- Z1DA--585-18-117 Upgrade Outbuilding Heating Systems Construction Iron Mountain VA Medical Center
- Solicitation number
- 36C25220B0016
About this file
36C25220B0016 S02 - Att5 Drawings 585-18-117.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25220B0016-0002000.docx | DOCX document | |
| 36C25220B0016-0001000.docx | DOCX document | |
| 36C25220B0016-004.pdf | ||
| 36C25220B0016-009.pdf | ||
| 36C25220B0016-008.pdf | ||
| 36C25220B0016-006.mov | MOV file | |
| 36C25220B0016-005.mov | MOV file | |
| 36C25220B0016-002.docx | DOCX document | |
| 36C25220B0016-011.pdf | ||
| 36C25220B0016-010.docx | DOCX document | |
| 36C25220B0016-003.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-002 B-003 B-004 B-0051
(1) PUMP (3) PUMPS
(1) PUMP (3) PUMPS
(1) PUMP (3) PUMPS
(1) PUMP (3) PUMPS
EX
EX EX
EX
BOILER BOILER BOILER BOILERCTRL
PNL CTRL
PNL
CTRL
PNL CTRL
PNLA A A A
EXISTING
PANEL TO
REMAIN
EXISTING
PANEL TO
REMAIN
EXISTING
PANEL TO
REMAIN
EXISTING
PANEL TO
REMAIN
EX
EX EX
EX
B B
B B
BOILER
A
EXISTING PANEL
TO REMAIN
B
BOILER CTRL PNL
B-001
(1) PUMP
(3) PUMPS
ELECTRICAL WORK PLANS
E101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
OUTBUILDING HEATING
SYSTEM
OSCAR G. JOHNSON VA HOSPITAL
4 AND 5
Project Director
03-29-2019Revisions: Date:
50% DESIGN SUBMITTAL 02-08-2019
5700.20
585-18-117
95% DESIGN SUBMITTAL 02-26-2019
100% DESIGN SUBMITTAL 03-18-2019
ISSUED FOR BIDDING 03-29-2019
E101
D3
BUILDING #5-BASEMENT NEW WORK
1/8" = 1'-0"
E101
F3
BUILDING #5-BASEMENT DEMOLITION WORK
1/8" = 1'-0"
E101
F7
BUILDING #4 DEMOLITION WORK
1/8" = 1'-0"
E101
D7
BUILDING #4 NEW WORK
1/8" = 1'-0"
(NEW WORK ONLY)
PLAN KEYED NOTES
PROVIDE ADDITIONAL 20 AMP, 120 VOLT DIRECT CONNECTION(S) TO
THE NEW BOILER(S). FROM THE BOILERS, CONNECT TO FOUR (4)
FRACTIONAL HORSEPOWER PUMPS. PROVIDE CONDUIT AND #12
CONDUCTORS AS REQUIRED. UTILIZE CIRCUITS SALVAGED FROM
DEMOLITION WORK. COORDINATE WITH MECHANICAL CONTRACTOR.
REFERENCE THE BOILER WIRING DIAGRAM.
A
(DEMOLITION WORK ONLY)
PLAN KEYED NOTES
DEMO 120V POWER TO BOILER, (3) PUMPS, AND BOILER CONTROL
PANEL. EXISTING POWER TO H.W. RECIRC. PUMP TO REMAIN.
REMOVE WIRING TO WATER HEATER SENSOR, HWS SENSOR, AND
BOILER LOW WATER CUT-OUT SALVAGE 24V WIRING TO OUTSIDE AIR
SENSOR AND ROOM THERMOSTAT FOR REUSE. REMOVE
TRANSFORMER AND WIRING.
(DEMOLITION WORK ONLY)
GENERAL NOTES
ALL EQUIPMENT SHOWN ON DEMOLITION PLAN IS TO BE
DISCONNECTED, UNLESS NOTED OTHERWISE.
ELECTRICAL SYMBOLS
PLAN NOTE
MOTOR - NO SCHEDULE REFERENCE
SPECIAL CONNECTION - NO SCHEDULE REFERENCE
ELECTRICAL PANEL
X
BOILER WIRING DIAGRAM
WIRE 24V HWS/HWR SENSORS FURNISHED BY BOILER MANUFACTURER.
WIRE 120V POWER TO BOILER PUMP.
PROVIDE NEW PROGRAMMABLE THERMOSTATS; HONEYWELL TH6220D
OR EQUAL. WIRE ASSOCIATED 120V ZONE PUMP.
WIRE LOW WATER CUT-OFF SENSOR FURNISHED BY BOILER
MANUFACTURER.
PROVIDE NEW 24V OA SENSOR.
WIRE 120V POWER.
PROVIDE TEMP SENSOR FOR DOMESTIC WATER HEATER AND WIRE
SENSOR AND 120V POWER TO PUMP.
B
M.L. N.P.
HWS
HWR
HWS
HWR
G
3 "
4"
EXISTING WATER
HEATER - SEE PP101
DEMO BOILER CONTROL
PANEL - SALVAGE OA
SENSOR AND ROOM STAT.
DEMO
BOILER
DEMO EXPANSION
TANK
D4
MH101
DEMO
VENTING
FD
D
HWS
HWR
HWS
HWR
G
NEW WATER
HEATER - SEE PP101
NEW
BOILER
(B-001)
NEW EXPANSION
TANK (ET-002)
D7
MH101
NEW VENTING PER
MANUFACTURERS
THRU EXISTING
HOLES.
FD
D
1"
1"
H
W
S
1 "
H W
R
H
W
R
H
W
S
H
W
S
1-1/4" TO 2ND FLOOR
1" TO 2ND FLOOR
C
W
TEMP.
SENSOR
LOW
WATER
CUTOUT
H
W
R
H
W
R
1" TO BSMT.
& 1ST FLOOR
1-1/4" TO BSMT.
& 1ST FLOOR
1 "
DEMO PRESSURE
REGULATING
DEMO (3) CIRC. PUMPS
W/ 24V THERMOSTAT
CONTROL
VALVE (12 PSI)
DEMO BACKFLOW
PREVENTER
WATTS 9D
4 GAL.
EXP TANK
DEMO BOILER
(BURNHAM RV6NSL)
EXISTING WATER HEATER
(40 GAL - INDIRECT)
D
DRAIN
PIPE
DEMO
3/4" GAS
DEMO
PIPING
DEMO
PIPING
DEMO
PIPING
NOTE: DEMO ALL EQUIPMENT
AND PIPING DASHED
CONDENSING
BOILER (B-001)
INDIRECT WATER
HEATER (SEE
PP101)
NEUTRALIZER
3/4" DRAIN TO
FLOOR DRAIN
TO VENT DUCT
PUMP
LOW
WATER
CUTOUT
EXP. TANK
C
W
NEW PRESSURE
REGULATING
VALVE (12 PSI)
NEW BACKFLOW
PREVENTER
WATTS 9D
AIR SEPERATOR
H
W
S
1 1/4" TO 2ND FLOOR
1 1/4" TO BSMT.
& 1ST FLOOR
H
W
S
NEW CONNECTION
PUMP
PUMP
1 "
1 "
1"
1 "
H
W
R
1 1/4" TO 2ND FLOOR
1 1/4" TO BSMT.
& 1ST FLOOR
H
W
R
NEW CONNECTION
(P-006)
(P-008)
(P-007)
(AS-002)
VENT
(ET-002)
12"
UNION &
DIRT LEG
G
NEW CONNECTION TO GAS
DRAIN
PUMP
(P-005)
NEW CONNECTION
TO FILL SYSTEM
PROVIDE NEW BYPASS PIPE AND
VALVES ON EXISTING FILL SYSTEM
-ALL NEW PIPING SHALL BE INSULATED.
BUILDING 4 - FLOOR PLANS AND
DIAGRAMS
MH101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
OUTBUILDING HEATING
SYSTEM
OSCAR G. JOHNSON VA HOSPITAL
4 AND 5
Project Director
03-29-2019Revisions: Date:
50% DESIGN SUBMITTAL 02-08-2019
5700.20
585-18-117
95% DESIGN SUBMITTAL 02-26-2019
100% DESIGN SUBMITTAL 03-18-2019
ISSUED FOR BIDDING 03-29-2019
MH101
F4
BUILDING 4 - BASEMENT FLOOR PLAN - DEMOLITION
1/8" = 1'-0"
MH101
F7
BUILDING 4 - BASEMENT FLOOR PLAN - NEW WORK
1/8" = 1'-0"
MH101
D4
BUILDING 4 - BOILER PIPING DIAGRAM - DEMOLITION
NO SCALE
MH101
F9
KEYPLAN
NO SCALE
N
N N
GENERAL SYMBOLS
NATURAL GASG
X=
OF PIPE, OR BOTTOM OF DUCT OR EQUIPMENT.
DISTANCE FROM FINISHED FLOOR TO CENTERLINE
WS
TB
SP
PRS
O.A.
FTR
DRGR
AP
E=
UNLESS OTHERWISE NOTED.
HUMIDITY SENSOR AT FOUR FEET ABOVE FINISHED FLOOR
LPCR
LPS
MPCR
MPS
HPCR
HPS
CPD
V
D
CWR
CWS
HWR
HWS
H
S
T
WALL SLEEVE
TIGHT TO BEAM
STATIC PRESSURE
PRESSURE REDUCING STATION
OUTSIDE AIR
FINNED TUBE RADIATION
DOOR GRILLE
ACCESS PANEL IN WALL OR CEILING
OR BOTTOM OF DUCT OR EQUIPMENT FROM DATUM.
ELEVATION - DISTANCE FROM CENTERLINE OF PIPE,
UNLESS OTHERWISE NOTED.
SWITCH AT FOUR FEET ABOVE FINISHED FLOOR
UNLESS OTHERWISE NOTED. (DIGITAL OR PNEUMATIC)
THERMOSTAT AT FOUR FEET ABOVE FINISHED FLOOR
PRESSURE GAUGE
THERMOMETER
STRAINER
BUTTERFLY VALVE
BALL VALVE
GATE OR GLOBE VALVE
RELIEF VALVE
CONTROL VALVES (3-WAY OR 2-WAY)
STEAM CONDENSATE TRAP
CAP PIPING
UNION
REDUCER OR INCREASER
AS DASHED SHALL BE REMOVED.
ANY OF THE ABOVE PIPING SYMBOLS INDICATED
WITH AN (X) IMPLIES PIPING IS EXISTING.
ANY OF THE ABOVE PIPING SYMBOLS INDICATED
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM (0-15 psi)
MEDIUM PRESSURE CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16-99 psi)
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM (100 psi +)
CONDENSATE PUMP DISCHARGE
VENT
DRAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HOT WATER RETURN (155°F)
HOT WATER SUPPLY (180°F)
FIRE RATED PIPE SLEEVE
FRPS
UNLESS NOTED OTHERWISE
UNO
TYPICAL
TYP.
PLUMBING TRADE
PT
GENERAL TRADE
GT
ELECTRICAL TRADE
ET
D OR P
LWT LEAVING WATER TEMPERATURE
MBTU 1,000 BRITISH THERMAL UNITS PER HOUR
IPLV INTEGRATED PART LOAD VALUE
BTUH
BRITISH THERMAL UNITS PER HOUR
CFM
CUBIC FEET PER MINUTE
CV
ENTERING WATER TEMPERATURE
EWT
FINS PER INCH
FPI
FEET PER MINUTE
FPM
FT
FEET
GALLONS PER MINUTE
GPM
HZ
HERTZ
HORSEPOWER
HP
LAT LEAVING AIR TEMPERATURE
MCA MINIMUM CIRCUIT AMPS
MERV MINIMUM EFFICIENCY REPORTING VALUE
MOCP MAXIMUM OVER CURRENT PROTECTION
NC
NO CHANGE REQUIRED
PSI
POUNDS PER SQUARE INCH
RLA
RUNNING LOAD AMPS
RPM
REVOLUTIONS PER MINUTE
SS
STAINLESS STEEL
TC
TEMPERATURE CONTROL
TSP
TOTAL STATIC PRESSURE
V
VENT
WPD
WATER PRESSURE DROP
A/E
ARCHITECT/ENGINEER
COP
COEFFICIENT OF PERFORMANCE
AFF
ABOVE FINISHED FLOOR
D
DOWN
F&T
FLOAT & THERMOSTAT TRAP
FLEXIBLE
FLEX
GAUGE
GA
IFBP INTERNAL FACE AND BYPASS
FLOW COEFFICIENT
BF
BOILER FEED
CHECK VALVE
BALANCE VALVE
EXPANSION VALVE
TRIPLE DUTY VALVE
SOLENOID VALVE
AREA OF
WORK
MH101
D7
BUILDING 4 - BOILER PIPING DIAGRAM - NEW WORK
NO SCALE
J.G.D. K.K.S.
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text 002-4
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
UNEXCAVATED
AutoCAD SHX Text
AutoCAD SHX Text 003-4
AutoCAD SHX Text
MECH. ROOM
AutoCAD SHX Text
AutoCAD SHX Text
UNEXCAVATED
AutoCAD SHX Text
AutoCAD SHX Text 001-4
AutoCAD SHX Text
HOMELESS STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text 002-4
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
UNEXCAVATED
AutoCAD SHX Text
AutoCAD SHX Text 003-4
AutoCAD SHX Text
MECH. ROOM
AutoCAD SHX Text
AutoCAD SHX Text
UNEXCAVATED
AutoCAD SHX Text
AutoCAD SHX Text 001-4
AutoCAD SHX Text
HOMELESS STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
BLDG 5
AutoCAD SHX Text
BLDG 4
AutoCAD SHX Text
TUNNEL
AutoCAD SHX Text
TUNNEL
AutoCAD SHX Text
BLDG 11
AutoCAD SHX Text
BLDG 4
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SMOKER
AutoCAD SHX Text #17
AutoCAD SHX Text
SMOKER
AutoCAD SHX Text #18
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
H
W
S
1 "
H W
R
H
W
R
H
W
S
H
W
S
1" TO 2ND FLOOR
DEMO (3) CIRC. PUMPS
W/ 24V THERMOSTAT
CONTROL
C
W
TEMP.
SENSOR
LOW
WATER
CUTOUT
H
W
R
H
W
R
1" TO BSMT.
& 1ST FLOOR
1" TO BSMT.
& 1ST FLOOR
1 "
DEMO PRESSURE
REGULATING VALVE
AND VALVES (12 PSI)
DEMO BACKFLOW
PREVENTER
WATTS 9D
4 GAL.
EXP TANK
DEMO BOILER
(BURNHAM RV5NSL)
EXISTING WATER HEATER
(40 GAL - INDIRECT)
D
DRAIN
PIPE
1" TO 2ND FLOOR
DEMO
3/4" GAS
DEMO
PIPING
DEMO
PIPING
DEMO
PIPING
NOTE: DEMO ALL EQUIPMENT
AND PIPING DASHED
H W
R
H W
S
H W
R
H W
S
3"
3 "
D
UP TO 2ND FLOOR
HWR
HWS
HWS
HWR
H W
R
H W
S
H W
R
H W
S
G
3"
3 "
D
UP TO 2ND FLOOR
HWR
HWS
HWS
HWR
H W
R
H W
S
H W
R
H W
S
3"
3 "
D
UP TO 2ND FLOOR
HWR
HWS
HWS
HWR
H W
R
H W
S
H W
R
H W
S
G
3"
3 "
D
UP TO 2ND FLOOR
HWR
HWS
HWS
HWR
DEMO VENTING DEMO VENTING DEMO VENTING
EXISTING
BOILER
EXISTING WATER
HEATER - SEE PP102
D4
MH102
EXISTING WATER
HEATER - SEE PP102
EXISTING
BOILER
D4
MH102
EXISTING
BOILER
EXISTING WATER
HEATER - SEE PP102
D4
MH102
EXISTING WATER
HEATER - SEE PP102
EXISTING
BOILER
D4
MH102
DEMO BOILER CONTROL
PANEL. SALVAGE OA
SENSOR AND ROOM STAT.
DEMO BOILER CONTROL
PANEL. SALVAGE OA
SENSOR AND ROOM STAT.
DEMO BOILER CONTROL
PANEL. SALVAGE OA
SENSOR AND ROOM STAT.
DEMO BOILER CONTROL
PANEL. SALVAGE OA
SENSOR AND ROOM STAT.
H W
R
H W
S
H W
R
H W
S
UP TO 2ND FLOOR
HWS
HWS
HWR
H W
R
H W
S
H W
R
H W
S
G
UP TO 2ND FLOOR
HWS
HWS
HWR
H W
R
H W
S
H W
R
H W
S
UP TO 2ND FLOOR
HWS
HWS
HWR
H W
R
H W
S
H W
R
H W
S
G
UP TO 2ND FLOOR
HWS
HWS
HWR
D
HWR
D
HWR
D
HWR
D
HWR
NEW WATER
HEATER - SEE PP102
NEW WATER
HEATER - SEE PP102
NEW WATER HEATER -
SEE PP102
NEW WATER HEATER -
SEE PP102
NEW BOILER
(B-003)
NEW BOILER
(B-002)
NEW BOILER
(B-004)
NEW BOILER
(B-005)
D7
MH102
D7
MH102
D7
MH102
D7
MH102
NEW VENTING PER
MANUFACTURER
THRU EXISTING
HOLES
NEW VENTING PER
MANUFACTURER
THRU EXISTING
HOLES
NEW VENTING PER
MANUFACTURER
THRU EXISTING
HOLES
NEW VENTING PER
MANUFACTURER
THRU EXISTING
HOLES
CONDENSING BOILER
(B-002 TO B-004)
INDIRECT WATER
HEATER (SEE
PP102)
NEUTRALIZER
3/4" DRAIN TO
FLOOR DRAIN
TO VENT DUCT
PUMP
LOW
WATER
CUTOUT
EXP. TANK
C
W
NEW PRESSURE
REGULATING
VALVE (12 PSI)
NEW BACKFLOW
PREVENTER
WATTS 9D
AIR SEPERATOR
H
W
S
1" TO 2ND FLOOR
1" TO BSMT.
& 1ST FLOOR
H
W
S
NEW CONNECTION
PUMP
PUMP
1 "
1 "
1"
1 "
H
W
R
1" TO 2ND FLOOR
1" TO BSMT.
& 1ST FLOOR
H
W
R
NEW CONNECTION
(P-003)
(ET-001)
P-002)
(P-004)
(AS-001)
VENT
PUMP
(P-001)
DRAIN
12"
NEW CONNECTION
TO FILL SYSTEM
UNION &
DIRT LEG
G
NEW CONNECTION TO GAS
- ALL NEW PIPING SHALL
BE INUSLATED.
BUILDING 5 - FLOOR PLANS AND
DIAGRAMS
MH102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
OUTBUILDING HEATING
SYSTEM
OSCAR G. JOHNSON VA HOSPITAL
4 AND 5
Project Director
03-29-2019Revisions: Date:
50% DESIGN SUBMITTAL 02-08-2019
5700.20
585-18-117
95% DESIGN SUBMITTAL 02-26-2019
100% DESIGN SUBMITTAL 03-18-2019
ISSUED FOR BIDDING 03-29-2019
GENERAL SYMBOLS
NATURAL GASG
X=
OF PIPE, OR BOTTOM OF DUCT OR EQUIPMENT.
DISTANCE FROM FINISHED FLOOR TO CENTERLINE
WS
TB
SP
PRS
O.A.
FTR
DRGR
AP
E=
UNLESS OTHERWISE NOTED.
HUMIDITY SENSOR AT FOUR FEET ABOVE FINISHED FLOOR
LPCR
LPS
MPCR
MPS
HPCR
HPS
CPD
V
D
CWR
CWS
HWR
HWS
H
S
T
WALL SLEEVE
TIGHT TO BEAM
STATIC PRESSURE
PRESSURE REDUCING STATION
OUTSIDE AIR
FINNED TUBE RADIATION
DOOR GRILLE
ACCESS PANEL IN WALL OR CEILING
OR BOTTOM OF DUCT OR EQUIPMENT FROM DATUM.
ELEVATION - DISTANCE FROM CENTERLINE OF PIPE,
UNLESS OTHERWISE NOTED.
SWITCH AT FOUR FEET ABOVE FINISHED FLOOR
UNLESS OTHERWISE NOTED. (DIGITAL OR PNEUMATIC)
THERMOSTAT AT FOUR FEET ABOVE FINISHED FLOOR
PRESSURE GAUGE
THERMOMETER
STRAINER
BUTTERFLY VALVE
BALL VALVE
GATE OR GLOBE VALVE
RELIEF VALVE
CONTROL VALVES (3-WAY OR 2-WAY)
STEAM CONDENSATE TRAP
CAP PIPING
UNION
REDUCER OR INCREASER
AS DASHED SHALL BE REMOVED.
ANY OF THE ABOVE PIPING SYMBOLS INDICATED
WITH AN (X) IMPLIES PIPING IS EXISTING.
ANY OF THE ABOVE PIPING SYMBOLS INDICATED
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM (0-15 psi)
MEDIUM PRESSURE CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16-99 psi)
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM (100 psi +)
CONDENSATE PUMP DISCHARGE
VENT
DRAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HOT WATER RETURN (155°F)
HOT WATER SUPPLY (180°F)
FIRE RATED PIPE SLEEVE
FRPS
UNLESS NOTED OTHERWISE
UNO
TYPICAL
TYP.
PLUMBING TRADE
PT
GENERAL TRADE
GT
ELECTRICAL TRADE
ET
D OR P
LWT LEAVING WATER TEMPERATURE
MBTU 1,000 BRITISH THERMAL UNITS PER HOUR
IPLV INTEGRATED PART LOAD VALUE
BTUH
BRITISH THERMAL UNITS PER HOUR
CFM
CUBIC FEET PER MINUTE
CV
ENTERING WATER TEMPERATURE
EWT
FINS PER INCH
FPI
FEET PER MINUTE
FPM
FT
FEET
GALLONS PER MINUTE
GPM
HZ
HERTZ
HORSEPOWER
HP
LAT LEAVING AIR TEMPERATURE
MCA MINIMUM CIRCUIT AMPS
MERV MINIMUM EFFICIENCY REPORTING VALUE
MOCP MAXIMUM OVER CURRENT PROTECTION
NC
NO CHANGE REQUIRED
PSI
POUNDS PER SQUARE INCH
RLA
RUNNING LOAD AMPS
RPM
REVOLUTIONS PER MINUTE
SS
STAINLESS STEEL
TC
TEMPERATURE CONTROL
TSP
TOTAL STATIC PRESSURE
V
VENT
WPD
WATER PRESSURE DROP
A/E
ARCHITECT/ENGINEER
COP
COEFFICIENT OF PERFORMANCE
AFF
ABOVE FINISHED FLOOR
D
DOWN
F&T
FLOAT & THERMOSTAT TRAP
FLEXIBLE
FLEX
GAUGE
GA
IFBP INTERNAL FACE AND BYPASS
FLOW COEFFICIENT
BF
BOILER FEED
CHECK VALVE
BALANCE VALVE
EXPANSION VALVE
TRIPLE DUTY VALVE
SOLENOID VALVE
MH102
D4
BUILDING 5 - BOILER PIPING DIAGRAM - DEMOLITION
NO SCALE
MH102
F2
BUILDING 5 - BASEMENT FLOOR PLAN - DEMOLITION
1/8" = 1'-0"
MH102
F5
BUILDING 5 - BASEMENT FLOOR PLAN - NEW WORK
1/8" = 1'-0"
N
MH102
F9
KEYPLAN
NO SCALE
NN
AREA OF
WORK
MH102
D7
BUILDING 5 - BOILER PIPING DIAGRAM - NEW WORK
NO SCALE
J.G.D. K.K.S.
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-1
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-1
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/1
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-2
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-2
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/2
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-3
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-3
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/3
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-4
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-4
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-1
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-1
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/1
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-2
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-2
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/2
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-3
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-3
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/3
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-4
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-4
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
BLDG 5
AutoCAD SHX Text
BLDG 4
AutoCAD SHX Text
TUNNEL
AutoCAD SHX Text
TUNNEL
AutoCAD SHX Text
BLDG 11
AutoCAD SHX Text
BLDG 4
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SMOKER
AutoCAD SHX Text #17
AutoCAD SHX Text
SMOKER
AutoCAD SHX Text #18
AutoCAD SHX Text X
AutoCAD SHX Text X
X
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
1312 14
[125] [100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 2418 14 16128
1064 532 2 1/2 1 1/2
1 1 1/4
[9100] [9600][8500] [7600] [8200][7000][5800] [6700]
[5200][4100] [4900][3700][3000] [3400][2700]
[2100]
[4900]
[4100][3700] [4000]
[3000][2400][1800] [1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000
LB. [453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE
43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
BAND
1-5/8" [43mm] 12 GAUGE
CHANNEL OR 2"x2"x1/4"
[50x50x6.4mm] ANGLE
1/2" [15mm] DIA.
HANGER RODS WITH
36" [900mm] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm] m m
M
A X
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
SCHEDULES AND DETAILS
MH501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
OUTBUILDING HEATING
SYSTEM
OSCAR G. JOHNSON VA HOSPITAL
4 AND 5
Project Director
03-29-2019Revisions: Date:
50% DESIGN SUBMITTAL 02-08-2019
5700.20
585-18-117
95% DESIGN SUBMITTAL 02-26-2019
100% DESIGN SUBMITTAL 03-18-2019
ISSUED FOR BIDDING 03-29-2019
BOILER SCHEDULE
AIR DIRT ELIMINATION SCHEDULE
EXPANSION TANK SCHEDULE
MH501
F8
PIPE HANGER
NO SCALE
PUMP SCHEDULE
J.G.D. K.K.S.
TAG LOCATION SYSTEM MANUFACTURER MODEL No.
CONN. SIZE SYSTEM FLOW MAX P.D. DRAIN SIZE
MINIMUM
DIMENSIONS
NOTES
OPER.
WEIGHT
REMARKS
INCH GPM FT INCH
H x D x LF (INCH)
LBS
AS-001
APARTMENT HOT WATER SPIROTHERM VDR 1 1/4" 15 1 1/2 14x3x8.6 1 TO 9 9
(4-TOTAL)
AS-002
OFFICE HOT WATER SPIROTHERM VDR 1 1/2" 30 1 1/2 14x3x8.6 1 TO 9 9
REMARKS:
1. PROVIDE COALESCING TYPE SEPARATORS. CENTRIFUGAL TYPE NOT ACCEPTED.
2. VESSEL SHALL BE RATED FOR 150# WORKING PRESSURE AND BE FURNISHED WITH CLASS 150 STEEL WELD-NECK RAISED-FACE FLANGES.
3. UNIT SHALL INCLUDE AN INTERNAL COPPER BUNDLE FILLING THE ENTIRE VESSEL.
4. VESSELS WITH LOOSE OR PARTIALLY FILLED INTERNAL MEDIA NOT ACCEPTABLE.
5. UNIT SHALL REMOVE 100% OF FREE AND ENTRAINED AIR AND 99.6% OF DISSOLVED AIR AS TESTED BY INDEPENDENT LAB.
6. UNIT SHALL REMOVE 80% OF THE 30 MICRON PARTICLES IN 100 CIRCULATIONS. UNIT CAPABLE OF 5 MICRON PARTICLE SIZE REMOVAL.
7. TEMPERATURE, PRESSURE, AND FLOW VELOCITY MUST BE HELD CONSTANT DURING INDEPENDENT PERFORMANCE TESTS.
8. PROVIDE INTEGRAL FULL PORT FLOAT ACTUATED BRASS VENTING MECHANISM.
9. OR APPROVED EQUAL.
ITEM LOCATION * MANUFACTURER MODEL
INPUT (MBH)
OUTPUT
(MBH)
GPM
EWT (°F) LWT (°F)
WPD FT.
HEAD
NAT. GAS
(IN. WG.)
TURNDOWN
RELIEF
VALVE
EFF @ 140°
EWT (%)
VOLT/PHASE NOTES SIZE
WEIGHT
(LBS)
WATER
VOLUME
VENT SIZE REMARKS
B-001 OFFICE WEIL-McLAIN EVG-220 220 194 20 140 160 5 MAX. 11 10:1 30 PSI 88 120/1 1 TO 4 45x23x23 215 4.6 4" 95% CONDENSING
B-002 APARTMENT WEIL-McLAIN EVG-155 155 137 14 140 160 5 MAX. 11 5:1 30 PSI 88 120/1 1 TO 4 41x18x18 145 3.2 3" 95% CONDENSING
B-003 APARTMENT WEIL-McLAIN EVG-155 155 137 14 140 160 5 MAX. 11 5:1 30 PSI 88 120/1 1 TO 4 41x18x18 145 3.2 3" 95% CONDENSING
B-004 APARTMENT WEIL-McLAIN EVG-155 155 137 14 140 160 5 MAX. 11 5:1 30 PSI 88 120/1 1 TO 4 41x18x18 145 3.2 3" 95% CONDENSING
B-005 APARTMENT WEIL-McLAIN EVG-155 155 137 14 140 160 5 MAX. 11 5:1 30 PSI 88 120/1 1 TO 4 41x18x18 145 3.2 3" 95% CONDENSING
NOTES
1. CONDENSATE NEUTRALIZING KIT
2. MATCH PUMP P-001 AND P-005 TO BOILER PRESSURE PLUS 5 FEET.
3. FLOOR STAND.
4. BOILERS CAPABLE OF OPERATION FROM 100°F TO 180°F.
* OR APPROVED EQUAL.
ITEM LOCATION SERVICE TYPE
TANK
VOLUME
(GAL)
TANK
ACCEPTANCE
VOLUME
(GAL)
DIAMETER
(IN)
HEIGHT /
LENGTH
(IN)
MAX
PRESSURE
(PSIG)
DESIGN
CODE
SUPPORT
SYSTEM FILL
PRESSURE
(PSIG)
SYSTEM RELIEF
PRESSURE (PSIG)
APPROX.
OPER. WEIGHT
(LBS)
REMARKS
ET-001
APARTMENT HEATING DIAPHRAGM 4.4 2.5 11 15 100 ASME PIPE 12 30 9
B&G HFT-30 (4-TOTAL)*
ET-002
OFFICE HEATING DIAPHRAGM 4.4 2.5 11 15 100 ASME PIPE 12 30 9 B&G HFT-30*
* OR APPROVED EQUAL.
ITEM LOCATION FLANGE SIZE
SYSTEM AND/OR
SERVICE
TYPE
CIRCULATING FLUID
MIN % EFF.
MOTOR
REMARKS
FLUID
FLOW HEAD
NPSH
AVAILABLE
TEMPERATURE
SP GR
NOMINAL
POWER
PHASE VOLT MAX RPM
SPPED
CONTROL
GPM FT FT °F HP
P-001 APARTMENT 1 1/4" BOILER BOOSTER INLINE WATER 10 10 1 170 1 125 WATT 1 120V 2950 CONSTANT
B&G NRF-33 (4-TOTAL)*
1.1 FLA
P-002 APARTMENT 1" BLDG. HEAT BOOSTER INLINE WATER 7 11 1 170 1 92 WATT 1 120V 2940 CONSTANT
B&G NRF-22 (4-TOTAL)*
.8 FLA
P-003
APARTMENT 1"
INDIRECT WATER
HEATER
BOOSTER INLINE WATER 8 9 1 170 1 92 WATT 1 120V 2940 CONSTANT
B&G NRF-22 (4-TOTAL)*
.8 FLA
P-004 APARTMENT 1" BLDG. HEAT BOOSTER INLINE WATER 7 11 1 170 1 92 WATT 1 120V 2940 CONSTANT
B&G NRF-22 (4-TOTAL)*
.8 FLA
P-005 OFFICE 1 1/2" BOILER BOOSTER INLINE WATER 15 10 1 170 1 1/6 HP 1 120V 3400 CONSTANT
B&G PL-75*
2.1 FLA
P-006 OFFICE 1 1/4" BLDG. HEAT BOOSTER INLINE WATER 10 10 1 170 1 125 WATT 1 120V 2950 CONSTANT
B&G NRF-33*
1.1 FLA
P-007 OFFICE 1" INDIRECT HEATER BOOSTER INLINE WATER 8 9 1 170 1 92 WATT 1 120V 2940 CONSTANT
B&G NRF-22*
.8 FLA
P-008 OFFICE 1 1/4" BLDG. HEAT BOOSTER INLINE WATER 10 10 1 170 1 125 WATT 1 120V 2950 CONSTANT
B&G NRF-33*
1.1 FLA
* OR APPROVED EQUAL.
V
H W
C W
H
W
R
AQUASTAT
EXISTING
RECIRC PUMP
B&G NBF-8S
NOTE:
DEMO ALL EQUIPMENT AND
PIPING SHOWN DASHED.
REMOVE EXISTING
WATER HEATER
(40 GAL - INDIRECT)
TEMPERATURE SENSOR
TO CONTROL HEATING
PUMP
REMOVE 2 GALLON
EXPANSION TANK
HW
CW
HWR
HW
CW
HWR
HW
CW
HWR
HW
CW
HWR
REMOVE WATER
HEATER(S) AND PIPING
REMOVE WATER
HEATER(S) AND PIPING
D4
PP102
D4
PP102
HW
CW
HWR
HW
CW
HWR
HW
CW
HWR
HW
CW
HWR
NEW WATER
HEATER(S)
AND PIPING
NEW WATER
HEATER(S)
AND PIPING
D5
PP102
D5
PP102
PROVIDE 30x30x4
CONCRETE PAD
PROVIDE 30x30x4
CONCRETE PAD
V
H W
C W
H
W
R
AQUASTAT
EXISTING
RECIRC PUMP
B&G NBF-8S
NEW WATER HEATER
(45 GAL - INDIRECT FIRED)
TEMPERATURE SENSOR
TO CONTROL HEATING
PUMP
NEW 2 GALLON
EXPANSION TANK
RELIEF VALVE
UNION(S) (TYP.)
NEW 3/4" TMV
NEW CONN.
NEW CONN.
BUILDING 5 - FLOOR PLANS AND
DIAGRAMS
PP102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
OUTBUILDING HEATING
SYSTEM
OSCAR G. JOHNSON VA HOSPITAL
4 AND 5
Project Director
03-29-2019Revisions: Date:
50% DESIGN SUBMITTAL 02-08-2019
5700.20
585-18-117
95% DESIGN SUBMITTAL 02-26-2019
100% DESIGN SUBMITTAL 03-18-2019
ISSUED FOR BIDDING 03-29-2019
N
PP102
F9
KEYPLAN
NO SCALE
NN
AREA OF
WORK
PLUMBING SYMBOLS
WATER CLOSET
WASTE STACK
WASTE PIPING
WALL CLEANOUT
STORM OR CLEARWATER PIPING
SANITARY SEWER
JANITOR'S CURB
FLOOR DRAIN
FLOOR CLEANOUT
VS
WC
WS
W
W.CO
VT
VENT STACK
VENT
ST
SS
SH
SAN
SOIL STACK
SHOWER
LAV / L
JC
HD
FD
F.CO
LAVATORY
HUB DRAIN
CIRCUIT SETTER
BACKFLOW PREVENTER
SHEET DETAIL OR DIAGRAM IS DRAWN ON
DETAIL OR DIAGRAM NUMBER
ROOM NUMBER
ELECTRIC WATER COOLER
CIRCUIT VENT
ACCESS PANEL
THERMOMETER
TYPICAL FIXTURE STOP
WATER HAMMER ARRESTOR
FLOOR CLEANOUT
CHECK VALVE
ARROW INDICATES DIRECTION OF FLOW IN
DISTRIBUTION OR DRAINAGE PIPING
EXISTING PIPING TO BE REMOVED OR ABANDONED
-SEE PLAN FOR NOTES
CO
EWC
BFP
C.VT
CLEANOUT
AP
CORE DRILL
BALL VALVE
HOT WATER RECIRCULATION PIPING [HWR]
HOT WATER DISTRIBUTION PIPING [HW] (110°-120°F)
COLD WATER MAIN OR DISTRIBUTION PIPING [CW]
STORM AND CLEARWATER DRAINAGE PIPING [ST.]
SANITARY VENT PIPING [VT.]
SANITARY PIPING [SAN.]
H/CW HOT AND COLD WATER
WET VENTW.VT
KEYED PLAN NOTE
A1
P101
CLEANOUT
AIR GAP WASTEAGW
OR
OR
GATE VALVE
BUTTERFLY VALVE
PP102
D4
BUILDING 5 - DOMESTIC WATER HEATER - DEMOLITION
NO SCALE
PP102
F2
BUILDING 5 - BASEMENT FLOOR PLAN - DEMOLITION
1/8" = 1'-0"
PP102
F5
BUILDING 5 - BASEMENT FLOOR PLAN - NEW WORK
1/8" = 1'-0"
PP102
D5
BUILDING 5 - DOMESTIC WATER HEATER - NEW WORK
NO SCALE
RELIEF VALVE
J.G.D. K.K.S.
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-1
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-1
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/1
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-2
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-2
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/2
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-3
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-3
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/3
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-4
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-4
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-1
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-1
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/1
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-2
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-2
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/2
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-3
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-3
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text 002A/5/3
AutoCAD SHX Text
MAIN AREA
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 001-5-4
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text 002-5-4
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
BLDG 5
AutoCAD SHX Text
BLDG 4
AutoCAD SHX Text
TUNNEL
AutoCAD SHX Text
TUNNEL
AutoCAD SHX Text
BLDG 11
AutoCAD SHX Text
BLDG 4
AutoCAD SHX Text
BLDG 8
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SMOKER
AutoCAD SHX Text #17
AutoCAD SHX Text
SMOKER
#18
| E101 - ELECTRICAL NEW WORK PLANS |
| E101 |
| MH101 BUILDING 4 - FLOOR PLANS AND DIAGRAMS |
| MH102 BUILDING 5 - FLOOR PLANS AND DIAGRAMS |
| MH501 SCHEDULES AND DETAILS |
| PP101 BUILDING 4 - FLOOR PLANS AND DIAGRAMS |
| PP102 BUILDING 5 - FLOOR PLANS AND DIAGRAMS |