Regulation Compliance:
1. Comply with laws, ordinances, rules, and regulations of federal, state, and local authorities having jurisdiction regarding removing, handling, storing, transporting, and disposing lead waste materials.
a. Comply with applicable requirements of 29 CFR Part 1910.1025.
02 83 33.13 - 6
b. Notify Contracting Officer's Representative and request resolution of conflicts between regulations and specified requirements before starting work.
B. Paint Removal Contractor: Experienced contractor, registered or licensed by applicable state agency regulating lead-based paint removal.
C. Testing Laboratory: State certified independent testing laboratory experienced in airborne lead monitoring, testing, and reporting.
1. Successful participant in NIOSH Proficiency Analytical Testing (PAT)
Program within prior 12 months.
2. Accredited by American Industrial Hygiene Association (AIHA).
D. Certified Industrial Hygienist: Certified as CIH by American Board of
Industrial Hygiene in comprehensive practice and responsible for:
1. Certify Training.
2. Review and approve lead-based paint removal plan for conformance to applicable referenced standards.
3. Inspect lead-based paint removal work for conformance with approved plan.
4. Direct monitoring.
5. Ensure work is performed according to specifications.
6. Ensure personnel and environment hazardous exposures are adequately controlled.
E. Paint Disposal Facility: State certified disposal facility qualified to receive and dispose lead-based paint.
F. Lead-based Paint Removal Plan:
1. Submit detailed, site-specific plan describing lead-based paint removal procedures.
2. Include sketch showing location, size, and details of lead control areas, decontamination rooms, change rooms, shower facilities, and mechanical ventilation system.
3. Include eating, drinking, and restroom procedures, interface of trades, work sequencing, collected wastewater and paint debris disposal plan, air sampling plan, respirators, protective equipment, and detailed description of containment methods ensuring airborne lead concentrations do not exceed action level outside lead control area.
a. Eating, drinking, and smoking are not acceptable within lead control area.
02 83 33.13 - 7
4. Include air sampling, training and strategy, sampling methodology, frequency, duration, and qualifications of air monitoring personnel.
G. Respiratory Protection Program: Establish and implement program required by 29 CFR Part 1910.134, 29 CFR Part 1910.1025, and
29 CFR Part 1926.62.
1. Provide each employee negative pressure or other appropriate respirator.
a. Test fit each employee's respirator at initial fitting and maximum 6-month intervals, as required by 29 CFR Part 1926.62.
H. Hazard Communication Program: Establish and implement program required by 29 CFR Part 1910.1200.
I. Hazardous Waste Management Plan: Establish and implement plan according to applicable requirements of Federal, State, and local hazardous waste regulations including the following:
1. Identification of hazardous wastes associated with work.
2. Estimated quantities of generated and disposed waste.
3. Names and qualifications of each contractor transporting, storing, treating, and disposing wastes. Include facility location and
24-hour point of contact. Provide two copies of EPA, state and/or local hazardous waste permits.
4. Names and qualifications (experience and training) of personnel working on-site with hazardous wastes.
5. List of required waste handling equipment including cleaning, volume reduction, and transport equipment.
6. Spill prevention, containment, and cleanup contingency implementation measures.
7. Work plan and schedule for waste containment, removal, and disposal with daily waste cleaned up and containerization.
8. Hazardous waste disposal cost.
1.8 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 PAINT REMOVAL PRODUCTS
A. Chemical Stripper: Biodegradable, non-toxic, capable of removing existing paint layers in one application, and acceptable to CIH.
02 83 33.13 - 8
2.2 ACCESSORIES
A. Waste Collection Drums: 49 CFR Part 178; Type 1A2, steel, removable head, 200 L (55 gal.) capacity, capable of containing waste without loss.
B. Vacuum Cleaner: HEPA filtered type.
C. Scrapers:
1. Metal type for use on metal, concrete, and masonry surfaces.
2. Plastic type for use on wood, plaster, gypsum board, and other surfaces.
D. Rinse Water: Potable.
E. Cleaning Cloths: Cotton.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Before exposure to lead-contaminated dust, provide workers with comprehensive medical examination required by 29 CFR Part 1926.62 (I)
(1) (i) and (ii).
1. Exemption: Examination is not required when employee medical records show last examination required by 29 CFR Part 1926.62(I) was completed within previous 12 months.
B. Maintain complete and accurate employee medical records according to
29 CFR Part 1910.20.
C. Train each employee performing paint removal, disposal, and air sampling operations according to 29 CFR Part 1926.62.
1. Certify training is completed before employee is permitted to work on project and enter lead control area.
3.2 PREPARATION
A. Protect existing work indicated to remain.
1. Perform paint removal work without damaging and contaminating adjacent work.
2. Restore damage and contamination to original condition.
B. Notify Contracting Officer 10 days before starting paint removal work.
C. Lead Control Area Requirements:
1. Establish lead control area by completely enclosing lead-based paint and lead-containing materials removal work area within negative pressure containments with HEPA filtered exhaust screens.
02 83 33.13 - 9
2. Contain removal operations using negative pressure full containment system with minimum one change room and HEPA filtered exhaust.
D. Boundary Requirements: Provide physical boundaries around lead control area by roping off area // designated on drawings // or providing curtains, portable partitions or other enclosures to ensure that airborne lead concentrations do not meet or exceed action level outside of lead control area.
E. Heating, Ventilating and Air Conditioning (HVAC) Systems: Shut down, lock out, and isolate HVAC systems supplying exhausting, and passing through lead control areas. Seal HVAC inlets and outlet within lead control area with 6-mil plastic sheet and tape. Tape seal seams in HVAC components passing through lead control area.
F. Change Room and Shower Facilities: Provide clean change rooms and shower facilities within physical boundary around lead control area according to 29 CFR Part 1926.62.
G. Mechanical Ventilation System:
1. Provide ventilation system to control personnel exposure to lead according to 29 CFR Part 1926.57.
2. Design, construct, install, and maintain HEPA filtered fixed local exhaust ventilation system according to ANSI Z9.2 and approved by
CIH.
3. Exhaust ventilation air to exterior wherever possible.
4. When exhaust ventilation air must be recirculated into work area, provide HEPA filter with reliable back-up filter and controls to monitor lead concentration in return air and to bypass recirculation system automatically when system fails.
H. Personnel Protection: Provide and use required protective clothing and equipment within lead control area.
I. Warning Signs: Provide warning signs complying with 29 CFR Part 1926.62 at lead control area approaches. Locate signs so personnel read signs and take necessary precautions before entering lead control area.
3.3 WORK PROCEDURES
A. Remove lead-based paint according to approved lead-based paint removal plan.
1. Perform work only in presence of CIH or Industrial Hygienist (IH)
Technician under direction of CIH ensuring continuous inspection of work in progress and direction of air monitoring activities.
02 83 33.13 - 10
2. Handle, store, transport, and dispose lead or and lead contaminated waste according to 40 CFR Part 260, 40 CFR Part 261, 40 CFR Part 262, 40 CFR Part 263, 40 CFR Part 264, and
40 CFR Part 265. Comply with land disposal restriction notification requirements as required by 40 CFR Part 268.
B. Use procedures and equipment required to limit occupational and environmental lead exposure when lead-based paint is removed according to 29 CFR Part 1926.62.
C. Dispose removed paint and waste according to Environmental Protection
Agency (EPA), federal, state, and local requirements.
D. Personnel Exiting Procedures:
1. When personnel exit lead control area, comply with the following procedures:
a. Vacuum exposed clothing surfaces.
b. Remove protective clothing and equipment in decontamination room. Place clothing in approved impermeable disposal bag.
c. Shower.
d. Dress in clean clothes before leaving lead control area.
E. Monitoring - General:
1. Monitor airborne lead concentrations according to
29 CFR Part 1910.1025by testing laboratory as directed by CIH.
2. Take personal air monitoring samples on employees anticipated to have greatest exposure risk as determined by CIH. Additionally, take air monitoring samples on minimum 25 percent of work crew or minimum of two employees, whichever is greater, during each work shift.
3. Submit results of air monitoring samples, signed by CIH, within 24 hours after taking air samples. Notify Contracting Officer's
Representative immediately of lead exposure at or exceeding action level outside of lead control area.
F. Monitoring During Paint Removal:
1. Perform personal and area monitoring during entire paint removal operation.
2. Conduct area monitoring at physical boundary daily for each work shift to ensure unprotected personnel are not exposed above action level anytime.
3. For outdoor operations, take at least one sample on each shift leeward of lead control area. When adjacent areas are contaminated, 02 83 33.13 - 11 clean area of contamination and have CIH visually inspect and certify lead contamination is cleaned.
4. Stop work when outside boundary lead levels meet or exceed action level. Notify Contracting Officer's Representative, immediately.
5. Correct conditions causing increased lead concentration as directed by CIH.
6. Review sampling data collected during work stoppage to determine if conditions require additional work method modifications as determined by CIH.
7. Resume paint removal when approved by CIH.
3.4 LEAD-BASED PAINT REMOVAL
A. Remove paint within areas indicated on drawings completely exposing substrate. Minimize damage to substrate.
B. Comply with paint removal processes described lead paint removal plan.
C. Lead-Based Paint Removal: Select processes for each application to minimize work area lead contamination and waste.
3.5 SUBSTRATE SURFACE PREPARATION
A. Protect substrates from deterioration and contamination until refinished.
1. Protect metal substrates from flash rusting.
B. Prepare and paint substrates according to Section 09 91 00, PAINTING.
3.6 FIELD QUALITY CONTROL
A. Field Tests: Performed by testing laboratory specified in Section
01 45 29, TESTING LABORATORY SERVICES.
B. Perform sampling and testing for:
1. Air monitoring.
2. Lead based paint.
3.7 CLEANING AND DISPOSAL
A. Cleaning:
1. Maintain lead control area surfaces free of accumulating paint chips and dust. Confine dust, debris, and waste to work area.
2. Vacuum clean work area daily, at end of each shift, and when paint removal operation is complete.
B. CIH Certification: Certify in writing that inside and outside lead control area air monitoring samples are less than action level, employee respiratory protection was adequate, the work was performed
02 83 33.13 - 12 according to 29 CFR Part 1926.62, and no visible accumulations of lead-based paint and dust remain on worksite.
1. Do not remove lead control area or roped-off boundary and warning signs before Contracting Officer's Representative's receipt of CIH's certification.
2. Reclean areas showing dust or residual paint chips.
C. Testing: Where indicated and when directed by Contracting Officer's
Representative, test lead-based paint residue and used abrasive according to 40 CFR Part 261 for hazardous waste.
D. Waste Collection:
1. Collect lead-contaminated materials including waste, scrap, debris, bags, containers, equipment, and clothing, which may produce airborne lead contamination.
2. Place lead contaminated materials in waste disposal drums. Label each drum identifying waste type according to 49 CFR Part 172 and date waste materials were first put into drum. Obtain and complete the Uniform Hazardous Waste Manifest forms. Comply with land disposal restriction notification requirements required by
40 CFR Part 268:
3. Coordinate temporary storage location on project site with
Contracting Officer's Representative.
E. Waste Disposal:
1. Minimum 14 days before delivery, notify Contracting Officer's
Representative who will arrange for job site inspection of drums and manifests by paint disposal facility personnel.
2. Contracting Officer's Representative will arrange hazardous wastes removal, transport and delivery to paint disposal facility to ensure drums do not remain on project site longer than 90 calendar days from drum label date.
F. Waste Disposal:
1. Do not store hazardous waste drums in temporary storage location longer than 90 calendar days from drum label date.
2. Remove, transport, and deliver drums to paint disposal facility.
a. Obtain signed receipt including date, time, quantity, and description of materials received according to 40 CFR Part 262.
b. Obtain final report of materials disposition after disposal completion.
02 83 33.13 - 13
- - - E N D - - -
Limited Lead Based Paint (LBP) XRF Survey Report
2418 MERRIAM LANE
KANSAS CITY, KS 66106
Report Prepared For:
Valhalla Engineering Group
750 W. Hampden Ave., Suite 300
Englewood, CO 80110
Project:
Limited LBP XRF Survey
Project Number 657-19-103JB (VEG 19.07)
Replace Mechanical Systems
TES Project #: 19052A
SEPTEMBER 20, 2019
A Full Service Environmental Consulting and Testing Firm P.O. Box 410295, Kansas City, MO 64141 Phone: 913-432-5500 Fax: 913-432-0704
September 20, 2019 TES Project# 19052A.04
Valhalla Engineering Group, LLC
Englewood, CO 80110
RE: Limited LBP XRF Survey
Project Number 657-19-103JB (VEG 19.07) Replace Mechanical Systems - Building 18 & 60 - St. Louis VAMC
Dear Client:
Please find enclosed the limited LBP XRF survey report for Buildings 18 and 60 at the V.A. Medical Center located at 1 Jefferson Barracks Dr., St. Louis, MO. The limited lead-based paint survey was performed by Titan Environmental Services, Inc. (MO License # 060130-004227, Expiration January 30, 2020), following the Housing and Urban Development (HUD) Guidelines Chapter 7 (revised 2012) and all applicable local and State regulations.
The purpose of the limited survey was to assess the presence of lead-based paint on building components that may be impacted during the removal and replacement of mechanical systems.
The limited impact-specific LBP XRF survey was performed on August 28-30, 2019.
Joseph Taylor, MO Certified Lead-based Paint Inspector/Risk Assessor (License # 160314- 300004925, Expiration date: March 14, 2020) conducted the limited survey. The limited LBP XRF survey was performed through the use of a Heuresis Pb200i Series X-Ray Fluorescence (XRF) testing instrument, serial # 1056.
XRF TESTING
Upon arriving on-site, the LBP inspector conducted the initial calibration procedures for the XRF instrument, using a National Institute of Standards and Technology (NIST) LBP calibration paint film, standardized to 1.02 mg/cm2. The results of the initial calibration indicated that the instrument was functioning within the 0.3 mg/cm2 calibration check variation tolerance limits.
Following completing the initial calibration, a total of six-hundred and thirteen (613) individual tests (assays) were performed on impact specific components within the areas of work that may be impacted through planned renovation and demolition activities. Results from the XRF testing indicated that thirty-two (32) of the painted surfaces tested contain LBP at or above the existing action level of 1.0 mg/cm2, the level at which HUD and the EPA consider surface coatings to be lead-based. The testing locations, LBP components and positive readings are outlined in the table below.
SAMP
BUILDING LOCATION COMPONENT SUBSTRATE COLOR COND.
XRF Reading
(mgcm2)
6 Bldg. 60 Kitchen Wall Tile Ceramic Cream Intact 2.3
13 Bldg. 60 Kitchen - Roof MUA1 Vent Pipe Metal Gray Intact 1.4
14 Bldg. 60 Kitchen - Roof MUA1 Vent Pipe Flashing Metal Gray Intact 20.6
19 Bldg. 60 Kitchen - Roof MUA2 Exhaust Pipe Flashing Metal Gray Intact 1.4
20 Bldg. 60 Kitchen - Roof MUA2 Exhaust Pipe Base Metal Gray Intact 71.0
21 Bldg. 60 Kitchen - Roof Window Sill Metal Cream Poor 1.3
SAMP
BUILDING LOCATION COMPONENT SUBSTRATE COLOR COND.
XRF Reading
(mgcm2)
22 Bldg. 60 Kitchen - Roof Window Sill Metal Cream Poor 1.4
33 Bldg. 18 - Stairway 2 Stair Riser Metal Cream Intact 2.1
34 Bldg. 18 - Stairway 2 Rail Metal Cream Intact 3.5
35 Bldg. 18 - Stairway 2 Stair Stringer Metal Cream Intact 3.1
37 Bldg. 18 - H001 Door Jamb Metal Cream Intact 1.3
44 Bldg. 18 - H002 Door Jamb Metal White Intact 1.3
56 Bldg. 18 - 002 Rail Metal Black Intact 3.9
57 Bldg. 18 - 002 Stair Stringer Metal Black Intact 3.6
62 Bldg. 18 - 002 Stair Tread Metal Black Intact 4.2
63 Bldg. 18 - 001 Wall Brick Cream Intact 1.3
64 Bldg. 18 - 001 Wall Concrete Gray Poor 1.7
65 Bldg. 18 - 001 Door Jamb Metal Cream Intact 1.4
66 Bldg. 18 - 001 Floor Concrete Gray Poor 2.6
146 Bldg. 18 - H101 Door Jamb Metal White Intact 1.4
147 Bldg. 18 - H101 Door Jamb Metal White Intact 1.3
148 Bldg. 18 - 120 Door Jamb Metal Cream Intact 1.4
157 Bldg. 18 - 119 Floor Sink Metal White Intact 35.0
237 Bldg. 18 - 131 Window Case Wood Cream Intact 1.3
247 Bldg. 18 - H105 Door Jamb Metal Cream Intact 1.2
293 Bldg. 18 - 113 Door Jamb Metal Cream Intact 1.3
313 Bldg. 18 - 114A Window Case Wood White Intact 1.4
329 Bldg. 18 - Stairs 3 Stair Stringer Metal Black Intact 2.1
453 Bldg. 18 - 210 Window Case Wood Cream Intact 1.5
460 Bldg. 18 - 207B Window Sill Wood Cream Intact 2.1
474 Bldg. 18 - Stairs 1 Stair Stringer Metal Black Intact 1.3
498 Bldg. 18 - 305 Wall Plaster White Intact 1.3
According to Chapter 7 HUD guidelines (Second Edition, 2012), if one testing combination (i.e. walls, or ceilings, etc.) is positive for lead in an interior or exterior room equivalent, then all other similar testing combinations in those areas are also assumed to be positive for lead.
Those components which were found to contain LBP and which were in intact condition should be monitored by the owner of the property; any further deterioration of components or components that are already in poor condition should undergo corrective action (i.e., scrapping, priming and painting) to maintain the LBP surface.
Please note that while the testing and reporting was performed in accordance with the HUD Guidelines Chapter 7 Regulations for lead-based paint inspections, the entire structure was not tested.
Some inspectors and risk assessors test non-paint surfaces such as unpainted ceramic tile and porcelain bathtubs for lead content because these items can be a source of high levels of lead dust causing cross contamination outside of work areas and potential airborne lead exposure for workers during demolition or renovation.
For this reason, some inspectors and risk assessors include ceramic tile and bathtubs in pre-rehabilitation inspections/risk assessments and reference the OSHA lead in construction standard (29 CFR 1926.62) in their reports.
GENERAL REQUIREMENTS
XRF testing has indicated detectable concentrations of lead present in the existing coatings that may be impacted as a part of the planned FCU replacement project. The OSHA Lead in Construction Standard (29 CFR 1926.62) requires that controls be implemented if any detectable concentrations of lead are present.
The OSHA Compliance Directive issued for the OSHA Lead in Construction Standard, Instruction CPL 2- 2.58, states that if an employer has appropriately tested for lead (e.g., tested all layers of paints or coatings that may be disturbed) utilizing a valid detection method, and found no detectable levels of lead, then the standard does not apply. However, in this case, paints with detectable concentrations of lead require the contractor performing the work to implement lead-safe work practices and assess actual employee exposures during the work in accordance 29 CFR 1926.62.
Based on the findings of our limited survey, 29 CFR 1926.62 must be invoked during the FCU replacement project that will disturb the lead-based paint during renovation and demolition activities.
It should be noted that other hazardous metals can also be present in coatings. Any disturbance of paint containing heavy metals in addition to lead must be performed in accordance with the requirements of the applicable OSHA standards. In addition, containment will be required for the protection of the environment and the public, and any hazardous waste must be properly managed.
Any contracting firm tasked to impact (i.e., scrape, drill/core, demo, etc.) lead based surface coated components associated with the above referenced project shall at least be a Certified EPA Lead Safe Renovation Firm and employ at least Certified EPA Lead Safe Renovators and shall implement all required lead safe work practices during the work and adhere to all applicable EPA and OSHA Regulations.
CLOSING COMMENTS
TES has performed the tasks set forth above in a thorough and professional manner consistent with industry standards. The limited component-specific LBP XRF survey was performed by TES at the request of the client. Consequently, TES cannot guarantee and does not warrant that this limited assessment has revealed all lead-based surface coatings and other adverse environmental conditions affecting the site.
The results reported and any opinions reached by TES are for the benefit of the client. The results and opinions set forth by TES in its report will be valid as of the date of the report.
TES appreciates the opportunity to be of assistance to you and Valhalla Engineering. If you have any questions, please don’t hesitate to contact us.
Respectfully, Joseph Taylor MO LBP Risk Assessor
Attachments –
1. Lead-Based Paint (LBP) Component Location Drawings
2. Representative LBP Component Photo Log
3. LBP XRF Survey Results Spreadsheet
4. Individual & Corporate Licenses
Attachment 1:
Lead-Based Paint (LBP) Component Location Drawings
Attachment 2
Representative LBP Component Photo Log
Building 60 - Representative LBP Component Photo Log
Bldg. 60 - Kitchen Overview
Bldg. 60 - Roof Overview
Building 18 - Representative LBP Component Photo Log
Stairway 2
002 Mechanical Room
001 Mechanical Room
Room H101
Room 120 (H.K. Main Office)
Room 119
Room 131
Room H105
Room 113
Room 114A
Room 210
Room 207B
Room 305
Attachment 3
LBP XRF Survey Results Spreadsheet
Titan Environmental Services, Inc. Client: Valhalla Engineering Group, LLC
2418 Merriam Lane 750 W. Hampden Ave., Suite 300
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 28, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
1 Calibration 1.0
2 Calibration 1.0
3 Calibration 1.0
4 Bldg. 60 Kitchen Ceiling Drywall White Intact 0.0 Negative
5 Bldg. 60 Kitchen Wall Drywall White Intact 0.0 Negative
6 Bldg. 60 Kitchen Wall Tile Ceramic Cream Intact 2.3 Positive
7 Bldg. 60 Kitchen Electrical Column Metal Gray Intact 0.0 Negative
8 Bldg. 60 Kitchen Upper Hood Wall Drywall White Intact 0.2 Negative
9 Bldg. 60 Roof (over) Kitchen MUA1 Roof Metal Red Intact 0.1 Negative
10 Bldg. 60 Roof (over) Kitchen MUA1 Roof Metal Gray Intact 0.0 Negative
11 Bldg. 60 Roof (over) Kitchen MUA1 Support Beam Metal Red Intact 0.4 Negative
12 Bldg. 60 Roof (over) Kitchen MUA1 Support Beam Metal Cream Poor 0.2 Negative
13 Bldg. 60 Roof (over) Kitchen MUA1 Vent Pipe Metal Gray Intact 1.4 Positive
14 Bldg. 60 Roof (over) Kitchen MUA1 Vent Pipe Flashing Metal Gray Intact 20.6 Positive
15 Bldg. 60 Roof (over) Kitchen MUA1 Piping Metal Gray Intact 0.0 Negative
16 Bldg. 60 Roof (over) Kitchen MUA2 Metal Metal Gray Intact 0.0 Negative
17 Bldg. 60 Roof (over) Kitchen MUA2 Support Beam Metal Cream Poor 0.2 Negative
18 Bldg. 60 Roof (over) Kitchen MUA2 Exhaust Pipe Metal Gray Intact 0.0 Negative
19 Bldg. 60 Roof (over) Kitchen MUA2 Exhaust Pipe Flashing Metal Gray Intact 1.4 Positive
20 Bldg. 60 Roof (over) Kitchen MUA2 Exhaust Pipe Base Metal Gray Intact 71.0 Positive
21 Bldg. 60 Roof (over) Kitchen Window Sill Metal Cream Poor 1.3 Positive
22 Bldg. 60 Roof (over) Kitchen Window Sill Metal Cream Poor 1.4 Positive
23 Calibration 1.0
24 Calibration 1.0
25 Calibration 1.1
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
26 Calibration 1.1
27 Calibration 1.0
28 Calibration 1.0
29 Bldg. 18 - Stairway 2 Wall Plaster Cream Intact 0.0 Negative
30 Bldg. 18 - Stairway 2 Wall Plaster Cream Intact 0.4 Negative
31 Bldg. 18 - Stairway 2 Ceiling Plaster Cream Intact 0.0 Negative
32 Bldg. 18 - Stairway 2 Stair Tread Metal Black Intact 0.0 Negative
33 Bldg. 18 - Stairway 2 Stair Riser Metal Cream Intact 2.1 Positive
34 Bldg. 18 - Stairway 2 Rail Metal Cream Intact 3.5 Positive
35 Bldg. 18 - Stairway 2 Stair Stringer Metal Cream Intact 3.1 Positive
36 Bldg. 18 - Stairway 2 Door Jamb Metal Brown Intact 0.2 Negative
37 Bldg. 18 - H001 Door Jamb Metal Cream Intact 1.3 Positive
38 Bldg. 18 - H001 Bracket Metal Cream Intact 0.0 Negative
39 Bldg. 18 - H001 Wall Plaster Cream Intact 0.2 Negative
40 Bldg. 18 - H001 Wall Plaster Cream Intact 0.2 Negative
41 Bldg. 18 - H001 Breaker Case Metal Cream Intact 0.2 Negative
42 Bldg. 18 - H002 Wall Plaster White Intact 0.3 Negative
43 Bldg. 18 - H002 Wall Plaster White Intact 0.2 Negative
44 Bldg. 18 - H002 Door Jamb Metal White Intact 1.3 Positive
45 Bldg. 18 - H002 Door Jamb Metal Cream Intact 0.2 Negative
46 Bldg. 18 - H002 Bracket Metal Cream Intact 0.0 Negative
47 Bldg. 18 - 004 Wall Plaster White Intact 0.1 Negative
48 Bldg. 18 - 004 Wall Plaster White Intact 0.0 Negative
49 Bldg. 18 - 004 Wall Tile Ceramic Cream Intact 0.1 Negative
50 Bldg. 18 - 004 Stall Door Metal Tan Intact 0.0 Negative
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
51 Bldg. 18 - 004 Door Jamb Metal White Intact 0.1 Negative
52 Bldg. 18 - 005 Wall Plaster White Intact 0.0 Negative
53 Bldg. 18 - 005 Wall Plaster White Intact 0.1 Negative
54 Bldg. 18 - 005 Wall Tile Ceramic Yellow Intact 0.2 Negative
55 Bldg. 18 - 005 Stall Metal Cream Intact 0.0 Negative
56 Bldg. 18 - 002 Rail Metal Black Intact 3.9 Positive
57 Bldg. 18 - 002 Stair Stringer Metal Black Intact 3.6 Positive
58 Bldg. 18 - 002 Wall Brick Cream Poor 0.4 Negative
59 Bldg. 18 - 002 Wall Concrete Gray Poor 0.3 Negative
60 Bldg. 18 - 002 Wall Brick Gray Poor 0.4 Negative
61 Bldg. 18 - 002 Wall Concrete Cream Poor 0.4 Negative
62 Bldg. 18 - 002 Stair Tread Metal Black Intact 4.2 Positive
63 Bldg. 18 - 001 Wall Brick Cream Intact 1.3 Positive
64 Bldg. 18 - 001 Wall Concrete Gray Poor 1.7 Positive
65 Bldg. 18 - 001 Door Jamb Metal Cream Intact 1.4 Positive
66 Bldg. 18 - 001 Floor Concrete Gray Poor 2.6 Positive
67 Bldg. 18 - 003 Wall Plaster Cream Intact 0.2 Negative
68 Bldg. 18 - 003 Wall Plaster Cream Intact 0.3 Negative
69 Bldg. 18 - 003 Column Plaster Cream Poor 0.2 Negative
70 Bldg. 18 - 003 Floor Concrete Gray Poor 0.2 Negative
71 Bldg. 18 - 003 Door Jamb Metal Brown Intact 0.4 Negative
72 Bldg. 18 - 003A Door Jamb Metal Brown Intact 0.3 Negative
73 Bldg. 18 - 003A Wall Concrete Cream Intact 0.2 Negative
74 Bldg. 18 - 003A Floor Concrete Gray Poor 0.0 Negative
75 Bldg. 18 - 003A Radiator Metal Cream Poor 0.2 Negative
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
76 Bldg. 18 - 003A Radiator Metal Cream Poor 0.4 Negative
77 Bldg. 18 - 003A Door Jamb Metal Brown Intact 0.3 Negative
78 Bldg. 18 - 007 Door Jamb Metal Cream Intact 0.2 Negative
79 Bldg. 18 - 007 Wall Plaster White Intact 0.3 Negative
80 Bldg. 18 - 007 Wall Plaster White Intact 0.4 Negative
81 Bldg. 18 - 007 Window Sill Wood White Intact 0.2 Negative
82 Bldg. 18 - 007 Radiator Metal Cream Intact 0.2 Negative
83 Bldg. 18 - 008 Door Jamb Metal Cream Intact 0.2 Negative
84 Bldg. 18 - 008 Wall Plaster White Intact 0.0 Negative
85 Bldg. 18 - 008 Wall Plaster White Intact 0.1 Negative
86 Bldg. 18 - 008 Window Sill Wood Cream Intact 0.2 Negative
87 Bldg. 18 - 010 Door Jamb Metal Cream Intact 0.2 Negative
88 Bldg. 18 - 010 Wall Plaster White Intact 0.0 Negative
89 Bldg. 18 - 010 Wall Plaster White Intact 0.0 Negative
90 Bldg. 18 - 010 Window Sill Wood White Intact 0.0 Negative
91 Bldg. 18 - 011 Window Sill Wood White Intact 0.0 Negative
92 Bldg. 18 - 011 Door Jamb Metal Cream Intact 0.0 Negative
93 Bldg. 18 - 011 Wall Plaster White Intact 0.0 Negative
94 Bldg. 18 - 011 Wall Plaster White Intact 0.0 Negative
95 Bldg. 18 - 011 Window Case Wood White Intact 0.6 Negative
96 Bldg. 18 - 012 Window Case Wood White Intact 0.3 Negative
97 Bldg. 18 - 012 Window Sill Wood White Intact 0.2 Negative
98 Bldg. 18 - 012 Wall Plaster White Intact 0.0 Negative
99 Bldg. 18 - 012 Wall Plaster White Intact 0.0 Negative
100 Bldg. 18 - 012 Door Jamb Metal White Intact 0.2 Negative
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
101 Bldg. 18 - 013 Door Jamb Metal Cream Intact 0.2 Negative
102 Bldg. 18 - 013 Wall Plaster Cream Intact 0.3 Negative
103 Bldg. 18 - 013 Wall Plaster Cream Intact 0.2 Negative
104 Bldg. 18 - 013 Window Sill Wood White Intact 0.2 Negative
105 Bldg. 18 - 013 Window Case Wood White Intact 0.7 Negative
106 Bldg. 18 - 013 Radiator Metal Cream Intact 0.2 Negative
107 Bldg. 18 - 013 Piping Metal White Intact 0.0 Negative
108 Bldg. 18 - H003 Radiator Metal White Intact 0.1 Negative
109 Bldg. 18 - H003 Door Jamb Metal Cream Intact 0.2 Negative
110 Bldg. 18 - H003 Wall Plaster White Intact 0.2 Negative
111 Bldg. 18 - H003 Wall Plaster White Intact 0.2 Negative
112 Bldg. 18 - H002 Janitor Closet Door Jamb Metal Cream Intact 0.1 Negative
113 Bldg. 18 - H002 Janitor Closet Wall Plaster Cream Intact 0.2 Negative
114 Bldg. 18 - H002 Janitor Closet Wall Plaster Cream Intact 0.2 Negative
115 Bldg. 18 - H002 Janitor Closet Wall Tile Ceramic Yellow Intact 0.2 Negative
116 Bldg. 18 - H103 Wall Plaster Cream Intact 0.2 Negative
117 Bldg. 18 - H103 Wall Drywall White Intact 0.2 Negative
118 Bldg. 18 - H103 Door Jamb Metal Cream Intact 0.1 Negative
119 Bldg. 18 - 102 Door Jamb Metal Cream Intact 0.2 Negative
120 Bldg. 18 - 102 Wall Drywall White Intact 0.0 Negative
121 Bldg. 18 - 102 Wall Drywall White Intact 0.0 Negative
122 Bldg. 18 - 102 Wall Tile Ceramic Cream Intact 0.1 Negative
123 Bldg. 18 - 102 Stall Metal Cream Intact 0.0 Negative
124 Bldg. 18 - 101 Stall Metal Cream Intact 0.0 Negative
125 Bldg. 18 - 101 Wall Tile Ceramic Cream Intact 0.2 Negative
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
126 Bldg. 18 - 101 Wall Plaster White Intact 0.1 Negative
127 Bldg. 18 - 101 Wall Plaster White Intact 0.2 Negative
128 Bldg. 18 - 101 Door Jamb Metal Cream Intact 0.0 Negative
129 Bldg. 18 - 101 Vent Metal Cream Intact 0.0 Negative
130 Bldg. 18 - 101 Window Sill Wood Cream Intact 0.2 Negative
131 Bldg. 18 - 101 Window Case Wood Cream Intact 0.2 Negative
132 Bldg. 18 - H104 Wall Plaster Cream Intact 0.0 Negative
133 Bldg. 18 - H104 Wall Plaster Cream Intact 0.1 Negative
134 Bldg. 18 - H104 Radiator Metal Cream Intact 0.2 Negative
135 Bldg. 18 - H104 Ceiling Plaster Cream Poor 0.0 Negative
136 Bldg. 18 - 120 (H.K. Main Office) Window Sill Wood Cream Intact 0.2 Negative
137 Bldg. 18 - 120 (H.K. Main Office) Window Case Wood Cream Intact 0.4 Negative
138 Bldg. 18 - 120 (H.K. Main Office) Wall Plaster Cream Intact 0.0 Negative
139 Bldg. 18 - 120 (H.K. Main Office) Wall Plaster Cream Intact 0.0 Negative
140 Bldg. 18 - 120 (H.K. Main Office) Radiator Cover Metal Cream Intact 0.0 Negative
141 Bldg. 18 - 120 (H.K. Main Office) Bracket Metal Cream Intact 0.0 Negative
142 Bldg. 18 - 120 (H.K. Main Office) Door Jamb Metal Cream Intact 0.1 Negative
143 Bldg. 18 - H101 Wall Plaster White Intact 0.0 Negative
144 Bldg. 18 - H101 Wall Plaster White Intact 0.1 Negative
145 Bldg. 18 - H101 Door Jamb Metal White Intact 0.2 Negative
146 Bldg. 18 - H101 Door Jamb Metal White Intact 1.4 Positive
147 Bldg. 18 - H101 Door Jamb Metal White Intact 1.3 Positive
148 Bldg. 18 - 120 Door Jamb Metal Cream Intact 1.4 Positive
149 Bldg. 18 - 120 Wall Plaster White Intact 0.0 Negative
150 Bldg. 18 - 120 Wall Plaster White Intact 0.1 Negative
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
151 Bldg. 18 - 120 Window Sill Wood White Intact 0.0 Negative
152 Bldg. 18 - 120 Window Case Wood White Intact 0.0 Negative
153 Bldg. 18 - 119 Wall Plaster White Intact 0.0 Negative
154 Bldg. 18 - 119 Wall Plaster White Intact 0.0 Negative
155 Bldg. 18 - 119 Window Sill Wood White Intact 0.2 Negative
156 Bldg. 18 - 119 Window Case Wood White Intact 0.5 Negative
157 Bldg. 18 - 119 Floor Sink Metal White Intact 35.0 Positive
158 Bldg. 18 - 119 Vent Metal White Intact 0.2 Negative
159 Bldg. 18 - 119 Wall Tile Ceramic Yellow Intact 0.3 Negative
160 Bldg. 18 - 121 Wall Plaster White Intact 0.0 Negative
161 Bldg. 18 - 121 Wall Plaster White Intact 0.1 Negative
162 Bldg. 18 - 121 Ceiling Plaster White Intact 0.0 Negative
163 Bldg. 18 - 121 Bracket Metal Cream Intact 0.1 Negative
164 Bldg. 18 - 121 Door Jamb Metal Cream Intact 0.6 Negative
165 Bldg. 18 - 121 Radiator Cover Metal Cream Intact 0.1 Negative
166 Bldg. 18 - 121 Window Sill Wood White Intact 0.3 Negative
167 Bldg. 18 - 121 Window Case Wood White Intact 0.7 Negative
168 Bldg. 18 - 122 Door Jamb Metal Cream Intact 0.2 Negative
169 Bldg. 18 - 122 Radiator Cover Metal Cream Intact 0.0 Negative
170 Bldg. 18 - 122 Wall Plaster White Intact 0.2 Negative
171 Bldg. 18 - 122 Wall Plaster White Intact 0.3 Negative
172 Bldg. 18 - 122 Window Sill Wood White Intact 0.2 Negative
173 Bldg. 18 - 122 Window Case Wood White Intact 0.6 Negative
174 Bldg. 18 - 123 Window Sill Wood White Intact 0.4 Negative
175 Bldg. 18 - 123 Window Case Wood White Intact 0.7 Negative
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
176 Bldg. 18 - 123 Wall Plaster White Intact 0.1 Negative
177 Bldg. 18 - 123 Wall Plaster White Intact 0.0 Negative
178 Bldg. 18 - 123 Door Jamb Metal White Intact 0.3 Negative
179 Bldg. 18 - 123 Radiator Cover Metal White Intact 0.0 Negative
180 Bldg. 18 - 124 Radiator Cover Metal Cream Intact 0.0 Negative
181 Bldg. 18 - 124 Door Jamb Metal Cream Intact 0.4 Negative
182 Bldg. 18 - 124 Wall Plaster White Intact 0.3 Negative
183 Bldg. 18 - 124 Wall Plaster White Intact 0.2 Negative
184 Bldg. 18 - 124 Window Sill Wood White Intact 0.4 Negative
185 Bldg. 18 - 124 Window Case Wood White Intact 0.6 Negative
186 Bldg. 18 - 125 Window Sill Wood White Intact 0.0 Negative
187 Bldg. 18 - 125 Window Case Wood White Intact 0.5 Negative
188 Bldg. 18 - 125 Wall Plaster Cream Intact 0.3 Negative
189 Bldg. 18 - 125 Wall Plaster Cream Intact 0.2 Negative
190 Bldg. 18 - 125 Door Jamb Metal Cream Intact 0.1 Negative
191 Bldg. 18 - 125 Radiator Cover Metal Cream Intact 0.0 Negative
192 Bldg. 18 - 125 Bracket Metal Cream Intact 0.2 Negative
193 Bldg. 18 - 128 Door Jamb Metal Cream Intact 0.0 Negative
194 Bldg. 18 - 128 Radiator Cover Metal Cream Intact 0.0 Negative
195 Bldg. 18 - 128 Wall Plaster Cream Intact 0.1 Negative
196 Bldg. 18 - 128 Wall Plaster Cream Intact 0.2 Negative
197 Bldg. 18 - 128 Door Jamb Metal Cream Intact 0.1 Negative
198 Bldg. 18 - 128 Window Sill Wood Cream Intact 0.1 Negative
199 Bldg. 18 - 128 Window Case Wood Cream Intact 0.0 Negative
200 Bldg. 18 - 127 Window Sill Wood Cream Intact 0.1 Negative
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
201 Bldg. 18 - 127 Window Case Wood Cream Intact 0.0 Negative
202 Bldg. 18 - 127 Wall Plaster Cream Intact 0.2 Negative
203 Bldg. 18 - 127 Door Jamb Metal Cream Intact 0.0 Negative
204 Bldg. 18 - 127 Radiator Cover Metal Cream Intact 0.1 Negative
205 Bldg. 18 - 127 Bracket Metal Cream Intact 0.0 Negative
206 Bldg. 18 - 129 Door Jamb Metal Cream Intact 0.6 Negative
207 Bldg. 18 - 129 Bracket Metal Cream Intact 0.0 Negative
208 Bldg. 18 - 129 Radiator Cover Metal Cream Intact 0.0 Negative
209 Bldg. 18 - 129 Wall Plaster White Intact 0.2 Negative
210 Bldg. 18 - 129 Wall Plaster White Intact 0.3 Negative
211 Bldg. 18 - 129 Window Sill Wood White Intact 0.1 Negative
212 Bldg. 18 - 129 Window Case Wood White Intact 0.0 Negative
213 Bldg. 18 - 132 Door Jamb Metal White Intact 0.2 Negative
214 Bldg. 18 - 132 Radiator Cover Metal White Intact 0.0 Negative
215 Bldg. 18 - 132 Wall Plaster Cream Intact 0.2 Negative
216 Bldg. 18 - 132 Wall Plaster Cream Intact 0.0 Negative
217 Bldg. 18 - 132 Window Sill Wood White Intact 0.0 Negative
218 Bldg. 18 - 132 Window Case Wood White Intact 0.0 Negative
219 Bldg. 18 - 132 Bracket Metal White Intact 0.0 Negative
220 Bldg. 18 - 134 Door Jamb Metal White Intact 0.3 Negative
221 Bldg. 18 - 134 Radiator Cover Metal White Intact 0.0 Negative
222 Bldg. 18 - 134 Window Sill Wood White Intact 0.1 Negative
223 Bldg. 18 - 134 Window Case Wood White Intact 0.0 Negative
224 Bldg. 18 - 134 Wall Plaster White Intact 0.2 Negative
225 Bldg. 18 - 134 Wall Plaster White Intact 0.2 Negative
Kansas City, Kansas 66106 Englewood, CO 80110
LEAD-BASED PAINT SURVEY RESULTS
XRF: Heuresis Pb 200i Series, S/N: 1056
INSPECTOR: Joseph Taylor Survey Location: St. Louis V.A. Medical Center
KANSAS RADIATION LICENSE #: 22-B1028 1 Jefferson Barracks Dr.
SURVEY DATE: Aug. 29, 2019 St. Louis, MO 63125
Dwelling Construction Date (approx.): Pre-1978
SAMP BUILDING COMPONENT SUBSTRATE COLOR COND. XRF Reading Lead-
# LOCATION (mgcm2) based
226 Bldg. 18 - 133 Door Jamb Metal Cream Intact 0.5 Negative
227 Bldg. 18 - 133 Radiator Cover Metal Cream Intact 0.0 Negative
228 Bldg. 18 - 133 Wall Plaster Cream Intact 0.2 Negative
229 Bldg. 18 - 133 Wall Plaster Cream…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .