36C25520R0063-011.pdf
PDF Posted
- Solicitation number
- 36C25520R0063
About this file
This pre-solicitation notice seeks proposals for a competitive total set-aside contract to replace mechanical systems in Buildings 18 and 60 at the Jefferson Barracks Division of the VA Saint Louis Health Care System. The Department of Veterans Affairs will award a contract with a period of performance of 426 calendar days and a cost range between $2,000,000 to $5,000,000. The contractor must provide all labor, materials, tools and equipment to demolish existing structures and install new mechanical systems as specified in the drawings and specifications. The solicitation will be posted to FedBizOpps on April 7, 2020, with proposals due as specified therein. The contractor must self-perform at least 25% of construction labor under NAICS code 238220. Only one pre-solicitation site visit will be held and attendance is encouraged.
36C25520R0063 657-19-103JB - Combined Specifications 100PCT_Part5.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25520R0063-014.pdf | ||
| 36C25520R0063-016.pdf | ||
| 36C25520R0063-006.pdf | ||
| 36C25520R0063-008.pdf | ||
| 36C25520R0063-015.pdf | ||
| 36C25520R0063-004.pdf | ||
| 36C25520R0063-009.pdf | ||
| 36C25520R0063-002.docx | DOCX document | |
| 36C25520R0063-013.pdf | ||
| 36C25520R0063-007.pdf | ||
| 36C25520R0063-003.pdf | ||
| 36C25520R0063-010.pdf | ||
| 36C25520R0063-012.pdf | ||
| 36C25520R0063-005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1st FLOOR
2ND FLOOR
3RD FLOOR
ATTIC
2008 Reinspection Photographs
ST. LOUIS V. A. MEDICAL CENTER
JEFFERSON BARRACKS DIVISION
BUILDING 18
sample does not contain asbestos
JB-18-00-T-Z001-001A JB-18-00-T-Z001-002A
JB-18-00-F-S002-003A JB-18-00-F-010-004A
sample contains asbestos
JB-18-00-F-008-005A JB-18-01-F-115C-006A
JB-18-01-F-114-007A JB-18-01-F-H105-008A
JB-18-01-M- H102-009A JB-18-01-M- H101-010A
JB-18-01-F-122-011A JB-18-01-M-H102-012A
JB-18-02-F-215A-013A JB-18-02-F-216-014A
JB-18-02-F-H201-015A JB-18-03-S-RF-016A
JB-18-03-S-RF-017A
JB-18-00-F-011-018A
2008 Reinspection Laboratory Reports
Sample Location Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805370
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-00-T-Z001-
001A 390805370-0001 wht block TSI insulation debris
White Non-Fibrous
Heterogeneous
Chrysotile29%Non-fibrous (other)71%
JB-18-00-T-Z001-
002A 390805370-0002 brn paper insulation/(piping) debris
Brown Fibrous
Heterogeneous
Chrysotile9%Cellulose89% Non-fibrous (other)2%
JB-18-00-F-S002-
003A Floortile 390805370-0003 wht 12x12 w/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-S002-
003A Adhesive 390805370-0003A wht 12x12 w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-010-
004A Floortile 390805370-0004 wht 12x12/ylw mastic/grey 9x9/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-010-
004A Adhesive 390805370-0004A wht 12x12/ylw mastic/grey 9x9/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-18-00-F-010-
004A Floortile 390805370-0004B wht 12x12/ylw mastic/grey 9x9/blk mastic
Gray None Detected
Non-Fibrous
Heterogeneous
Cellulose4% Non-fibrous (other)96%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (12) mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805370
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-00-F-010-
004A Adhesive 390805370-0004C wht 12x12/ylw mastic/grey 9x9/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-18-00-F-008-
005A Floortile 390805370-0005 wht 12x12/ylw mastic/grey 9x9/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-008-
005A Adhesive 390805370-0005A wht 12x12/ylw mastic/grey 9x9/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)96% Quartz4%
JB-18-00-F-008-
005A Floortile 390805370-0005B wht 12x12/ylw mastic/grey 9x9/blk mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-18-00-F-008-
005A Adhesive 390805370-0005C wht 12x12/ylw mastic/grey 9x9/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805369
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
10100 Woolworth Road Keithville, LA 71047
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 1st floor (amended report issued 11/25/08).
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 11/25/2008
EMSL Analytical, Inc.
3029 S. Jefferson, Saint Louis, MO 63118 Phone: (314) 577-0150 Fax: (314) 776-3313 Email: saintlouislab@emsl.com
JB-18-01-F-115C-
006A Floortile 390805369-0001 grey 12x12 w/ylw mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-18-01-F-115C-
006A Adhesive 390805369-0001A grey 12x12 w/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-18-01-F-114-
007A Floortile 390805369-0002 carpet glue/grey 12x12/ylw mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-18-01-F-114-
007A Adhesive 390805369-0002A carpet glue/grey 12x12/ylw mastic
Various None Detected composite adhesive result
Non-Fibrous
Heterogeneous
Synthetic2% Non-fibrous (other)98%
JB-18-01-F-H105-
008A Floortile 390805369-0003 carpet glue/grey 12x12/ylw mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-18-01-F-H105-
008A Adhesive 390805369-0003A carpet glue/grey 12x12/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805369
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 1st floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-01-M-H101-
010A 390805369-0005 brn glue dot Brown None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-18-01-F-122-
011A Floortile 390805369-0006 carpet glue/wht 12x12/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-18-01-F-122-
011A Adhesive 390805369-0006A carpet glue/wht 12x12/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Synthetic2% Non-fibrous (other)98%
JB-18-01-F-122-
011A Adhesive 390805369-0006B carpet glue/wht 12x12/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)86% Quartz2%
JB-18-01-M-H102-
012A 390805369-0007 brn glue dot Brown None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805371
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 2nd floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-02-F-215A-
013A Adhesive 390805371-0001 carpet glue/brn flooring material/cloth backing
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-02-F-215A-
013A Flooring 390805371-0001A carpet glue/brn flooring material/cloth backing
Brown None Detected
Non-Fibrous
Heterogeneous
Cellulose9% Non-fibrous (other)91%
JB-18-02-F-215A-
013A Felt 390805371-0001B carpet glue/brn flooring material/cloth backing
Tan None Detected
Fibrous
Heterogeneous
Cellulose89% Non-fibrous (other)11%
JB-18-02-F-216-
014A Adhesive 390805371-0002 carpet glue/brn flooring material/cloth backing
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-02-F-216-
014A Flooring 390805371-0002A carpet glue/brn flooring material/cloth backing
Brown None Detected
Non-Fibrous
Heterogeneous
Cellulose9% Non-fibrous (other)91%
JB-18-02-F-216-
014A Felt 390805371-0002B carpet glue/brn flooring material/cloth backing
Tan None Detected
Fibrous
Heterogeneous
Cellulose89% Non-fibrous (other)11%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (9)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805371
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 2nd floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-02-F-H201-
015A Adhesive 390805371-0003 carpet glue/brn flooring material/cloth backing
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-02-F-H201-
015A Flooring 390805371-0003A carpet glue/brn flooring material/cloth backing
Brown None Detected
Non-Fibrous
Heterogeneous
Cellulose9% Non-fibrous (other)91%
JB-18-02-F-H201-
015A Felt 390805371-0003B carpet glue/brn flooring material/cloth backing
Tan None Detected
Fibrous
Heterogeneous
Cellulose89% Non-fibrous (other)11%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (9)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805372
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 Exterior
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-03-S-RF-
016A 390805372-0001 roofing shingles Various None Detected
Non-Fibrous
Heterogeneous
Glass19% Non-fibrous (other)79% Quartz2%
JB-18-03-S-RF-
017A 390805372-0002 roofing tar Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (2)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805376
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-00-F-011-
018A Floortile 390805376-0001 wht 12x12/ylw mastic/grey 9x9/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-011-
018A Adhesive 390805376-0001A wht 12x12/ylw mastic/grey 9x9/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-011-
018A Floortile 390805376-0001B wht 12x12/ylw mastic/grey 9x9/blk mastic
Gray None Detected
Non-Fibrous
Heterogeneous
Cellulose4% Non-fibrous (other)96%
JB-18-00-F-011-
018A Adhesive 390805376-0001C wht 12x12/ylw mastic/grey 9x9/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (4)
Certifications
1139 Olive Street, Suite 300 – Saint Louis, MO 63101 ph 314-436-9492 – fx 314-436-9733
RSH-STL.com
2018 ASBESTOS & LEAD REINSPECTION
at
BUILDING 60
VA JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DR.
ST. LOUIS, MO. 63125
PREPARED FOR
St. Louis V. A. Medical Center
1 Jefferson Barracks Dr.
St. Louis, MO. 63125
RIVERFRONT PROJECT NO. SH1476
June 24, 2019
ENVIRONMENTAL, HEALTH AND
SAFETY CONSULTANTS
General Industrial Hygiene Exposure Assessment and Risk Management
Indoor Air Quality Investigations
Asbestos & Lead-Based Paint Inspection and Risk Management
Hazard Communication Programs
Hazardous Noise & Hearing Conservation Programs
OSHA Compliance Program Development
Phase I & II ESA— Due Diligence
Brownfields Redevelopment
Environmental Risk Assessment
Underground Storage Tank Management
Subsurface Investigation/Remediation
Remediation Oversight
CERCLA / RCRA
and more…
1139 Olive Street, Suite 300 – Saint Louis, MO 63101 ph 314-436-9492 – fx 314-436-9733 RSH-STL.com
June 24, 2019
RIVERFRONT PROJECT NO. SH1476
Mr. Michael Beitenman St. Louis VAMC – John Cochran Division Project Engineer 915 North Grand Ave St. Louis, MO 63106
RE: 2018 Asbestos/Lead Re-Inspection and Management Plan; Building 60
Dear Mr. Beitenman:
Riverfront Safety & Health (Riverfront) is pleased to present the following summary of findings from the asbestos/lead re-inspection and assessment performed from June 2018 through June 2019.
Sincerely, Riverfront Safety & Health, LC
Justin R. Rhyneer, CIH
2018 Asbestos/Lead Inspection Report St. Louis Jefferson Barracks VAMC – Bldg. 60
TABLE OF CONTENTS
SECTION DESCRIPTION
0.0 Definitions
1.0 Introduction
2.0 Scope of Work
3.0 Management Plan Recommendations
4.0 Limitations
5.0 Asbestos Containing Material Homogenous Material/Area Summary Tables and Drawings (w/sample locations; HMA locations; ACM color coding)
6.0 ACM Condition & Removal Priority Table with Abatement Cost Estimates
7.0 Master Bulk Sample Summary Tables
8.0 Asbestos Inspection Photo Log
9.0 Asbestos Inspection Laboratory Reports
10.0 Professional Certifications
11.0 Periodic Surveillance Forms
12.0 Management Plan Updates
13.0 Response Actions
14.0 Training Documents
15.0 Annual Notification Letters
16.0 Limited Lead Survey Summary Tables
17.0 Previous Inspection Reports
This 2018 Asbestos/Lead Re-inspection report was provided by:
CONTRACTOR:
Riverfront Safety & Health, LC 1139 Olive Street, Suite 300 St. Louis, MO 63101
(314) 436-9492 (Office)
(314) 436-9733 (Fax)
ASBESTOS/LEAD INSPECTORS:
Zachary Haselhorst MO Asbestos Certification No. 7118111618MOIR16667
MO Lead Certification No. 160229-300004899
ASBESTOS MANAGEMENT PLANNER:
Justin Rhyneer, CIH MO Certification No. 7011092718MOMPR8065
Accreditation Agencies: Missouri Department of Natural Resources (Asbestos) and Missouri Department of Public Health (Lead)
SECTION 0
DEFINITIONS
Section 0.0 DEFINITIONS
0.1 AHERA refers to the EPA Asbestos Hazard Emergency Response Act. Asbestos regulations for schools issued in 1987.
0.2 Asbestos shall mean chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos and any of these minerals that have been chemically treated and/or altered. This definition includes all “Presumed Asbestos Containing Materials
(PACM)”.
0.3 Asbestos Containing Building Material (ACBM) means any building material containing more than 1% asbestos.
0.4 Asbestos Containing Material (ACM) means any material containing more than 1% asbestos.
0.5 Asbestos Abatement refers to the procedures to control fiber release from asbestos-containing materials, typically during removal. Includes removal, encapsulation, enclosure, demolition and renovation activities related to asbestos.
0.6 Certified Industrial Hygienist (CIH) refers to one certified in the general practice of industrial hygiene by the American Board of Industrial Hygiene. An industrial hygienist Certified in Comprehensive Practice by the American Board of Industrial Hygiene.
0.7 Disturbance refers to activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM. Disturbance includes cutting away small amounts of ACM or PACM, no greater than the amount that can be contained in one standard sized glove bag or waste bag in order to access a building component.
0.8 Dry shall mean having no apparent wetness through visual or tactile means in the opinion of the Owner’s Representative.
0.9 Encapsulant refers to a material that surrounds or embeds asbestos fibers in an adhesive matrix and prevents the release of fibers.
0.10 Encapsulation refers to treating ACM with an encapsulant.
0.11 Friable Asbestos shall mean any asbestos containing material that can be crumbled or pulverized by hand.
0.12 Homogenous Material Area (HMA) refers to any distinct building material (carpet; floor tile; pipe insulation; stucco; etc.) that has been identified/observed in a given area (Building; Floor; Room), and has been included in this assessment effort.
0.13 HVAC refers to Heating, Ventilation and Air Conditioning systems.
0.14 Industrial hygienist (IH) refers to a professional qualified by education, training, and experience to anticipate, recognize, evaluate and develop controls for occupational health hazards.
0.15 Intact refers to when an ACM has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.
0.16 Lead Based Paint refers to paint exhibiting a lead content equal to or greater than 1.0 mg/cm2, as defined by The U.S. EPA.
0.17 Management Planner refers to a person who has successfully completed the training requirements for an asbestos management planner as required by 40 CFR 763 Appendix C, Part I.
0.18 National Emission Standards for Hazardous Air Pollutants (NESHAPs) refers to EPA's rule to control emissions of asbestos to the environment.
0.19 OSHA shall refer to The Occupational Safety & Health Administration – A regulatory agency charged with enforcing the lawful protection of workers.
0.20 Owner refers to any person or entity who owns, leases, operates, controls, or supervises the facility being demolished or renovated or any person who owns, leases, operates, controls, or supervises the demolition or renovation operation, or both.
0.21 Owner’s Representative shall be the person or firm responsible for giving directions to
Contractor and measure Contractor’s performance.
0.22 Polarized light microscopy (PLM) – Refers to light microscopy using dispersion staining techniques and refractive indices to identify and quantify the type(s) of asbestos present in a bulk sample.
0.23 Presumed ACM (PACM) refers to thermal system insulation, surfacing, and flooring material installed in buildings prior to 1981.
0.24 Project designer refers to a person who has successfully completed the training requirements for an asbestos abatement project designer as required by 40 CFR 763 Appendix C, Part I.
0.25 Regulated ACM (RACM) refers to friable ACM; Category I non-friable ACM that has become friable; Category I no friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading or; Category II no friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of the demolition or renovation operation.
0.26 Removal refers to all operations where ACM, PACM and/or RACM is taken out or stripped from structures or substrates, including demolition operations.
0.27 Renovation refers to altering a facility or one or more facility components in any way, including the stripping or removal of asbestos from a facility component which does not involve demolition activity.
0.28 Surfacing ACM refers to a material containing more than 1 percent asbestos that is sprayed, troweled on or otherwise applied to surfaces for acoustical, fireproofing and other purposes.
0.29 TEM refers to Transmission Electron Microscopy, which is the laboratory analysis method prescribed by EPA (AHERA) for the analysis of bulk samples from non-organically bound resilient flooring materials, such as vinyl floor tiles, due to its ability to detect and measure asbestos fibers that are too small to be observed using standard PLM analysis methods.
0.30 Thermal System Insulation (TSI) refers to a material containing more than 1 percent asbestos and applied to pipes, fittings, boilers, breeching, tanks, ducts, or other structural components to prevent heat loss or gain.
0.31 VA Representative refers to The VA official responsible for on-going project work, which is typically the VA Project Engineer.
0.32 Visible emissions refers to any emissions, which are visually detectable without the aid of instruments, coming from the disturbance, removal or renovation of ACM/PACM/RACM or ACM waste material.
0.33 Wet, Wetted or Adequately Wetted shall mean moistened with a wetting agent (amended water) such that the liquid is able to thoroughly penetrate ACM and exhibits no signs or potential for visible emissions.
SECTION 1.0
INTRODUCTION
Section 1.0 INTRODUCTION
The Veterans Administration, and more specifically The St. Louis VA Medical Center Engineering Department, through the VISN 15 Contracting Office (Contract No. 36C25518C0113), retained Riverfront Safety & Health, LC (RSH) to conduct an asbestos-containing material (ACM) and limited lead based paint (LBP) survey in accordance with the VA contract specifications, as well as to recommend asbestos management procedures and cost estimates for the VA John Cochran Medical Center (VAMC) in St. Louis, MO.
Full size drawings that indicate the locations of bulk samples, homogenous materials and ACM have also been prepared as part of this project. All results, recommendations, cost estimates and drawings have been provided within this written package (1 set for each building), as well as in electronic format (3 x CD sets for each building).
This campus wide survey, which included the collection of over 2600 asbestos bulk samples and over 13,000 lead samples from all surveyed buildings at the Jefferson Barracks VAMC Campus, and was conducted from December 2018 through July 2019. The lead project asbestos and lead inspector was Mr. Zachary Haselhorst, with Asbestos Management Plan support from Mr. Justin Rhyneer, CIH, both accredited through the Missouri Department of Natural Resources as licensed asbestos inspectors. Certifications of additional field inspection team personnel can be found within Section 10 of this report.
The quality control review for this survey was conducted by Mr. Justin Rhyneer, CIH, who is licensed by the Missouri Department of Natural Resources as a licensed Asbestos Building Inspector and Asbestos Management Planner and is also an accredited lead inspector/risk assessor.
All asbestos bulk samples have been collected and analyzed in accordance with EPA Method 600/ R-93/116, Polarized Light Microscopy (PLM) coupled with dispersion staining techniques.
All lead bulk samples were collected using a Heuresis X-Ray Fluorescence (XRF) machine (Model Pb200i; SN1920; Co-57 5mCi source; Reference Date 6/1/18), which was calibrated at the beginning and end of each shift using NIST standards.
Primary laboratory analysis has been provided by EMSL Laboratories (EMSL), Inc., which participates in the NIST-NVLAP (National Voluntary Laboratory Accreditation Program No.
200742-0) and is an AIHA (American Industrial Hygiene Association) accredited laboratory (Lab No. 102636).
Secondary quality control split sample analysis has been performed for quality control purposes by Batta Laboratories (NVLAP 101032-0; AIHA 100448).
SECTION 2.0
SCOPE OF WORK
Section 2.0 SCOPE OF WORK
Riverfront conducted an ACM & LBP Assessment, in accordance with applicable requirements of The Scope of Work, as outlined within VA Contract Number 36C25518C0113, including Amendments 1, 2 & 3. Riverfront was responsible for implementing all technical and logistical requirements of this task, including those specified in The Scope of Work. All work was performed by qualified and licensed individuals.
1.0 TARGET BUILDINGS
a. Jefferson Barracks VAMC Campus Scope Buildings/Structures: 1, 1T, 2, 3, 3T, 18, 23, 24, 25, 35, 49, 51, 51T, 52, 53, 53T, 55, 56, 56G, 57, 58, 59, 60, 60T, 75, 83, 84, 86, 87, 89, 90, 91, 93, 99
b. John Cochran VAMC Campus Scope Buildings: 1, 1T, 2, 3, 4, 6, 6A, 7, 7A, 8, 8A, 8B, 11, 14, 16
2.0 FIELD INSPECTION STRATEGY
a. Asbestos Survey
i. The inspection performed as part of this survey complies with the requirements set forth within the EPA-AHERA regulatory guidance documents pertaining to the inspection of buildings for the presence, quantity and condition of ACM of all accessible spaces for in scope buildings.
ii. Ultimate objective was to show current conditions by:
1. Study/assess/verify 2008 Altec inspection report for each building as work progresses through each campus
2. Reconcile 2008 report with subsequent construction projects that included ACM removal:
a. Reference VHA NRM project list and review scope documents and record documents as needed to assess impacts to ACM inspection scope (no ACM scope = presume same as previous)
b. Reference historical project records to assess impacts to inspection scope (no ACM scope = presume same as previous)
3. Perform additional bulk sampling as needed to close data gaps within 2008 report and/or subsequent remediation work, as follows:
a. No change in material = no sampling; assess condition only
b. Omitted SACM (Suspect Asbestos Containing Material) = collect minimum of 3 samples
c. New SACM = collect minimum of 3 samples
d. Collection of additional bulk samples was made such that damage to existing suspect materials, which is unavoidable for asbestos bulk sampling efforts, is reasonably inconspicuous (i.e. behind doors; under equipment; etc.).
4. Each facility (i.e. building; space; etc. included in scope of work by contract) was inspected by an individual licensed through the State of Missouri as an asbestos inspector holding a current license for such.
5. For each facility, the inspector performed the following tasks:
a. Visually inspected, sampled, analyzed and assessed the condition of all friable known, suspected or assumed ACBM.
b. Visually inspected, sampled, analyzed and assessed suspect material considered non-friable ACBM.
c. Collected bulk samples of any building materials suspected as being ACBM, whether friable or non-friable, to determine asbestos content and regulatory status.
d. Recorded above information on field inspection forms for each facility.
6. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each inspection and assessment, per facility.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
7. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central location.
8. The date(s) of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed
ACBM.
9. If sample were collected, the exact locations where samples were collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector collecting the samples, state of accreditation, and his or her accreditation number.
10. Any assessments or reassessments made of ACBM, the name and signature of the accredited inspector making the assessments, state of accreditation and his or her accreditation number.
b. Limited Lead Paint Survey
i. XRF sampling efforts were limited to following surfaces for each room/space
(hallways & other common spaces to be treated as a single room) encountered in buildings throughout both campuses:
1. Door jamb/frame x 1
2. 4 main walls (north; south; east; west) x 1 each
a. Shooting outermost walls for 4 main wall shots
b. One additional wall shot collected if secondary painted wall material noted for confirmation purposes (i.e. shoot plaster walls above drop ceiling where accessible)
3. Hard ceilings x 1 (acoustical drop ceilings excluded)
a. Shoot lowest level exposed hard ceiling
b. If concealed by acoustical drop, remove tile for access to painted hard ceiling surface for sample collection
4. Suspect wall fixtures/materials (i.e. ceramic tile) x 1 each per room
(maximum)
ii. All XRF sample data points reported, including results showing lead levels above 0 but below the standard limit of 1.0 mg/cm2 for Lead Based Paint as defined by EPA. Paint layers containing lead below LBP limit may be actionable for future OSHA compliance purposes.
c. ICRA Considerations
i. Inspection Team completed ICRA forms and submitted for VA consideration prior to field activities within each building.
ii. VA ICRA Team identified “special” or “High Risk” areas for consideration in the planning/phasing/scheduling of field inspection activities, as delineated within maps provided by VA.
iii. Above ceiling inspections were carried out in a manner reflective of risk ranking as assigned and approved on ICRA worksheet, as follows:
1. HEPA cart (i.e. pre-manufactured cart with HEPA filtered air machines) required in all High-Risk areas
2. HEPA cart use will be limited by reasonable access restrictions (desks;
small doorways; etc.); lack of access in High Risk areas will be assessed conservatively and with worst case assumptions made accordingly
3. HEPA cart use may be dismissed if only displacing one ceiling tile at a time in Non-High-Risk areas
SECTION 3.0
MANAGEMENT PLAN RECOMMENDATIONS
| 028211A TRADITIONAL ASBESTOS ABATEMENT REPORT |
| 6.5 - JB-60-Report.pdf (p.320-516) |
| JB-Draft-60-Report |
| CoverLetter60 |
| JB-Draft-1-Report |
| JB-Draft-1-Report |
| SH1476-Final-1 |
| SH1476-Final-1 |
| SH1476-Final-2 |
| SH1476-Final-2 |
| SH1476-Final-2 |
| SH1476-Final-2 |
| CoverLetter60 |
| Section 0.0 DEFINITIONS |
| Summary-60 |
| JB-Draft-60-Report |
| 60-tunnels |
| Sheets and Views |
| Model |
| JB-Draft-60-Report |
| 60-floor |
| Sheets and Views |
| Model |
| 60-misc |
| Sheets and Views |
| Model |
| 60-surface |
| Sheets and Views |
| Model |
| 60-TSI |
| Sheets and Views |
| Model |
| 60-sample |
| Sheets and Views |
| Model |
| 60-TSI |
| JB-Draft-60-Report |
| CoverLetter60 |
| 60-condition |
| ACMSummary60 |
| JB-Draft-60-Report |
| CoverLetter60 |
| BulkSample60 |
| JB-Draft-60-Report |
| CoverLetter60 |
| Bldg 60 Photo Log |
File details come from the government source that posted it. Updated .