This pre-solicitation notice announces a forthcoming solicitation for replacement of mechanical systems in two buildings at the Jefferson Barracks Division of the VA Saint Louis Health Care System. The project cost is estimated between $2-5 million. The NAICS code is 238220, with a small business size standard of $16.5 million. The duration is estimated at 426 calendar days. This project is a competitive total set-aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation will be posted on April 7, 2020 to FedBizOpps. A site visit is scheduled and attendance is encouraged. No hard copies will be provided and phone questions will not be accepted. Questions shall be emailed to the specified addresses. The successful prime contractor must perform at least 25% of construction labor. Registration in SAM and VetBiz is required to submit an offer, which shall be evaluated using Best Value Lowest Price Technically Acceptable. Award will be made without discussions unless necessary.
36C25520R0063 657-19-103JB - Combined Drawings 100PCT_Part1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25520R0063-014.pdf | ||
| 36C25520R0063-016.pdf | ||
| 36C25520R0063-011.pdf | ||
| 36C25520R0063-006.pdf | ||
| 36C25520R0063-008.pdf | ||
| 36C25520R0063-015.pdf | ||
| 36C25520R0063-004.pdf | ||
| 36C25520R0063-009.pdf | ||
| 36C25520R0063-002.docx | DOCX document | |
| 36C25520R0063-013.pdf | ||
| 36C25520R0063-007.pdf | ||
| 36C25520R0063-010.pdf | ||
| 36C25520R0063-012.pdf | ||
| 36C25520R0063-005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 160 VO LTS
D UST CO LLECTO R
LIQ
UEFIED PETRO
LEUM
G
AS
FLAM
M
ABLE G
AS 2
TRASH CO M PACTO R
P S
ILVER
B
UILDING
1 23
B UILDING 23
VA PO LICE
E LECTR IC AC CESS
TRANSFO RM ER
TRANSFO RM ER
TRANSFO RM ER
H VAC UNIT
E LECTRI C PANEL
H VAC UNIT
S&C PAD M O UNTED G EAR
CATALO G # 55152-C3DG IG 2P1V M O DEL# PM H-9E E13299 SG -52
13278
1CC
56G
3T 183
1CC
1G
1CC
5 4
4T
60G 51T
60T
52SG
52G
53G 53T
1CC
104T
102T
101T
1CC
55G th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:3 :5
P
M
00-GI-001
COVER SHEET FCA - REPLACE MEHCANICAL
SYSTEMS BLDG 18 & 60
TL SD
18 & 60
Drawing # 1 of 77
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
VA PROJECT NUMBER: 657-19-103JB
JEFFERSON BARRACKS
##-XX-###
SG = STRUCTURAL GENERAL
SF = STRUCTURAL FRAMING
MG = MECHANICAL GENERAL
MP = MECHANICAL PIPING
MH = MECHANICAL HVAC
PG = PLUMBING MEDICAL GAS
PL = PLUMBING FIXTURES
EG = ELECTRICAL GENERAL
EL = ELECTRICAL LIGHTING
DRAWING INDEX LEGEND
SHEET TYPE DESIGNATORS
0 = GENERAL
1 = PLANS
2 = ELEVATIONS
3 = SECTIONS
4 = LARGE-SCALE VIEWS
5 = DETAILS
6 = SCHEDULES & DIAGRAMS
7 = USER DEFINED
8 = USER DEFINED
9 = 3D REPRESENTATIONS
BUILDING NUMBER
FLOOR NUMBER ON PLAN SHEETS
SHEET NUMBER
OVERALL CAMPUS SITE PLAN, BUILDING NUMBER, AND PROJECT LOCATOR
P la n N or th
True North
FCA - REPLACE MECHANICAL
SYSTEMS BLDG 18 & 60
PROJECT
LOCATION
PROJECT
LOCATION
SHEET INDEX
SHEET
NUMBER SHEET NAME
00-GI-001 COVER SHEET
00-AS-101 ARCHITECTURAL SITE PLAN
00-AE-501 CHILLER PAD PLAN & STRUCTURAL DETAILS
18-AL-101 ARCHITECTURAL LIFE SAFETY AND PHASING PLAN
18-AL-102 ARCHITECTURAL LIFE SAFETY AND PHASING PLAN
60-AL-101 ARCHITECTURAL LIFE SAFETY AND PHASING PLAN
18-AD-101 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FLOOR 00
18-AD-111 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FLOOR 01
18-AD-121 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FLOOR 02
18-AD-131 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FLOOR 03
60-AC-101 ARCHITECTURAL REFLECTED CEILING PLAN - FLOOR 01
00-MG-001 MECHANICAL ABBREVIATIONS AND GENERAL NOTES
00-MG-002 MECHANICAL SYMBOLS
00-MG-501 MECHANICAL DETAILS
00-MG-502 MECHANICAL DETAILS
00-MG-503 MECHANICAL DETAILS
00-MG-504 MECHANICAL DETAILS
00-MG-505 MECHANICAL DETAILS
00-MG-506 MECHANICAL DETAILS
00-MG-507 MECHANICAL DETAILS
00-MG-508 MECHANICAL DETAILS
00-MG-601 MECHANICAL EQUIPMENT SCHEDULES
00-MG-602 MECHANICAL EQUIPMENT SCHEDULES
00-MG-701 MECHANICAL CONTROLS
00-MG-702 MECHANICAL CONTROLS
18-MG-801 MECHANICAL PHASING PLAN
18-MD-101 MECHANICAL DEMOLITION PLAN - SUB-BASEMENT
18-MD-102 MECHANICAL DEMOLITION PLAN - FLOOR 00
18-MD-111 MECHANICAL DEMOLITION PLAN - FLOOR 01
18-MD-121 MECHANICAL DEMOLITION PLAN - FLOOR 02
18-MD-131 MECHANICAL DEMOLITION PLAN - FLOOR 03
18-MD-141 MECHANICAL DEMOLITION PLAN - FLOOR 04
18-MH-101 MECHANICAL HVAC PLAN - FLOOR 00
18-MH-111 MECHANICAL HVAC PLAN - FLOOR 01
18-MH-121 MECHANICAL HVAC PLAN - FLOOR 02
18-MH-131 MECHANICAL HVAC PLAN - FLOOR 03
18-MH-141 MECHANICAL HVAC PLAN - FLOOR 04
18-MH-401 MECHANICAL HVAC LARGE-SCALE VIEWS
18-MH-601 MECHANCIAL RISER DIAGRAM - HVAC
18-MP-100 MECHANICAL PIPING PLAN - SUB-BASEMENT
18-MP-101 MECHANICAL PIPING PLAN - FLOOR 00
18-MP-111 MECHANICAL PIPING PLAN - FLOOR 01
18-MP-121 MECHANICAL PIPING PLAN - FLOOR 02
18-MP-131 MECHANICAL PIPING PLAN - FLOOR 03
18-MP-401 MECHANICAL PIPING LARGE-SCALE VIEWS
18-MP-601 MECHANCIAL RISER DIAGRAM - PIPING
60-MD-111 MECHANICAL DEMOLITION PLAN - FLOOR 01
60-MD-121 MECHANICAL DEMOLITION PLAN - FLOOR 02
60-MH-111 MECHANICAL HVAC PLAN - FLOOR 01
60-MH-121 MECHANICAL HVAC PLAN - FLOOR 02
00-EG-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
00-EG-002 ELECTRICAL SYMBOLS
00-EG-501 ELECTRICAL DETAILS
00-EG-502 ELECTRICAL SEISMIC DETAILS
18-EG-503 ELECTRICAL PANEL SCHEDULES
18-EG-504 ELECTRICAL EQUIPMENT SCHEDULE
18-EG-601 ELECTRICAL ONE LINE
18-ED-101 ELECTRICAL DEMOLITION PLAN - FLOOR 00
18-ED-111 ELECTRICAL DEMOLITION PLAN - FLOOR 01
18-ED-121 ELECTRICAL DEMOLITION PLAN - FLOOR 02
18-ED-131 ELECTRICAL DEMOLITION PLAN - FLOOR 03
18-EP-101 ELECTRICAL POWER PLAN - FLOOR 00
18-EP-111 ELECTRICAL POWER PLAN - FLOOR 01
18-EP-121 ELECTRICAL POWER PLAN - FLOOR 02
18-EP-131 ELECTRICAL POWER PLAN - FLOOR 03
18-EI-101 ELECTRICAL INSTRUMENTATION PLAN - FLOOR 00
18-EI-111 ELECTRICAL INSTRUMENTATION PLAN - FLOOR 01
18-EI-121 ELECTRICAL INSTRUMENTATION PLAN - FLOOR 02
18-EI-131 ELECTRICAL INSTRUMENTATION PLAN - FLOOR 03
60-ED-111 ELECTRICAL DEMOLITION PLAN - FLOOR 01
60-ED-121 ELECTRICAL DEMOLITION PLAN - FLOOR 02
60-EP-111 ELECTRICAL POWER PLAN - FLOOR 01
60-EP-121 ELECTRICAL POWER PLAN - FLOOR 02
60-EI-111 ELECTRICAL INSTRUMENTATION PLAN - FLOOR 01
60-EI-121 ELECTRICAL INSTRUMENTATION PLAN - FLOOR 02
60-EG-501 ELECTRICAL PANEL SCHEDULES
60-EG-601 ELECTRICAL ONE LINE
DISCIPLINE DESIGNATORS EXAMPLES
GI = GENERAL INFORMATION
GC = GENERAL CONTRACT
CS = CIVIL SITE
AD = ARCHITECTURAL DEMOLITION
AS = ARCHITECTURAL SITE
AE = ARCHITECTURAL ELEMENTS
FLOOR PLANS, ELEVATIONS, DETAILS
AI = ARCHITECTURAL INTERIORS
AG = ARCHITECTURAL GRAPHICS
AF = ARCHITECTURAL FINISHES
AC = ARCHITECTURAL CEILING PLAN
AW = ARCHITECTURAL WAYFINDING
AP = ARCHITECTURAL SPACE PLANNING
FLOOR PLANS & SCHEDULES
AL = ARCHITECTURAL LIFE SAFETY
DRAWINGS
AREA MAP
N o rt h
Robert Thornbrugh
MVP
4 160 VO LTS
D UST CO LLEC TO R
L
IQ
UE
FIED
PETR
O
LEUM
G
AS
F
LAM
M
A
BLE G
AS 2
T RAS H CO M PAC TO R
P S
IL
VER
B
UILD
ING
1 23
B UIL DING 23
V A PO LICE
E LE CT RIC A CCE SS
T RAN SFO R M ER
T RAN SFO R M ER
T RAN SFO R M ER
H VA C U NIT
E LE CTR IC PAN EL
H VA C U NIT
S &C PA D M O U NTED G EAR
C ATAL O G # 55152 -C3DG IG 2P1 V M O D EL# P M H-9E E13 299 SG -52
1 3278
REFER TO DETAIL 1/00-AE-501
FOR ENLARGED PLAN.
TEMPORARY GRAVEL LOT FOR
CONSTRUCTION STAGING
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:3 :5
P
M
00-AS-101
ARCHITECTURAL SITE PLAN FCA - REPLACE MEHCANICAL
SYSTEMS BLDG 18 & 60
MVP SD
18 & 60
Drawing # 2 of 77
Plan North
True North
1" = 100'-0"
ARCHITECTURAL SITE PLAN
EXISTING CHILLER AND PAD TO BE
REMOVED. REFER TO MECHANICAL
DRAWINGS FOR MORE INFORMATION.
LINE OF NEW
CHILLER
6"
4"
6' - 0" 7' - 4 3/4" 6' - 0"
4"
6"
/4
LINE OF EXISTING CURB
EXISTING MECHANICAL AREA WELL
M30-P1 BOLLARD SYSTEM. TYP.
SEE DETAIL 2/00-AE-501.
A
A
B B
/4
21' - 0 3/4"
1' - 6" 8" 9' - 11 3/8" 9' - 9 3/8" 8" 1' - 6"
5' - 10" 5' - 10"
SEE PLAN
#4 BARS @ 12" O.C.
EXISTING GRADE
NEW CHILLER. SEE
MECHANICAL.
8"
1" CHAMFER (ALL SIDES
4" FENCE POST (BY
CONTRACTOR). SET IN
CONCRETE 4" MIN.
EMBEDMENT DEPTH.
LINE OF EXISTING BUILDING
#4 BARS @ 12" O.C.
NEW CHILLER. REFER TO
MECHANCIAL DRAWINGS.
#4 BARS @ 12" O.C.
8"
(M A
X
#4 BARS @ 12" O.C.6
SEE PLAN
8"
6"
4" FENCE POST (BY
CONTRACTOR). SET IN
CONCRETE 4" MIN.
EMBEDMENT DEPTH
1" CHAMFER
(ALL SIDES)
6"
1" CHAMFER (ALL SIDES)
4" FENCE POST (BY
CONTRACTOR). SET IN
CONCRETE 4" MIN.
EMBEDMENT DEPTH.
3" MIN. COVER (TYP.)
4"
FIXED BOLLARD IN
REINFORCED
CONCRETE FOOTINGDIRECTION OF
IMPACT
CONCEPTUAL SECTION VIEW
NOTES:
1. CONTRACTOR SHALL PROVIDE M30-P1 BOLLARD SYSTEMS, PER ASTM F256-07.
2. INSTALLATION AND LOCATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
3. DO NOT SCALE DRAWINGS.
4. CONTRACTOR SHALL HAVE BOLLARDS DESIGNED BY MANUFACTURER TO MEET PROJECT REQUIREMENTS.
5. ALL INFORMATION CONTAINED HERIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED
AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:3 :5
P
M
00-AE-501
CHILLER PAD PLAN & STRUCTURAL
DETAILS
18 & 60
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
MVP SD Drawing # 3 of 77
3/16" = 1'-0"
PLAN DETAIL @ NEW CHILLER PAD
1" = 1'-0"
SECTION A-A
1" = 1'-0"
SECTION B-B
GENERAL STRUCTURAL NOTES:
1. THE DRAWINGS INDICATE THE SIZE AND RELATIVE LOCATION OF
STRUCTURAL MEMBERS, THE DESIGN LOADS AND OTHER
INFORMATION PERTINENT TO THE STRUCTURAL DESIGN. THEY
DO NOT INDICATE THE METHODS OF CONSTRUCTION.
2. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS
BEFORE BEGINNING CONSTRUCTION.
3. THE CONTRACTOR HAS THE OPTION TO INSTALL THE SLAB IN
ACCORDANCE WITH SECTION B-B IF THE SLAB SHOWN IN
SECTION A-A CANNOT BE ACHIEVED DUE TO THE SLOPE OF THE
EXISTING GRADE RESULTING IN AN EXCESS OF CUTTING AND
FILLING FOR A LEVEL SLAB.
CONCRETE AND SLAB NOTES:
1. REINFORCING BARS MUST CONFORM TO ASTMA615 (60KSI).
2. CONCRETE MUST HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH
(f'c) OF 3000PSI. (AIR ENTRAINED)
3. ALL SLAB EDGES SHALL BE CHAMFERED 1" ON EXPOSED EDGES U.N.O.
4. MAINTAIN A MINIMUM OF 6" CONCRETE EDGE DISTANCE FROM
EDGE OF FENCE POST AND EDGE OF CONCRETE SLAB.
5. CAST-IN-PLACE FENCE POSTS WITH A MINIMUM DEPTH OF 4" INTO
CONCRETE PAD
DESIGN CRITERIA:
1. BUILDING CODE: 2015 INTERNATIONAL BUILDING CODE (IBC)
2. WIND DESIGN DATA: (ASCE 7-10)
BASIC WIND SPEED, V 120 MPH
BUILDING CATEGORY IV
EXPOSURE CATEGORY B
3. SEISMIC DESIGN DATA: (ASCE 7-10)
SOIL SITE CLASS (ASSUMED) D
SEISMIC CATEGORY D
SS 0.451
S1
RISK CATEGORY IV
SEISMIC IMPORTANCE FACTOR, IE 1.5
ANALYSIS PROCEDURE USED MECHANICAL EQUIPMENT CH.13
4. GEOTECHNICAL INFORMATION
ALLOWABLE SOIL BEARING PRESSURE (ASSUMED) 1500 PSF
ACTIVE LATERAL PRESSURE 42 PCF
COEFFICIENT OF FRICTION 0.3
5. SPECIAL LOADS
CHILLER UNIT 5044 LBS
1" = 1'-0"
BOLLARD DETAIL
GEOTECHNICAL NOTES:
1. ALL BACKFILL UNDER SLAB ON GRADE SHALL BE COMPACTED TO 95% MINIMUM
COMPACTION PER ASTM D-698.
2. A LAYER OF COARSE ROCK AGGREGATE 6" IN THICKNESS SHALL BE USED BELOW
THE SLAB IN ACCORDANCE WITH EARTHWORK SPECIFICATION.
Plan North True North
UP
UP
UP
UP
UP
UP
UP
UP
FE
FAP
FAP
FAP
DF
FEC
6" A.F.F.
6" A.F.F.
AP
RAD
RAD RAD RAD
RAD
RAD
RAD
RADRADRAD
AP
FLOOR ELEVATION
-10' - 1"
RAD
PHASE I
PIPE CHASE
Z001
MECH. RM.
CORRIDOR
H001
CORRIDOR
H002
ELEVATOR
MACHINE RM.
STAIRWELL NO. 2
S002
TOILET, UNISEX
TOILET, FEMALE
HAC
BREAK RM.
OFFICE
OFFICE, CHIEF
OFFICE
OFFICE
VENDING
H003
OFFICE
MECH. RM.
003A
MECH. RM.
OI&T
003B
ELEVATOR LOBBY
CHASE
CH-3-B
ELEVATOR
E1
AP
FEC
FAP
FEC FEC
FAP
FAP
FAP
RAD RAD
RAD
RADRAD
RADRAD
RADRADRAD
RADRAD
RADRAD
RADRADRADRADRAD
RADRAD
RAD
RAD
RAD RAD
RAD RAD RAD
RAD
RAD RAD
RAD
RAD
RAD
RAD
DN
RAD
PHASE III
PHASE II
OFFICE
OFFICE
OFFICE
FILE RM.
OFFICE
OFFICE
124 WORK RM.
STORAGE
TOILET, MALE
ELEVATOR LOBBY
TOILET, FEMALE
STAIRWELL NO. 2
S102
CORRIDOR
H102
CORRIDOR
H103
OI&T
OFFICE
CORRIDOR
H101
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LIBRARY
CORRIDOR
H104
CONFERENCE RM.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
114 OFFICE
114A
OFFICE
BREAK RM.
115A
OFFICE, OPEN
OFFICE
OFFICE, CHIEF
113A
OFFICE
OFFICE
OFFICE
CORRIDOR
H105
CLOSET
115C
CLOSET
115B
ELEVATOR
E1
STAIRWELL NO. 3
S103
RECEPTION
STAIRWELL NO. 1
S101
CHASE
CH-1-1
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:3 :0
P
M
18-AL-101
ARCHITECTURAL LIFE SAFETY AND
PHASING PLAN
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
MVP SD Drawing # 4 of 77
3/32" = 1'-0"
FLOOR PLAN - BUILDING 18 - FLOOR 00
1 Plan North
True North
3/32" = 1'-0"
FLOOR PLAN - BUILDING 18 - FLOOR 01
2 Plan North
True North
CODE ANALYSIS - BUILDING 18
NOTE: THE CONSTRUCTION TYPE WAS DETERMINED FROM REVIEW OF THE ORIGINAL CONSTRUCTION DOCUMENTS DATED 3-26-1981 TITLED: RELOCATE ADMINISTRATION AND VISUAL INSPECTION BY THE DESIGN
TEAM.
PROJECT DESCRIPTION: REPLACEMENT OF MECHANICAL SYSTEM
BUILDING USE: OFFICE ADMINISTRATION
BUILDING CONSTRUCTION TYPE: TYPE V
BUILDING OCCUPANCY: GROUP B
OCCUPANCY SEPARATION: NOT REQUIRED
FIRE RESISTANCE: PER IBC 2018, TABLE 601
RATING REQUIREMENTS: TYPE II-B
STRUCTURAL FRAME 0 HR
BEARING WALLS
EXTERIOR 0 HR
INTERIOR 0HR
NON-BEARING WALLS
EXTERIOR <5'-0" 1 HR
5'-0" TO 10'-0" 1 HR
10'-0" TO 30'-0" 0 HR
> 30'-0" 0 HR
INTERIOR 0 HR
FLOOR CONSTRUCTION 0 HR
ROOF CONSTRUCTION 0 HR
RATED CORRIDORS: NOT REQUIRED
PLUMBING FIXTURE COUNT: THE HISTORIC NUMBER OF FIXTURES WILL BE MAINTAINED.
NO ADDITIONS OR DELETIONS.
APPLICABLE CURRENT CODES
2018 INTERNATIONAL BUILDING CODE (IBC)
2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2018 INTERNATIONAL MECHANICAL CODE (IMC)
2018 INTERNATIONAL PLUMBING CODE (IPC)
NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA)
2020 NATIONAL ELECTRICAL CODE (NEC)
2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2013 ASME A17.1 SAFETY CODE FOR ELEVATORS AND ESCALATORS
2005 ASME A17.3 SAFETY CODE FOR ELEVATORS AND ESCALATORS
2017 ICC / ANSI A117.1
2018 NFPA 101 LIFE SAFETY CODE
KEY NOTES:
PROVIDE CLASS II INFECTION CONTROL BARRIER FOR DUST CONTROL. PROVIDE 45-MINUTE RATED DOOR ASSEMBLY
IN TEMPORARY 1-HOUR RATED INFECTION CONTROL BARRIER.
2 NEW 6'-0" x 7'-0" WOOD DOOR IN HOLLOW METAL DOOR FRAME. MATCH EXISTING WOOD DOOR SPECIES AND
FINISH COLOR. PAINT HOLLOW METAL FRAME TO MATCH EXISTING.
ILSM - MAINTAIN THE ACCESS/EXIT POINTS FOR ANY OCCUPIED SPACE.3
AP
FAP
FEC
FAP
FEC
AP
FAP
FEC
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RADRAD
RADRADRADRADRAD
RADRAD
RAD
RAD RAD
RAD RAD RAD RAD
RAD
RAD RAD
RAD RAD RAD RAD RAD
RAD
RAD
RAD
RAD
DN
RADRADRAD
PHASE V
PHASE IV
OFFICE
217C
OFFICE
217D
OFFICE
217E
OFFICE, SUPV.
HAC
OFFICE
215A
OFFICE
OFFICE
OFFICE
217A
OFFICE
217B
STAIRWELL NO. 1
S201
OFFICE
OFFICE
OFFICE
OFFICE
OI&T
ELEC. CLOSET
TOILET, MALE
TOILET, FEMALE
STAIRWELL NO. 2
S202
OFFICE
OFFICE
OFFICE, SUPV.
OFFICE, CHIEF
CORRIDOR
H203
CORRIDOR
H202
ELEVATOR LOBBY
CORRIDOR
H204
OFFICE
207A
OFFICE
207B
OFFICE
OFFICE
210B
OFFICE
210A
OFFICE
205A
CORRIDOR
H201
KITCHENETTE
212A
ELEVATOR
E1
CHASE
CH-2-1
STAIRWELL NO. 3
S203
AP
FAP
FAPFEC
FEC
FAP
RAD
RADRAD
RADRADRADRAD
RAD
RAD
RADRADRADRADRADRADRADRADRAD
RAD
RAD
RAD RAD
RAD RAD RAD RAD RAD
RAD
RAD
RAD
RADRAD
RAD
RAD
RAD
DN
RAD
RAD RAD RAD RAD
PHASE VII
PHASE VI
STAIRWELL NO. 1
S301
CREDENTIALS
SUPERVISOR
CREDENTIALS
OFFICE
TELEHEALTH
SUPERVISOR
KITCHEN
HAC
CORRIDOR
H302
CORRIDOR
H303
TOILET, MALE
ELEVATOR LOBBY
TOILET, FEMALE
STAIRWELL NO. 2
S302
OI&T
ELEC. CLOSET
CORRIDOR
H304
OFFICE
305A
OFFICE
CONFERENCE RM.
OFFICE
OFFICE
306A
OFFICE
OFFICE
BREAK RM.
OFFICE
OFFICE
311A
OFFICE
311E
OFFICE
OFFICE
311D
OFFICE
311B
OFFICE
311C
ELEVATOR
E1
CHASE
CH-3-1
VESTIBULE
H304A
STAIRWELL NO. 3
S303
TELEHEALTH
SUPPLIES
TELEHEALTH
WORKROOM
CORRIDOR
H301A
CORRIDOR
H301
CREDENTIALS
SUPPLIES
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:3 :1
P
M
18-AL-102
ARCHITECTURAL LIFE SAFETY AND
PHASING PLAN
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
MVP SD Drawing # 5 of 77
3/32" = 1'-0"
FLOOR PLAN - BUILDING 18 - FLOOR 02
Plan North True North
Plan North True North3/32" = 1'-0"
FLOOR PLAN - BUILDING 18 - FLOOR 03
CODE ANALYSIS - BUILDING 18
NOTE: THE CONSTRUCTION TYPE WAS DETERMINED FROM REVIEW OF THE ORIGINAL CONSTRUCTION DOCUMENTS DATED 3-26-1981 TITLED: RELOCATE ADMINISTRATION AND VISUAL INSPECTION BY THE DESIGN
TEAM.
PROJECT DESCRIPTION: REPLACEMENT OF MECHANICAL SYSTEM
BUILDING USE: OFFICE ADMINISTRATION
BUILDING CONSTRUCTION TYPE: TYPE V
BUILDING OCCUPANCY: GROUP B
OCCUPANCY SEPARATION: NOT REQUIRED
FIRE RESISTANCE: PER IBC 2018, TABLE 601
RATING REQUIREMENTS: TYPE II-B
STRUCTURAL FRAME 0 HR
BEARING WALLS
EXTERIOR 0 HR
INTERIOR 0HR
NON-BEARING WALLS
EXTERIOR <5'-0" 1 HR
5'-0" TO 10'-0" 1 HR
10'-0" TO 30'-0" 0 HR
> 30'-0" 0 HR
INTERIOR 0 HR
FLOOR CONSTRUCTION 0 HR
ROOF CONSTRUCTION 0 HR
RATED CORRIDORS: NOT REQUIRED
PLUMBING FIXTURE COUNT: THE HISTORIC NUMBER OF FIXTURES WILL BE MAINTAINED. NO ADDITIONS
OR DELETIONS.
APPLICABLE CURRENT CODES
2018 INTERNATIONAL BUILDING CODE (IBC)
2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2018 INTERNATIONAL MECHANICAL CODE (IMC)
2018 INTERNATIONAL PLUMBING CODE (IPC)
NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA)
2020 NATIONAL ELECTRICAL CODE (NEC)
2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2013 ASME A17.1 SAFETY CODE FOR ELEVATORS AND ESCALATORS
2005 ASME A17.3 SAFETY CODE FOR ELEVATORS AND ESCALATORS
2017 ICC / ANSI A117.1
2018 NFPA 101 LIFE SAFETY CODE
KEY NOTES:
PROVIDE ICRA BARRIER FOR THE DUST CONTROL.
ILSM - MMAIINTAIN THE ACCESS/EXIT POINTS FOR ANY COCCUPIED SPACE.2
FAP
FAP
FE
FE
FE
FAP
FE
FE
FE
FAP
LOADING DOCK
FAP
FAP
Plan North
True North
KEYPLAN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:3 :0
P
M
60-AL-101
ARCHITECTURAL LIFE SAFETY AND
PHASING PLAN
FCA - REPLACE MEHCANICAL
SYSTEMS BLDG 18 & 60
MVP SD
Drawing # 6 of 77
1/8" = 1'-0"
OVERALL FLOOR PLAN - BUILDING 60 - FLOOR 01
CODE ANALYSIS - BUILDING 60
NOTE: THE CONSTRUCTION TYPE WAS DETERMINED FROM REVIEW OF THE ORIGINAL CONSTRUCTION DOCUMENTS DATED 9-07-1950. SPRINKLER DRAWINGS ARE DATED 9-07-1962 AND REVISED IN APRIL 1969.
PROJECT DESCRIPTION: REPLACEMENT OF MECHANICAL SYSTEM
BUILDING USE: COMMERCIAL KITCHEN
BUILDING CONSTRUCTION TYPE: TYPE V
BUILDING OCCUPANCY: F-2 COMMERCIAL KITCHEN
OCCUPANCY SEPARATION: NOT REQUIRED
FIRE RESISTANCE: PER IBC 2018, TABLE 601
RATING REQUIREMENTS: TYPE V-B
STRUCTURAL FRAME 0 HR
BEARING WALLS
EXTERIOR 0 HR
INTERIOR 0HR
NON-BEARING WALLS
EXTERIOR <5'-0" 1 HR
5'-0" TO 10'-0" 1 HR
10'-0" TO 30'-0" 0 HR
> 30'-0" 0 HR
INTERIOR 0 HR
FLOOR CONSTRUCTION 0 HR
ROOF CONSTRUCTION 0 HR
RATED CORRIDORS: NOT REQUIRED
PLUMBING FIXTURE COUNT: THE HISTORIC NUMBER OF FIXTURES WILL BE MAINTAINED. NO ADDITIONS
OR DELETIONS.
APPLICABLE CURRENT CODES
2018 INTERNATIONAL BUILDING CODE (IBC)
2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2018 INTERNATIONAL MECHANICAL CODE (IMC)
2018 INTERNATIONAL PLUMBING CODE (IPC)
NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA)
2020 NATIONAL ELECTRICAL CODE (NEC)
2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2013 ASME A17.1 SAFETY CODE FOR ELEVATORS AND ESCALATORS
2005 ASME A17.3 SAFETY CODE FOR ELEVATORS AND ESCALATORS
2017 ICC / ANSI A117.1
2018 NFPA 101 LIFE SAFETY CODE
Plan North
True North
KEYNOTES:
PROVIDE ICRA BARRIER FOR DUST CONTROL.
KITCHEN EXHAUST SYSTEM TO BE REMOVED AND REPLACED.
IISLM - MAINTAIN THE ACCESS/EXITT POINTS FOR ANY OCCUPIED SPACE.
10' - 9"
7' - 10"
9' - 6"
7' - 11"
7' - 11"
10' - 9"
8' - 0"
8' - 0"
7' - 11" 8' - 0"
8' - 0"
7' - 8"
9' - 1"
9' - 0"8' - 0"
9' - 8" 9' - 8"
9' - 0"
9' - 6"
9' - 6" 8' - 0"
8' - 0"
9' - 4" 9' - 4"
9' - 4"9' - 4"
10' - 9"
10' - 9"
PIPE CHASE
Z001
MECH. RM.
CORRIDOR
H001
CORRIDOR
H002
ELEVATOR
MACHINE RM.
STAIRWELL NO. 2
S002
TOILET, UNISEX
TOILET, FEMALE
HAC
BREAK RM.
OFFICE
OFFICE, CHIEF
OFFICE
OFFICE
VENDING
H003
OFFICE
MECH. RM.
003AMECH. RM.
OI&T
003B
ELEVATOR LOBBY
CHASE
CH-1-B
CHASE
CH-2-B
CHASE
CH-3-B
CHASE
CH-4-B
ELEVATOR
E1
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:3 :5
P
M
18-AD-101
ARCHITECTURAL DEMOLITION
REFLECTED CEILING PLAN - FLOOR 00
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
MVP SD Drawing # 7 of 77
1/8" = 1'-0"
ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BUILDING 18 - FLOOR 00
Plan North True North
DEMOLITION KEY NOTES:
REMOVE CEILING TILE GRID, DEVICES AND EQUIPMENT IN THIS AREA TO
INSTALL MECHANICAL DUCT WORK AND RELATED DIFFUSERS. REPLACE TILE
CEILING, TILE GRID AND ALL DEVICES. REPLACE ANY DAMAGED TILE GRID, OR
LIGHT FIXTURES WITH LIKE KIND IF DAMAGED.
8' - 10" 8' - 10"
8' - 10"
7' - 6" 7' - 9"
10' - 7"
8' - 11"
7' - 9"
8' - 10"8' - 10"8' - 10"
7' - 8 3/4"
8' - 2"
8' - 0"
7' - 7" 9' - 0" 9' - 0" 7' - 10"
9' - 0"
9' - 0"
9' - 0" 9' - 0"
9' - 0" 9' - 0"
7' - 11"
9' - 0" 9' - 0" 9' - 0"
8' - 9"
7' - 2"
7' - 8"
8' - 10"
8' - 10"
8' - 10"
10' - 4"
9' - 0"
10' - 3"
7' - 11"
9' - 0"
7' - 11"
9' - 0"
7' - 11"
9' - 0"
7' - 11"
8' - 9"
9' - 0"
9' - 0"
7' - 11"7' - 11"
9' - 0"
9' - 0"
9' - 0"
8' - 8"
7' - 6"
7' - 2"
7' - 11"
7' - 1" 7' - 6"
9' - 0" 9' - 0"
9' - 0"
9' - 0"
8' - 0"
9' - 2"
8' - 0"
9' - 2"
8' - 0"
9' - 2"
8' - 0"
7' - 10"
8' - 10"
7' - 10"
8' - 10" 8' - 10"
7' - 10" 7' - 10"
8' - 10"
7' - 10"
8' - 10" 8' - 6"
8' - 0"
8' - 11"
7' - 5"
7' - 4"
8' - 6"
8' - 6"
7' - 11"7' - 11"
8' - 9"
7' - 11"
8' - 9"
7' - 11"
8' - 9"
7' - 11"
8' - 9" 8' - 9"
7' - 11"
AP
7' - 2"7' - 5"
10' - 4"
9' - 8"
9' - 8"
10' - 3" 9' - 8"
8' - 8" 8' - 8"
10' - 8"
8' - 0"
OFFICE
OFFICE
OFFICE
FILE RM.
OFFICE
OFFICE
WORK RM.
STORAGE
TOILET, MALE
ELEVATOR LOBBY
TOILET, FEMALE
STAIRWELL NO. 2
S102
CORRIDOR
H102
CORRIDOR
H103
OI&T
OFFICE
CORRIDOR
H101
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LIBRARY
CORRIDOR
H104
CONFERENCE RM.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
114A
OFFICE
BREAK RM.
115A
OFFICE, OPEN
OFFICE
OFFICE, CHIEF
113A
OFFICE
OFFICE
OFFICE
CORRIDOR
H105
CLOSET
115C
CLOSET
115B
ELEVATOR
E1
CHASE
CH-1-1
CHASE
STAIRWELL NO. 3
S103
RECEPTION
STAIRWELL NO. 1
S101
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:3 :0
P
M
18-AD-111
ARCHITECTURAL DEMOLITION
REFLECTED CEILING PLAN - FLOOR 01
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
MVP SD Drawing # 8 of 77
1/8" = 1'-0"
ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BUILDING 18 - FLOOR 01
1 Plan North
True North
DEMOLITION KEY NOTES:
REMOVE CEILING TILE GRID, DEVICES AND EQUIPMENT IN THIS AREA TO
INSTALL MECHANICAL DUCT WORK AND RELATED DIFFUSERS. REPLACE TILE
CEILING, TILE GRID AND ALL DEVICES. REPLACE ANY DAMAGED TILE GRID, OR
LIGHT FIXTURES WITH LIKE KIND IF DAMAGED.
8' - 0"
7' - 5"
10' - 3"
7' - 6"
7' - 5"
7' - 6"
7' - 9 1/2"
8' - 0"
8' - 0"
8' - 0"
9' - 9"
7' - 5"
7' - 6"
7' - 6"
8' - 8"
8' - 1 3/8" 8' - 1"
7' - 5"
8' - 1" 8' - 2" 8' - 2"
8' - 2"
8' - 2"
8' - 2"8' - 2"
7' - 6"
7' - 6"
8' - 2"
7' - 6"
8' - 2"
8' - 2"
8' - 1"
8' - 0"
7' - 6"
8' - 3" 8' - 3"
8' - 3"
8' - 3"
8' - 3" 8' - 3" 8' - 3" 8' - 3" 7' - 9 1/2"
7' - 8"
OFFICE
217C
OFFICE
217D
OFFICE
217E
OFFICE, SUPV.
HAC
OFFICE
215A
OFFICE
OFFICE
OFFICE
217A
OFFICE
217B
STAIRWELL NO. 1
S201
OFFICE
OFFICE
OFFICE
OFFICE
OI&T
ELEC. CLOSET
TOILET, MALE
TOILET, FEMALE
STAIRWELL NO. 2
S202
OFFICE
OFFICE
OFFICE, SUPV.
OFFICE, CHIEF
CORRIDOR
H203
CORRIDOR
H202
ELEVATOR LOBBY
CORRIDOR
H204
OFFICE
207A
OFFICE
207B
OFFICE
OFFICE
210B
OFFICE
210A
OFFICE
205A
CORRIDOR
H201
KITCHENETTE
212A
ELEVATOR
E1
CHASE
CH-2-1
STAIRWELL NO. 3
S203
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:3 :0
P
M
18-AD-121
ARCHITECTURAL DEMOLITION
REFLECTED CEILING PLAN - FLOOR 02
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
MVP SD Drawing # 9 of 77
Plan North True North1/8" = 1'-0"
ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BUILDING 18 - FLOOR 02
DEMOLITION KEY NOTES:
REMOVE CEILING TILE GRID, DEVICES AND EQUIPMENT IN THIS AREA TO
INSTALL MECHANICAL DUCT WORK AND RELATED DIFFUSERS. REPLACE TILE
CEILING, TILE GRID AND ALL DEVICES. REPLACE ANY DAMAGED TILE GRID, OR
LIGHT FIXTURES WITH LIKE KIND IF DAMAGED.
8' - 0"
7' - 8 1/2"
7' - 9 3/4"
7' - 8 1/4"
10' - 3"
8' - 0"
8' - 0" 7' - 9" 8' - 3"
8' - 0"
8' - 0"
7' - 9"
8' - 0" 9' - 11"
7' - 8 3/4"
8' - 2"
8' - 0"
7' - 5"
8' - 0"
8' - 2"
7' - 9"
7' - 9"
7' - 9"
8' - 0"
8' - 8"
9' - 1"
8' - 1"
7' - 10"
8' - 6"8' - 6"8' - 6"
8' - 2"
7' - 8"
7' - 9"
8' - 6"
7' - 9"
8' - 2"
7' - 10"
8' - 6"
9' - 11"
ROOF
HATCH
8' - 0"
8' - 0"
7' - 6"
8' - 6"
7' - 7 1/4"
STAIRWELL NO. 1
S301
CREDENTIALS
SUPERVISOR
CREDENTIALS
OFFICE
TELEHEALTH
SUPERVISOR
KITCHEN
HAC
CORRIDOR
H302
CORRIDOR
H303
TOILET, MALE
ELEVATOR LOBBY
TOILET, FEMALE
STAIRWELL NO. 2
S302
OI&T
ELEC. CLOSET
CORRIDOR
H304
OFFICE
305A
OFFICE
CONFERENCE RM.
OFFICE
OFFICE
306A
OFFICE
OFFICE
BREAK RM.
OFFICE
OFFICE
311A
OFFICE
311E
OFFICE
OFFICE
311D
OFFICE
311B
OFFICE
311C
ELEVATOR
E1
CHASE
CH-3-1
VESTIBULE
H304A
STAIRWELL NO. 3
S303
TELEHEALTH
SUPPLIES
TELEHEALTH
WORKROOM
CORRIDOR
H301A
CORRIDOR
H301
CREDENTIALS
SUPPLIES
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:3 :0
P
M
18-AD-131
ARCHITECTURAL DEMOLITION
REFLECTED CEILING PLAN - FLOOR 03
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
MVP SD Drawing # 10 of 77
Plan North True North1/8" = 1'-0"
ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BUILDING 18 - FLOOR 03
DEMOLITION KEY NOTES:
REMOVE CEILING TILE GRID, DEVICES AND EQUIPMENT IN THIS AREA TO
INSTALL MECHANICAL DUCT WORK AND RELATED DIFFUSERS. REPLACE TILE
CEILING, TILE GRID AND ALL DEVICES. REPLACE ANY DAMAGED TILE GRID, OR
LIGHT FIXTURES WITH LIKE KIND IF DAMAGED.
S M
11' - 3"
9' - 5"
8' - 6"
11' - 10"
8' - 5"
14' - 9"
11' - 10"
9' - 5"
11' - 2"
9' - 5"
11' - 1 1/2"
9' - 6"
7' - 11"
7' - 11"
9' - 4"
9' - 5"
8' - 5"
9' - 6"
7' - 11"
9' - 0"
8' - 5"
7' - 9"
8' - 3"
8' - 3"
9' - 8"
9' - 2"
9' - 6"
8' - 2"
9' - 5"
7' - 4"
8' - 5"
8' - 0" 7' - 10"
9' - 1"
8' - 2"
9' - 8"
11' - 10"
10' - 4" 9' - 6"
9' - 0"
19' - 1 1/4" 16' - 2 1/4"
8' - 0"
7' - 8"
7' - 6"
7' - 6"
7' - 8"
16' - 6" 14' - 1"
11' - 10" 9' - 0 1/4"
8' - 5"
9' - 0"
11' - 1 1/2"
12' - 11 1/4"
Plan North
True North
KEYPLAN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:3 :5
P
M
60-AC-101
ARCHITECTURAL REFLECTED CEILING
PLAN - FLOOR 01
FCA - REPLACE MEHCANICAL
SYSTEMS BLDG 18 & 60
MVP SD
Drawing # 11 of 77
Plan North
True North
1/8" = 1'-0"
OVERALL CEILING PLAN - BUILDING 60 - FLOOR 01
KEYNOTES:
PROVIDE ICRA BARRIER FOR DUST CONTROL.
KITCHEN EXHAUST SYSTEM TO BE REMOVED AND REPLACED.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:1 :5
A
M
00-MG-001
MECHANICAL ABBREVIATIONS AND
GENERAL NOTES
18 & 60
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
DD RT Drawing # 12 of 77
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, AND BALANCING
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UCT UNDERCUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WASTE
WAG WASTE ANESTHESIA GAS
WB WET BULB
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCPU WATER COOLED HEAT PUMPS
WEF WATER COOLED PACKAGED UNIT
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DROP
PEF PROPELLER TYPE EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAUGE
PGW PROPYLENE GLYCOL-WATER SOLUTION
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING VALVE STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH, ABSOLUTE
PSIG POUNDS PER SQUARE INCH, GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOFTOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN SUBMISSION 1
SD-2 SCHEMATIC DESIGN SUBMISSION 2
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
KG KILOGRAM
KG/H KILOGRAMS PER HOUR
KPA KILOPASCAL
KW KILOWATT
KWH KILOWATT HOURS
L LITER
L/H LITERS PER HOUR
L/M LITERS PER MINUTE
L/S LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LB/H POUND PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER
M/S METERS PER SECOND
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING UNIT
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOW METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTER DIAMETER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOHX FUEL OIL HEAT EXCHANGER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FINNED TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVD HOISTWAY VENT DAMPER
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING WATER PUMP
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCHES OF WATER COLUMN
IN WG INCHES OF WATER, GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING
TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING
TOWER)
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
Db DRY BULB TEMPERATURE dB DECIBEL
DD-1 DESIGN DEVELOPMENT SUBMISSION 1
DD-2 DESIGN DEVELOPMENT SUBMISSION 2
DDC DIRECT DIGITAL CONTROLS
DEG DEGREES
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
ACFM ACTUAL CUBIC FEET PER MINUTE
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CUBIC FEET
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CHW CHILLED WATER
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
BAS BUILDING AUTOMATION SYSTEMS
MECHANICAL ABBREVIATIONS
1. CONTRACTOR SHALL PROVIDE AN INFECTION CONTROL RISK ASSESSMENT BARRIER AROUND
THE PROJECT AREA CONSISTENT WITH THE CONTRACTOR'S PHASING PLAN AS APPROVED BY
THE VA.
SEE SPECIFICATION SECTION 01 00 00 PART 1.2 - F FOR WORK HOURS.
HVAC GENERAL NOTES
MECHANICAL ASCE 7 NONSTRUCTURAL
SEISMIC RESTRAINT AND ANCHORAGE NOTES:
GENERAL NOTES
2.
REFERENCE SPECIFICATION: SECTION 13 05 41
SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS
SEISMIC DESIGN DATA FOR ANALYSIS AND DESIGN
SEISMIC RISK CATEGORY = IV
COMPONENT IMPORTANCE FACTOR IP = 1.50 (ASCE 7-10 TABLE 1.5-2)
MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS:
SS=0.447G S1=0.171G
SITE CLASS D (ASSUMED)
DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS:
SDS=0.443G SD1=0.241G
SEISMIC DESIGN CATEGORY D BASED UPON SD1 > 0.20G
CLARIFICATION OF ASCE 7 "12 INCH RULE" SUSPENDED SEISMIC BRACING CODE EXCEPTION FOR PIPING
AND HVAC DUCTWORK:
ALL PIPING SUSPENDED BY INDIVIDUAL HANGAR RODS 12" OR LESS AS MEASURED FROM THE TOP OF THE PIPE TO THE BOTTOM OF THE SUPPORT WHERE THE HANGER IS ATTACHED. IF THE 12" LIMIT IS EXCEEDED BY ANY HANGER IN THE RUN, SEISMIC BRACING IS REQUIRED FOR THE RUN. NOTE: A SINGLE SUPPORT LOCATION THAT MEETS THE REQUIREMENT OF THIS EXCEPTION DOES NOT CONSTITUTE A SEISMIC SWAY
BRACE LOCATION.
THE EXCEPTION ALSO APPLIES FOR TRAPEZE SUPPORTED SYSTEMS IF THE DISTANCE AS MEASURED FROM THE POINT OF ATTACHMENT TO THE TRAPEZE TO THE POINT OF ATTACHMENT TO THE STRUCTURE IS LESS THAN 12". NOTE: IF DIRECTIONAL CHANGES OR OFFSETS TO EQUIPMENT CONNECTIONS DO NOT ALLOW FOR FLEXIBILITY OF THE TRAPEZED SYSTEM (E.G. LONG OFFSETS OR FLEXIBLE CONNECTORS) THEN THE SYSTEM MUST BE BRACED REGARDLESS OF PIPE DIAMETER OR DISTANCE TO THE STRUCTURE IF THE
COMBINED WEIGHT PER FOOT (METER) OF ALL ITEMS IS GREATER THAN 10 LBS/FT.
IN ADDITION, TO MEET THE CODE REQUIREMENTS, ALL OF THE FOLLOWING CONDITIONS MUST ALSO BE
SATISFIED:
1. LATERAL MOTION OF PIPING OR DUCTWORK WILL NOT CAUSE DAMAGING IMPACT WITH
SURROUNDING SYSTEMS (E.G. OTHER PIPE, DUCT, EQUIPMENT, SPRINKLER HEADS ETC.) OR CAUSE
LOSS OF SYSTEM VERTICAL SUPPORT.
2. PIPING MUST BE MADE OF DUCTILE MATERIAL WITH DUCTILE CONNECTIONS (E.G. WELDED STEEL
PIPE, BRAZED COPPER PIPE, ETC.)
3. VERTICAL SUPPORT CONNECTIONS CANNOT DEVELOP MOMENTS (E.G. SWIVEL JOINTS, EYE BOLTS, VIBRATION INSULATION HANGERS, ETC.)
1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED
IN A FURRED CHASE OR ABOVE THE CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL
VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS
SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS.
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM,
TERMINAL UNITS, FILTERS, COILS, ETC.
5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE
EQUIPMENT DETAILS.
6. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK
SIZES.
7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE
MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
8. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE
INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 7" ABOVE FINISHED
FLOOR.
9. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS NOTED OTHERWISE
10. ALL CONTROL SYSTEM EQUIPMENT SHALL BE COMPATIBLE WITH EXISTING
BUILDING MANAGEMENT SYSTEM CONTROLS. EXTEND EXISTING CONTROL
SYSTEM TO INCLUDE ALL OF THE CONTROLS AND SEQUENCES SHOWN.
11. COORDINATE EXISTING FIRE SPRINKLER HEADS AND LIGHTS WITH DIFFUSERS.
12. SUBMIT COMPLETE CONSOLIDATED AND COORDINATED SHOP DRAWINGS FOR
ALL NEW SYSTEMS, AND FOR EXISTING SYSTEMS THAT ARE IN THE SAME AREAS.
DO NOT INSTALL EQUIPMENT FOUNDATIONS, EQUIPMENT, OR PIPING UNTIL
COORDINATION/SHOP DRAWINGS HAVE BEEN APPROVED.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:1 :5
A
M
00-MG-002
MECHANICAL SYMBOLS
18 & 60
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
DD BT Drawing # 13 of 77
T
TT
M
MT
PT
TT
FT
IT
CT
SPS
SD
PDT
KR
TSL
HS
ZC
LC
LT
PDS
TSH
EPT
AT
CO2
AT
CO
AT
OC
LTCP
HVAC
ECC
TC
VSMC
PC
SC
FC
PSH
FSH
PSL
26-SF 3
26-TU-I-I
H4
H7
A
BDD
FD
VD
SUPPLY
RETURN45°
45°
N
2 1
1/24
F/S DPR
FE
AV
MV
RH
SCH
SH
TH
PS
RC
WB
CSH
SS
VR
CTPS
CTPD
FWPS
FWPD
CF
FWS
BWS
CBD
BO
TC
A
OFL
HW
SW
CW
FOR
FOS
LPG(I)
G(I)
G
HPS
HPR
MPS
MPR
LPS
LPR
PC
HWS
HWR
GHS
GHR
V
SWS
SWR
CWR
CHR
GCR
RL
RS
RHG
CWS
CHS
GCS
MW
D
GRR
GRS
X
A
PTAC
A TWU
A
FCU
FCU
A
PTACA
MB
KC
FSL
A
M
BAS
DN
DN
UP
UP
D
R
DNUP
FC
10x8
LC
M
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY STANDARD PRACTICE SP-58
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
CONNECT TO EXISTING
LIMIT OF DEMOLITION
AIR SEPERATOR
TERMINAL UNIT WITH REHEAT COIL
DOUBLE DUCT MIXING BOX.
FAN POWERED VARIABLE VOLUME
TERMINAL UNIT WITH HEATING COIL.
EXISTING DUCT TO BE REMOVED
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL
SECTION.)
FLEXIBLE DUCTWORK (INSULATED)
DUCT WITH SOUND LINING
MANUAL VOLUME DAMPER
FIRE DAMPER
BACK DRAFT DAMPER
COMBINATION FIRE/SMOKE DAMPER
POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE
IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
MANUAL SPLITTER DAMPER
STANDARD BRANCH SUPPLY OR RETURN, NO
SPLITTER (45° TAP)
DUCT MOUNTED COIL (HOT WATER OR STEAM
COIL)
DUCT MOUNTED COIL (ELECTRIC)
CONVECTOR OR RADIATOR (RECESSED)
CONVECTOR OR RADIATOR (WALL HUNG)
FLOOR MOUNTED VERTICAL RECESSED FAN COIL UNIT.
LETTER INDICATES UNITSIZE.
FLOOR MOUNTED VERTICAL CABINET FAN
COIL UNIT. LETTER INDICATES UNIT SIZE.
THRU WALL AIR CONDITIONING UNIT.
LETTER INDICATES UNIT SIZE.
WINDOW TYPE AIR CONDITIONING UNIT.
LETTER INDICATES UNIT SIZE.
FLOOR MOUNTED HEAT PUMP. LETTER
INDICATES UNIT SIZE.
AIR CURTAIN
UNIT HEATER (HORIZONTAL)
UNIT HEATER (VERTICAL)
2'x2' RADIANT CEILING PANEL
2'x4' RADIANT CEILING PANEL
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
SQUARE 1-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING
REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM
REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE
(WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOLITION
FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION,
OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS):
WIDTH x DEPTH (RECTANGULAR)
WIDTH / DEPTH (FLAT OVAL)
EXISTING DUCT TO REMAIN
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL
MOUNT
TEMPERATURE TRANSMITTER
TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
CURRENT TRANSMITTER
CONDUCTIVITY TRANSMITTER
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .