36C25225Q0217 0002.docx
DOCX document 27 KB Posted
- Attached to
- H312--Fire Damper Inspection Services - Clement J. Zablocki VA Medical Center Milwaukee, WI
- Solicitation number
- 36C25225Q0217
About this file
This document is an Amendment of Solicitation/Modification of Contract for Fire Damper Testing Services at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The solicitation (36C25225Q0217) seeks a vendor to perform comprehensive fire damper inspections across four buildings, with the largest facility containing 14 floors and a total of 265 dampers. Inspections must adhere to NFPA 80 standards (2010 edition), with consideration of NFPA 101, NFPA 105, and International Building and Fire Codes.
Key requirements include: vendor-provided equipment (ladders, carts), on-site escort for facility access, and detailed documentation of damper conditions. Vendors must note code references on all inspection documents and immediately flag dampers requiring extensive cleaning. The solicitation closes on Wednesday, March 19, 2025, at 10:00 AM local time. Previous inspections were completed in 2017 and 2021. Any necessary air handler shutdowns require prior approval from the Contracting Officer's Representative (COR), and the site is located at 5000 W. National Ave, with a site map to be provided to the awarded vendor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25225Q0217 0001.docx | DOCX document | |
| 36C25225Q0217_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-14-2025 695-25-2-6093-0021 Department of Veterans Affairs
GLAC (69D)
115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs
GLAC-MILWAUKEE (69D)
Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25225Q0217
X X X 695-3650162-6093-854100-2543 010050190 X Reference Solicitation 36C25225Q0217 for Fire Damper Testing Services at Clement J. Zablocki VAMC in Milwaukee, WI, and amend to reflect answers to submitted vendor questions. See continuation page.
SOLICITATION CLOSE DATE WEDNESDAY, MARCH 19,
at 10:00AM, local time. All other terms and conditions of the solicitation remain the same.
Dorr, Joni Contracting Officer
CONTINUATION PAGE
1) The code being referenced is the 2024 and 2025 editions. We currently inspect all hospitals to the following: Vendor will provide damper inspection services as per NFPA 80 (with consideration given to applicable NFPA 101, NFPA 105, International Building Codes, and International Fire Codes). Dampers shall be inspected to the 2010 NFPA 80.19.3-4 test standards as required.
This is permissible. Vendor must state the code reference on all documents that they are inspecting under.
2) Will damper locations be marked on current life safety plans or mechanical drawings? If the latter, then are current life safety drawings also available?
Damper locations are marked at the location and on the life safety drawings, copies will be provided when onsite.
3. Cleaning of dampers: some dampers require extensive cleaning; however, most are relatively clean. Could the cleaning be included in a secondary repair phase since that would then allow us to estimate how many dampers require extensive cleaning (which may potentially include a dust vac) No, if the damper requires that much cleaning to operate it should be failed with detailed notes as to why.
4. Decommissioning of dampers, installation of access doors, and re-inspection of dampers are typically all included in a secondary repair phase. Is this acceptable? Yes, this should be very minimal as we have done this work several times now.
5. Are we responsible for providing the containment cart, or will there be one provided for us?
We have one containment cart onsite that can be used, if more than one is needed vendor should plan to bring an additional cart.
a. Will we need to provide our own ladders – yes, vendor must provide their own ladders.
b. Will we need to provide our own cart? – yes, vendor must provide their own cart.
c. Will we be provided with the necessary badging and keys for access, or will an escort need to be provided?
An escort will be provided to the vendor with access.
d. Will vendor be responsible for cleaning the critical access areas like OR etc. or will the facility perform a terminal clean.
Any small mess should be cleaned up by vendor, if opening tiles in critical areas VA can request EMS do a terminal clean.
6. Also, can you please provide the address for each of the buildings to be included in the proposal?
There is only one address for the site, 5000 W. National Ave and then buildings are numbered with signage. A site map will also be provided to the awarded vendor.
i. 4 Buildings, Biggest building has 14 floors. Total 265 Dampers.
j. When was the last inspection completed and by what company?
It was completed in 2017 and 2021 the last two times.
k. What are the rules for shutting down air handlers at the facilities if necessary for testing dampers?
An approved outage needs to be submitted and approved with the COR prior to the work taking place.
Fire Damper Inspections