5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-26-2022 676-22-2-6985-0017 676-21-111 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25222B0023 04-05-2022

X x x x

Amendment 00002 - see continuation pages for details.

Kristi Kluck Contracting Officer

CONTINUATION PAGE

SOL 36C25222B0023 – 676-21-111 Repair Sidewalks – Amendment 00002

Amendment 00002 hereby addresses the contractor questions outlined below:

I. Questions & Answers A. Do you have a list of total QTYs of the following? (4/11/2022)

1. SF of sidewalk to be removed and replaced or was the intent to remove and replace the entire sidewalk run from the West border limit to the East border limit?

VA REPLY: The only section not to be removed and replaced is between 2nd and 3rd street where the sidewalk is not cracked and broken. The corners of this segment are to receive new ADA ramps.

2. LF of sidewalk joints to be grinded.

VA REPLY: There is only one joint that appears to need grinding. The joint is 6’ wide. Other locations might be improved by grinding.

3. LF of C&G to be removed and replaced.

VA REPLY: It appears that all curb and gutter are satisfactory. One ADA ramp will require cutting into the curb on Task 5. The new ADA ramp on the west side of 2nd street may also require curb cutting under Task 1.

4. # of ADA ramps to be installed, are all truncated dome areas 2’x5’?

VA REPLY: One Type 1 and Six Type 3 ramps.

5. I saw Tasks 1A, 1B, and 3 are listed. What about Task 2? Are there more than 1-3 tasks, if so where are those located?

VA REPLY: Please see the full scope of work published on the SAM website. The text of the SOW shows six tasks. There are two appendices showing details and drawings.

B. Would it be acceptable to provide concrete paving for sub-task 6 in lieu of asphalt paving? (4/25/2022):

VA REPLY: Yes, concrete is acceptable (reinforced 4” or un-reinforced 6” thick).

II. Attached is a copy of the site-visit sign-in sheet.

Offeror due date has NOT changed; offers are due NLT Tuesday, May 10, 2022 at 12:45 CST.

(END OF DOCUMENT)

ATTACHMENTS:

See attached document: S06.2 Att1 676 21 111 Site Visit Sign-in Sheet.

File details come from the government source that posted it. Updated .