About this file

This document is an amendment to solicitation 36C25224Q0514 for the removal and installation of facility-provided heat transfer pumps at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin.

The key details are:

  • The solicitation due date has been extended to June 12, 2024 at 8:00 AM.
  • The VA has responded to several vendor questions, including clarifying that the experience of the prime contractor only will be considered, that balancing and commissioning requirements have been modified, and that the VA will program the VFDs. The VA also provided details on the requirements for floor protection, elevator access, and piping and electrical specifications.
  • All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
36C25224Q0514 0001.docx DOCX document
36C25224Q0514.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) Department of Veterans Affairs

GLAC

(69D) 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs

GLAC-MILWAUKEE (69D)

Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25224Q0514 05-19-2024

X X X Extended to 6/12/2024 at 8:00 AM See CONTINUATION Page X Reference solicitation 36C25224Q0514 for replacing Heat Pumps at the Clement J Zablocki VA Hospital in Milwaukee, WI

The purpose of this amendment is to respond to vendor questions and extend the due date of the solicitation.

Due date is extended to Jun 12th, 2024, at 8:00 AM.

All other terms and conditions remain the same.

Derrick Paquette

MER 8 Pump Replacement Questions and Responses

1. Our question pertains to whether to offeror in this section exclusively refers to the prime contractor?

VA Response: The experience of the Prime Contractor only will be considered.

2. In the description of services dictates to provide testing, balancing, and commissioning for a fully functional system. The existing pump set up does not have pressure ports for balancing.

a. Is there an existing pre-balance report?

VA Response: There is no existing balancing report available. Balancing will be descoped and is not required for this contract.

b. Are Pete’s Plugs (pressure/ temperature ports) required for the new installation?

VA Response: No.

c. What is required for the commissioning process?

VA Response: Contractor is required to commission the pumps per the manufactures requirements to ensure full operation. The VA will not be hiring an external commissioning agent.

3. It is understood that (1) VFD is malfunctioning and is going to be replaced prior to this project.

a. Will this unit be programmed?

VA Response: VFD will be programed by VA.

4. Would you like both VFD’s programed prior to pump commissioning of the new MER 8 Pumps on this project to be included in our scope/bid?

VA Response: VFDs will be programed by VA.

5. There is a large amount of material that needs to be transported through the hatch on the 10th floor by the bank of 4 elevators (B-8 through B-11)

a. What is required to work in that space? Floor coverings, plastic barriers etc.

VA Response: Contractor is required to protect the flooring with Masonite boards. Contractor to block Corridor from stairwell 1 to limit access.

b. Can the area be utilized during normal working hours?

VA Response: Yes.

c. Are there any special provisions needed to work in the space (lockout of the floor on the elevators so the public cannot enter during the material transport, signage, etc.)?

VA Response: Elevators doors can be blocked off with the 10th floor buttons marked out of service. VA to Lock out 10th floor of B wing elevator from the system preventing access.

6. Note 23 indicates to modify all associated controls if necessary.

a. Are control modifications expected?

VA Response: No.

b. Are the existing pressure differential switches functional?

VA Response: Yes.

7. Is there a piping specification that should be referenced for the suction diffusers/ gauges, valves, etc.?

VA Response:

1. Provide suction diffuser as follows:

Body: Cast-iron with steel inlet vanes and combination diffuser-strainer orifice cylinder with 5mm (3/16 inch) diameter openings for pump protection. Provide taps for strainer blowdown and gauge connections.

2. Provide Shut-Off Valves as follows:

Ball Valves (Pipe Sizes 50 mm (2 inch) and Smaller): MSS SP-110, screwed or solder connections, brass or bronze body with chrome-plated ball with full port and Teflon seat at //2758 kPa (400 psig)// //4138 kPa (600 psig)// working pressure rating. Provide stem extension to allow operation without interfering with pipe insulation.

3. Provide gauges as follows: ASME B40.100, Accuracy Grade 1A, (pressure, vacuum, or compound for air, oil or water), initial mid-scale accuracy 1 percent of scale (Qualify grade), metal or phenolic case, 114 mm (4-1/2 inches) in diameter, 6 mm (1/4 inch) NPT bottom connection, white dial with black graduations and pointer, clear glass or acrylic plastic window, suitable for board mounting. Provide red "set hand" to indicate normal working pressure.

4. Provide brass lever handle union cock. Provide brass/bronze pressure snubber for gauges in water service.

5. Range of Gauges: Provide range equal to at least 130 percent of normal operating range.

8. Is there an electrical specification that should be referenced for the electrical disconnects?

VA Response: Refer to VA Specification section 26 29 21 Enclosed Switches and Circuit Breakers for electrical disconnect switches.

SECTION 26 29 21

ENCLOSED SWITCHES AND CIRCUIT BREAKERS

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the furnishing, installation, and connection of fused disconnect switches (indicated as switches in this section), for use in electrical systems rated 600 V and below.

1.2 RELATED WORK – NOT USED

1.3 qualITY ASSURANCE A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.

1.4 SUBMITTALS – NOT USED

1.5 APPLICABLE PUBLICATIONS

A.Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.
B.International Code Council (ICC):
IBC-21International Building Code
C.National Electrical Manufacturers Association (NEMA):
FU l-12Low Voltage Cartridge Fuses
KS l-13Heavy Duty Enclosed and Dead-Front Switches (600 Volts Maximum)
D.National Fire Protection Association (NFPA):
70-23National Electrical Code (NEC)
E.Underwriters Laboratories, Inc. (UL):
98-16Enclosed and Dead-Front Switches
248 1-11Low Voltage Fuses
489-16Molded Case Circuit Breakers and Circuit Breaker Enclosures

PART 2 - PRODUCTS

2.1 FUSed SWITCHES RATED 600 AMPERES AND LESS

A.Switches shall be in accordance with NEMA, NEC, UL, as specified, and as shown on the drawings.
B.Shall be NEMA classified General Duty (GD) for 240 V switches, and NEMA classified Heavy Duty (HD) for 480 V switches.
C.Shall be horsepower (HP) rated.
D.Shall have the following features:
1.Switch mechanism shall be the quick-make, quick-break type.
2.Copper blades, visible in the open position.
3.An arc chute for each pole.
4.External operating handle shall indicate open and closed positions, and have lockopen padlocking provisions.
5.Mechanical interlock shall permit opening of the door only when the switch is in the open position, defeatable to permit inspection.
6.Fuse holders for the sizes and types of fuses specified.
7.Solid neutral for each switch being installed in a circuit which includes a neutral conductor.
8.Ground lugs for each ground conductor.
9.Enclosures:
a.Shall be the NEMA types shown on the drawings.
b.Where the types of switch enclosures are not shown, they shall be the NEMA types most suitable for the ambient environmental conditions.
c.Shall be finished with manufacturer’s standard gray baked enamel paint over pretreated steel.

PART 3 - EXECUTION

3.1 INSTALLATION

A.Installation shall be in accordance with the NEC, and manufacturer’s instructions.
B.Fused switches shall be furnished complete with fuses. Arrange fuses such that rating information is readable without removing the fuses.

3.2 Acceptance Checks and Tests

A.Perform in accordance with the manufacturer's recommendations. In addition, include the following:
1.Visual Inspection and Tests:
a.Compare equipment nameplate data with specifications and approved shop drawings.
b.Inspect physical, electrical, and mechanical condition.
c.Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method.
d.Vacuum-clean enclosure interior. Clean enclosure exterior.

---END---

File details come from the government source that posted it. Updated .