This pre-solicitation notice is for project 657-19-103JB to replace mechanical systems in Buildings 18 and 60 at the Jefferson Barracks Division of the VA Saint Louis Health Care System. The contractor must provide all labor, materials, tools, equipment, supervision and site preparation to demolish existing structures and install new mechanical systems as required by the drawings and specifications. The project cost range is $2,000,000 to $5,000,000 and has a NAICS code of 238220 with a small business size standard of $16.5 million. The duration is estimated at 426 calendar days from notice to proceed. The solicitation will be posted to FedBizOpps on April 7, 2020. This is a competitive total SDVOSB set-aside and the prime contractor must perform at least 25% of construction labor. Proposals are due as specified in the solicitation. The Department of Veterans Affairs plans to award without discussions.
36C25520R0063 657-19-103JB - Combined Drawings 100PCT_Part4.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25520R0063-014.pdf | ||
| 36C25520R0063-016.pdf | ||
| 36C25520R0063-011.pdf | ||
| 36C25520R0063-008.pdf | ||
| 36C25520R0063-015.pdf | ||
| 36C25520R0063-004.pdf | ||
| 36C25520R0063-009.pdf | ||
| 36C25520R0063-002.docx | DOCX document | |
| 36C25520R0063-013.pdf | ||
| 36C25520R0063-007.pdf | ||
| 36C25520R0063-003.pdf | ||
| 36C25520R0063-010.pdf | ||
| 36C25520R0063-012.pdf | ||
| 36C25520R0063-005.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
J
J
J
J
J
J
J
J
J
J
J
J
T T
T
TTT
J
T
T
J
J
J J
J
J
T
18-ACCU-1
SIGNAL
18-CCF-5
SIGNAL
VAV-B-6
SIGNAL
VAV-B-4
SIGNAL
VAV-B-5
SIGNAL
VAV-B-1B
SIGNAL
VAV-B-3
SIGNAL
VAV-B-2
SIGNAL
VAV-B-1A
SIGNAL
18-AHU-SF
SIGNAL
18-AHU-RF-1SIGNAL
18-UH-1
SIGNAL
18-EF-1
SIGNAL
18-DWH-1
SIGNAL
18-PRV-1A/B
SIGNAL
18-HHW-P-1
SIGNAL
18-HHW-P-2
SIGNAL
18-GMP-01
SIGNAL
18-ET-01
VAV
3-3T
SIGNAL
18-HX-1A
SIGNAL
18-DHW-P-1
18-SDS-1
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:5 :3
P
M
18-EI-101
ELECTRICAL INSTRUMENTATION PLAN
- FLOOR 00
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
TL GG Drawing # 66 of 77
1/8" = 1'-0"
ELECTRICAL INSTRUMENTATION PLAN - FLOOR 00
Plan North
True North
KEYNOTES:
ELECTRICAL CONTRACTOR SHALL PROVIDE SMOKE DAMPER
SIGNAL JUNCTION BOX FOR SMOKE DAMPER "SD" AND 2
POSITION BINARY CONTROL POINT WITH DEDICATED 3/4" RED
EMT TO FIRE ALARM CONTROL PANEL IN LOBBY ON 1ST
FLOOR. PROVIDE DAMPER POSITION FEEDBACK CONTROL
"ZS" WITH DEDICATED 3/4" EMT TO ECC IN BASEMENT MECH
RM-002. SEE SHEET 00-MG-701 DETAIL 3 AND I/O POINTS LIST
ON SHEET 00-MG-702 FOR MORE DETAILS. MECHANICAL
CONTRACTOR SHALL PROVIDE 3/4" EMT AND APPROPRIATE
CONDUCTOR FROM PRESSURE SWITCH HIGH "PSH" TO SHUT
DOWN FAN UPON REACHING HIGH PRESSURE SETPOINT AND
3/4" CONDUIT WITH CONDUCTOR FROM "ZS" TO CONTROL
JUNCTION BOX.
MECHANICAL CONTRACTOR SHALL CONNECT ALL SIGNALS
TO LOCAL AUM ONSITE THROUGH DDC AND COORDINATE
WITH LOCAL VA TO TEST, BALLANCE AND COMMISSION
SYSTEM ACCORDING TO SPECIFICATIONS.
rwwhe Image
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
J
J
J
J
J
J
J J J
J
J J JJ
J
J
J
T T T
T TTTT
T
T
T
T
T
T
T
T
T T
T
T
J
J J J
J
J
J
T
T
TT
T
J
JJ
AP
FEC
FAP
FEC FEC
FAP
FAP
FAP
RAD
RAD
RAD
RADRAD
RADRAD
RADRADRAD
RAD
RAD
RADRAD
RADRADRADRAD
RAD
RADRAD
RAD
RAD
RAD RAD
RAD RAD RAD
RAD
RAD RAD
RAD
RAD
RAD
RAD
RAD
OFFICE
OFFICE
OFFICE
FILE RM.
OFFICE
OFFICE
WORK RM.
STORAGE
OI&T
CORRIDOR
H102
CORRIDOR
H103
TOILET, MALE
102 TOILET, FEMALE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CHASE
CH-1-1
STAIRWELL NO. 2
S102
OFFICE
OFFICE
114A
OFFICE
STAIRWELL NO. 3
S103
BREAK RM.
115A
CLOSET
115C
CLOSET
115B
OFFICE, OPEN
OFFICE
OFFICE, CHIEF
113A
OFFICE
OFFICE
OFFICE
CONFERENCE RM.
CORRIDOR
H104
CORRIDOR
H105
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LIBRARY
OFFICE
RECEPTION
ELEVATOR
E1
AP
FEC
FAP
FEC FEC
FAP
FAP
FAP
RAD
RAD
RAD
RADRAD
RADRAD
RADRADRAD
RAD
RAD
RADRAD
RADRADRADRAD
RAD
RADRAD
RAD
RAD
RAD RAD
RAD RAD RAD
RAD
RAD RAD
RAD
RAD
RAD
RAD
RAD
SIGNAL
18-ACU-01
SIGNAL
VAV-1-11
SIGNAL
VAV-1-10
SIGNAL
VAV-1-9
SIGNAL
VAV-1-1C
SIGNAL
VAV-1-7
SIGNAL
VAV-1-8
SIGNAL
VAV-1-6
SIGNAL
VAV-1-5
SIGNAL
VAV-1-4
SIGNAL
VAV-1-3
SIGNAL
VAV-1-2
SIGNAL
VAV-1-1D
SIGNAL
VAV-1-1A
SIGNAL
VAV-1-1B
SIGNAL
VAV-1-12
SIGNAL
VAV-1-13
SIGNAL
VAV-1-15
SIGNAL
VAV-1-14
SIGNAL
VAV-1-1E
SIGNAL
VAV-1-17
SIGNAL
VAV-1-16
SIGNAL
VAV-1-19
SIGNAL
VAV-1-18
SIGNAL
18-ACU-1A
(N)18-SDS-3
(N)18-SDS-2
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:5 :4
P
M
18-EI-111
ELECTRICAL INSTRUMENTATION PLAN
- FLOOR 01
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
TL GG Drawing # 67 of 77
1/8" = 1'-0"
ELECTRICAL INSTRUMENTATION PLAN - FLOOR 01
Plan North
True North
KEYNOTES:
ELECTRICAL CONTRACTOR SHALL PROVIDE SMOKE DAMPER
SIGNAL JUNCTION BOX FOR SMOKE DAMPER "SD" AND 2
POSITION BINARY POINT WITH DEDICATED 3/4" RED EMT TO
FIRE ALARM CONTROL PANEL IN LOBBY ON 1ST FLOOR AND
DAMPER POSITION FEEDBACK "ZS" WITH DEDICATED 3/4" EMT
TO ECC IN BASEMENT MECH RM-002. SEE SHEET 00-MG-701
DETAIL 3 AND I/O POINTS LIST ON SHEET 00-MG-702 FOR
MORE DETAILS. MECHANICAL CONTRACTOR SHALL PROVIDE
3/4" EMT AND APPROPRIATE CONDUCTOR FROM PRESSURE
SWITCH HIGH "PSH" TO SHUT DOWN FAN UPON REACHING
HIGH PRESSURE SETPOINT AND CONDUCTOR AND 3/4"
CONDUIT FROM "ZS" TO CONTROL JUNCTION BOX.
MECHANICAL CONTRACTOR SHALL CONNECT ALL SIGNALS
TO LOCAL AUM ONSITE THROUGH DDC AND COORDINATE
WITH LOCAL VA TO TEST AND BALLANCE AND COMMISION
SYSTEM ACCORDING TO SPECIFICATIONS.
UP
UP
J
J J
J
J J
J
J J
J J
J
J J J J
J J
J
J
J
T T
T T
T T
T
T
T
T
T
T
T
T
T
T T
J
J T
T
T
T
T
T
T
JJ
AP
FAP
FEC
FAP
FEC
AP
FAP
FEC
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RADRAD
RADRADRADRADRAD
RADRAD
RAD
RAD RAD
RAD RAD RAD
RAD
RAD
RAD RAD
RAD RAD RAD RAD RAD
RAD
RAD
RAD
RAD
RAD
RADRAD
OFFICE
217C
OFFICE
217D
OFFICE
217E
OFFICE, SUPV.
HAC
OFFICE
215A
OFFICE
OFFICE
OFFICE
217A
OFFICE
217B
OFFICE
OFFICE
OFFICE
OFFICE
OI&T
ELEC. CLOSET
TOILET, MALE
TOILET, FEMALE
STAIRWELL NO. 2
S202
OFFICE
OFFICE
OFFICE, SUPV.
OFFICE, CHIEF
CORRIDOR
H203
CORRIDOR
H202
ELEVATOR LOBBY
CORRIDOR
H204
OFFICE
207A
OFFICE
207B
OFFICE
OFFICE
210B
OFFICE
210A
OFFICE
205A
CORRIDOR
H201
KITCHENETTE
212A
ELEVATOR
E1
CHASE
CH-2-1
STAIRWELL NO. 3
S203
AP
FAP
FEC
FAP
FEC
AP
FAP
FEC
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RADRAD
RADRADRADRADRAD
RADRAD
RAD
RAD RAD
RAD RAD RAD
RAD
RAD
RAD RAD
RAD RAD RAD RAD RAD
RAD
RAD
RAD
RAD
RAD
RADRAD
SIGNAL
VAV-2-11
SIGNAL
VAV-2-10
SIGNAL
VAV-2-9
SIGNAL
VAV-2-8
SIGNAL
VAV-2-6
SIGNAL
VAV-2-7
SIGNAL
VAV-2-1C
SIGNAL
VAV-2-5
SIGNAL
VAV-2-4
SIGNAL
VAV-2-3
SIGNAL
VAV-2-2
SIGNAL
VAV-2-1A
SIGNAL
VAV-2-1B
SIGNAL
VAV-2-1D
SIGNAL
18-ACU-1B
SIGNAL
VAV-2-13
SIGNAL
VAV-2-12
SIGNAL
VAV-2-14
SIGNAL
VAV-2-15
SIGNAL
VAV-2-17
SIGNAL
VAV-2-20
SIGNAL
VAV-2-19
SIGNAL
VAV-2-18
(N)18-SDS-5
(N)18-SDS-4
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:5 :4
P
M
18-EI-121
ELECTRICAL INSTRUMENTATION PLAN
- FLOOR 02
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
TL GG Drawing # 68 of 77
1/8" = 1'-0"
ELECTRICAL INSTRUMENTATION PLAN - FLOOR 02
Plan North
True North
KEYNOTES:
ELECTRICAL CONTRACTOR SHALL PROVIDE SMOKE DAMPER
SIGNAL JUNCTION BOX FOR SMOKE DAMPER "SD" AND 2
POSITION BINARY POINT WITH DEDICATED 3/4" RED EMT TO
FIRE ALARM CONTROL PANEL IN LOBBY ON 1ST FLOOR AND
DAMPER POSITION FEEDBACK "ZS" WITH DEDICATED 3/4" EMT
TO ECC IN BASEMENT MECH RM-002. SEE SHEET 00-MG-701
DETAIL 3 AND I/O POINTS LIST ON SHEET 00-MG-702 FOR
MORE DETAILS. MECHANICAL CONTRACTOR SHALL PROVIDE
3/4" EMT AND APPROPRIATE CONDUCTOR FROM PRESSURE
SWITCH HIGH "PSH" TO SHUT DOWN FAN UPON REACHING
HIGH PRESSURE SETPOINT AND CONDUCTOR AND 3/4"
CONDUIT FROM "ZS" TO CONTROL JUNCTION BOX.
MECHANICAL CONTRACTOR SHALL CONNECT ALL SIGNALS
TO LOCAL AUM ONSITE THROUGH DDC AND COORDINATE
WITH LOCAL VA TO TEST AND BALLANCE AND COMMISION
SYSTEM ACCORDING TO SPECIFICATIONS.
JJ
J J
J J
J
J J
J
J
J J
J
J
J
J
J
T
T
T T T
T
T
TT
T
T
J
J
J
J
T
T
T
T
T T
T
T
T
T
T
JJ
STAIRWELL NO. 1
S301
CREDENTIALS
SUPERVISOR
CREDENTIALS
OFFICE
KITCHEN
HAC
CORRIDOR
H302
OI&T
CHASE
CH-3-1
ELEC. CLOSET
CORRIDOR
H303
STAIRWELL NO. 2
S302
TOILET, FEMALE
TOILET, MALE
OFFICE
OFFICE
305A
OFFICE
BREAK RM.
OFFICE
311A
OFFICE
311C
OFFICE
311B
STAIRWELL NO. 3
S303
OFFICE
311D
OFFICE
311E
OFFICE
OFFICE
OFFICE
OFFICE
306A
OFFICE
CONFERENCE RM.
TELEHEALTH
WORKROOM
TELEHEALTH
SUPPLIES
TELEHEALTH
SUPERVISOR
CORRIDOR
H301
CORRIDOR
H304
(N)
VAV
3-1C
SIGNAL
AP
FAP
FAPFEC
FEC
FAP
RAD
RADRAD
RADRADRADRAD
RAD
RAD
RADRADRADRADRADRADRADRADRAD
RAD
RAD
RAD RAD
RAD
RAD RAD
RAD RAD
RAD
RAD
RAD
RADRAD
RAD
RAD
RAD
RAD
RAD RAD RAD RAD
CREDENTIALS
SUPPLIES
CORRIDOR
H301A
SIGNAL
VAV-3-9
SIGNAL
VAV-3-10
SIGNAL
VAV-3-7
SIGNAL
VAV-3-8
SIGNAL
VAV-3-5
SIGNAL
VAV-3-6
SIGNAL
VAV-3-1C
SIGNAL
VAV-3-3
SIGNAL
VAV-3-4SIGNAL
VAV-3-2
SIGNAL
VAV-3-1A
SIGNAL
VAV-3-1B
SIGNAL
18-ACU-1C
SIGNAL
VAV-3-11
SIGNAL
VAV-3-1D
SIGNAL
VAV-3-12
SIGNAL
VAV-3-13
SIGNAL
VAV-3-14SIGNAL
VAV-3-16
SIGNAL
VAV-3-15
SIGNAL
VAV-3-18
SIGNAL
VAV-3-17
(N)18-SDS-6 (N)18-SDS-7
Plan North True North KEYPLAN th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS: 657-19-103JB
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
02/10/2020
/1
/2
:5 :5
P
M
18-EI-131
ELECTRICAL INSTRUMENTATION PLAN
- FLOOR 03
FCA - REPLACE MECHANICAL
SYSTEMS IN BUILDING 18 & 60
TL GG Drawing # 69 of 77
1/8" = 1'-0"
ELECTRICAL INSTRUMENTATION PLAN - FLOOR 03
Plan North
True North
KEYNOTES:
ELECTRICAL CONTRACTOR SHALL PROVIDE SMOKE DAMPER
SIGNAL JUNCTION BOX FOR SMOKE DAMPER "SD" AND 2
POSITION BINARY POINT WITH DEDICATED 3/4" RED EMT TO
FIRE ALARM CONTROL PANEL IN LOBBY ON 1ST FLOOR AND
DAMPER POSITION FEEDBACK "ZS" WITH DEDICATED 3/4" EMT
TO ECC IN BASEMENT MECH RM-002. SEE SHEET 00-MG-701
DETAIL 3 AND I/O POINTS LIST ON SHEET 00-MG-702 FOR
MORE DETAILS. MECHANICAL CONTRACTOR SHALL PROVIDE
3/4" EMT AND APPROPRIATE CONDUCTOR FROM PRESSURE
SWITCH HIGH "PSH" TO SHUT DOWN FAN UPON REACHING
HIGH PRESSURE SETPOINT AND CONDUCTOR AND 3/4"
CONDUIT FROM "ZS" TO CONTROL JUNCTION BOX.
MECHANICAL CONTRACTOR SHALL CONNECT ALL SIGNALS
TO LOCAL AUM ONSITE THROUGH DDC AND COORDINATE
WITH LOCAL VA TO TEST AND BALLANCE AND COMMISION
SYSTEM ACCORDING TO SPECIFICATIONS.
SB
FAP
FAP
FAP
FAP
LOADING DOCK
FAP
FAP
60-BA
60-B1 60-B2
BA
P4 P4A DP-60EM
60-C
Plan North
True North
KEYPLAN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:1
:1
A
M
60-ED-111
ELECTRICAL DEMOLITION PLAN -
FLOOR 01
FCA - REPLACE MECHANICAL
SYSTEMS IN BLDG 18 & 60
TL GG
Drawing # 70 of 77
Plan North
True North
1/8" = 1'-0"
ELECTRICAL DEMOLITION PLAN - FLOOR 01
Valhalla Engineer
Plan North
True North
KEYPLAN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:1
:1
A
M
60-ED-121
ELECTRICAL DEMOLITION PLAN -
FLOOR 02
FCA - REPLACE MECHANICAL
SYSTEMS IN BLDG 18 & 60
TL GG
Drawing # 71 of 77
Plan North
True North
1/8" = 1'-0"
ELECTRICAL DEMOLITION PLAN - FLOOR 02
SB
J
FAP
FAP
FAP
FAP
LOADING DOCK
FAP
FAP
60-BA
60-2
60-B1 60-B2
BA
P4 P4A DP-60EM
60-KH-1
HOOD
60-C
Plan North
True North
KEYPLAN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:1
:2
A
M
60-EP-111
ELECTRICAL POWER PLAN - FLOOR 01 FCA - REPLACE MECHANICAL
SYSTEMS IN BLDG 18 & 60
TL GG
Drawing # 72 of 77
Plan North
True North
1/8" = 1'-0"
ELECTRICAL POWER PLAN - FLOOR 01
60-MAU-2
60-MAU-1
Plan North
True North
KEYPLAN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:1
:2
A
M
60-EP-121
ELECTRICAL POWER PLAN - FLOOR 02 FCA - REPLACE MECHANICAL
SYSTEMS IN BLDG 18 & 60
TL GG
Drawing # 73 of 77
Plan North
True North
1/8" = 1'-0"
ELECTRICAL POWER PLAN - FLOOR 02
SB
J
FAP
FAP
FAP
FAP
LOADING DOCK
FAP
FAP
60-BA
60-2
60-B1 60-B2
BA
P4 P4A DP-60EM
60-KH-1-HOOD
SIGNAL
Plan North
True North
KEYPLAN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:1
:1
A
M
60-EI-111
ELECTRICAL INSTRUMENTATION PLAN -
FLOOR 01
FCA - REPLACE MECHANICAL
SYSTEMS IN BLDG 18 & 60
TL GG
Drawing # 74 of 77
1/8" = 1'-0"
ELECTRICAL INSTRUMENTATION PLAN - FLOOR 01
Plan North
True North
60-MAU-1
SIGNAL
60-MAU-2-SIGNAL
1/8" = 1'-0"
ELECTRICAL INSTRUMENTATION PLAN - FLOOR 02
Plan North
True North
KEYPLAN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:1
:1
A
M
60-EI-121
ELECTRICAL INSTRUMENTATION PLAN -
FLOOR 02
FCA - REPLACE MECHANICAL
SYSTEMS IN BLDG 18 & 60
TL GG
Drawing # 75 of 77
Plan North
True North th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:1
:1
A
M
60-EG-501
ELECTRICAL PANEL SCHEDULES FCA - REPLACE MECHANICAL
SYSTEMS IN BLDG 18 & 60
TL GG
Drawing # 76 of 77
NOTES:
EST. DEMAND CURRENT: 25 A
CONNECTED CURRENT: 25 A
ESTIMATED DEMAND: 9000 VA
CONNECTED LOAD: 9000 VA
Power 9000 VA 100.00% 9000 VA
LOAD CLASSIFICATION CONNECTED DEMAND ESTIMATED PANEL TOTALS
TOTAL... 26 A 26 A 24 A
TOTAL... 3 kVA 3 kVA 3 kVA
-- -- -- ... 0.2 0.2 42 -- -- --
-- -- -- ... 0.2 0.2 40 -- -- --
(N) EXHAUST FAN 2 20 A 3 ... 0.2 0.2 38 3 30 A (E) BUFFALO CHOPPER
(E) BLENDER 20 A 1 ... 0.5 0.2 36 -- -- --
(E) RECPT WEST COLUMN 20 A 1 ... 0.5 0.2 34 -- -- --
-- -- -- ... 0.3 0.2 32 3 30 A (N) EXHAUST FAN
(E) FOOD CART RM 113 20 A 2 ... 0.3 0.3 30 -- -- --
(E) GREASE PUMP 20 A 1 ... 0.5 0.3 28 2 20 A (E) POTATO PEELER
(E) SPARE 20 A 1 ... 0.5 0.5 26 1 20 A (E) RECPT WATER COOLER
-- -- -- ... 0.2 0.2 24 -- -- --
-- -- -- ... 0.2 0.2 22 -- -- --
(E) 30A PLUG GRILL 40 A 3 ... 0.2 0.2 20 3 20 A (E) WARMER
-- -- -- ... 0.2 0.2 18 -- -- --
-- -- -- ... 0.2 0.2 16 -- -- --
(E) COMBI #3 90 A 3 ... 0.2 0.2 14 3 40 A (E) GRILL #2
-- -- -- ... 0.2 0.2 12 -- -- --
-- -- -- 9 0.2 0.2 10 -- -- --
(E) COMBI #1 60 A 3 7 0.2 0.2 8 3 90 A (E) COMBI #2
-- -- -- 5 0.2 0.2 6 -- -- --
-- -- -- 3 0.2 0.2 4 -- -- --
(E) DEEP FRYER 90 A 3 1 0.2 0.2 2 3 60 A (E) BASE OVEN
LOAD DESCRIPTION BKR P
C
PHASE A
kVA
PHASE B
kVA
PHASE C
kVA
C
... P BKR LOAD DESCRIPTION
BUS AMPS:
MAIN DEVICE: 100 A SPECIAL:
MOUNTING: Surface Type 1 A.I.C. RATING:
LOCATION: VOLTAGE: 120/208 Wye V. 3 ø ...
PANELBOARD: 60-2
KEYNOTES:
WORK TO BE PERFORMED IN THIS PANEL COORDINATE WITH
VA FOR LOCK OUT TAG OUT AND UPDATES TO ONE LINE
REUSE CIRCUIT COORDINATE WITH VA FOR LOCK OUT TAG
OUT AND INSTALL NEW BREAKER2
TO BLDG.60G
EM
LIGHTS
EXHAUST
HOODS
TO BLDG.60T
E N
E N
4.0 ft
4 per phase
350 kcmil
Copper
300 kVA
Pri 4160 V
Sec 208 V
5.3000 %
260.0 ft
1 per phase
3/0 AWG
Copper
100.0 ft
1 per phase
3/0 AWG
Copper
208.0 V
1600.0 A
CUTLER-HAMMER
CRD
1600.0 A
CUTLER-HAMMER
BAB
20.0 A
CUTLER-HAMMER
ED
100.0 A
CUTLER-HAMMER
ED
100.0 A
CUTLER-HAMMER
ED
100.0 A
CUTLER-HAMMER
ED
100.0 A
CUTLER-HAMMER
CA
225.0 A
CUTLER-HAMMER
CA
225.0 A
CUTLER-HAMMER
DA
400.0 A
CUTLER-HAMMER
DA
400.0 A
CUTLER-HAMMER
DA
400.0 A
CUTLER-HAMMER
MDL
800.0 A
12.0 ft
4 per phase
350 kcmil
Copper
389 kVA
X"d 0.2 pu
CUTLER-HAMMER
CND
1200.0 A
208.0 V
1200.0 A
CUTLER-HAMMER
MDL
800.0 A
CUTLER-HAMMER
DA
400.0 A
208.0 V
1200.0 A
CUTLER-HAMMER
MDL
800.0 A
CUTLER-HAMMER
DK
400.0 A
CUTLER-HAMMER
HLB
400.0 A
CUTLER-HAMMER
CA
225.0 A
CUTLER-HAMMER
ED
100.0 A
CUTLER-HAMMER
GB
100.0 A
CUTLER-HAMMER
DK
400.0 A
CUTLER-HAMMER
CA
225.0 A
CUTLER-HAMMER
GB
100.0 A
CUTLER-HAMMER
GB
100.0 A
131.0 ft
2 per phase
250 kcmil
Copper
208.0 V
400.0 A
CUTLER-HAMMER
ED
100.0 A
208.0 V
400.0 A
5.0 ft
1 per phase
1 AWG
Copper
99.0 ft
1 per phase
350 kcmil
Copper
208.0 V
0.0 A
16.0 ft
1 per phase
350 kcmil
Copper
2.0 ft
1 per phase
350 kcmil
Copper
208.0 V
225.0 A
208.0 V
225.0 A
50.0 ft
1 per phase
350 kcmil
Copper
208.0 V
225.0 A
126.0 ft
2 per phase
250 kcmil
Copper
208.0 V
400.0 A
138.0 ft
1 per phase
350 kcmil
Copper
208.0 V
225.0 A
5.0 ft
1 per phase
350 kcmil
Copper
0.1 ft
1 per phase
350 kcmil
Copper
208.0 V
225.0 A
27.0 ft
1 per phase
1 AWG
Copper
208.0 V
225.0 A
208.0 V
225.0 A
16.0 ft
1 per phase
1 AWG
Copper
NumMotors 1
Total 100 hp
50.0 ft
2 per phase
250 kcmil
Copper
CUTLER-HAMMER
DA
400.0 A
S&C
SMU-20, 100E
100.0 A
S&C
SMU-20, 200E
200.0 A
SPARE
SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
CBL-60-MDP-60
60-XF2-BLDG 60
CBL-51-XF2-BLDG 51
CBL-60-XF2 BLDG 60
60-PANEL-MDP-60
PD60-MDP-60-MCB
PD60-SP1 PD60-SP2 PD60-SP3 PD60-SP4 PD60-SP5 PD60-SP6 PD60-SP7 PD60-SP8 PD60-SP9 PD60-ATS 60-1-N PD60-ATS 60-2-N
CBL-60-60P
GEN60P
PD60-60P
60-PANEL-60P
PD60-ATS 60-2-E PD60-ATS 60-1-E
60-PANEL-DP-60EM
PD60-DP-60EM-MCB
PD60-REF PNL-B
PD60-P2 PD60G-GB PD60-EXHAUST HOODS PD60-EM LIGHTS PD60T-MDP 60T PD60-RISER-B1 PD60-P4 PD60-SP10
CBL-60-REF PNL-B
60-PANEL-REF PNL-B
PD60-A
60-PANEL-B
CBL-60-A
CBL-60-P2-1
BUS-0373
CBL-60-P2-2
CBL-60-BA
60-PANEL-60-BA
PNL-60-P2
CBL-60G-GB
60G-PANEL-GB BLDG.60G
CBL-60T-MDP 60T
60-PANEL-MDP-60T BLDG 60T
CBL-60-RISER-B1
60-PANEL-60-B1
CBL-60-B1 CBL-60-B2
60-PANEL-60-B2
CBL-60-P4
60-PANEL-P4 60-PANEL-P4A
CBL-60-P4A
60-AC 60 TON
60-CBL-AC 60 TON
PD60-SPACE
51-PD-XF2-BLDG 51
FUSE-SG51-60-3
SHEET 51-E-201
SG51-60 4160.0
V 600 A
60-ATS 60-2 Amps
Rating 800.0 A AIC
50.00 kA
60-ATS 60-1 Amps
Rating 400.0 A AIC
35.00 kA th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM VEG 19.7
100% CONTRACT DOCUMENT SUBMITTAL DRAWINGS
02/10/2020
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
657-19-103JB
/1
/2
:1
:1
A
M
60-EG-601
ELECTRICAL ONE LINE FCA - REPLACE MECHANICAL
SYSTEMS IN BLDG 18 & 60
TL GG
Drawing # 77 of 77
KEYNOTES:
WORK TO BE PERFORMED IN THIS PANEL COORDINATE WITH
VA FOR LOCK OUT TAG OUT AND UPDATES TO ONE LINE
| ELEC Drawings w Stamp |
| 18-EI-101 - ELECTRICAL INSTRUMENTATION PLAN - FLOOR 00 |
| 18-EI-111 - ELECTRICAL INSTRUMENTATION PLAN - FLOOR 01 |
| 18-EI-121 - ELECTRICAL INSTRUMENTATION PLAN - FLOOR 02 |
| 18-EI-131 - ELECTRICAL INSTRUMENTATION PLAN - FLOOR 03 |
| ELEC Drawings B60 w Stamp - Copy |
| 60-ED-111 - ELECTRICAL DEMOLITION PLAN - FLOOR 01 |
| 60-ED-121 - ELECTRICAL DEMOLITION PLAN - FLOOR 02 |
| 60-EP-111 - ELECTRICAL POWER PLAN - FLOOR 01 |
| 60-EP-121 - ELECTRICAL POWER PLAN - FLOOR 02 |
| 60-EI-111 - ELECTRICAL INSTRUMENTATION PLAN - FLOOR 01 |
| 60-EI-121 - ELECTRICAL INSTRUMENTATION PLAN - FLOOR 02 |
File details come from the government source that posted it. Updated .