36C25518R0513-009.pdf
PDF 16 MB Posted
- Attached to
- Construct Substance Abuse Residential Rehabilitation Treatment Building 59 P/N:589A7-CSI-401
- Solicitation number
- 36C25518R0513
About this file
36C25518R0513 ARCHITECTURAL.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25518R0513-008.pdf | ||
| 36C25518R0513-012.pdf | ||
| 36C25518R0513-007.docx | DOCX document | |
| 36C25518R0513-011.pdf | ||
| 36C25518R0513-013.pdf | ||
| 36C25518R0513-010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1610 11
2 3 4
6 8 10
1 2 3 4
A
B
D
E
G
A
C
D
E
F
J
L
N
H
K.5
N
P
2.3 2.7
T
FINISH
FLOOR =
100'-0"
M.6 M.6
T
R
A
V
E
L
D
I
S
T
A
N
C
E
M
A
X
I
M
U
M
TRAVEL DISTANCE = 103'
MAXIMUM 200'
26 OCCUPANTS X .2 = 5.2"
REQ'D. 36" PROVIDED
11 OCCUPANTS X .2 = 2.2"
REQ'D. 36" PROVIDED
10 OCCUPANTS X .2 = 2.0"
REQ'D. 36" PROVIDED
F.E.
F.E.
F.E.
FIRE DEPARTMENT
CONNECTION
21 OCCUPANTS X .2 = 4.2"
REQ'D. 36" PROVIDED
ALLOY ARCHITECTURE
project no.
15207.00
6 8 10
1 2 3 4
A
B
D
E
G
A
C
D
E
F
J
L
N
H
K.5
N
P
2.3 2.7
T
FINISH
FLOOR =
100'-0"
M.6 M.6
EXISTING RAMP UP
A-404
A-404
A-404
A-403
A
A-404
D
A-403
B
A
A-404
A
A-404
A-404
A-404
ALLOY ARCHITECTURE
6 8 10
1091 2 3 4 6 7
A
B
D
E
G
K
A
C
D
E
F
J
L
N
H
M
K.5
N
P
2.3 2.7
T.O. WALL =
126'-3 3/4"
11-1/2"
T.O. WALL =
116'-2"
T.O. WALL =
116'-2"
T.O. WALL =
116'-2"
T.O. WALL =
114'-8"
T.O. SLAB =
114'-0"
T.O. SLAB =
114'-0"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
ALLOY ARCHITECTURE
DN
UP
UP
2 3 4
6 8 10
1 2 3 4
A
B
D
E
G
A
C
D
E
F
J
L
N
H
K.5
N
P
2.3 2.7
T
FINISH
FLOOR =
100'-0"
M.6 M.6
EXISTING RAMP UP
PRODUCTS LISTED ARE THE BASIS OF DESIGN. EQUAL PRODUCTS THAT COMPLY WITH SPECIFICATIONS WILL BE CONSIDERED.
1.
CPU SUPPLIED AND INSTALLED BY OWNER. CONTRACTOR TO SUPPLY AND INSTALL CPU SLING - DOUG MOCKETT & COMPANY #CPU1A.
COMPUTER HOLDER OF PREFINISHED METAL, ADJUSTABLE IN HEIGHT AND WIDTH, WITH PROVISIONS FOR ANCHORAGE
UNDERCOUNTER.
2.
CPU SUPPLIED AND INSTALLED BY OWNER. CONTRACTOR TO SUPPLY AND INSTALL CPU SLING - DOUG MOCKETT & COMPANY #CPU1A.
UNDERCOUNTER COMPUTER HOLDER OF PREFINISHED METAL, ADJUSTABLE IN HEIGHT AND WIDTH, WITH PROVISIONS FOR
ANCHORAGE UNDERCOUNTER.
3.
ALLOY ARCHITECTURE
6 8 10
1 2 3 4
A
B
D
E
G
A
C
D
E
F
J
L
N
H
K.5
N
P
2.3 2.7
M.6 M.6
ALLOY ARCHITECTURE
DN
UP
UP
2 3 4
6 8 10
1 2 3 4
A
B
D
E
G
A
C
D
E
F
J
L
N
H
K.5
N
P
2.3 2.7
T
M.6 M.6
ALLOY ARCHITECTURE
T
FINISH
FLOOR =
100'-0"
ALLOY ARCHITECTURE
STANDARD CORNER
ALLOY ARCHITECTURE
1 2 3 4 5 6 8 10
C D E F J L N1 2 3 4
ALLOY ARCHITECTURE
9 C 4
A A
A
ALLOY ARCHITECTURE
A-404
A
A
T
FIN. FLOOR
= 100'-8 1/2"
FIN. FLOOR
= 100'-6 3/8"
FIN. FLOOR
= 100'-9 1/2"
FIN. FLOOR
= 100'- 9 3/8"
FIN. FLOOR
= 100'-10 1/8"
FIN. FLOOR
= 100'-7 7/8"
FIN. FLOOR
= 100'-6 11/16"
FIN. FLOOR
= 100'-6 1/4"
ELEVATOR PIT
- REF. C/A-403
A-502
ALLOY ARCHITECTURE
Main Medical Facility
H
Building 60
ALLOY ARCHITECTURE
File details come from the government source that posted it.