36C25221B0009 0003.docx
DOCX document 21 KB Posted
- Attached to
- Z2LZ--Campus Line Striping Federal contract opportunity
- Solicitation number
- 36C25221B0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25221B0009 0002.docx | DOCX document | |
| S02 - Maps 2.pdf | ||
| S02 - Maps 1.pdf | ||
| 36C25221B0009 0001.docx | DOCX document | |
| 36C25221B0009_1.docx | DOCX document | |
| P07 - DBWD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
695-21-111 Campus Line Stripping Bidder RFIs
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 04-23-2021 No Change None 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee
WI
53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee
WI
53214-1476 To all Offerors/Bidders
36C25221B0009 04-23-2021
X X X
No Change X See Continuation Page(s) for changes/edits to this solicitation.
RYAN MCMILLIN
CONTRACTING OFFICER
Q1. Do the directional arrows (line item 3) require reflective beads?
A1. See SOW section 2.0 item A
Q2. Are all the lines included with line item 4 street paving and requiring reflective beads?
A2. See SOW section 2.0 item A
Q3. Is there an average length for crosswalk?
A3. The VA’s roads and parking lots are to be considered of average width and length and are constructed to code. Crosswalks should be priced per lane. Therefore, if the VA is requesting a two lane road (4 lanes all together), have a new crosswalk painted on it, that would be quantity 4.
Q4. Are handicap hatches considered with line item 4? I don't see a separate line item for hatches.
A4. 4-inch lines shown on sheet C-301 detail 16
Q5. Is the prime contractor and subcontractor required to submit the OSHA 300 and OSHA 300A, as well as our EMR rating? Or just the subcontractor ? If either parties do have to submit these logs, can we just submit the summary page ?
A5. Refer to page 25 of 74 in solicitation/ GLAC to answer
Q6. Can any work be done during normal daytime work shifts?
A6. Refer to SOW section 8
Q7. The parking space lines are specified to be alkyd or latex paint. Low VOC solvent-based paint is more durable and commonly used for pavement marking. Can Low VOC solvent-based paint be used on parking stripes?
A7. Refer to WIDOT specifications per SOW section 3; specifically, WIDOT Approved Products list: Pavement Marking/Delineators/Flexible Tubular Markers 2019
Q8. What does Item Number 0007, White Paint Striping Per Statement of Work, Quantity 30.00 EA include? The specifics of that line item are not provided. Is it hatched areas?
A8. This only applies to the option years as maintenance for up to 30 white lines per option year.
Q9. Which of the work items in the Price/Cost Schedule should include reflective beads in the paint?
A9. See SOW section 2.0 item A.
Q10. Do additional costs such as sweeping, pressure washing, supervision, and traffic control need to be included in the unit costs for each of the eight items on the “Price/Cost Schedule”?
A10. Refer to SOW section 2.0 item B.
Q11. There are no requirements indicated for removal of existing paint. In areas that have been previously painted will the new paint be applied over the old or does the paint need to be removed?
A11. Refer to SOW section 3.0 item B.
Q12. On page 44 of the solicitation the number of days to complete the work is “TBD”. What is the period of performance for the work?
A12. It is anticipated that each year’s task order will be awarded around May 1st. Once award is made the contractor will have a twenty-day pre-construction phase in which the contractor must do at least the following:
1. Submit bonds
1. Submit a schedule
1. Schedule and have pre-construction meeting with VA at a mutually agreeable time.
The construction phase shall begin after the twenty-day pre-construction phase and it is estimated that the construction phase shall be between 15-45 calendar days (depending on each order). Some orders could have more work to do and would be closer to 45 calendar days, while other years could include less work and would have a shorter period of performance.
Once completed and the VA accepts the work, a 15 day post-substantial completing phase will begin. In this phase, the contractor can dispose of their bonds for the task order and submit the final invoice.