36C25519Q0064-0002000.docx
DOCX document 22 KB Posted
- Solicitation number
- 36C25519Q0064
About this file
36C25519Q0064 0002 36C25519Q0064 0002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25519C0038-000.docx | DOCX document | |
| 36C25519Q0064-0001000.docx | DOCX document | |
| 36C25519Q0064-003.xlsx | XLSX spreadsheet | |
| 36C25519Q0064-001.docx | DOCX document | |
| 36C25519Q0064-002.docx | DOCX document | |
| 36C25519Q0064-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 11-20-2018 None 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 To all Offerors/Bidders
36C25519Q0064 11-09-2018
X X X
Identify Branch Electrical Circuits, Jefferson Barracks Division, St. Louis VA Medical Center
1. The hour and date specified for receipt of Offers is extended:
From - Monday, 11/26/2018 at 12:01pm To - Wednesday, 11/28/2018 at 12:01pm
2. Answers to Technical Questions asked by prospective offerors are found on pages 2 and 3 of this amendment. These answers will become part of the Statement of Work (SOW) in any resulting contract to this solicitation.
3. All other terms, conditions and provisions remain the same.
Technical Questions and Answers
1. Question: Is this a new requirement or is there an incumbent vendor? If available, can you please send along the incumbent contract number?
Answer:
This is a new requirement, there is no incumbent vendor or contract number.
2. Question: The VA lists the number of electrical panels, but the list does not include the number of circuits in each panel. A panel could have as few as (12) circuits or as many as (64) circuits. An average electric panel would have (42) circuits. To price the work, it would be important to know how many circuits in each panel need to be identified.
Answer:
Plan for all panels to contain 42 circuits.
3. Question: Can we do the work during normal working hours? Mon-Fri 7am - 3:30pm? We would NOT have to turn off power to identify the circuit.
Answer:
Yes, normal working hours are authorized.
4. Question: What is meant by “identify the circuits”? I would assume, for example, you could say that circuit #2 powers lighting on the second floor.
Answer:
The requirement is to identify everything on each circuit e.g. “Lights rooms 201, 202, and 203” or “electrical outlet/receptacle, east wall, room C130”, or Fan Coil Unit (FCU) room 1E120.”
5. Question: What level of detail is required when identifying circuits?
Answer:
To identify:
· specific all pieces of hardwired equipment on each circuit and
· all lights and/or receptacle/outlets on each circuit and
· the majority of load, in cases of lighting and receptacles/outlets, on each circuit For example, you cannot find the first item on each circuit and be done. You must attach your panel tracer to each circuit in a panel and take the probe around to all the light fixtures and receptacle/outlets in the area, to get a complete picture of what is on that circuit.
Also, any existing panel schedule, if posted, should only be used to point you in the right direction, since these schedules are not all complete and/or accurate.
6. Question: If we need to work above a ceiling to trace circuits, do we have to use a Hepi-Cart to contain dust from above the ceiling?
36C25519Q0064 00002
Answer:
For situations like this, we require that you submit an Infectious Control Risk Assessment (ICRA) / Interim Life Safety Measures (ISLA) form which is available through the COR. Once submitted, the COR will approve and direct the appropriate procedures to be followed.
7. Question: Will we have full access to all rooms in the building? Will we have keys, key cards, security codes, and any other means of access to all rooms?
Answer:
You will have keys to most areas. Access to controlled areas will be coordinate through the COR and the affected service.
8. Question: Can we complete the work on a specific panel before we move to the next panel?
Answer:
Yes, as long as you perform within the required period of performance.
9. Question: Will we provide a new, complete, and accurate panel schedule for each panel on the list? Will we be required to mark the circuit numbers on any of the devices in the field? For example, mark circuit number on receptacle plates, or mark circuit number on motors?
Answer:
Yes, we will provide you with an Excel templet for our panel schedules. All panel and circuit information will be listed on that template and saved. Copies of the spreadsheet will be printed and placed into each panel. Also, the electronic Excel file for each panel will be provided to the VA.
Yes, all electrical switch covers, receptacle/outlet covers and equipment that is hard-wired into the electrical system, must be marked with panel and circuit locations. For this, use a 3/8” label with black lettering on clear tape. Labels can be larger for hard-wired equipment.