36C25519R0046 A0002 36C25519R0046 A0002.docx

View the file

Other files

File Type Posted
36C25519C0067-000.docx DOCX document
36C25519R0046-A0001001.pdf PDF
36C25519R0046-A0001002.pdf PDF
36C25519R0046-A0001000.docx DOCX document
36C25519R0046-004.pdf PDF
36C25519R0046-015.pdf PDF
36C25519R0046-020.pdf PDF
36C25519R0046-010.pdf PDF
36C25519R0046-016.pdf PDF
36C25519R0046-021.pdf PDF
36C25519R0046-013.pdf PDF
36C25519R0046-003.pdf PDF
36C25519R0046-008.pdf PDF
36C25519R0046-014.pdf PDF
36C25519R0046-007.pdf PDF
36C25519R0046-006.pdf PDF
36C25519R0046-009.pdf PDF
36C25519R0046-002.docx DOCX document
36C25519R0046-022.pdf PDF
36C25519R0046-011.pdf PDF
36C25519R0046-005.pdf PDF
36C25519R0046-017.pdf PDF
36C25519R0046-019.pdf PDF
36C25519R0046-018.pdf PDF
36C25519R0046-012.pdf PDF
36C25519R0046-001.docx DOCX document
36C25519R0046-000.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A0002 02-25-2019

657-18-116JC

36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 To all Offerors/Bidders

36C25519R0046 02-05-2019

X X X

AMENDMENT REASON: INCLUDE RFI CLARIFICATIONS

A. THIS AMENDMENT IS TO INCLUDE RFI CLARIFICATIONS

B. THE PROPOSAL DUE DATE AND TIME REMAIN UNCHAGED.

Question 1-A. What is the minimum fire rating of the ICRA enclosure - it is not (specifically) specified in the drawings/specs?

Detail 1/E003, states: Minimum fire rating shall match rating of closet or enclosed walls.

General notes on E001 states corridor walls and plumbing partitions shall be considered 1 hour fire rated; floor slabs, vertical shafts and stairwells shall be considered 2 hour fire rated.

Question4-C. Arc Flash study will not be able to be complete at time of panel board submission due to lack of conductor information – please clarify the government’s response on this question.

The Arc Flash Study and Circuit breaker coordination study needs to be submitted with or prior to submitting panelboards. This includes obtaining conductor information that is needed to complete the study.

Question 8-A. Is it safe to assume then, that all existing conditions that will need to be remedied will constitute a change order (or not be the responsibility of the contractor)?

As previously stated, existing code violations should be brought to the VA intention for direction when discovered.

Question 8-B. It is not possible, at this time, to know how many conductors will need to be replaced for the branch circuits, should we give an allowance or would all of them be considered change orders? If we are to give an allowance, please provide an assumption for all bidders to utilize.

Branch circuit extensions needed to allow for completion of work are required per the contract documents.

Question 8-D. More clarification, it is understood that the new panels will need printed panel schedules. Our question was in reference to the existing panels and if they have their panel schedules – AND that they include accurate information… OR will the contractor need to trace out all branch circuits?

Typically, the panelboards have panelboard schedules or the schedules are on file. Contractor does not need to trace out all of the branch circuits. Refer to contract documents.