Renovate Basement Lounge Locker Rooms Project No. 589A4-18-010
Solicitation number
36C25520R0020
Issued by

About this file

This document package includes a federal contract solicitation and related pre-bid questions and answers file. The solicitation is for renovation work at the Harry S. Truman VA Medical Center in Columbia, Missouri. The contractor shall renovate existing male and female staff locker rooms into new modern locker rooms and an employee exercise and break room totaling approximately 11,100 square feet. Scope includes architectural, mechanical, electrical, and plumbing work to demolish and replace systems serving the project area. The period of performance is 270 calendar days. The estimated project cost range is $500,000 to $1,000,000. The NAICS code is 236220. This is an SDVOSB set-aside solicitation from the Department of Veterans Affairs. The pre-bid questions and answers file provides responses to contractor questions on project phasing, laydown areas, product substitutions, asbestos abatement specifications, and clarification of bid items.

36C25520R0020 0002 36C25520R0020 0002.docx

View the file

Other files

File Type Posted
36C25520R0020 0004.pdf PDF
Amendment 3-36C25520R0020 0003.docx DOCX document
36C25520R0020-0002001.pdf PDF
36C25520R0020-0002003.pdf PDF
36C25520R0020-0002002.pdf PDF
36C25520R0020-0001001.pdf PDF
36C25520R0020-0001000.docx DOCX document
36C25520R0020-005.pdf PDF
36C25520R0020-006.pdf PDF
36C25520R0020-004.pdf PDF
36C25520R0020-003.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HARRY S TRUMAN VA MEDICAL CENTER –RENOVATE BASEMENT LOUNGE AND LOCKER ROOMS PROJECT 589A4-18-010

PRE-BID QUESTIONS AND ANSWERS

MARCH 10, 2020

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 03/30/2020 589A4-18-010 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25520R0020 03-30-2020

X X X

June 15, 2020 by 2:00 PM CDT Renovate Basement Lounge and Locker Rooms, Project 589A4-18-101 This amendment provides the following:

A. Extends the question and answer period to May 1, 2020 questions are to be submitted by 2:00 PM CDT.

B. Proposal closing date is extended to June 15, 2020 proposals must be submitted by 2:00 PM CDT.

C. Questions and answers received as of 3-30-2020 are included starting on page 2.

D. Revised Bid Item page attached.

E. The following two specifications are added:

Specification 02 82 13.13 Glovebag Asbestos Abatement Specification 02 82 13.19 Floor Tile Mastic Abatement F. All other terms and conditions remain unchanged.

CONTINUATION PAGE

PROJECT NARRATIVE

FINAL DESIGN DEVELOPMENT DOCUMENTS – AN OVERVIEW

The design development process for the Renovate Basement Lounge and Locker Rooms Project 589A4-18-010. M+HFG facilitated general meetings with various stakeholders at the VA and took the information obtained to develop construction documents for remodeling a portion of an existing Lounge and Locker room area.

Through on-site meetings and off-site analysis, the project team was able to identify the project parameters, determine priorities, collect relevant information, develop a opinion of probable cost, and develop a set of construction documents.

PROJECT DESCRIPTION

Our understanding of the project scope is that the hospital has identified a need to better serve staff by maximizing the available space to create a new, user friendly lounge and locker room area for VA staff to utilize as a changing and lounge area. The work is as outlined in the proposal package Supplement B and includes evaluating and upgrading the existing mechanical, electrical and plumbing systems to modern standards.

QUESTIONS AND ANSWERS

QUESTION #1

Phasing and how will it be handled?

QUESTION #1 ANSWER

Phasing plans are included in the building set of plans, contractor to coordinate final phasing plans with VA staff prior to implementing work. Considerations should be made for noise control, which may require night and weekend work schedules.

QUESTION #2

Will a job trailer be allowed?

QUESTION #2 ANSWER

Due to limited space at the facility job trailers will not be allowed.

QUESTION #3

Will a laydown area be designated for this project?

QUESTION #3 ANSWER

Due to limited space at the facility laydown area will be limited to the site. Coordinate with VA staff.

QUESTION #4

Substitution request for Tennant product instead of Dur-a-Flex for Epoxy Resinous Floor.

QUESTION #4 ANSWER

Substitution request accepted. During submittal process a custom blend with small flake sample to be submitted and approved by architect and COR. Original selection noted on drawings has a large flake specified and architect has received notification that a small flake is preferred.

QUESTION #5

Substitution requests for originally specified Z-Style lockers by Republic which are no longer available.

QUESTION #5 ANSWER

Architect recommends that List Industries Classmate Z-Style lockers. Unibody all-welded corridor lockers with hasp be substituted. Contact: Bobby Allbritton, bobbyalbritton@listindustries.com Substitution requests accepted as long as the material, size and style of locker can be provided by locker manufacturer.

QUESTION #6

Please provide an asbestos specification for the project.

QUESTION #6 ANSWER

Asbestos abatement specifications have been provided along with amounts to be expected.

QUESTION #7

Does the contractor need to provide a 3rd party monitoring for asbestos abatement?

QUESTION #7 ANSWER

The VA furnishes the independent hygienist to do the monitoring according to the standard VA spec. Contractor shall be the main point of contact for scheduling.

QUESTION #8

Please confirm if the ductwork and piping insulation to be demo’ d contains ACM.

QUESTION #8 ANSWER

The facility has a data base of all ACM and it does show that proper asbestos removal is required on ductwork, piping and flooring.

QUESTION #10

Spec section 096723.20 1.1B notes the specs is omitted if the Bid Item 4 is accepted. There is not a Bid Item 4 on this project, please advise.

QUESTION #10 ANSWER

Please delete reference 096723.20 1.1B in the specifications.

General Specification 01 00 00 section 1.2 has been revised adding three (3) unit price bid items:

1.2 Statement of Bid Items

A. Bid Item 1 (Base Bid), General Construction: Work includes general construction, alterations, mechanical and electrical work, necessary removal of existing structures and construction and construction and certain other items as identified in the specifications and drawings. The period of performance is 270 days.

B. Bid Item 2 (Deduct 1), Includes all work in Bid Item 1 with the following exceptions. The period of performance is 270 calendar days.1. Remove all Fitness Room Equipment from project.

BID ITEMS 3-5 are ABATEMENT UNIT PRICING

C. BID ITEM #3: UNIT PRICING-Provide abatement unit price per insulation fitting of 6” or less diameter. This will be used for possible modification as required for additional fittings beyond what is specified or for credit if specified amount is not required. See revised General Specification provided in Amendment 2 for further information.

D. BID ITEM #4: UNIT PRICING-Provide abatement unit price per insulation fitting greater than 6” diameter. This will be used for possible modification as required for additional fittings beyond what is specified or for credit if specified amount is not required. See revised General Specification provided in Amendment 2 for further information.

E. BID ITEM #5: Provide abatement unit price per square feet of flooring and mastic. This will be used for possible modification as required for additional fittings beyond what is specified or for credit if specified amount is not required. See revised General Specification provided in Amendment 2 for further information.

See attached document: BID ITEMS.

See attached document: Specification 028213.19_Floor Tile Mastic Abatement- 62 pages.

See attached document: Specification 028213.13 -Glove Bag Abatement- 49 pages.

image1.png