About this file

This document is a Request for Quote (RFQ) solicitation for Emergency Generator Maintenance, Repair and Load Bank Testing services at the Captain James A. Lovell Federal Health Care Center (FHCC) in North Chicago, IL. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) or Veteran-Owned Small Businesses (VOSBs).

The contractor shall provide all labor, supervision, materials, tools, and equipment necessary to perform annual 2-hour and triennial 4.5-hour load bank testing on 13 standby generators at the FHCC. Additional requirements include annual fuel testing, battery replacement every 36 months, and maintenance or repair services as needed. The period of performance is a 1-year base period with four 1-year option periods. Quotes are due by May 30, 2024 at 10:00 AM CDT. The contract will be awarded as a firm-fixed-price contract. The government intends to evaluate offers and award without discussions. Background investigation requirements and facility access procedures are provided.

View the file

Other files

File Type Posted
P07 - Lake County IL WD 2015-4935 Rev-23 dated 12.26.2023 02.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25224Q0458

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

36C25224Q0458 05-17-2024 Klug,Michelle 224-610-3248 05-30-2024 10:00

CDT

36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Road North Chicago IL 60064 X X 811310 $12.5 Million N/A X

FHCC VAMC

3001 GREEN BAY RD

NORTH CHICAGO IL 60064

36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Road North Chicago IL 60064

Department of Veterans Affairs Financial Services Center PO Box 149971 Austin TX 78714 78714-9971 877 353 9791 512 460 5540 x See CONTINUATION Page Generator Load Bank Testing at the FHCC VAMC:

The Contractor shall provide all labor, supervision, materials, tools, and equipment necessary to provide the inspection, maintenance, and testing services for the required 2.0 hour annual and 4.5-hour triennial load Bank testing. Located at Captain James A. Lovell FHCC campus, North Chicago, IL., per the statement of work.

****Please reference Addendum to FAR 52.212 52.212-1 Instruc to to Offerors – Commercial Items for Requirements for this offer**** See CONTINUATION Page X X

MICHELLE KLUG

CONTRACTING OFFICER

36C25224Q0458

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA (continuation from Standard Form 1449)

OFFERORS MUST COMPLETE AND RETURN ALL INFORMATION DESIGNATED HEREIN PRIOR TO THE TIME SPECIFIED IN BLOCK 8 OF SF 1449 IN ORDER TO BE CONSIDERED FOR AWARD.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NODATE
________________________________________________________
________________________________________________________
________________________________________________________

1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

CONTRACTOR NAME _____________________________________

ADDRESS ________________________________________________

CITY-STATE-ZIP __________________________________________

POINT OF CONTACT/TITLE ________________________________

PHONE NUMBER______________________________________
FAX NUMBER______________________________________
E-MAIL ADDRESS______________________________________

SAM UEI NO. ____________________________________________

CAGE CODE _____________________________________________

CONTRACTOR’S PAST PERFORMANCE POINT OF CONTACT

(IF DIFFERENT THAN ABOVE):

NAME: __________________________________________

EMAIL ADDRESS:_________________________________

b. GOVERNMENT:

MICHELLE KLUG CONTRACTING OFFICER

CONTRACTING OFFICE CODE: 36C252

DEPARTMENT OF VETERANS AFFAIRS
GREAT LAKES ACQUISITION CENTER
115 S. 84TH ST., STE 100

MILWAUKEE WI 53214

2.ACQUISITION OF COMMERCIAL ITEMS: This Request for Quote (RFQ) solicitation is issued under the authority of FAR Part 13.5 Simplified Procedures for Certain Commercial Items in which simplified acquisition procedures in FAR Part 13 will be used. FAR Part 14 and 15 will not be used. From this RFQ, the Government intends to award a firm fixed price contract where the contractor provides a price that is not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract. (Note: The terms “offeror” and “quoter” are both used in this Solicitation. For the purposes of this Solicitation, these terms are interchangeable; there is no difference in meaning between the two.)

2. SET-ASIDE (If any): See box 10 of STANDARD FORM 1449

3. SOLICITATION TIMELINE SUMMARY:

A. RFQ QUESTIONS:

In order to maintain integrity of this solicitation and subsequent award date, all offerors are advised that any question and answer requests must be submitted in a written form via e-mail to the Contracting Officer MICHELLE.KLUG2@va.gov no later than THURSDAY MAY 23RD, AT 10:00AM CST LOCAL TIME. Contracting will issue a consolidated response via solicitation amendment to https://sam.gov Contract Opportunities within 2 business days to all parties

B. SOLICITATION CLOSES/QUOTES DUE:

See box 8 of STANDARD FORM 1449 or most recent Amendment.

C. SUBMISSION OF QUOTE:

See 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services and addendum for specific instructions to offerors.

4. CONTRACTING OFFICER AUTHORITY:

The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitment or issue changes that will affect price, quantity or quality of performance of this contract. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred thereof.

5. INVOICES:

a. All payments by the Government to the contractor will be made in accordance with: FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

b. Invoices shall be submitted monthly in arrears in accordance with: 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)

c. Payments shall be made in arrears upon receipt of a properly prepared invoice

d. Facsimile, e-mail, and scanned documents are not acceptable forms of submission for payment requests.

e. The VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with Tungsten Network e-Invoicing network, for submissions of all electronic invoices to VA. Tungsten Network electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with Tungsten Network by submitting an email to VA.Registration@Tungsten-Network.com or calling 1-877-489-6135 for Enrollment.

f. Contractor shall submit an electronic invoice by the tenth (10th) of the following month services were performed to the Veterans Affairs Financial Services Center (VAFSC) e-Invoice through the website at https://portal.Tungsten-Network.com/Login.aspx. For questions regarding the submission of VA electronic invoices, Tungsten Network customer service may be contacted at 1-877-489-6135.

g. All invoices shall reference the vendor name and address, customer name, contract number, appropriate obligation/funding order number, description of services provided, quantity, unit price, and total invoice amount (any additional info). Invoices shall also include any payment discount terms.

h. VA’s Electronic Invoice Presentment and Payment System – The Veterans Affairs Financial Services Center (VAFSC) uses a third-party contractor, Tungsten Network e-Invoice, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/customer-campaigns/veteransaffairs/ to begin submitting electronic invoices, free of charge.

i. As of July 1, 2020, the VA10091 form has been eliminated and the VAFSC is requiring our vendors to update and add their information in the Customer Engagement Portal (CEP) at https://www.cep.fsc.va.gov/. This is for new vendors being added to FMS only.

j. For assistance setting up e-Invoice, the below information is provided:

* Tungsten Network e-Invoice Setup Information: 1-877-489-6135

* Tungsten Network e-Invoice email: VA.Registration@Tungsten-Network.com

* FSC e-Invoice Contact Information: 1-877-353-9791

* FSC e-invoice email: vafsccshd@va.gov

6. FACILITY REQUIREMENTS: In addition to any other requirements set forth in this Contract, the Contractor, including its employees, agents, and subcontractors (collectively “the Contractor”), shall comply with the following facility requirements. Failure to comply with these requirements shall be considered a material breach of this Contract and may be a violation of Federal law resulting in charges answerable in the United States District Court.

a. Contractor is responsible to follow all on site facility policies

b. All VA property is considered Federal property and all Federal laws are applicable.

c. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VA will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.

d. All VA facilities are drug free. Possession of drugs, to include Marijuana and all Marijuana bi-products are prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

e. All contractor personnel are required to adhere to all VA rules and regulations.

f. Smoking is prohibited on the entire campus, both inside and outside the VA Facility

g. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

h. VHA DIRECTIVE 1192: This Veterans Health Administration (VHA) directive establishes policy and provides guidance for the prevention of seasonal influenza in VHA facilities through the vaccination or masking of health care personnel (HCP). AUTHORITY: Title 38 United States Code (U.S.C.) 7301(b), 7318(b). Contractor is responsible in ensuring that all aspects of this directive are implemented, including providing face masks and influenza vaccines for all employees working at a VA facility.

7. SECURITY & PRIVACY CONTROL:

The Authorization & Accreditation (A&A) requirements of VHA Handbook 6500.6 do not apply to this requirement, therefore, a Security Accreditation Package is not required. No A&A or MOU/ISA is required. Sensitive information exposure as part of this contract involves applicable security controls within the facility as part of the VA Information Security If there are any questions related to privacy, please have a member of your staff contact the VA Privacy Service at (202) 461-6309. If there are any questions related to the information security, please have a member of your staff contact the Office of Cyber Security at (304) 262-7733.

Non-PIV Card Applies to unsupervised, logical and/or physical access for less than 6 months OR less than 180 aggregate days in a one-year period

Defined in VA Directive 0735 as: “Non-PIV Credential: A VA ID card containing a photograph issued to persons who do not require a PIV Credential but need unaccompanied, infrequent access to VA facilities or information systems for a period not to exceed six (6) months.”

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform in accordance with the statement of work is: Special Agreement Check (SAC). This requirement is applicable to all subcontractor personnel requiring the same access.

A SAC is an automated records check conducted by the Federal Bureau of Investigation in collaboration with the Office of Personnel Management.

The current FY21 fees associated with background investigations: SAC is $20. This fee is the responsibility of the Contractor and will be billed accordingly.

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform in accordance with the statement of work is: Special Agreement Check (SAC) & National Agency Check with Inquiries (NACI). This requirement is applicable to all subcontractor personnel requiring the same access.

The current fees associated with background investigations are as follows:

The SAC fingerprints is $22. This fee is the responsibility of the Contractor and will be billed accordingly.

National MOU/ISA is in place and applies to this contract. Sensitive information exposure as part of this contract involves applicable security controls within the facility as part of the VA Information Security. If there are any questions related to privacy, please have a member of your staff contact the VA Privacy Service at (202) 461-6309. If there are any questions related to the information security, please have a member of your staff contact the Office of Cyber Security at (304) 262-7733.

Routine Access and Personal Identity Verification of Contractor Personnel:

The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24 and Federal Information Processing Standards Publication (FIPS PUB) Number 201.

The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

(1) When no longer needed for contract performance.

(2) Upon completion of the Contractor employee’s employment.

(3) Upon contract completion or termination.

The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.

It shall be the responsibility of the prime Contractor to return such identification to the VA.

SECTION B.2 STATEMENT OF WORK

GENERATOR LOAD BANK TESTING STATEMENT OF WORK

The Contractor shall provide all labor, supervision, materials, tools, and equipment necessary to provide the inspection, maintenance, and testing services for the required 2.0 hour annual and 4.5-hour triennial load Bank testing on (13) thirteen standby generators located Captain James A. Lovell FHCC campus, North Chicago, IL. per the statement of work.

1. SCOPE

A. The following SOW details the requirements for standby generator testing according to Attachment A, VHA Directive 1028 “Electrical Power Distribution Systems” and all applicable NFPA, Joint Commission, Federal, State and Local regulations.

B. See Schedule 1, “Equipment Identification and Locations” below.

C. The contractor shall test emergency standby generators that shall be load banked tested on an annual basis for a period of two (2) continuous hours in the following intervals:

1) 50% of name plate rating for 30 minutes, followed by,

2) 75% of name plate rating for 60 minutes, followed by,

3) 30% of name plate rating for 30 minutes.

D. During the triennial load bank test, which shall occur in 2025 and 2028 of this contract; the contractor shall test emergency standby generators for a period of four and one half (4.5) continuous hours in the following intervals:

1) 30% of name plate rating for 30 minutes, followed by,

2) 50% of name plate rating for 30 minutes, followed by,

3) 75% of name plate rating for 3.5 hours.

E. Maintenance, repair, or battery replacement services shall be documented on a work order provided by the VA after the expected service is verbalized to the COR by the Contractor. Battery replacement services shall be a part of the Contractor’s cost and are required every 36 months unless required earlier. The VA will replace defective batteries immediately upon discovery of defects that are found prior to the purchase and installation by contractor. The Contractor shall provide the completed work order to the COR upon completion of services. Generator batteries to be replaced according to manufacturer’s specifications. Contractor to cross reference the VA TIL (Technical Information Library) for certain specifications on materials. Acceptance of services will be sent in written form from the COR and CO to the contractor prior to turnover.

F. Contractor shall perform annual laboratory fuel testing of all (8) eight standby generator underground/above ground fuel supply tanks and send testing report to COR per Section 7, “Contract Deliverables” below. Fuel shall be tested to all NFPA 99, NFPA 110, and ASTM D-975 standards and in accordance with VHA Directive 1028 and Joint Commission requirements and any other Federal, State and Local regulations.

G. Contractor shall visually check general condition of the EPPS (Electrical Power Supply System) and note any unusual condition or vibration, leakages, noises, temperatures, or general deterioration of overall system. Any discrepancies shall be noted and be included as a contract deliverable per Section 7 below.

H. Contractor shall check operation of day tank, to include, operational test of day tank float switch, transfer pump operation, solenoid valve operation (if so equipped) and inspection of all fuel lines and fuel line connectors for indication of wear or fuel leaks.

I. Contractor shall restore system to automatic operation upon completion of all required testing services.

J. Any changes to this SOW shall be authorized and approved only through written modification of this contract from the CO (Contracting Officer) in coordination with the COR (Contracting Officers Representative). Costs incurred by the contractor through the actions of parties other than the Contracting Officer shall be borne by the contractor.

K. Notwithstanding, the Contractor shall perform no additional work without the prior written authorization of the Contracting Officer. Any additional work, which may be performed by the Contractor without this approval, shall be performed by the Contractor at no additional cost to the Government.

2. SERVICE HOURS AND FEDERAL HOLIDAYS

A.Normal hours of coverage are Monday through Friday from 7:30 am to 4:30 pm, excluding holidays. All work shall be performed during normal hours of coverage unless otherwise requested or approved by the COR or their designee.
B.All contract work shall be on a date and time mutually agreed upon between the Contractor and the COR.

C. Federal Holidays observed by Lovell FHCC are:

New Years’ Day
Independence Day
Christmas Day
Columbus Day
Labor Day
Martin Luther King Day
Memorial Day
Presidents’ Day
Veterans’ Day
Juneteenth
Thanksgiving Day

3. GENERAL INFORMATION

A. Compliance with General Safety Regulations:

1) All Contractors and Subcontractors performing services for the Government shall comply with all Occupational Safety and Health Administration (OSHA), State, County and Municipal Safety and Occupational Health Standards and any other applicable rules and regulations. All Contractors and Subcontractors shall be held responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site area under this contract.

2) All ladders, scaffolding, tools, equipment, personal protective equipment, etc. shall be OSHA approved for the work to be performed. Contractor shall use caution signs as required by OSHA Regulations. Caution signs shall be on-site on commencement of Contract.

3) The Contractor shall coordinate all dates for service and testing with contract COR.

4) The contractor’s FST (Field Service Technician) shall contact the COR/POC prior to performing service at this location and shall communicate to the COR of their presence on the Captain James A. Lovell Federal Health Care Center campus.

5) The contractor shall obtain all other necessary licenses and/or permits required to perform all work under this contract.

6) The Contractor shall provide all necessary documentation that demonstrates the Contractors ability to perform all work under this scope of work and on the specific generators, and related equipment, systems, and assemblies, located at the Lovell FHCC.

7) Contractor is responsible to replace any items damaged by the contractor, sub- contractor, their employees, or equipment at no extra charge to the Government.

8) Contractor shall not interrupt any utility service while performing under this contract.

9) Contractor personnel must conduct their work in a manner that does not interfere with the normal functions of the facility and shall stop work if asked by the CO/COR as required if interruptions do occur.

10) The Contractor is responsible for supplying, completing, and submitting all reports required or requested by any additional Federal, State, or local codes as they pertain to any work performed under this contract.

11) No hot electrical work shall be performed. Any electrical work that requires any interruption in electricity must be coordinated with the COR and the facility electricians. All OSHA and Facility lockout/tagout procedures shall be followed.

4. CONTRACTING OFFICER’S REPRESENTATIVE (COR)

A. Scheduling of work shall be arranged with at least one, or all the Point of Contacts below and in the following order: contract COR (Contracting Officers Representative) or contract ACOR (Alternate Contracting Officers Representative).

1) See Table 1 below for Point of Contact information.

Table 1:

NAME
POSITION
PHONE
EMAIL
Jerry Montgomery
COR/Maintenance Supervisor
224-610-3500
Jerry.montgomery1@va.gov
Michael Salemi
Alternate COR/Work leader
224610-3507
michael.salemi@va.gov

Timothy Kerkman

Automotive mechanic

224610-3501
Timothy.kerkman@va.gov

5. COMPETENCIES AND QUALIFICATIONS OF PERSONNEL SERVICING EQUIPMENT:

A. Each respondent must have an established business, with an office and staff; The staff includes a Field Service Engineer (FSE) and a second Field Service Engineer who will serve as the backup.

B. FSE shall have a minimum of two (2) years of experience performing this service. The FSE(s) shall have completed a formalized training program for the equipment identified in the Statement of Work. For field experience, the FSE(s) shall have a minimum of two years of experience, with respect to scheduled generator load bank testing, on the generators listed in Schedule 1, “Equipment Identification and Locations” below.

C. The FSEs shall be authorized by the Contractor to perform the maintenance services. The Contractor shall provide written assurance of the competency of their personnel and a list of credentials of approved FSEs for each make and model the Contractor services at the FHCC. The CO may authenticate the training requirements, request training certificates or credentials from the Contractor at any time for any personnel who are servicing or installing any FHCC equipment. The CO and/or COR specifically reserves the right to reject any of the Contractor's personnel and refuse them permission to work on the FHCC equipment.

D. If subcontractor(s) are used, they must be approved by the CO; the Contractor shall submit any proposed change in Subcontractor(s) to the CO for approval/disapproval. The contractor shall be fully staffed on the first day of work under the contract. All personnel shall receive close and continuing first-line supervision by the contractor. Individuals who are performing the work must be experienced, fully trained and a regular employee of the contractor.

E. Contractor's personnel shall be regular employees of the Contractor, day laborers are not acceptable.

6. ORIENTATION FOR CONTRACTOR EMPLOYEES:

A. Contractor shall attend an orientation meeting as arranged by the Contracting Officer's Representative (COR). The VA will schedule this meeting and it will include discussion of the following topics: (VA will provide information to the contractor regarding these topics and will document the meeting)

· Fire and Safety

· Infection control

· Disaster procedures - Other B. The Contractor shall be responsible to ensure that Contractor employees coming to the work site will receive the information required above.

7. CONTRACT DELIVERABLES

Contractor shall provide, to the COR after completion of work, at the minimum, the following deliverables:

A. The following information, which shall be recorded, during each increment of testing as defined in Section 1, Part C, Line Items 1 through 3 and Section 1, Part D, Line Items 1 through 3.

1) Building Number

2) Date

3) Testing Start Time

4) Testing Stop Time

5) Testing Run Time

6) Oil Pressure

7) Water Temperature

8) Exhaust Gas Temperature (Infrared Reading Ahead of Turbocharger)

9) Cycles

10) Volts

11) Engine Loading (AMP Meter)

12) Engine Hour Meter at Stop

13) Initials of Technician Performing Testing

14) Exact time of load change (increase / decrease ) during the test

15) Annual fuel analysis and reporting

16) Battery replacement services every thirty-six (36) months unless required earlier and reporting.

B. Provide COR with results of annual laboratory testing of fuel in all standby generator, above ground and below ground fuel tanks.

C. Above information shall be provided to the COR in both Digital and Hardcopy formats and within 30 days upon completion of testing.

8. SECURITY REQUIREMENTS

A. All Contractor FST’s (Field Service Technician(s)) shall obtain contractor ID badges from the COR. Identification shall be worn visible always by the Contractor and all FST’s while on premises. Contractor shall coordinate with COR to acquire said identification badges.

B. During normal working hours of operation, Monday through Friday, the contractor shall check in with the COR/Lovell FHCC (Federal Health Care Center) POC (Point of Contact) when arriving to perform work and check out with the COR/FHCC POC when work/workday is complete.

C. During other than normal hours of operation, the contractor shall sign in and out with the Police Dispatch located in building 133EF next to the Emergency Room.

D. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The FHCC will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.

E. Smoking is prohibited both inside and outside (entire campus) at the Lovell FHCC.

F. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

9. RISK CONTROL

A.The Contractor shall take all necessary precautions to protect government property and shall repair any damage caused by their efforts.
B.All work affecting patients shall be coordinated in advance by the Government and the Contractor to have minimal impact on the patients.

10. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

A. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chap. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

B. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

C. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

D. The Captain James A. Lovell Federal Health Care Center and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of Lovell FHCC or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to Lovell FHCC. The agency must report promptly to NARA in accordance with 36 CFR 1230.

E.

F. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government's behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to Lovell FHCC control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the contract. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (E).

G. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and Lovell FHCC guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

H. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VA policy.

I. The Contractor shall not create or maintain any records containing any non-public Lovell FHCC information that are not specifically tied to or authorized by the contract.

J. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

K. The Lovell FHCC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which the Lovell FHCC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

L. Training.

1) All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take the Lovell FHCC- provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

2) To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.

M. Flow down of requirements to Sub-contractors.

1) The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.

N. Violation by a subcontractor of any provision set forth in this clause shall be attributed to the Contractor.

11. PLACE OF PERFORMANCE

Captain James A. Lovell FHCC, Bldg. 32, 3001 Green Bay Road, North Chicago, IL 60064

12. Period of Performance.

A. Support and service, as defined in this SOW, is to occur as scheduled and as required during the period of performance.

B. Work shall be completed in a timely manner and a performance schedule shall be coordinated with the Government upon contract award.

C. Within fourteen (14) days of the award of this contract, the Contractor and the Government shall agree upon a date for work to take place.

13. Schedule 1: Equipment Identification and Locations:

Bldg. 201/202 Green Homes
Bldg. 205/206 Green Homes
Make:
Generac
Make:
Generac
Model:
13508080100
Model:
15702220100
Serial Number:
2112745
Serial Number:
8355271
Kilowatts:
200
Kilowatts:
200
Voltage:
208
Voltage:
208
Amperage:
693.9
Amperage:
693.9
Battery
Part number: SLI31PAGM
Battery
Part number: SLI31PAGM
Bldg. 151
Bldg. 152
Make:
Magna One
Make:
Onan
Model:
440FDR8032AA-F331W
Model:
500FDR 8040AA F331
Serial Number:
8N3421
Serial Number:
KD-94808
Kilowatts:
160
Kilowatts:
250
Voltage:
208
Voltage:
208
Amperage:
555
Amperage:
781
Battery
Part number: SLIA8D
Battery
Part number: SLIA8D
Bldg. 155
Bldg. 156
Make:
Onan
Make:
Maga One
Model:
250DFAC
Model:
68FDR8060AC-P328 W
Serial Number:
1970649933
Serial Number:
KD-94809
Kilowatts:
250
Kilowatts:
440
Voltage:
208
Voltage:
480
Amperage:
867
Amperage:
662
Battery
Part number: SLIA8D
Battery
Part number: SLIA8D
Bldg. 190 #1
Bldg. 190 #2
Make:
Caterpillar
Make:
Caterpillar
Model:
SR-4
Model:
SR-4

Serial Number:

Serial Number:
6MA00907
Kilowatts:
600
Kilowatts:
600
Voltage:
480
Voltage:
480
Amperage:
902
Amperage:
902
Battery
Part number: SLIA8D
Battery
Part number: SLIA8D
Bldg. 190 #3
Bldg. 192 #1
Make:
Caterpillar
Make
Caterpillar
Model:
SR-4
Model
SR-4
Serial Number:
6MA00905
Serial Number
6FA10464
Kilowatts:
600
Kilowatts
661
Voltage:
480
Voltage
480
Amperage:
902
Amperage
250
Battery
Part number: SLIA8D
Battery
Part number: SLIA8D
Bldg. 192 #2
Portable Emergency Generator bldg. 37
Make:
Caterpillar
Make:
Onan
Model:
SR-4
Model:
60-0DA-15R/18850-J
Serial Number:
6MA01123
Serial Number:
D70D408731
Kilowatts:
600
Kilowatts:
60
Voltage:
480
Voltage:
240
Amperage:
902
Amperage:
104
Battery
Part number: SLIA8D
Battery
VA TO CHANGE

Portable Emergency Generator Bldg. 37

Make:
Onan
Model:
DGBC-4489061
Serial Number:
J000158941
Kilowatts:
40
Voltage:
480
Amperage:
138.8
Battery
VA TO CHANGE

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
YR
__________________
__________________

Annual Emergency Generator Preventive Maintenance and Load Contract Period: Base POP Begin: 08-01-2024 POP End: 07-31-2025 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J031 - Maintenance, Repair, and Rebuilding of Equipment - Bearings

1.00
YR
__________________
__________________

Annual Emergency Generator Preventive Maintenance and Load Testing

Contract Period: Option 1 POP Begin: 08-01-2025 POP End: 07-31-2026 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

1.00
YR
__________________
__________________

Annual Emergency Generator Preventive Maintenance and Load Testing Contract Period: Option 2 POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

1.00
YR
__________________
__________________

Year 2026 Batteries Contract Period Batteries are AGM TYPE :

Part number: SLI31PAGM

CCA: 925

RC: 190

20 HR Ah: 100 12V

A TOTAL OF 4 EACH

FOR THE GREEN HOME GENERATORS

Batteries are AGM TYPE:

Part number: SLIA8D

CCA: 1450

20 HR Ah: 245Ah 12V

A TOTAL OF 18 EACH

FOR THE GENERATOR BUILDINGS

POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

1.00
YR
__________________
__________________

Annual Emergency Generator Preventive Maintenance and Load Testing

POP Begin: 08-01-2027 POP End: 07-31-2028 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

1.00
YR
__________________
__________________

Annual Emergency Generator Preventive Maintenance and Load Testing

POP Begin: 08-01-2028 POP End: 07-31-2029 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

1.00
YR
__________________
__________________

Year 2029 Batteries Contract Period Batteries are AGM TYPE :

Part number: SLI31PAGM

CCA: 925

RC: 190

20 HR Ah: 100 12V

A TOTAL OF 4 EACH

FOR THE GREEN HOME GENERATORS

Batteries are AGM TYPE:

Part number: SLIA8D

CCA: 1450

20 HR Ah: 245Ah 12V

A TOTAL OF 18 EACH

FOR THE GENERATOR BUILDINGS

Contract Period: Option 4 POP Begin: 08-01-2028 POP End: 07-31-2029 PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

GRAND TOTAL
__________________

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .