Revised Drawings 550-24-203 (1).pdf
PDF 7 MB Posted
- Solicitation number
- 36C25224B0002
About this file
This document package includes bid documents for a roof replacement project at a Veterans Affairs medical center. The project involves replacing the roof on Building 58's chiller area and Building 98's ambulance bay at the VA Illiana Health Care System in Danville, Illinois. Drawings and specifications are provided for demolishing the existing EPDM roof systems and installing new tapered rigid insulation and a 60 mil white TPO membrane on both buildings. Additional scope includes reinstalling equipment, adding walkway pads and two-way vents, and properly terminating the lightning protection system. Bidders must schedule demolition and new work with the contracting officer's representative and follow safety protocols. The bid due date is not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination 11-17-23.pdf | ||
| Revised Specifications 550-24-203.pdf | ||
| 36C25224B0002 0001.docx | DOCX document | |
| SOW Synopsis.pdf | ||
| Wage Determination 11-07-23.pdf | ||
| Specifications.pdf | ||
| Pre-Construction Checklist 550-24-203.pdf | ||
| Drawings.pdf | ||
| 36C25224B0002_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE ROOF B-98 AMBULANCE
BAY & B-58 CHILLER AREA ROOF
BID DOCUMENTS
VA ILLIANA HEALTH CARE SYSTEM
1900 EAST MAIN STREET, DANVILLE, IL 61832
B-58 ROOF TOP
CHILLER AREA
B-98 AMBULANCE
BAY AREA ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
GI 1
COVER SHEET BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
DOCUMENTATION SET LIST
DWG NUM SHEET NAME
GI 1 COVER SHEET
GI 2 GENERAL NOTES & SITE PLANS
GI 3 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
58-AS 1 BLDG-58 ROOF TOP CHILLER AREA DEMOLITION PLAN
58-AS 2 BLDG-58 ROOF TOP CHILLER AREA NEW ROOF PLAN
98-AS 1 BLDG-98 AMBULANCE BAY ROOF DEMOLITION PLAN
98-AS 2 BLDG-98 AMBULANCE BAY NEW ROOF PLAN
AS 3 ROOF DETAILS
AS 4 ROOF DETAILS
ES 1 LIGHTENING GROUNDING DETAILS
VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS
A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION,
ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW
STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER
CODES AND STANDARDS THAT THE VA FOLLOWS ON ITS PROJECTS:
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY
INTERNATIONAL BUILDING CODE (WHEN REFERENCED IN VA DESIGN DOCUMENTS) -
LATEST VERSION
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES, WITH EXCEPTION OF NFPA 900, AND NFPA 5000
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
NATIONAL ELECTRICAL CODE
INTERNATIONAL PLUMBING CODE
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE
INSTITUTE AND COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
:9919A :1259816.3010 :1192939.1750 :639.93
24"DIA W/
20' DRIP
24"DIA W/
15' DRIP
TRANSFORMER
FO
FO FO
FO
HC
RESERVED
EX-POW
RESERVED
EX-POW
GATE
GATE
UNKNOWN
UTILITY
MARKING
7' CHAIN
LINK FENCE
METAL POST
(TYP)
"V
C
SSMH (3459)
RIM: 639.90
INV IN: 636.30 (NE)
INV IN: 634.75 (SE)
INV IN: 628.95 (S)
INV IN: 635.85 (SW)
INV OUT: 628.95 (N)
"V
C
6"VC
4"VC
8"V C
4"V C
10"VC
10"VC
SSMH (4000)
DOGHOUSE MH
RIM: 639.62
INV IN: 630.22 (NE)
INV IN: 628.52 (SE)
INV OUT: 628.52 (NW)
(HOLE IN TOP OF 10"VC PIPE)AI
R
CONDIT
IO
NIN
G
UNIT
BUILDING
# 58
COVE
RED
W
AL
KW
AY
COVERED WALKWAY
ST (1035)
RIM: 638.80
INV IN: 627.27 (NE)
INV IN: 626.45 (SE)
INV OUT: 626.40 (SW)
O
T
T
T
T
T
T
T
T
T
T
T
T
O
O
:9916A :1259933.5780 :1192826.7520 :639.23
SSMH (3458)
RIM: 639.16
INV IN: 625.05 (SE)
INV IN: 624.21 (NE)
INV OUT: 624.16 (W)
10"VC
"V
CAPPROX.
LOCATION
SSMHCURB INLET
REPORTED
RIM: 637.12
INV IN: 635.0 (NE)
INV OUT: 631.8 (SW)
"R
C C
P
T T
T T
T
T
T
TT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
GI 2
GENERAL NOTES AND SITE PLANS BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
SF
1 BLDG-98 AREA OF WORK
SCALE: NTSGI 2
N
1 BLDG-58 AREA OF WORK
SCALE: NTSGI 2
N
AutoCAD SHX Text
FO
AutoCAD SHX Text
F.F. ELEV.: 643.84 FT.
AutoCAD SHX Text
F.F. ELEV.: 640.32 FT.
AutoCAD SHX Text
F.F. ELEV.: 643.80 FT.
AutoCAD SHX Text
F.F. ELEV.: 642.28 FT.
AutoCAD SHX Text
(2) 3"SIG
AutoCAD SHX Text
(1) 4"SIG
AutoCAD SHX Text
UNDERGROUND FUEL TANK
AutoCAD SHX Text
REPORTED MANHOLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
UM
AutoCAD SHX Text S
AutoCAD SHX Text
ST
http://architecture4design.com/ http://architecture4design.com/ http://architecture4design.com/ http://architecture4design.com/ http://architecture4design.com/ AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text "W
AutoCAD SHX Text
AutoCAD SHX Text "W
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text
AutoCAD SHX Text
TS#
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text
AutoCAD SHX Text
TS#
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
TS#
AutoCAD SHX Text
AutoCAD SHX Text
TS#
AutoCAD SHX Text
AutoCAD SHX Text
TS#
AutoCAD SHX Text
"ST
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
UE
AutoCAD SHX Text
(2) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
(6) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
(2) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
REPORTED (2) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
(6) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
(2) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(3) 4"
AutoCAD SHX Text "W
AutoCAD SHX Text
AutoCAD SHX Text
UL
AutoCAD SHX Text
UL
AutoCAD SHX Text
UL
AutoCAD SHX Text
UL
AutoCAD SHX Text
UL
AutoCAD SHX Text
UL
AutoCAD SHX Text
OXY
AutoCAD SHX Text
OXY
AutoCAD SHX Text
OXY
AutoCAD SHX Text
OXY
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text "W
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text
"STM
AutoCAD SHX Text
AutoCAD SHX Text
"STM
AutoCAD SHX Text
AutoCAD SHX Text
"STM
AutoCAD SHX Text 2½
AutoCAD SHX Text
"STM
AutoCAD SHX Text
AutoCAD SHX Text
"STM
AutoCAD SHX Text
AutoCAD SHX Text
"STM
AutoCAD SHX Text
AutoCAD SHX Text
"STM
AutoCAD SHX Text 1½
AutoCAD SHX Text
"STM
AutoCAD SHX Text
AutoCAD SHX Text
"STM
AutoCAD SHX Text
AutoCAD SHX Text
"STM
AutoCAD SHX Text 2½
AutoCAD SHX Text
FIBER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text
OXY
AutoCAD SHX Text
OXY
AutoCAD SHX Text
OXY
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text
COM
AutoCAD SHX Text
OXY
AutoCAD SHX Text
FIRE DEPARTMENT ALARM BOX
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
ST
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(2) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(6) 4"
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text "G
AutoCAD SHX Text
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(2) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(5) 4"
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(1) 4"
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
"SAN
AutoCAD SHX Text
AutoCAD SHX Text
UE
AutoCAD SHX Text
(4) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
(2) 4"
AutoCAD SHX Text
UE
AutoCAD SHX Text
(2) 4"
AutoCAD SHX Text
"STM
AutoCAD SHX Text 2½
AutoCAD SHX Text
"STM
AutoCAD SHX Text 1½
AutoCAD SHX Text
"STM
AutoCAD SHX Text
AutoCAD SHX Text
UL
AutoCAD SHX Text
UL
AutoCAD SHX Text
SIG
AutoCAD SHX Text
(3) 3"
AutoCAD SHX Text
UCATV
AutoCAD SHX Text
UE
AutoCAD SHX Text
COM
AutoCAD SHX Text "G
AutoCAD SHX Text 1-1/4
AutoCAD SHX Text
AutoCAD SHX Text GENERAL 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL LAWS AND REGULATIONS. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND APPROVALS REQUIRED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 3. THE UTILITIES INDICATED ON THESE PLANS MAY NOT THE UTILITIES INDICATED ON THESE PLANS MAY NOT BE A COMPLETE INVENTORY OF ALL UTILITIES CURRENTLY ON OR NEAR THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING PUBLIC AND/OR PRIVATE UTILITY LOCATING SERVICES PRIOR TO STARTING CONSTRUCTION. 4. THE SIZE AND LOCATIONS OF THE UTILITIES THE SIZE AND LOCATIONS OF THE UTILITIES INDICATED ON THESE PLANS ARE APPROXIMATE. THE CONTRACTOR IS TO DETERMINE AND FIELD VERIFY ALL HORIZONTAL AND VERTICAL LOCATIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES. 5. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE AND CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO CONSTRUCTION SO THAT REDESIGN OR CLARIFICATION MAY OCCUR. SITE PLAN 1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS ON THE SITE PRIOR TO CONSTRUCTION. 2. ANY DISCREPANCIES IDENTIFIED SHALL BE BROUGHT ANY DISCREPANCIES IDENTIFIED SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE. 3. WHERE WORK IS DONE IN EXISTING AREAS, THE WHERE WORK IS DONE IN EXISTING AREAS, THE EXISTING FINISHED CONDITIONS ARE TO BE REPAIRED OR REPLACED. THESE FINISHED CONDITIONS ARE TO MATCH EXISTING UNLESS OTHERWISE NOTED. 4. ANY DAMAGE INCURRED THROUGH THE PROCESS OF ANY DAMAGE INCURRED THROUGH THE PROCESS OF DEMOLITION AND INSTALLATION OF THE NEW ROOFING SYSTEMS TO THE EXISTING LANDSCAPING AND NEARBY INFRASTRUCTURE SHALL BE REPAIRED AT THE COST OF THE CONTRACTOR.
AutoCAD SHX Text
SITE NOTES
AutoCAD SHX Text
CONSTRUCTION FENCE
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
CONSTRUCTION LIMITS
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
SEEDING LIMITS
AutoCAD SHX Text
CONSTRUCTION STAGING LIMITS
AutoCAD SHX Text
BUILDING LIMITS
AutoCAD SHX Text
EQUIPMENT LAYDOWN AREA
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH
ARROW
EXTENT OF REVISION
REVISION SET
PROJECT
BOUNDARY
BEYOND PROJECT BOUNDARY,
NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/E
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
BLDG BUILDING
CMU CONCRETE MASONRY UNIT
CTR CENTER
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG DRAWING
E EAST
EA EACH
EPA ENVIRONMENTAL PROTECTION AGENCY
EQ EQUAL
ETC AND SO FORTH OR ET CETERA
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FEC FIRE EXTINGUISHER CABINET
FLEX FLEXIBLE
FOW FACE OF WALL
FT FEET OR FOOT
GA GAGE OR GYPSUM ASSOCIATION
GC GENERAL CONTRACTOR
GYP GYPSUM
HAZ MAT HAZARDOUS MATERIALS
IBC INTERNATIONAL BUILDING CODE
INFO INFORMATION
LED LIGHT EMITTING DIODE
MIN MINIMUM MINUTE OR MINUTE MINIMUM
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
OC ON CENTER
OZ OUNCE
PCF POUNDS PER CUBIC FOOT
PREFIN PREFINISH
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RO ROUGH OPENING
SF SQUARE FOOT (FEET)
SIM SIMILAR
S SOUTH
TEMP TEMPERATURE OR TEMPORARY
THRU THROUGH
TO TOP OF ___
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
V VOLT
VIF VERIFY IN FIELD
VOLT VOLTAGE
W/ WITH
W/O WITHOUT
X X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION
REFERENCE DRAWING
NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
REVISION TO PLAN CALLOUT
PT-1
A
T
FINISH INDICATION
FRAME /
WINDOW
GLAZING1
1 PLAN NOTE
1 DEMOLITION NOTE
ALTERNATE/BID DEDUCT
ITEM
KEY NOTE
SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLS ARCHITECTURAL ABBREVIATIONS
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN
PREPARED USING THE CONSTRUCTION SPECIFICATIONS
INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE NATIONAL
CAD STANDARD AS GUIDES.
2. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE
IMMEDIATELY BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER'S REPRESENTATIVE. CONTRACTOR
SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR
GREATER QUANTITY OF WORK WHEN BIDDING IF A
CLARIFICATION CAN NOT BE OBTAINED BY THE BID DUE DATE.
3. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE
OF WORK WITH OWNER'S REPRESENTATIVE/COR AND
VARIOUS FACILITY PERSONNEL INVOLVED WITH UTILITY SHUT
DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE LIFE
SAFETY, ACCESS CONTROL, ETC.
4. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF
DEMARCATION ARE SHOWN FOR THE CONVENIENCE OF THE
CONTRACTOR ON SHEET GI 2, THE FULL SCOPE OF THE
PROJECT LIMIT OF BOUNDARY REQUIRES COORDINATION
WITH THE DESIGN SCOPE OF WORK AND ACCESS TO
EXISTING UTILITIES FOR TIE IN.
5. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF
ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS
WITH THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE
OF THE SPECIFICATIONS AND THE SURROUNDING
CONSTRUCTION CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL
INSTALLATION REQUIREMENTS.
6. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF
THE ENTIRE SCOPE OF WORK OUTLINED IN THE CONTRACT
DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR THE
COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE
OF WORK THEY PROVIDE. SUB-CONTRACTORS ARE
RESPONSIBLE FOR THEIR FULL SCOPE OF WORK WITHIN THE
CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO
ONLY CERTAIN SHEETS AND SPECIFICATIONS, CROSS
COORDINATION IS REQUIRED.
7. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH
RESPONSIBLE FOR UNDERSTANDING INFORMATION
OUTLINED IN THE SPECIFICATIONS, KEYED NOTES, GENERAL
NOTES, LEGEND, CODES, ETC., AS PROVIDED IN THE
CONTRACT DOCUMENTS.
8. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
MAINTAINING SMOKE/FIRE RATINGS OF EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS
INCLUDES PATCHING PENETRATIONS IN ROOF. ONLY U.L.
APPROVED METHODS, MATERIALS AND INSTALLATION ARE
ACCEPTABLE.
9. THE GENERAL CONTRACTOR IS TO COORDINATE THE
LOCATIONS OF ALL MECHANICAL, PLUMBING AND
ELECTRICAL EQUIPMENT WITH THE COR.
10. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
DIMENSIONS. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION BETWEEN THE CONTRACT DOCUMENTS,
INSTALLED AND UNINSTALLED EQUIPMENT. NOTIFY COR OF
ANY ADDITIONAL DISCREPANCIES OR MISSING DIMENSIONS.
11. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR
COMPONENTS OF CONSTRUCTION TO PROVIDE A FLUSH
FINISH SURFACE.
12. ALL INDICATED DIMENSIONS ARE MEASURED TO FACE OF
EXISTING MEMBERS UNLESS NOTED OTHERWISE.
13. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND
NOTES ARE IDENTIFIED AS "TYPICAL" OR "SIMILAR" FOR EACH
OCCURRENCE THAT IS THE SAME IN NATURE TO THE
DETAILED, AREA, OR ITEM REFERENCED.
14. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY
THE CONTRACTOR. CONTRACTOR IS RESPONSIBLE FOR
COORDINATION OF DELIVERY, MOUNTING, INSTALLATION,
NECESSARY BLOCKING AND ROUGH-IN OF ALL NEW
MATERIALS AND EQUIPMENT.
15. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER
FURNISHED MATERIALS AND EQUIPMENT. CONTRACTOR IS
RESPONSIBLE FOR COORDINATION OF MATERIAL DELIVERY,
MOUNTING, INSTALLATION AND ROUGH IN OF ALL NEW
MATERIALS AND EQUIPMENT.
16. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE
MATERIALS AND EQUIPMENT TO THE OWNER. CONTRACTOR
IS RESPONSIBLE FOR COORDINATION OF DELIVERY AND
ROUGH IN.
17. ALL PROVIDED WORK SHALL BE COMPLETED WITH NEW
MATERIALS UNLESS SPECIFICALLY CALLED OUT AS
SALVAGED OR SAVE MATERIAL FOR RE-INSTALL.
18. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH
THE PROJECT SHALL BE FAMILIAR WITH THE RULES AND
REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH
ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS
PROJECT.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING
AND PROTECTING ALL UTILITY LINES. LOCATIONS SHOWN
ARE APPROXIMATE. REPAIR ALL DAMAGE TO UTILITY LINES
CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO
THE OWNER.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
TEMPORARY BRACING AND SHORING REQUIRED DURING
CONSTRUCTION.
21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTING ADJACENT CONSTRUCTION, FINISHES,
EQUIPMENT AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE
WEAR BY THE CONSTRUCTION TEAM SHALL BE
REPAIRED/REPLACED BY THE CONTRACTOR AT NO COST TO
THE OWNER.
22. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN THE
CONTRACT DRAWINGS, THE CONTRACTING OFFICER'S
REPRESENTATIVE SHALL DETERMINE AN APPROPRIATE
RESOLUTION TO DESIGN.
23. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY
MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH
HAVE BEEN APPROVED.
24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACQUIRING
I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID
FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES.
COORDINATE WITH CONTRACTING OFFICER'S
REPRESENTATIVE. NO CONTRACT PERSONNEL ON SITE UNTIL
BADGING IS COMPLETED
25. THE CONTRACTOR SHALL COORDINATE ONLY WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE AND THE
CONTRACTING OFFICER.
26. CONTRACTOR SHALL PROVIDE A WRITTEN FIRE SAFETY
CHECKLIST AT THE END OF EVERY WORK DAY TO THE
CONTRACTING OFFICER'S REPRESENTATIVE CERTIFYING
THAT ALL WORK AREAS HAVE BEEN SURVEYED AND FOUND
TO BE SECURE, SAFE, AND FREE OF ANY FLAMMABLE LIQUIDS
OR MATERIALS.
27. CONTRACTOR TO REMOVE AND RE-INSTALL ANY ITEMS
NECESSARY FOR NEW WORK TO BE COMPLETED.
REINSTALLED ITEMS SHALL BE IN SAME WORKING CONDITION
PRIOR TO REMOVAL OF SYSTEM OR BETTER.
28. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL
UL MASTER CERTIFICATIONS FOR LIGHTENING PROTECTION.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S
REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO
REMOVAL OF SYSTEM
29. ALL ROOF HAZARDS SHALL BE REVIEWED WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO THE
START OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE NECESSARY PROTECTIVE EQUIPMENT TO BE WORN
BY PERSONNEL AT ALL TIMES.
30. COMPLIANCE WITH REQUIREMENTS FOR FALL PROTECTION
31. THE BUILDINGS SHALL REMAIN IN USE DURING
CONSTRUCTION ACTIVITIES. PROVIDE PROTECTION AT
EXTERIOR ENTRANCES TO BUILDING TO PROTECT VISITORS,
PATIENTS, VAHCS STAFF, ETC FROM FALLING OBJECTS AT
ANY ENTRY NEAR WORK AREAS. INCLUDE THE PROPOSED
PROTECTION PLAN AND PROTECTION IN ACCIDENT
PREVENTION PLAN.
32. WHERE ROOF AREAS ARE OPENED UP FOR INSTALLATION OF
NEW WORK OR REPLACEMENT OF DETERIORATED
MATERIALS, CONTRACTOR SHALL PROVIDE SHIELD/BARRIER
TO PREVENT WATER/MOISTURE DAMAGE TO MATERIALS AND
SPACES BELOW. BEFORE COMMENCEMENT OF DEMOLITION
ACTIVITIES, PROVIDE WRITTEN PLAN FOR PROTECTION TO BE
REVIEWED AND APPROVED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE.
33. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO FACE
OF EXISTING WALL SURFACE.
34. CONTRACTOR TO SCHEDULE A WALK-THROUGH BEFORE
CONSTRUCTION WARRANTY EXPIRES WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE TO REVIEW THE
CONDITION OF THE ROOFING AND ASSOCIATED WORK.
35. COORDINATE CONTRACTOR STAGING AND DUMPSTER
LOCATION WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
36. CONTRACTOR AND CONTRACTING OFFICER'S
REPRESENTATIVE SHALL COORDINATE DEMOLITION AND
NEW WORK AMONG DISCIPLINES.
37. ROOF DETAILS MAY VARY BY MANUFACTURER DETAILS MAY
BE VARIED SLIGHTLY AS REQUIRED TO COMPLY WITH
MANUFACTURER'S WARRANTY CONDITIONS. FLASHING SHALL
COMPLY WITH MANUFACTURER'S SPECIFIED REQUIREMENTS.
38. ALL METAL FLASHING TO BE ALUMINUM.
39. ALL ROOF NAILERS AND BLOCKING TO BE PRESSURE
TREATED.
40. ALL EQUIPMENT AND EQUIPMENT SUPPORT THAT IS NOT
DIRECTLY FASTENED TO STRUCTURAL DECK SHALL HAVE
EPDM WALKWAY PADS BENEATH SUPPORTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
GI 3
ARCHITECTURAL SYMBOLS &
ABBREVIATIONS BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
ROOF HATCH ACCESS
CHILLER
OUTLINE
SCUPPER
LOCATION
TYPICAL
ROOF
RIDGE
LINE
SL
O
PE
1 4"
=1 '0
STONE CAP
PARAPET WALL 24" H TO BOTTOM OF
STONE CAP AT SCUFFER LOCATIONS
27'-8" 11"
'-6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
58-AS 1
BLDG-58 ROOF TOP CHILLER AREA
DEMOLITION PLAN BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
2 B-58 Roof-Top Chiller Area Roof Picture
SCALE: NTS
3 B-58 Roof-Top Chiller Area Roof Picture
SCALE: NTS
1 General layout of B-58 Roof top Chiller Area
SCALE: 14" = 1'-0"58-AS 1
N
58-AS 1
58-AS 1
# KEYED NOTES
GENERAL NOTES
1. THIS PLAN HAS BEEN PROVIDED TO SHOW A GENERAL SCOPE OF DEMOLITION FOR
THE EXISTING BLDG-58 CHILLER AREA ROOF. THE CONTRACTOR SHALL VERIFY ALL
EXISTING SITE CONDITIONS. SEE GENERAL LAYOUT DRAWING AND PICTURES FOR
DETAILS.
2. COORDINATE DEMOLITION WITH GENERAL PLANS, DETAILS, PICTURES, AND
GENERAL DRAWING LAYOUT. CLOSELY COORDINATE WORK WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE.
3. ALL DEVICES AND EQUIPMENT REMOVED DURING DEMOLITION ARE PROPERTY OF
OWNER AND SHALL BE DISPOSED OF OR SORTED AS DIRECTED BY THE
CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL
LAWS AND REGULATIONS.
5. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR
DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE COR
PRIOR TO CONSTRUCTION.
1. REMOVE EXISTING EPDM ROOF SYSTEM AND UNDERLYING INSULATION DOWN TO
CONCRETE DECKING. REMOVE FROM JOB SITE FOR PROPER DISPOSAL .
2. REMOVE UNDER-FLASHING IN ITS ENTIRETY.
3. DO NOT REMOVE ALUMINUM FLASHING BELOW COPING, ATTACH NEW MEMBRANE
FLASHING SYSTEM UNDER ALUMINUM FLASHING. CONCEAL HARDWARE FOR NEW
MEMBRANE FLASHING BEHIND ALUMINUM FLASHING COVER.
4. REMOVE MEMBRANE ROOFING ASSEMBLY
5. REMOVE EXISTING EXHAUST CAPS, SALVAGE FOR REINSTALLATION
6. REMOVE ABANDONED EXHAUST, DO NOT REINSTALL THE ABANDONED EXHAUST.
7. TEMPORARILY REMOVE EXISTING ROOF ACCESS LADDER HATCH TO PROPERLY
FLASH UNDER LIP OF DOOR, REINSTALL ROOF ACCESS LADDER HATCH UPON
COMPLETION.
8. EXISTING ROOF TOP ANTENNA TO REMAIN, REINSTALL UPON COMPLETION OF NEW
ROOF MEMBRANE INSTALLATION PROPERLY GROUNDED ON RE-INSTALLATION.
DEMOLITION NOTES
STEAM EXHAUST
ABANDONED EXHAUST
LIGHTENING GROUND RODS
AIR HANDLER INTAKE
LIGHTENING PROTECTION SYSTEM
ANTENNA
POWER SUPPLY TO CHILLER
CHILLER SUPPORT
VENT
ROOF HATCH ACCESS
CHILLER
OUTLINE
SCUPPER
LOCATION
TYPICAL
ROOF
RIDGE
LINE
SL
O
PE
1 4"
=1 '0
STONE CAP
PARAPET WALL 24" H TO BOTTOM OF
STONE CAP AT SCUFFER LOCATIONS
27'-8" 11"
'-6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
58-AS 2
BLDG-58 ROOF TOP CHILLER AREA
NEW ROOF PLAN BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
4 B-58 Roof-Top Chiller Area Roof Picture
SCALE: NTS
2 B-58 Roof-Top Chiller Area Roof Picture
SCALE: NTS58-AS 2
3 B-58 Roof-Top Chiller Area Roof Picture
SCALE: NTS58-AS 2 58-AS 2
1 General layout of B-58 Roof top Chiller Area
SCALE: 14" = 1'-0"58-AS 2
N
GENERAL NOTES
1. EXERCISE CAUTION WHEN WORKING NEAR EXISTING HVAC
UNITS AND OTHER EQUIPMENT. CONTRACTOR IS FULLY
RESPONSIBLE FOR REPAIRS TO HVAC UNITS OR OTHER
EQUIPMENT THAT IS DAMAGED IN COURSE OF ROOF DEMO
AND INSTALLATION.
2. CONTRACTOR IS RESPONSIBLE FOR ALL FASTENER COSTS
PENETRATING ELECTRICAL CONDUITS, AND WIRING PLACED
AGAINST THE ROOF DECK.
3. CONTRACTOR IS RESPONSIBLE FOR ALL LABOR AND
MATERIALS REQUIRED TO COMPLETE THE ROOF
INSTALLATION
4. CONTRACTOR IS REQUIRED TO PROVIDE A TENTATIVE
SCHEDULE WITH INITIAL BID AND A FINAL LIFT PLAN TO
CONTRACTING OFFICER'S REPRESENTATIVE 2-WEEKS AHEAD
OF SCHEDULE.
5. CONTRACTOR MUST KEEP CONSTRUCTION DEBRIS
CONTAINED AT ALL TIMES AND PROPERLY REMOVE FROM
SITE AT THE END OF EACH WORK DAY.
6. CERTIFICATE OF ROOF COVERAGE AS WELL AS WARRANTY
MUST BE PROVIDED TO CONTRACTING OFFICER'S
REPRESENTATIVE BEFORE THE FINAL INVOICE.
7. FOLLOW SAFETY OSHA COMPLIANCE AS LISTED ON THE
SPECIFICATION SECTION.
NEW ROOF PLAN NOTES
1. INSTALL DOUBLE LAYER OF 4' X 8' SHEETS OF RIGID FOAM
INSULATION OVER CONCRETE ROOF DECK, ANCHORING
EACH SHEET WITH MANUFACTURER APPROVED ADHESIVE
AND-OR FASTENING DEVICES . LAYER OF INSULATION WILL
BE INSTALLED IN A PERPENDICULAR ORIENTATION TO ONE
ANOTHER , TO AVOID GAPS IN THE INSULATION SYSTEM.
2. TOP LAYERS OF RIGID FOAM INSULATION SHOULD BE
TAPERED TOWARD SCUPPERS WITH A PEAK AT THE
MIDPOINT OF THE ROOF AT A SLOPE OF 14"=1'0".
3. ROOF WITH DURO-LAST OR SIMILAR SINGLE PLY MINIMUM 50
MIL MEMBRANE IN WHITE, ANCHORING TO ROOF DECK PER
MANUFACTURER'S SPECIFICATIONS.
4. FLASH ALL ROOF OBSTRUCTIONS WITH CUSTOM MADE
DURO-LAST OR SIMILAR COMPONENTS - STACKS, VENTS,
PARAPET WALLS ETC. PER MANUFACTURING
SPECIFICATIONS.
5. PARAPET WALLS WILL BE FLASHED TO A POINT ABOVE
EXISTING ROOF MATERIAL, SECURED IN TO STRIP MASTIC
TERMINATION BAR HELD EVERY SIX INCHES ON CENTER WITH
APPROPRIATE APPROVED FASTENER. FLASH UNDER
ALUMINUM FLASHING SIMILAR TO EXISTING.
6. INSTALL NEW PROTECTIVE WALKWAY PADS AT THE ROOF
HATCH AND AROUND THE CHILLER TO MATCH EXISTING.
7. INSTALLED THROUGH-WALL SCUPPERS WILL BE LINED WITH
DURO-LAST OR SIMILAR MATERIAL.
8. INSTALL TWO WAY VENTS AT THE DENSITY OF ONE PER 1000
SQUARE FEET FOR THE RELIEF OF HUMIDITY DEVELOPED
WITHIN THE ROOF SYSTEM.
9. UL APPROVED ROOF SYSTEM TO MEET REQUIREMENTS PER
NFPA FIREPROOFING AND LATEST IFC CODES REQUIRED.
SOLUTION IS UP TO CONTRACTOR AND SHOULD BE
PROVIDED TO CONTRACTING OFFICER'S REPRESENTATIVE
PENDING FINAL APPROVAL.
10. RE-CONNECT ALL LIGHTENING GROUNDING SYSTEMS, MAKE
REPAIRS TO EXISTING AS NECESSARY TO SATISFY NEEDS.
11. CREATE PROPER GROUNDING TO CHILLER UNIT, ATTACH TO
EXISTING LIGHTENING GROUNDING SYSTEM.
12. SEE SHEET ES 1 FOR LIGHTENING GROUNDING DETAILS.
13. EXISTING ROOF TOP ANTENNA TO REMAIN, REINSTALL UPON
COMPLETION OF NEW ROOF MEMBRANE INSTALLATION
PROPERLY GROUNDED ON RE-INSTALLATION.
14. CREATE NEW GROUNDING FOR CHILLER SYSTEM, ATTACH
NEW GROUNDING SYSTEM TO ROOF GROUNDING CABLE.
ROUTE MASONRY MORTAR MIN
THREE MASONRY COURSES
ABOVE TOP OF NEW ROOF FOR
FLASHING INSTALLATION ON
PRIMARY WALLS ALONG LENGTH
OF AMBULANCE BAY ROOF
29'-6"
9'-6"
'-1
0"
REMOVE EXISTING GUTTERS AND
ORIGINAL ROOF DOWN TO
CONCRETE DECKING. EXISTING
LIGHTENING GROUNDING
SYSTEM TO BE REMOVED BELOW
ROOF DECKING.
REMOVE EXISTING ALUMINUM
DECKING, GUTTERS AND
SCUPPERS
# DEMOLITION KEY NOTES
GENERAL NOTES
1. ROOFING CONTRACTOR TO REVIEW AND VERIFY ALL
ROOFING DETAILS AND VERIFY EXISTING DETAIL PRIOR TO
START OF CONSTRUCTION.
2. COORDINATE THE SCOPE OF DEMOLITION WORK WITH COR
FOR THE PROJECT.
3. CONTRACTOR SHALL REMOVE INDICATED DEMOLITION OF
CONSTRUCTION ASSEMBLIES IN THEIR ENTIRETY, UNLESS
OTHERWISE NOTED TO ACCOMMODATE NEW
CONSTRUCTION.
4. COORDINATE SCHEDULE MINIMUM TWO WEEKS PRIOR TO
CONSTRUCTION WITH CONTRACTING OFFICER'S
REPRESENTATIVE.
1. REMOVE EXISTING EPDM ROOF SYSTEM AND UNDERLYING
INSULATION IN TO CONCRETE DECK, REMOVE FROM JOB
SITE FOR DISPOSAL .
2. REMOVE COPING IN ITS ENTIRETY.
3. REMOVE MEMBRANE ROOFING ASSEMBLY
4. REMOVE ALUMINUM ROOF PANELS
5. REMOVE SCUPPERS
6. REMOVE EXISTING GUTTERS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
98-AS 1
BLDG-98 AMBULANCE BAY ROOF
DEMOLITION PLAN BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
SCALE: NOT TO SCALE
3 BLDG-98 AMBULANCE BAY AREA ROOF PHOTO
SCALE: NOT TO SCALE
21 BLDG-98 AMBULANCE BAY ROOF DEMO PLAN
98-AS 1
N
SCALE: 14" = 1'-0" 98-AS 1
98-AS 1
BLDG-98 AMBULANCE BAY AREA ROOF PHOTO
SLOPE: 14" = 1'-0"
ORIGINAL ROOF OFFSET RIDGE
TO BE MADE FLUSH WITH BUILT
UP RIGID FOAM INSULATION,
ENTIRE ROOF TO HAVE MINIMUM
4" - 1'-0" SLOPE
NEW GUTTER ON NORTH AND
EAST SIDES OF ROOF
NEW DOWNSPOUT ON
NORTHWEST AND
SOUTHEAST CORNERS OF
ROOF
EXTEND LIGHTENING GROUND
PROTECTION BEYOND EXTENTS
OF AMBULANCE BAY ROOF, THEN
DOWN TO THE GROUND, DO NOT
PENETRATE NEW ROOF.
29'-6"
9'-6"
ROUTE CHANNEL THREE
MASONRY UNIT COURSES
ABOVE TOP OF NEW ROOF
HEIGHT TO ALLOW PROPER
FLASHING CHANNEL FOR
NEW ROOF MEMBRANE
SYSTEM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
98-AS 2
BLDG-98 AMBULANCE BAY NEW
ROOF PLAN BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
GENERAL NOTES
1. EXERCISE CAUTION WHEN WORKING AROUND EXISTING
HVAC UNITS OR OTHER EQUIPMENT. CONTRACTOR IS FULLY
RESPONSIBLE FOR REPAIRS TO HVAC UNITS OR OTHER
EQUIPMENT THAT IS DAMAGED IN COURSE OF ROOFING.
2. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS DUE TO
FASTENERS PENETRATING ELECTRICAL CONDUITS OR
WIRING PLACED AGAINST THE ROOF DECK.
3. CONTRACTOR IS RESPONSIBLE FOR ALL LABOR AND
MATERIAL REQUIRED TO COMPLETE THE ROOF INSTALLATION
4. CONTRACTOR IS REQUIRED TO PROVIDE LIFT PLAN TO
CONTRACTING OFFICER'S REPRESENTATIVE 2-WEEKS AHEAD
OF SCHEDULE.
5. CONTRACTOR MUST KEEP CONSTRUCTION DEBRIS IN
CONTAINERS AT ALL TIMES. CONTAINERS SHOULD BE
REMOVED AT END OF EACH WORK DAY.
6. CERTIFICATE OF ROOF COVERAGE AS WELL AS WARRANTY
MUST BE PROVIDED TO CONTRACTING OFFICER'S
REPRESENTATIVE BEFORE THE FINAL INVOICE.
7. FOLLOW SAFETY OSHA COMPLIANCE AS LISTED ON THE
SPECIFICATION SECTION.
NEW ROOF PLAN NOTES
1. INSTALL MINIMUM 20GA GALVANIZED STEEL DECKING WITH
MINIMUM 3" RIDGE SPACING WHERE ORIGINAL ALUMINUM
DECKING WAS LOCATED.
2. INSTALL SINGLE LAYER OF 5/8" OSB OVER ROOF SURFACE,
FASTENING PER SPECIFICATIONS
3. BUILD UP LAYERS OF 1" 4X8 SHEETS OF TAPERED RIGID
INSULATION OVER ROOF SURFACE, ANCHORING EACH SHEET
WITH APPROVED ADHESIVE AND CONNECTING HARDWARE.
PROVIDE MINIMUM 14"=1'-0" REQUIRED SLOPE AS PERMITTED.
4. ROOF WITH DURO-LAST OR SIMILAR SINGLE PLY MINIMUM 50
MIL MEMBRANE IN WHITE, ANCHORING TO ROOF DECK PER
MANUFACTURERS SPECIFICATIONS.
5. A NEW KYNAR OR SIMILAR COATED COMMERCIAL BOX
GUTTER AND DOWNSPOUT SHOULD BE INSTALLED ON THE
NORTH AND EAST ENDS. AT GUTTER, MEMBRANE WILL LAY
OVER EDGE INTO A LAYER OF STRIPS MASTICS AND BE
SECURED WITH TERMINATION BAR SECURED EVERY SIX
INCHES O.C. WITH APPROVED FASTENERS.
6. INSTALL TWO WAY VENTS AT THE DENSITY OF ONE PER 1000
SQUARE FEET FOR THE RELIEF OF HUMIDITY DEVELOPED
WITHIN THE ROOF SYSTEM DURING WINTER USE OF THE
STRUCTURE.
7. LIGHTING PROTECTION TO BE PROPERLY REINSTALLED. DO
NOT SEND THROUGH METAL ROOF DECKING, SEND LIGHTING
GROUND PROTECTION BEYOND THE NEW ROOFING SYSTEM
THEN TO GROUND LOCATION.
7 B-98 Ambulance Bay Area Roof Picture
SCALE: NTS
2 B-98 Ambulance Bay Area Roof Picture
SCALE: NTS
3 B-98 Ambulance Bay Area Roof Picture
SCALE: NTS
6 B-98 Ambulance Bay Area Roof Picture
SCALE: NTS
5 B-98 Ambulance Bay Area Roof Picture
SCALE: NTS
4 B-98 Ambulance Bay Area Roof Picture
SCALE: NTS98-AS 2 98-AS 2 98-AS 2 98-AS 2
98-AS 298-AS 2
1 BLDG-98 AMBULANCE BAY NEW ROOF PLAN
98-AS 1
N
SCALE: 14" = 1'-0"
SHEET METAL CAP
SURFACED CAP SHEET
INTERPLY
1/2" PROTECTION
BOARD
TAPERED RIGID INSULATION - 6" MIN
EXISTING CURB FRAMING
CANT STRIP
FULLY ADHERED 60 MIL WHITE
TPO ROOFING MEMBRANE
EXISTING CONCRETE DECK
EXISTING UNISTRUT PIPING
SUPPORT ASSEMBLY - SET IN
SEALANT
VAPOR BARRIER TURN UP AND OVER
CURB
EXISTING METAL DECK
FULLY ADHERED 60 MIL WHITE
TPO ROOFING MEMBRANE -
TURN MEMBRANE UP WALL
6" RIGID INSULATION
VAPOR BARRIER
FRT BLOCKING
REGLET FLASHING ATTACHED
w/ EXPANSION ANCHOR -
DARK BRONZE FINISH
SEALANT, FULL LENGTH
EXISTING WALL CONSTRUCTION
EXISTING ROOF STRUCTURE
8" M
IN
1/2" PROTECTION BOARD
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - MN 6"
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE - TURN
MEMBRANE DOWN FASCIA
EXISTING METAL DECK
WELDED SEAM
EXISTING ROOF
CONSTRUCTION
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - MN
6"
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE
EXISTING CONCRETE
DECK
EXISTING WALL
CONSTRUCTION
PREFINISHED ALUMINUM
GRAVEL STOP - DARK
BRONZE FINISH
CLEAT CLIP
NEW FRT BLOCKING
LAP SEALANT, FULL PERIMETER
COUNTER FLASHING
VAPOR
BARRIER
EXISTING BRICK
VENEER TO REMAIN
FILL VOID w/ BATT
INSULATION
TURN ROOF
MEMBRANE DOWN
FACE OF WALL - 8" MIN.
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - 6" MIN
EXISTING CONCRETE DECKING
FULLY ADHERED 60 MIL WHITE
TPO ROOFING MEMBRANE
BOOT FLASHING - SEALED AROUND PIPE
CUT AND MODIFY EXISTING PIPING AS
REQUIRED FOR EXTENSION OF
EXISTING VENT THROUGH ROOF
PIPING
SEALANT, FULL PERIMETER
VAPOR BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
AS 3
ROOF DETAILS BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
SCALE: 3" = 1'-0"
4 ROOF CURB DETAIL AT EXISTING BOXED OPENING AT BUILDING 58
SCALE: 3" = 1'-0"
5 ROOF FLASHING DETAIL AT BUILDING 98
SCALE: 3" = 1'-0"AS 3
2 THROUGH ROOF PIPING DETAIL AT BUILDING 58
SCALE: 3" = 1'-0"
1 TYPICAL ROOF MEMBRANE SEAM DETAIL
SCALE: 3" = 1'-0"
3 LAP DETAIL AT ROOF PENETRATIONS
AS 3
AS 3 AS 3
AS 3
EXISTING METAL PANEL
WALL CONSTRUCTION
PREFINISHED ALUMINUM
DRIP EDGE - DARK
BRONZE FINISH
CLEAT CLIP
NEW FRT BLOCKING
PREFINISHED ALUMINUM
FASCIA - DARK BRONZE FINISH
LAP SEALANT, FULL PERIMETER
1/2" PROTECTION
BOARD
TAPERED RIGID
INSULATION - MN 6"
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE - TURN MEMBRANE
DOWN FASCIA
EXISTING METAL
DECK
PREFINISHED 6" ALUMINUM
GUTTER - DARK BRONZE FINISH
PREFINISHED 6" ALUMINUM
DOWNSPOUT - DARK BRONZE
FINISH. PROVIDE SPLASH
BLOCK AT BASE.
2" MIN
ALUMINUM GRAVEL STOP
COPING - DARK BRONZE FINISH
INSTALL SCUPPER PAN OVER GRAVEL
STOP COPING - OVERLAP COPING 2" MIN.
LAP DETAIL
2" MIN
1' -0
3"
5"
3"
1/ 2"
3/
4"
2 1/4"
6 1/2"
PREFORMED .064 ALUMINUM SCUPPER w/
WELDED SEAMS BY GRAVEL STOP COPING
MANUFACTURER-DARK BRONZE FINISH
3"
1"
1" DRIP EDGE - CLOSE AT BOTH
ENDS
SCUPPER PAN DETAIL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
AS 4
ROOF DETAILS BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
2B-98 Ambulance Bay Area Roof Picture
SCALE: 3" = 1'-0"AS 4
BLDG-58 SCUPPER COPING DETAIL
SCALE: NTSAS 4
2 BLDG-58 SCUPPER DETAIL
SCALE: NTSAS 4
1 3
3/4" X 10'-0" COPPER-
CLAD STEEL GROUND
ROD
CADWELD EXOTHERMIC
WELDED CONNECTION
LIGHTNING PROTECTION
CLASS 1 COPPER
CONDUCTOR
BRONZE BONDING CONNECTOR
LIGHTNING PROTECTION
CLASS I COPPER
CONDUCTOR
LIGHTNING PROTECTION
CLASS 1 COPPER BONDING
CONDUCTOR
LIGHTNING PROTECTION
CLASS I COPPER DOWN
CONDUCTOR BELOW GRADE
TO GROUND ROD
LIGHTNING PROTECTION
CLASS I COPPER DOWN
CONDUCTOR UP TO ROOF
CONDUCTORS
TYPICAL COPPER CABLE
CLIP AND SCREW EVERY 36"
MAX. WITH SILICONE
SEALANT
STIFF COPPER CABLE GUARD
TYPICAL FASTENING CLIP
GRADE
8'- 0"
2'- 0"
MI
N.
BUILDING EXTERIOR
COPPER-CLAD STEEL
GROUND ROD, LOCATE MINIMUM OF
3'-0" TO MAXIMUM OF 8'-0" AWAY
FROM BUILDING AND MINIMUM 2'-0"
BELOW FINISHED GRADE TO TOP OF
ROD PER VA SPECIFICATIONS.
SEE DETAIL #1 ON SHEET EP500
CADWELD EXOTHERMIC
WELDED CONNECTION
EXTEND BOND TO WATER
LINE
NOTE:
1. BOND TOP AND BOTTOM OF VERTICAL CONDUIT.
2. LOCATE DOWN CONDUCTORS IN INCONSPICUOUS
LOCATIONS (I.E. CORNERS, ETC.).
LIGHTNING PROTECTION
COPPER CONDUCTOR
TYPICAL COPPER CABLE
CLIP AND SCREW WITH
STAINLESS STEEL ANCHOR
AND SILICONE SEALANT
CABLE FASTENER WITH SS
ANCHOR
PROVIDE CLIP EVERY 3'-0"
O.C.
3'-0" MAX.
BRONZE AIR TERMINAL
SURFACE BASE
3/8" x 18" CLASS I COPPER AIR TERMINAL
LIGHTNING PROTECTION CLASS I
COPPER CONDUCTOR
LIGHTNING PROTECTION
CLASS I COPPER
CONDUCTOR
ADHESIVE COPPER CABLE HOLDER
NOTE:
ADHESIVE COMPOUND SHALL BE PROVIDED BY
LIGHTNING PROTECTION CONTRACTOR. THE
ELECTRICAL CONTRACTOR SHALL COORDINATE WITH
THE ROOFING CONTRACTOR. THE ADHESIVE
COMPOUND SHALL BE COMPATIBLE WITH THE ROOFING
SYSTEM.
BRONZE AIR TERMINAL
SURFACE BASE
LIGHTNING PROTECTION
CLASS I COPPER
CONDUCTOR, RADIUS
NOT LESS THAN 8"
3/8" x 18" CLASS I COPPER AIR TERMINAL
ADHESIVE COPPER
CABLE HOLDER
LIGHTNING PROTECTION
CLASS I COPPER
CONDUCTOR
NOTE:
ADHESIVE COMPOUND SHALL BE PROVIDED BY
LIGHTNING PROTECTION CONTRACTOR. THE
ELECTRICAL CONTRACTOR SHALL COORDINATE WITH
THE ROOFING CONTRACTOR. THE ADHESIVE
COMPOUND SHALL BE COMPATIBLE WITH THE ROOFING
SYSTEM.
BRONZE BONDING LUG
LIGHTNING PROTECTION
CLASS 1 COPPER BONDING
CONDUCTOR EXISTING LADDER
LIGHTNING PROTECTION
CLASS 1 COPPER
CONDUCTOR
3/8" x 18" CLASS I COPPER AIR TERMINAL
STAINLESS STEEL STANDING SEAM CLAMP
STAINLESS STEEL
STANDING SEAM CLAMP
COPPER CABLE CLIP
BRONZE AIR TERMINAL SWIVEL BASE
METAL ROOF
BRONZE "T" CONNECTOR
LIGHTNING PROTECTION
CLASS I COPPER
CONDUCTOR
COPPER LIGHTNING CONDUCTOR TO
NEAREST LIGHTNING PROTECTION CABLE
BIMETAL CONNECTOR
ALUMINUM BONDING PLATE
ALUMINUM LOOP CABLE CLIP
ALUMINUM LIGHTNING CONDUCTOR
ALUMINUM FLAT SURFACE PLATE
ALUMINUM AIR TERMINAL
NOTE:
AIR TERMINALS ARE REQUIRED ON ROOF VENTILATOR
EXHAUST FANS THAT ARE NOT WITHIN A ZONE OF
PROTECTION OR WHEN HIGHER THAN ADJACENT AIR
TERMINALS.
NICKEL PLATED COPPER
AIR TERMINAL
FLU/VENT
COPPER LIGHTNING CONDUCTOR TO
NEAREST LIGHTNING PROTECTION CABLE
STAINLESS STEEL FASTENER WITH
STAINLESS STEEL SCREWS
VERTICAL AIR TERMINAL BASE
STAINLESS STEEL FASTENER WITH
STAINLESS STEEL SCREWS
12" MIN.
COPPER AIR TERMINAL
ADHESIVE MOUNTING BASE
DOWN CONDUCTOR
TO GROUND ROD, SEE DETAIL
#8 ON SHEET EP500
ROOF CONDUCTOR
NOTE:
AIR TERMINAL BASE, CABLE HOLDERS, CABLE, ETC.
SHALL NOT BE ADHERED TO METAL EDGE COPING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT:
Project Director
Revisions: Date:
Drawing Title
Approved:
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Director
ES 1
LIGHTENING GROUNDING DETAILS BID DOCUMENTS
FULLY SPRINKLERED
REPLACE ROOF BLDG-98
AMBULANCE BAY & BLDG-58
CHILLER ROOF AREA
DANVILLE, IL
550-24-203
BLDG 58 & 98
11.16.2023
SCALE: NOT TO SCALEES 1
1 GROUND ROD DETAIL
SCALE: NOT TO SCALEES 1
2 AIR TERMINAL DETAIL
SCALE: NOT TO SCALEES 1
3 AIR TERMINAL AT CORNER DETAIL
SCALE: NOT TO SCALEES 1
4 TYPICAL 1 BOLT BONDING CONNECTOR DETAIL
SCALE: NOT TO SCALEES 1
8 EXPOSED DOWN CONDUCTOR DETAIL
SCALE: NOT TO SCALEES 1
7 TYPICAL "T" CONNECTOR DETAIL
SCALE: NOT TO SCALEES 1
5 LADDER BONDING DETAIL
SCALE: NOT TO SCALEES 1
6 AIR TERMINAL DETAIL
SCALE: NOT TO SCALEES 1
9 AIR TERMINAL DETAIL AT EXHAUST FAN/VENT DETAIL
SCALE: NOT TO SCALEES 1
10 TYPICAL VERTICAL AIR TERMINAL BASE
SCALE: NOT TO SCALEES 1
11 DOWN CONDUCTOR CONNECTION DETAIL
| Sheets and Views |
| Drawing1 - Layout1 |
| Drawing2 - Layout1 |
| Drawing3 - Layout1 |
| Drawing4 - Layout1 |
| Drawing5 - Layout1 |
| Drawing6 - Layout1 |
| Drawing7 - Layout1 |
| Drawing8 - Layout1 |
| Drawing9 - Layout1 |
| Drawing10 - Layout1 |
File details come from the government source that posted it. Updated .