About this file

This document contains an amendment to a solicitation and responses to questions regarding a federal contract opportunity. The amendment changes the bid due date for solicitation 36C25221B0028 from August 26th to August 27th, 2021 at 11:00 AM. The solicitation is for a project at the Hines VA Medical Center in Hines, Illinois to ensure exhaust rooms 969, 970, and 970A comply with USP 800 standards. The estimated price range for construction is between $1 million and $2 million. The solicitation will be issued on or around July 8, 2021 with bid opening on or around August 12, 2021. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The Department of Veterans Affairs Veterans Health Administration is the contracting agency.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 578-21-3-6985-0326 578-21-027 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee

WI

53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee

WI

53214-1476 To all Offerors/Bidders

36C25221B0028 06-28-2021

X x x x Amendment 0002 • RFI Responses, • Bid due date is changed from August 26th 11am to August 27th, 2021 11am.

RFI questions due date has passed

See Continuation Page for additional details mack.taylor2@va.gov

Mack Taylor Contracting Officer

AMENDMENT TO SOLICITATION

Amendment A00002, Solicitation 36C25221B0028 578-21-027 - USP 800 Exhaust- Rms 969,970,970A at Hines VAMC, Hines, IL

Amendment consists of:

Bid due date and RFI responses (see below)

The following changes are hereby provided by amendment:

· RFI questions due date has passed

· Bid due date is changed from August 26th 11am to August 27th, 2021 11am.

Q1. Part of the bid is for new biological safety cabinets and laminar flow hoods. I have attached this specification...starts at page 5. The problem we have is this spec doesn't state the type of BSC, the size, or the options required. Not sure if you two can help. Your names were the only contacts listed. Can you help in providing a more detailed spec?

A1. This project does not require the purchase of new biological safety cabinets.

Q2. Are we capping off the recirculation vents in the mixing room?

A2. Yes, capped, and rebalanced. All airflow include exhaust no returned.

Q3. Are we adding NEMA 4 covers for the dampers on the roof?

A3. Yes. Damper controls.

Q4. Are we replacing the flex connector with a stainless-steel connecter?

A4. Yes. Replace with rigid stainless-steel duct.

Q5. Do we need to install new access doors where the old shut door is, it is going to be hard to match the tile from 40 years ago if we need to replace?

A5. If you have determined this will be your method of construction; then submit the same or a similar product for approval.

Q6. Please confirm work hours for this project are during regular hours.

A6. Yes, work will be conducted during regular work hours, unless specified by the COR to minimize interruption of facility operations.

Q7. Can you provide the contact for whomever holds the roofing warranty at the facility?

A7. The Roofing contractor is O’Neal roofing and Pine roofing.

Q8. Are we to assume that the laboratory fume hoods have contaminated the branch duct that we are to reuse? Need to determine PPE / risk involved with the reuse of this duct.

A8. No, these hoods have never been in service.

Q9. Since the trash chute is out of service, would demolition of the trash chute door and replacing with a larger access panel be considered? This would allow the prime contractor to access the chute more freely when rerouting the duct.

A9. Yes, it would be considered. All work methods and procedures must be submitted for approval.

Q10. Is the VA considering changing out the existing flex duct? It appears to be galvanized (from site visit). Stainless steel would provide a duct much more resistant to corrosion given that this duct is venting potentially corrosive fumes.

A10. Yes, the flex duct above the hoods are to be replaced and connected to the rigid duct above the ceiling.

Q11. Given that the prime contractor is owning the balancing of the system in Rooms 969 & 970, and the ante chamber between them, it is imperative to address another potential issue. The assumption is that larger exhaust fans will achieve the CFM necessary. Given information from the site visit, another potential issue could be the size and routing of the ductwork. You can hear the air whistling in those rooms through the ductwork. If the flex duct from the hood are both tied into the same branch duct, could the exhaust be choked down too much to achieve the needed flow? Just concerned that the design is thoroughly examined prior to simply installing larger exhaust fans. Sucking the air harder will just make the whistling louder and not let us achieve the CFM necessary. Has this been discussed?

A11. This theory can certainly be evaluated and discussed once the contract is awarded.

Q12. Is the steel framework for new fans being reused? Are the roof curbs being reused?

A12. Yes.

Q13. Is this project a design‐bid‐build project? We want to ensure this scope of work has been designed adequately to correct the issue at hand and that the ONUS is not put on prime contractors to correct the issue as a designer or engineer.

A13. No, this is not a design bid build project.

Q14. The scope of work states to anchor new ductwork in the trash chute. From the site visit, it seems like prime contractors would need to open the entire duct run from deck to deck to properly access the space to complete the work. Please confirm that this is the case, and that prime contractors should not assume access via the access door to complete this work.

A14. All work methods, processes, procedures, and materials must be submitted for approval, including but not limited to the installation of anchors, brackets, hangers, clamps, straps, and duct supports to properly suspend ductwork within the trash chute.

Q15. Will prime contractors have access to each room and location at the same time as one continuous phase? Can the rooms be out of service for the entire construction period, or will they need to be operable throughout the timeframe?

A15. The contractor must show where possession all rooms and locations for one continuous phase and at one time during the length of construction will benefit the VA. The contractor will submit a work plan for approval that will least likely interrupt facility operations.

Q16. With the current lead time of materials, we are worried that the PoP for pre‐construction at 45 days is too quick of a timeframe to procure the equipment. Will the VA consider an interim NTP to procure equipment and meet the overall 120d PoP timeframe?

A16. Any contract changes require the approval of the contracting officer.

Q17. Please confirm the size of the existing trash chute.

A17. The size of the existing chute is 24 inches.

Q18. Can stainless steel flex be used for hood connection?

A18. No.