This pre-solicitation notice seeks proposals for a construction project to replace mechanical systems in Buildings 18 and 60 at the Jefferson Barracks Division of the VA Saint Louis Health Care System. The project cost range is between $2,000,000 to $5,000,000. The NAICS code is 238220 with a small business size standard of $16.5 million. The project duration is estimated at 426 calendar days. The solicitation will be posted to FedBizOpps on or about April 7, 2020. Proposals are due in accordance with the solicitation. This is a competitive total SDVOSB set-aside. The successful prime contractor must perform no less than 25% of construction labor. The Department of Veterans Affairs and Valhalla Engineering will oversee the project.
36C25520R0063 657-19-103JB - Combined Specifications 100PCT_Part6.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25520R0063-014.pdf | ||
| 36C25520R0063-016.pdf | ||
| 36C25520R0063-011.pdf | ||
| 36C25520R0063-006.pdf | ||
| 36C25520R0063-008.pdf | ||
| 36C25520R0063-015.pdf | ||
| 36C25520R0063-004.pdf | ||
| 36C25520R0063-009.pdf | ||
| 36C25520R0063-002.docx | DOCX document | |
| 36C25520R0063-013.pdf | ||
| 36C25520R0063-007.pdf | ||
| 36C25520R0063-003.pdf | ||
| 36C25520R0063-010.pdf | ||
| 36C25520R0063-005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2018 Asbestos/Lead Inspection Report St. Louis Jefferson Barracks VAMC – Bldg. 60
Section 3.0 MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Re-inspection.
1) Removal Priorities were developed for each homogenous material area (HMA) identified as being an ACM, or PACM.
2) The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2018 Re-inspection Condition and Removal Priority Table in Section 6.0 for further detail.
3) Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan under Section 14.0.
4) Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with ACM are required to attend a two-hour awareness training should be filed in the Management Plan under Section 14.0.
5) The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress. Provide a copy of the notification to each facility and include a copy in the Management Plan under Section 15.0.
6) Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Warning labels should be installed in these areas as needed, and in a prominent location.
7) Review the 2018 Re-inspection Condition and Removal Priority Table in Section 6.0 for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8) Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspection is desired and, therefore, should be performed by the same team of individual(s) for all facilities. It is recommended that the inspection team rotate facility responsibilities regularly to allow for a less biased assessment and improve overall quality control of this effort. The surveillance inspections should be performed by an accredited inspector. Records of Surveillance Inspections should be filed within the facility Management Plan under Section 11.0.
9) Re-inspections (i.e. the scope of work executed during this project) are required every three
(3) years. Updated information should be added to the Management Plan as needed under Section 12.0.
10) The existing Management Plan (original) is amended by this Three-Year Re-inspection assessment.
11) An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines to support execution of the Management Plan, with training and licensure filed within Section 14.0 of the Plan.
12) ACBM must only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan under Section 13.0. Removal of limited amounts (i.e. less than one glovebag) of asbestos is within the scope of the Management Plan by the accredited Supervisor and/or trained individuals (i.e. Operations and Maintenance 24-hour trained).
13) Notification should be provided to “outside contractors” about ACM within each facility when their work could bring them into direct contact with said ACM. This should include such trades/services as telephone, electrical, plumbing, air conditioning and other construction trades. A form should be created for this purpose and filed within the Management Plan for regular use and access.
14) New building construction and portable buildings added to the facilities are required to be inspected and sampled for ACM. Please note that many ACM products can still be purchased and used in the construction industry to this day, with very few legal restrictions otherwise, and their absence should not be assumed. In lieu of this, a letter from the architect, engineer or manufacturer can be obtained that states “no ACM were specified or used in the facility during its construction”. A copy of this letter is to be filed within the Management Plan for each facility under Section 12.0. This letter will negate the requirement for sampling.
15) Abatement costs have been developed for each homogenous material area for each facility as part of this Management Plan and can be found within the 2018 Re-inspection Condition and Removal Priority Table in Section 6.0. The estimated abatement cost is for budget purposes only. The costs are based on the area of material and estimated abatement costs for this material, as per current (2018) industry standard unit rates. The cost is for abatement only and does not include abatement design, additional inspections needed for inaccessible locations, air monitoring or project oversight costs.
SECTION 4.0
LIMITATIONS
Section 4.0 LIMITATIONS
The following limitations apply to this inspection and assessment effort and report:
1) Due to limitations on the ability to penetrate the roofing systems matrix for each building (i.e. risk of voiding existing roofing system warranties paid for by the VA), no roofing matrix samples have been collected to confirm or deny the presence of asbestos containing materials. It should be noted that even recently installed roofing systems can be found to contain ACM, particularly within the flashing materials, as they are currently legally available in the commercial market and should be presumed to have been used unless the architect/engineer responsible for its installation can provide a letter stating otherwise (see Section 3.0). As such, all facility roofing systems are presumed to contain an asbestos containing material until sampled and proven otherwise and should be handled as such by VA Medical Center maintenance and/or custodial workers as well as outside contractors.
2) Inspection efforts taken during this assessment did NOT include making ceiling and/or wall penetrations into wall/ceiling cavities suspected to have contained ACM, particularly TSI systems, which are commonly found hidden within wall cavities and utility chases. Often, it is not possible to gain visual confirmation of the presence of TSI systems, however, the prevalence of surrounding systems and overall building trends strongly suggest them present. In the absence of visual confirmation, building systems suspected as having ACM TSI on water and/or steam lines have been assumed to be present behind inaccessible barriers until proven otherwise. For example, if a given building exhibits ACM TSI joint fittings on water lines in exposed locations (i.e. hallways), then those same lines feeding into inaccessible wall cavities near bathrooms or shower areas will also be assumed to contain ACM TSI joint fittings. These observations, and associated sampling results, are outlined within the attached report. However, it should also be noted that newer building finishes are often presumed by contractors/maintenance staff as having hidden wall cavity locations that would not be considered as “suspect”, and thus presumed as presenting no asbestos risks, which is a risky presumption. As such, wall cavities that have not otherwise been identified as containing ACM-TSI should be penetrated with caution, and preferably preceded with assessment by a licensed asbestos inspector using destructive means, should future renovation projects call for such demolition activities.
3) Inspection and sampling of flooring systems has been limited to those observations and sampling efforts afforded by “spot” checks performed in a representative number of locations in order to determine the type and extent of suspect building materials and any obvious trends associated with those systems. For example, if a given room flooring system consists of carpet over one or more layers of floor tile, only a single access point would have been made (typically in the least visible corner of the room) to observe and sample suspect materials. As such, there exists the possibility of unidentified suspect building materials present in concealed, inaccessible locations in other areas of the same room, hall or floor space, and that those materials could be found to be an ACM upon discovery and proper testing.
Similarly, if inspectors observed evidence of suspect materials within a given homogenous area, such as second floor tile layers and/or flooring adhesives, then those hidden materials were presumed present throughout the remaining homogenous area based on visible observations of the top flooring layers. As such, there exists the possibility of this inspection identifying an area as having a hidden layer of ACM floor tile and/or mastic which, upon demolition, would reveal a much smaller area of impact.
4) Due to limitations on the ability to collect sufficient suspect adhesive materials typically found beneath ceramic systems (particularly in restrooms and other areas designed for exposure to water), and to do so without significantly damaging the finished ceramic tile surface, samples of ceramic tile mastic/adhesive materials were not collected to confirm or deny the presence of ACM. Adhesives/mastics used for bathroom/kitchen/shower areas commonly contain ACM, are currently available in the commercial market and should be presumed to have been used unless the architect/engineer responsible for its installation can provide a letter stating otherwise (see Section 3.0). As such, all ceramic tile systems should be assumed to be underlain by an ACM adhesive/mastic until inspected and/or sampled and proven otherwise and should be handled as such by VA maintenance and/or custodial workers as well as outside contractors.
5) Inspection and sampling efforts during this assessment did not include the necessary destructive sampling techniques to sufficiently collect samples of fire rated doors as well as heat shields located in the perimeter steam convector units. Sampling of these materials would have caused a great deal of damage that would have not been able to be repaired. All fire rated doors and heat shields behind the steam convector units throughout the hospital shall be considered to contain asbestos unless sampled proving otherwise.
6) Suspect caulking/glazing materials observed on exterior window systems were safely assessed at ground level only with the assumption that window units at higher elevations are homogenous and carry the same designation with respect to asbestos containing materials.
7) Fixed objects, such as cabinets, lab hoods, etc. often conceal additional layers of older flooring that are not otherwise visible for observation and/or sampling during inspection, but are then uncovered during construction activities.
8) Building systems in constant operation which are critical to the building’s occupation are not capable of being inspected. For example, the interior spaces of an HVAC Air Handler Unit would be considered inaccessible for proper inspection due to safety risks by inspectors.
9) Inspection maps provided with this report indicate specific rooms/spaces in which access for visual inspection was not made possible during the 2018 inspection effort.
In such cases, previous conditions for ACM (as per 2008 Altec survey) was presumed unchanged and reported as such.
SECTION 5.0
ASBESTOS CONTAINING MATERIAL HOMOGENOUS MATERIAL AREA
(HMA) SUMMARY TABLES AND DRAWINGS
This section provides a quick table reference to all ACM Homogenous Material Areas (HMAs) found during the 2018 inspection, as well as a complete set of corresponding drawings with the exact location of bulk samples and ACM HMAs found during 2018 inspection.
2018 HMA Summary Table VA-Jefferson Barracks Medical Facility Building 60
VA JEFFERSON BARRACKS CAMPUS BLDG 60
ST. LOUIS, MISSOURI
2018 CAMPUS-WIDE ACM INSPECTION
ACM HOMOGENOUS AREAS SUMMARY TABLE
Building 60 Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous
Materials
Tunnel None None
20: ACM pipe insulation
21: Mudded fittings 57: Debris in tunnels
58: Chrysotile loose fill at hanger locations
59: TSI remnants in steam system penetrations
62: Sewer pipe penetration packing
None
A1: 12”x12” floor tile – white w/ black mastic
B1: 9”x9” floor tile – brown w/ black mastic
C1: 9”x9” floor tile – light brown w/ black mastic
9: 6”x24” floor tile – dark brown
None 19: Black TSI wrap
20: ACM pipe insulation 21: Mudded fittings
4: Wall mounted heaters
(PACM)
29: Flange gasket (PACM) 34: Fire door (PACM)
43: Black penetration caulk 56: Old covering under white canvas covering on hot water tank
Exterior
None
None None
48: Old, hard, gray window caulk 49: Gray window frame caulk 55: Old, gray window caulk
St. Louis Jefferson Barracks VAMC Bldg. 60
Section 5.0 MAP GUIDE
A. Title
a. Level
i. Indicates the floor or level of the hospital
ii. Crawlspace, Basement, First, Second, etc.
b. Floor/Miscellaneous/Surfacing/TSI HMA
i. Map representing specific categories of building materials
B. Legends
a. Asbestos Containing Materials HMA Guide
i. HMA’s representing building materials tested positive for asbestos
1. Each building material observed was given a different letter or number to represent that specific material
2. Letters (in boxes) were adopted from the 2008 reinspection to represent either ACM and/or Non-ACM HMAs
3. Numbers (in boxes) reflect ACM and Non-ACM HMA’s discovered during both the 2008 and the 2018 re-inspections.
ii. The location of the positive HMA’s will be indicated on the map using a hatching (highlight) with the specific HMA letter or number in or near the area where it is located which corresponds to the ACM HMA legend.
iii. Positive HMA’s will have a quantity that represents the estimated amount of that particular HMA throughout the entire floor/map area
1. Thermal system insulation will have quantities per functional space where TSI was observed in the thermal system insulation summary table
2. TSI conditions are to be presumed as “Good” unless otherwise noted on TSI maps/drawings as “D” corresponding to damaged conditions or “SD”, which corresponds to significantly damaged conditions.
iv. Assumed or presumed HMA’s are materials that could not be sampled or accessed for inspection but are nonetheless assumed to be asbestos containing until proven otherwise based on historical knowledge base at facility.
v. Asbestos containing pipe insulation (TSI) should be assumed in all chases and wet walls. Perimeter chases are shown with a red hatching (highlight) to reflect known historical trends of ACM TSI risers being left in place during even major renovations and are assumed present throughout unless proven otherwise.
b. Non- Asbestos General HMA Guide
St. Louis Jefferson Barracks VAMC Bldg. 60
i. HMA materials that were observed, sampled and tested negative for asbestos are represented within this legend/list of materials. Map users are to interpret items listed and described therein as a comprehensive list of materials observed on that floor/area that are known or believed to be a Non-ACM component.
c. Sample Locations
i. Each sample taken was numbered and represented on the map
ii. Red sample numbers indicate the sample number taken from that specific area tested positive for asbestos
iii. Blue sample numbers indicate the sample number taken from that specific area tested negative for asbestos
C. Inaccessible Areas
a. Often indicated with the term No Access or N/A
b. Re-inspection team assumed that the same materials noted as existing in that particular space from the 2008 inspection are presumed to remain now.
c. Various reasons contributed to no access
i. Could not utilize key
1. Police or engineering team could not enter as well
ii. HEPA Cart
1. Size limitations (cart couldn’t be moved into room)
iii. Inpatient Rooms (occupied by patients)
iv. Plaster ceilings or 1’x1’ ceiling tiles with no hatch for access
v. Could not interrupt important hospital functions
1. Emergency Room Area
2. SPD…(etc)
D. General Recommended Procedures for Updating Maps After Abatement
a. Remove highlight and HMA notation from the room abatement took place
b. Subtract quantity from the total in the legend and cost table
c. If TSI (pipe insulation) was removed, subtract the total quantity from the TSI
Summary Table and Cost Estimating Table as well.
d. When all ACM has been removed from the floor, remove HMA from legend, HMA Summary Table and Condition and Removal Priority Table.
Date
Project No.
DRAWING NO.
Project Title
Building Number
Location
Drawn
Checked
Drawing Title
SIXTY
V.A.M.C. ST. LOUIS, MO.
JEFFERSON BARRACKS DIVISION
ASBESTOS ASSESSMENT &
AREA LOCATION PROGRAM
V e t e r a n s
A d m i n i s t r a t i o n
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
DateRevisions
VA FORM 08-6231, FEB. 1983
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A o n e e i g h t i n c h o n e f o t o n e q u a r t e r i n o t t h r e e e i g h t s i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a d e h a l f i n c h e s o t t h r e e i n c h e o t o n e h a l f i n o t
F E
D C
B A
ASBESTOS CONTAINING MATERIALS
HMA GUIDE
57 Contaminated debris in tunnels - throughout tunnels - 3000 ft²
58 Chrysotile loose fill at hangers - throughout
59 TSI remnants in steam system penetrations - throughout, located at all wall mounted heater penetrations
62 Sewer pipe penetration packing - 16 ft
XX HMA Numbers
XX
Sample Numbers
C.DEY
VA-JB 2018 Asbestos and
Lead Reinspection
SH1476
6-24-2019
Riverfront Safety & Health
1139 Olive St. Suite 300
St. Louis, MO. 63101
FIRST FLOOR - TUNNEL
SYSTEM MAP
TUNNEL SYSTEM - FIRST FLOOR
JB-60-1-tunnel
J.RHYNEER
CRAWLSPACE ACCESS
D
All asbestos pipe insulation is assumed to be in Good condition unless noted as Damaged (D) or Significantly Damaged (SD)
Unknown amounts of asbestos pipe insulation may be inside all wet walls, pipe chases, inside plaster walls, or above plaster ceilings
AutoCAD SHX Text 133A
AutoCAD SHX Text
AutoCAD SHX Text 135A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H102
AutoCAD SHX Text 120B
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H103
AutoCAD SHX Text
AutoCAD SHX Text 101A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 120A
AutoCAD SHX Text H101
AutoCAD SHX Text 113A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UFIRST FLOOR PLAN
AutoCAD SHX Text
%%UBLDG. 60
DRAWING NO.
Project Title
Building Number
Location
Drawn
Checked
Drawing Title
SIXTY
V.A.M.C. ST. LOUIS, MO.
JEFFERSON BARRACKS DIVISION
ASBESTOS ASSESSMENT &
AREA LOCATION PROGRAM
V e t e r a n s
A d m i n i s t r a t i o n
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
DateRevisions
VA FORM 08-6231, FEB. 1983
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A o n e e i g h t i n c e f o o t o n e q u a r t e r i n c e f o o t t h r e e e i g h t s i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e i n c e f o o t o n e a n d o n e h a l f i n c h e e f o o t t h r e e i n c h e e f o o t o n e h a l f i n c e f o o t
F E
D C
B A
ASBESTOS CONTAINING MATERIALS
HMA GUIDE
A1 12"x12" floor tile white with black mastic - 500 ft²
B1 9"x9" floor tile brown with black mastic - 340 ft²
C1 9"x9" floor tile light brown with black mastic - 340 ft²
9 6"x24" floor tile dark brown - 340 ft²
XX HMA Numbers
XX
Sample Numbers
C.DEY
VA-JB 2018 Asbestos and
Lead Reinspection
SH1476
6-24-2019
NON-ASBESTOS GENERAL HMA GUIDE
1 Concrete
5 5"x5" floor tile red quarry tile
7 Terrazzo
Riverfront Safety & Health
1139 Olive St. Suite 300
St. Louis, MO. 63101
FIRST FLOOR - FLOORING
HMA LEGEND
FLOOR HMA - FIRST FLOOR
JB-60-1-Floor
J.RHYNEER
CRAWLSPACE ACCESS
B1 C1
A1
B1 C1 9 A1
AutoCAD SHX Text 133A
AutoCAD SHX Text
AutoCAD SHX Text 135A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H102
AutoCAD SHX Text 120B
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H103
AutoCAD SHX Text
AutoCAD SHX Text 101A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 120A
AutoCAD SHX Text H101
AutoCAD SHX Text 113A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UFIRST FLOOR PLAN
DRAWING NO.
Project Title
Building Number
Location
Drawn
Checked
Drawing Title
SIXTY
V.A.M.C. ST. LOUIS, MO.
JEFFERSON BARRACKS DIVISION
ASBESTOS ASSESSMENT &
AREA LOCATION PROGRAM
V e t e r a n s
A d m i n i s t r a t i o n
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
DateRevisions
VA FORM 08-6231, FEB. 1983
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 8 9
F E
D C
B A o n e e i g h t i n o t o n e q u a r t e r i n o t t h r e e e i g h t s i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a e h a l f i n c h e o t t h r e e i n c h e o t o n e h a l f i n o t
F E
D C
B A
ASBESTOS CONTAINING MATERIALS
HMA GUIDE
4 Wall mounted heater (PACM) - 22 units
29 Flange gasket (PACM) - throughout
34 Fire door (PACM) - 2 units
43 Black penetration caulk - 20 ft
48 Old hard gray window caulk - all exterior windows - 23 windows
49 Gray frame caulk - all exterior windows - 23 windows
55 Gray old window caulk - all exterior windows - 23 windows
56 Old covering under white canvas covering on hot water tank - 1 unit
XX HMA Numbers
XX
Sample Numbers
C.DEY
VA-JB 2018 Asbestos and
Lead Reinspection
SH1476
6-13-2019
NON-ASBESTOS GENERAL HMA GUIDE
1 Concrete
3 Dry wall/joint compound
10 White door caulk
11 White hard door caulk
12 White hard window caulk
13 Gray window caulk
15 Interior EFIS ceiling
16 4" Brown cove base
22 White caulking on freezer/ cooler doors
23 White penetration caulk
24 Surface black tar mastic
25 White cork
26 2'x2' White ceiling tile
27 White fixture caulk
28 Pipe dope
30 White paint on fiberglass
31 2'x4' White ceiling tile
32 Gray seam sealant on duct work
33 Red fire proof caulk
35 6" Brown cove base
37 Brown penetration caulk
38 Brown door caulk
39 Black cloth/rubber seal on swinging doors
40 White window glaze
41 2'x4' Aluminum ceiling tile
42 CMU block
44 4" Black cove base
45 6"x6" Frosted glass brick
46 Black vibration joint cloth on ventilation system
47 White canvas covering on the ends of hot water tank
50 Gray fixture caulk
51 Black window sash seal
52 Black dock cushion
53 Door window glaze black
54 Gray marble window cell
57 Tunnel debris
Riverfront Safety & Health
1139 Olive St. Suite 300
St. Louis, MO. 63101
FIRST FLOOR - MISCELLANEOUS
HMA LEGEND
MISCELLANEOUS HMA - FIRST FLOOR
JB-60-1-misc
J.RHYNEER
CRAWLSPACE ACCESS
AutoCAD SHX Text 133A
AutoCAD SHX Text
AutoCAD SHX Text 135A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H102
AutoCAD SHX Text 120B
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H103
AutoCAD SHX Text
AutoCAD SHX Text 101A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 120A
AutoCAD SHX Text H101
AutoCAD SHX Text 113A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UFIRST FLOOR PLAN
DRAWING NO.
Project Title
Building Number
Location
Drawn
Checked
Drawing Title
SIXTY
V.A.M.C. ST. LOUIS, MO.
JEFFERSON BARRACKS DIVISION
ASBESTOS ASSESSMENT &
AREA LOCATION PROGRAM
V e t e r a n s
A d m i n i s t r a t i o n
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
DateRevisions
VA FORM 08-6231, FEB. 1983
1 2 3 4 5 6 7 8 9
1 2 3 4 6 7 8 9
F E
D C
B A o n e e i g h t i n c e f o o t o n e q u a r t e r i n c e f o o t t h r e e e i g h t s i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e i n c e f o o t o n e a n d o n e h a l f i n c h e e f o o t t h r e e i n c h e e f o o t o n e h a l f i n c e f o o t
F E
D C
B A
2 Plaster
XX HMA Numbers
XX
Sample Numbers
C.DEY
VA-JB 2018 Asbestos and
Lead Reinspection
SH1476
6-18-2019
Riverfront Safety & Health
1139 Olive St. Suite 300
St. Louis, MO. 63101
FIRST FLOOR - SURFACING
HMA LEGEND
SURFACING HMA - FIRST FLOOR
JB-60-1-surfacing
J.RHYNEER
CRAWLSPACE ACCESS
NON-ASBESTOS GENERAL HMA GUIDE
AutoCAD SHX Text 133A
AutoCAD SHX Text
AutoCAD SHX Text 135A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H102
AutoCAD SHX Text 120B
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H103
AutoCAD SHX Text
AutoCAD SHX Text 101A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 120A
AutoCAD SHX Text H101
AutoCAD SHX Text 113A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UFIRST FLOOR PLAN
DRAWING NO.
Project Title
Building Number
Location
Drawn
Checked
Drawing Title
SIXTY
V.A.M.C. ST. LOUIS, MO.
JEFFERSON BARRACKS DIVISION
ASBESTOS ASSESSMENT &
AREA LOCATION PROGRAM
V e t e r a n s
A d m i n i s t r a t i o n
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
DateRevisions
VA FORM 08-6231, FEB. 1983
1 2 3 4 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A o n e e i g h t i n c e f o o t o n e q u a r t e r i n c e f o o t t h r e e e i g h t s i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e i n c e f o o t o n e a n d o n e h a l f i n c h e e f o o t t h r e e i n c h e e f o o t o n e h a l f i n c e f o o t
F E
D C
B A
ASBESTOS CONTAINING TSI
GUIDE
19 Black TSI wrap - 229 ft 20 ACM pipe insulation - 843 ft 21 Mudded fittings - 143 fittings
XX HMA Numbers
XX
Sample Numbers
C.DEY
VA-JB 2018 Asbestos and
Lead Reinspection
SH1476
6-24-2019
Riverfront Safety & Health
1139 Olive St. Suite 300
St. Louis, MO. 63101
FIRST FLOOR - TSI LOCATION
LEGEND
TSI LOCATION - FIRST FLOOR
JB-60-1-TSI
J.RHYNEER
CRAWLSPACE ACCESS
All asbestos pipe insulation is assumed to be in Good condition unless noted as Damaged (D) or Significantly Damaged (SD)
Unknown amounts of asbestos pipe insulation may be inside all wet walls, pipe chases, inside plaster walls, or above plaster ceilings
SD
SD
SD
SD
SD
AutoCAD SHX Text 133A
AutoCAD SHX Text
AutoCAD SHX Text 135A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H102
AutoCAD SHX Text 120B
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H103
AutoCAD SHX Text
AutoCAD SHX Text 101A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 120A
AutoCAD SHX Text H101
AutoCAD SHX Text 113A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UFIRST FLOOR PLAN
DRAWING NO.
Project Title
Building Number
Location
Drawn
Checked
Drawing Title
SIXTY
V.A.M.C. ST. LOUIS, MO.
JEFFERSON BARRACKS DIVISION
ASBESTOS ASSESSMENT &
AREA LOCATION PROGRAM
V e t e r a n s
A d m i n i s t r a t i o n
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
DateRevisions
VA FORM 08-6231, FEB. 1983
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A o n e e i g h t i n o t o n e q u a r t e r i n o t t h r e e e i g h t s i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a e h a l f i n c h e o t t h r e e i n c h e o t o n e h a l f i n o t
F E
D C
B A
XX HMA Numbers
XX
Sample Numbers
C.DEY
VA-JB 2018 Asbestos and
Lead Reinspection
SH1476
6-18-2019
Riverfront Safety & Health
1139 Olive St. Suite 300
St. Louis, MO. 63101
FIRST FLOOR - SAMPLE
LOCATION LEGEND
SAMPLE LOCATION - FIRST FLOOR
JB-60-1-sample
J.RHYNEER
CRAWLSPACE ACCESS
52 53
55 60 61 62
65 69
97 98
102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119
AutoCAD SHX Text 133A
AutoCAD SHX Text
AutoCAD SHX Text 135A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H102
AutoCAD SHX Text 120B
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H103
AutoCAD SHX Text
AutoCAD SHX Text 101A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 120A
AutoCAD SHX Text H101
AutoCAD SHX Text 113A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UFIRST FLOOR PLAN
V.A. MEDICAL CENTER
JEFFERSON BARRACKS DIVISION
2018 REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 101-60-JB magnesia pipe lagging 40 lf 0 4.00 101-60-JB mudded joint fittings on mag pipe lagging 0 ea 3 4.00
101A-60-JB magnesia pipe lagging 45 lf 0 4.00 101A-60-JB mudded joint fittings on mag pipe lagging 0 ea 5 4.00
102-60-JB magnesia pipe lagging 20 lf 4.00 102-60-JB mudded joint fittings on mag pipe lagging ea 6 4.00
103-60-JB magnesia pipe lagging 32 lf 4.00 103-60-JB mudded joint fittings on mag pipe lagging ea 4 4.00
108-60-JB mudded joint fittings on mag pipe lagging ea 1 4.00
110-60-JB magnesia pipe lagging 45 lf 4.00 110-60-JB mudded joint fittings on mag pipe lagging ea 6 4.00
111-60-JB magnesia pipe lagging 45 lf 4.00 111-60-JB mudded joint fittings on mag pipe lagging ea 6 4.00
112-60-JB magnesia pipe lagging 35 lf 0 4.00 112-60-JB mudded joint fittings on mag pipe lagging 0 ea 3 4.00 112-60-JB Black TSI wrap 60 lf 4.00
112A-60-JB magnesia pipe lagging 50 lf 0 4.00 112A-60-JB mudded joint fittings on mag pipe lagging 0 ea 10 4.00
113-60-JB magnesia pipe lagging 37 lf 5 4.00
114-60-JB magnesia pipe lagging 43 lf 0 4.00 114-60-JB mudded joint fittings on mag pipe lagging 0 ea 15 4.00 114-60-JB Black TSI wrap 8 lf
125-60-JB magnesia pipe lagging 16 lf 4.00 125-60-JB mudded joint fittings on mag pipe lagging ea 4 4.00
126-60-JB magnesia pipe lagging 20 lf 4.00 126-60-JB mudded joint fittings on mag pipe lagging ea 6 4.00
126-60-JB magnesia pipe lagging 15 lf 4.00 mudded joint fittings on mag pipe lagging ea 2 4.00
129-60-JB magnesia pipe lagging 15 lf 0 4.00 129-60-JB mudded joint fittings on mag pipe lagging 0 ea 8 4.00
129-60-JB magnesia pipe lagging 40 lf 4.00
Room # Description Qty S/LF Ftgs TH/DI 129-60-JB mudded joint fittings on mag pipe lagging ea 6 4.00
130-60-JB Black TSI wrap 40 lf 4.00
133-60-JB magnesia pipe lagging 10 lf 4.00 133-60-JB mudded joint fittings on mag pipe lagging ea 6 4.00
134-60-JB magnesia pipe lagging 25 lf 0 4.00 134-60-JB mudded joint fittings on mag pipe lagging 0 ea 7 4.00
135-60-JB magnesia pipe lagging 30 lf 0 4.00 135-60-JB mudded joint fittings on mag pipe lagging 0 ea 10 4.00 135-60-JB Black TSI wrap 10 lf 4.00
H101-60-JB magnesia pipe lagging 235 lf 0 4.00 H101-60-JB mudded joint fittings on mag pipe lagging 0 ea 28 4.00 H101-60-JB Black TSI wrap 85 lf 4.00
H103-60-JB magnesia pipe lagging 5 lf 4.00 H103-60-JB mudded joint fittings on mag pipe lagging ea 2 4.00 H103-60-JB Black TSI wrap 12 lf 4.00
TOTALS 1018 143
SECTION 6.0
ASBESTOS CONTAINING MATERIAL CONDITION & REMOVAL
PRIORITY TABLE
WITH
ABATEMENT COST ESTIMATES
This section provides a table with the current condition, potential for disturbance, and removal priority for each ACM HMA.
Condition and Removal Priority Table
MANAGEMENT PLAN REMOVAL PRIORITY ASSESSMENT CHARTS
Qualitative (Descriptive) Rankings for Current Condition of ACM Qualitative Ranking Example Descriptions of Current Condition
Good (G) Surfacing material has no visible damage; covering on TSI is intact; miscellaneous materials are intact; no visible debris.
Damaged (D) Surfacing material has moderate but not extensive visible damage; covering on TSI is cut or torn, exposing small but not extensive amounts of insulation; miscellaneous materials have moderate but not extensive damage; moderate but not extensive amounts of visible debris
Significantly Damaged (SD) Extensive damage to surfacing material; covering on TSI is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile is extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Note: Damage is considered “extensive” when the total area of distributed damage exceeds 10%, or 25% localized damage.
Qualitative Rankings for Potential for Disturbance of ACM Level of Potential Disturbance Frequency of Potential
Contact (accessibility) Influence of Vibration Potential for Air Erosion or
Water Damage
HIGH (H)
(potential for significant damage) High Any Value Any Value
Any Value High Any Value Any Value Any Value High
MODERATE (M)
(potential for damage)
Moderate Moderate or Low Moderate or Low Moderate or Low Moderate Moderate or Low Moderate or Low Moderate or Low Moderate
LOW (L) Low Low Low Note: Overall rating determined by assigning disturbance probabilities under all 3 categories then adopting highest individual score for each material.
Qualitative Rankings and Numerical Ratings for Removal Priority of ACM Hazard Rank/
Removal Priority ACBM Condition ACBM Disturbance
Potential Recommended Response Actions
1 Significantly Damaged
Any Evacuate or isolate area immediately. Remove ACBM immediately. O&M Required for all friable ACBM.
2 Damaged High Evacuate or isolate area immediately. Remove, enclose, encapsulate or repair ACBM to correct immediately. Reduce potential for disturbance of remaining materials. O&M Required for all friable ACBM.
3 Damaged Moderate Remove, enclose, encapsulate, or repair to correct damage as soon as feasible.
O&M Required for all friable ACBM.
4 Damaged Low Remove, enclose, encapsulate, or repair to correct damage as needed to facilitate future projects. Take steps to reduce potential for disturbance. O&M Required for all friable ACBM.
5 Good High Take steps to reduce potential for disturbance. O&M Required for all friable ACBM.
6 Good Moderate O&M Required for all friable ACBM.
7 Good Low O&M Required for all friable ACBM, but measures need not be as extensive as
Category 6.
VA JEFFERSON BARRACKS CAMPUS
2018 ASBESTOS INSPECTION
CONDITION AND REMOVAL PRIORITY TABLE FOR
BUILDING 60
Homogeneous Area No. Bldg Floor Material Description
Friable Yes/No
Accessibility Yes/No
Restricted
Current Condition Potential for Disturbance
Removal Priority
Rating Based On Rating Based On
Building 60 – Tunnels
HMA-20 60 T
ACM pipe insulation (see map for locations of damage and significant damage)
Yes No SD Significant damage M Access/
Maintenance 1
HMA-20 60 T ACM pipe insulation Yes Yes G Intact M Access/ Maintenance 6
HMA-21 60 T
Mudded fittings (see map for locations of damage and significant damage)
Yes No SD Significant damage M Access/
Maintenance 1
HMA-21 60 T Mudded fittings Yes Yes G Intact M Access/ Maintenance 6
HMA-57 60 T Debris in tunnels Yes No SD Significant Damaged L Access 1
HMA-58 60 T Assumed chrysotile loose fill at hanger locations Yes No SD Significant
Damaged L Access 1
HMA-59 60 T Assumed TSI remnant in steam system penetrations Yes No SD Significant
Damaged L Access 1
HMA-62 60 T Sewer pipe penetration packing Yes Yes G Intact M Access/ Maintenance 6
Building 60 – 1st Floor
HMA-A1 60 1 12”x12” floor tile – white w/ black mastic No Yes G Intact L Floor
Maintenance 7
HMA-B1 60 1 9”x9” floor tile – brown w/ black mastic No Yes G Intact L Floor
Maintenance 7
HMA-C1 60 1 9”x9” floor tile – light brown w/ black mastic No Yes G Intact L Floor
Maintenance 7
HMA-4 60 1 Wall mounted heater (PACM) No Yes G Intact L Maintenance 7
HMA-9 60 1 6”x24” floor tile – dark brown No Yes G Intact L Floor Maintenance 7
HMA-19 60 1 Black TSI wrap Yes Yes G Intact M Maintenance 6
HMA-20 60 1 ACM pipe insulation (see map for locations of damage and Yes Yes SD Significant damage M Maintenance 1
Homogeneous Area No. Bldg Floor Material Description
Friable Yes/No
Accessibility Yes/No
Restricted
Current Condition Potential for Disturbance
Removal Priority
Rating Based On Rating Based On significant damage)
HMA-20 60 1 ACM pipe insulation Yes Yes G Intact M Maintenance 6
HMA-21 60 1
Mudded fittings (see map for locations of damage and significant damage)
Yes Yes SD Significant damage M Maintenance 1
HMA-21 60 1 Mudded fittings Yes Yes G Intact M Maintenance 6
HMA-29 60 1 Flange gasket (PACM) No Yes G Intact L Maintenance 7
HMA-34 60 1 Fire door (PACM) No Restricted G Intact L Maintenance 7
HMA-43 60 1 Black penetration caulk No Yes G Intact L Maintenance 7
HMA-56 60 1 Old covering under white canvas covering on hot water tank Yes Yes G Intact L Maintenance 7
Building 60 – Exterior
HMA-48 60 Ext Old, hard, gray window caulk No Yes G Intact L Maintenance 7
HMA-49 60 Ext Gray window frame caulk No Yes G Intact L Maintenance 7
HMA-55 60 Ext Old, gray window caulk No Yes G Intact L Maintenance 7
2018 Asbestos Summary and Cost Table
2018 BUILDING 60 ACM SUMMARY AND COST TABLE
ACM
DESCRIPTION
FRIABLE? CONDITION EST.
QNTY.
UNIT COST COST TO REMOVE
Flange gasket
(PACM)
CAT 1
non-friable Good Unknown $500/ea TBD. Requires NESHAP
Inspection
Wall mounted heater (PACM)
CAT 2
non-friable Good 22 units $500/ea $11,000
Fire door (PACM)
CAT 2
non-friable Good 3 $750/ea $2,250
ACM pipe insulation Friable
Good to Severely Damaged
843 ft $25/ft $21,075
Mudded fittings Friable Good to Severely Damaged
143 fittings $50/fitting $7,150
Black TSI wrap Friable Good to Severely Damaged
229 ft $25/ft $5,725
12”x12” floor tile
– white w/ black mastic
CAT 1
non-friable Good 500 ft2 $7/ft2 $3,500
9”x9” floor tile – brown w/ black mastic
CAT 1
non-friable Good 340 ft2 $7/ft2 $2,380
9”x9” floor tile – light brown w/ black mastic
CAT 1
non-friable Good 340 ft2 $7/ft2 Floor tile is in same rooms;
Included in previous price
6”x24” floor tile – dark brown
CAT 1
non-friable Good 340 ft2 $7/ft2 Floor tile is in same rooms;
Included in previous price
Black penetration caulk
CAT 2
non-friable Good $100/ft 20 ft $2,000
Old covering under white canvas covering on hot water tank
Friable Good $2,560/unit 1 unit $2,560
Old, hard, gray window caulk
CAT 2
non-friable Good 23 windows $557/unit $12,811
Gray window frame caulk
CAT 2
non-friable Good 23 windows $557/unit Included in previous price;
Pricing is for all windows
Old, gray window caulk
CAT 2
non-friable Good 23 windows $557/unit Included in previous price;
Pricing is for all windows
2018 Asbestos Summary and Cost Table
2018 BUILDING 60 ACM SUMMARY AND COST TABLE
ACM
DESCRIPTION
FRIABLE? CONDITION EST.
QNTY.
UNIT COST COST TO REMOVE
Chrysotile loose fill at hanger locations Yes Severely
Damaged Unknown, throughout $25/ft TBD. Requires NESHAP
Inspection
TSI remnants in steam system penetrations
Yes Severely Damaged
Unknown, throughout $25/ft TBD. Requires NESHAP
Inspection
Sewer pipe penetration packing Yes Good 16 ft $25/ft $400
SECTION 7.0
MASTER BULK SAMPLE SUMMARY TABLES
This table provides a listing of all asbestos bulk samples taken during the 2018 inspection.
2018 Asbestos Bulk Sample Table
2018 ACM INSPECTION REPORT
VA JEFFERSON BARRACKS ST. LOUIS CAMPUS
BUILDING 60
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Historical Asbestos Bulk Sampling Summary
Sample No.
HMA Number and Material Description
Floor
Room
Asbestos Content
JB-60-01-M-
126-25 4" black cove base 01 126 None Detected
JB-60-01-S-
111-21 Cork and plaster insulation 01 111 None Detected
JB-60-01-S-
112-22
Cork and plaster insulation w/grid pattern 01 112 None Detected
JB-60-01-M-
120B-23 2x4 plain fiberglass ceiling tile 01 120B None Detected
JB-60-01-M-
103-24 1x1 white ceiling tile 01 103 None Detected
JB-60-01-M-
122-26 Black condensate wrap 01 122 None Detected
JB-60-01-M-
101-27 Gypsum drywall 01 101 None Detected
JB-60-01-T-
110-04
Mudded joint fitting on cardboard lagging 01 110 Positive Sample
JB-60-01-T-
H101-11
Mudded joint fitting on cork and tar lagging 01 H101 Positive Sample
JB-60-01-T-
108-16
Mudded joint fitting on magnesia pipe lagging 01 108 Positive Sample
JB-60-01-T-
110-01 Cardboard wrap pipe lagging 01 110 Positive Sample
JB-60-01-T-
H103-07 Cork and tar paper pipe lagging 01 H103 None Detected
Building 60
JB-60-01-T-
108-14 Magnesia pipe lagging 01 108 Positive Sample
JB-60-01-S-
H102-19 Hardwall plaster 01 H102 None Detected
JB-60-01-S-
112A-20 Gray plaster 01 112A None Detected
JB-60-01-M-
108-001A White vibration isolator 01 108 None Detected
JB-60-01-F-
115-002A
White 12x12 floor tile, black mastic 01 115 Positive Sample
JB-60-01-F-
126-003A
White 12x12 floor tile, black mastic 01 126 Positive Sample
JB-60-01-F-
107-004A Layer 1 - Brown 9x9 floor tile 01 107 Positive Sample
JB-60-01-F-
107-004A Layer 2 - Black mastic 01 107 None Detected
JB-60-01-F-
107-005A
Layer 1 - Light brown 9x9 floor tile 01 107 Positive Sample
JB-60-01-F-
107-005A Layer 2 - Black mastic 01 107 None Detected
JB-60-01-T-
129-006A
Black mastic, black tar paper wrap, brown insulation 01 129 Positive Sample
JB-60-01-T-
129-007A Layer 1 - 6" Elbow - black tar 01 129 Positive Sample
JB-60-01-T-
129-007A Layer 2 - 6" Elbow - black mastic 01 129 None Detected
JB-60-01-T-
129-007A Layer 3 - 6" Elbow - paper 01 129 None Detected
JB-60-01-F-
101A-008A Layer 1 - White 12x12 floor tile 01 101A None Detected
Building 60
JB-60-01-F-
101A-008A Layer 2 - Black mastic 01 101A Positive Sample
JB-60-01-F-
101-009A Layer 1 - Brown 9x9 floor tile 01 101 Positive Sample
JB-60-01-F-
101-009A Layer 2 - Black mastic 01 101 None Detected
JB-60-01-F-
101-010A
Layer 1 - Light brown 9x9 floor tile 01 101 Positive Sample
JB-60-01-F-
101-010A Layer 2 - Black mastic 01 101 None Detected
JB-60-01-F-
104-011A Layer 1 - Brown 9x9 floor tile 01 104 Positive Sample
JB-60-01-F-
104-011A Layer 2 - Black mastic 01 104 None Detected
JB-60-01-F-
104-012A
Layer 1 - Light brown 9x9 floor tile 01 104 Positive Sample
JB-60-01-F-
104-012A Layer 2 - Black mastic 01 104 None Detected
JB-60-01-S-
RF-013A Gray flashing, black roofing tar 01 Roof None Detected
2018 Asbestos Bulk Sampling Summary
1 48: Old hard gray window caulk Exterior Exterior 3% Chrysotile
2 48: Old hard gray window caulk Exterior Exterior Positive stop rule
Building 60
3 48: Old hard gray window caulk Exterior Exterior Positive stop rule
4 49: Gray frame caulk Exterior Exterior 6% Chrysotile
5 49: Gray frame caulk Exterior Exterior Positive stop rule
6 49: Gray frame caulk Exterior Exterior Positive stop rule
7 50: Gray fixture caulk Exterior Exterior None detected
8 50: Gray fixture caulk Exterior Exterior None detected
9 50: Gray fixture caulk Exterior Exterior None detected
10 51: Black window sash seal Exterior Exterior None detected
11 51: Black window sash seal Exterior Exterior None detected
12 51: Black window sash seal Exterior Exterior None detected
13 52: Black dock cushion Exterior Exterior None detected
14 52: Black dock cushion Exterior Exterior None detected
15 52: Black dock cushion Exterior Exterior None detected
16 53: Door window glaze black Exterior Exterior None detected
17 53: Door window glaze black Exterior Exterior None detected
Building 60
18 53: Door window glaze black Exterior Exterior None detected
19 9: 6"x24" FT dark brown 1 103 10% Chrysotile in tile
20 9: 6"x24" FT dark brown 1 101 Positive stop rule
21 9: 6"x24" FT dark brown 1 101 Positive stop rule
22 54: Gray marble window cell 1 101 None detected
23 54: Gray marble window cell 1 101 None detected
24 54: Gray marble window cell 1 101 None detected
25 14: 12"x12" CT white with insulation tile 1 101 None detected
26 14: 12"x12" CT white with insulation tile 1 101 None detected
27 2: Plaster 1 101 None detected
28 3: Dry wall/joint compound 1 103 None detected
29 3: Dry wall/joint compound 1 103 None detected
30 13: Gray window caulk 1 103 None detected
31 13: Gray window caulk 1 103 None detected
32 13: Gray window caulk 1 103 None detected
Building 60
33 12: White hard window caulk 1 101 None detected
34 12: White hard window caulk 1 101 None detected
35 12: White hard window caulk 1 135 None detected
36 15: Interior EFIS ceiling 1 nr 101 None detected
37 15: Interior EFIS ceiling 1 nr 101 None detected
38 15: Interior EFIS ceiling 1 nr 135 None detected
39 19: Black wrap on freon pipes (BW) 1 nr 101 58% Chrysotile
40 10: White door caulk 1 103 None detected
41 10: White door caulk 1 103 None detected
42 10: White door caulk 1 103 None detected
43 16: 4" Brown cove base 1 101 None detected
44 16: 4" Brown cove base 1 101 None detected
45 11: White hard door caulk 1 101 None detected
46 19: Black wrap on freon pipes (BW) 1 135 Positive stop rule
47 11: White hard door caulk 1 103 None detected
Building 60
48 25: White cork 1 103 None detected
49 25: White cork 1 103 None detected
50 25: White cork 1 103 None detected
51 22: White caulking on freezer/ cooler doors 1 134 None detected
52 22: White caulking on freezer/ cooler doors 1 131 None detected
53 22: White caulking on freezer/ cooler doors 1 130 None detected
54 26: 2'x2' White CT 1 133 None detected
55 26: 2'x2' White CT 1 nr 127 None detected
56 26: 2'x2' White CT 1 127 None detected
57 28: Pipe dope 1 133 None detected
58 30: White paint on FG 1 133 None detected
59 32: Gray seam sealant on ductwork 1 128 None detected
60 35: 6" Brown cove base 1 nr 127 None detected
61 35: 6" Brown cove base 1 nr 127 None detected
62 35: 6" Brown cove base 1 nr 127 None detected
Building 60
63 27: White fixture caulk 1 133 None detected
64 27: White fixture caulk 1 133 None detected
65 27: White fixture caulk 1 133 None detected
66 23: White penetration caulk 1 hall None detected
67 23: White penetration caulk 1 hall None detected
68 23: White penetration caulk 1 freezer None detected
69 31: 2'x4' White CT 1 133 None detected
70 31: 2'x4' White CT 1 133 None detected
71 33: Red fire proof caulk 1 120 None detected
72 33: Red fire proof caulk 1 117 None detected
73 33: Red fire proof caulk 1 127 None detected
74 37: Brown penetration caulk 1 hall None detected
75 37: Brown penetration caulk 1 hall None detected
76 37: Brown penetration caulk 1 hall None detected
77 38: Brown door caulk 1 117 None detected
Building 60
78 38: Brown door caulk 1 nr 120A None detected
79 38: Brown door caulk 1 nr 120A None detected
80 39: Black cloth/rubber seal on swinging doors 1 117 None detected
81 39: Black cloth/rubber seal on swinging doors 1 117 None detected
82 39: Black cloth/rubber seal on swinging doors 1 117 None detected
83 43: Black penetration caulk 1 115 15% Chrysotile
84 43: Black penetration caulk 1 115 Positive stop rule
85 43: Black penetration caulk 1 115 Positive stop rule
86 11: White hard door caulk 1 103 None detected
87 40: White window glaze 1 120 None detected
88 40: White window glaze 1 120 None detected
89 40: White window glaze 1 120 None detected
90 55: Gray old window caulk 1 120 4% Chrysotile
91 55: Gray old window caulk 1 120 Positive stop rule
92 55: Gray old window caulk 1 120 Positive stop rule
Building 60
93 44: 4" Black cove base 1 126 None detected
94 44: 4" Black cove base 1 126 None detected
95 16: 4" Brown cove base 1 103 None detected
96 3: Dry wall/joint compound 1 108 None detected
97 3: Dry wall/joint compound 1 108 None detected
98 3: Dry wall/joint compound 1 126 None detected
99 3: Dry wall/joint compound 1 126 None detected
100 2: Plaster 1 103 None detected
101 2: Plaster 1 125 None detected
102 47: White canvas covering on the ends of hot water tank 1 108 None detected
103 47: White canvas covering on the ends of hot water tank 1 108 None detected
104 47: White canvas covering on the ends of hot water tank 1 108 None detected
56: Old covering under white canvas covering on hot water tank 1 108 88% Chrysotile
56: Old covering under white canvas covering on hot water tank 1 108 Positive stop rule
56: Old covering under white canvas covering on hot water tank 1 108 Positive stop rule
Building 60
108 28: Pipe dope 1 108 None detected
109 28: Pipe dope 1 108 None detected
110 32: Gray seam sealant on duct work 1 108 None detected
111 32: Gray seam sealant on duct work 1 108 None detected
112 30: White paint on FG 1 108 None detected
113 30: White paint on FG 1 108 None detected
114 24: Surface black tar mastic 1 108 None detected
115 24: Surface black tar mastic 1 108 None detected
116 24: Surface black tar mastic 1 108 None detected
117 57: Tunnel debris 1 108 None detected
118 57: Tunnel debris 1 108 15% Amosite, 21% Chrysotile
119 57: Tunnel debris 1 108 Positive stop rule
120 57: Tunnel debris 1 108 Positive stop rule
121 60. Assumed Remnant on piping with FG TSI (Prior Abatement) T 108 None detected
122 60. Assumed Remnant on piping with FG TSI (Prior Abatement) T 108 None detected
Building 60
123 60. Assumed Remnant on piping with FG TSI (Prior Abatement) T 108 None detected
124 61: Tunnel entrance hatch T 108 None detected
125 61: Tunnel entrance hatch T 108 None detected
126 61: Tunnel entrance hatch T 108 None detected
127 62: Sewer pipe penetration packing T 108 86% Chrysotile, 6% Amosite
128 62: Sewer pipe penetration packing T 108 Positive stop rule
129 62: Sewer pipe penetration packing T 108 Positive stop rule
58: Assumed Chrysotile loose fill at hanger locations on FG-TSI system (Chilled Water for FCUs)
T 108 7% Chrysotile, 17% Amosite
58: Assumed Chrysotile loose fill at hanger locations on FG-TSI system (Chilled Water for FCUs)
T 108 Positive stop rule
58: Assumed Chrysotile loose fill at hanger locations on FG-TSI system (Chilled Water for FCUs)
T 108 Positive stop rule
59: Assumed TSI Remnant in Steam System Penetrations to
Steam Convectors T 108 88% Chrysotile, 18% Amosite
59: Assumed TSI Remnant in Steam System Penetrations to
Steam Convectors T 108 Positive stop rule
59: Assumed TSI Remnant in Steam System Penetrations to
Steam Convectors T 108 Positive stop rule
SECTION 8.0
ASBESTOS INSPECTION PHOTO LOG
This section provides photographs of all HMAs identified during the 2018 inspection effort, which should be referenced to visually confirm the identity of any suspect material in question versus this report.
PROJECT NAME: VA JC & JB LEAD AND ASB SURVEYS RSH PROJECT NO. SH1476
PROJECT SITE: JEFFERSON BARRACKS