About this file

36C25220B0016 S02 - Att5 Drawings 585-18-117.pdf

View the file

Other files

File Type Posted
36C25220B0016-0002000.docx DOCX document
36C25220B0016-0001000.docx DOCX document
36C25220B0016-004.pdf PDF
36C25220B0016-009.pdf PDF
36C25220B0016-008.pdf PDF
36C25220B0016-006.mov MOV file
36C25220B0016-005.mov MOV file
36C25220B0016-002.docx DOCX document
36C25220B0016-011.pdf PDF
36C25220B0016-010.docx DOCX document
36C25220B0016-003.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-002 B-003 B-004 B-0051

(1) PUMP (3) PUMPS

(1) PUMP (3) PUMPS

(1) PUMP (3) PUMPS

(1) PUMP (3) PUMPS

EX

EX EX

EX

BOILER BOILER BOILER BOILERCTRL

PNL CTRL

PNL

CTRL

PNL CTRL

PNLA A A A

EXISTING

PANEL TO

REMAIN

EXISTING

PANEL TO

REMAIN

EXISTING

PANEL TO

REMAIN

EXISTING

PANEL TO

REMAIN

EX

EX EX

EX

B B

B B

BOILER

A

EXISTING PANEL

TO REMAIN

B

BOILER CTRL PNL

B-001

(1) PUMP

(3) PUMPS

ELECTRICAL WORK PLANS

E101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

OUTBUILDING HEATING

SYSTEM

OSCAR G. JOHNSON VA HOSPITAL

4 AND 5

Project Director

03-29-2019Revisions: Date:

50% DESIGN SUBMITTAL 02-08-2019

5700.20

585-18-117

95% DESIGN SUBMITTAL 02-26-2019

100% DESIGN SUBMITTAL 03-18-2019

ISSUED FOR BIDDING 03-29-2019

E101

D3

BUILDING #5-BASEMENT NEW WORK

1/8" = 1'-0"

E101

F3

BUILDING #5-BASEMENT DEMOLITION WORK

1/8" = 1'-0"

E101

F7

BUILDING #4 DEMOLITION WORK

1/8" = 1'-0"

E101

D7

BUILDING #4 NEW WORK

1/8" = 1'-0"

(NEW WORK ONLY)

PLAN KEYED NOTES

PROVIDE ADDITIONAL 20 AMP, 120 VOLT DIRECT CONNECTION(S) TO

THE NEW BOILER(S). FROM THE BOILERS, CONNECT TO FOUR (4)

FRACTIONAL HORSEPOWER PUMPS. PROVIDE CONDUIT AND #12

CONDUCTORS AS REQUIRED. UTILIZE CIRCUITS SALVAGED FROM

DEMOLITION WORK. COORDINATE WITH MECHANICAL CONTRACTOR.

REFERENCE THE BOILER WIRING DIAGRAM.

A

(DEMOLITION WORK ONLY)

PLAN KEYED NOTES

DEMO 120V POWER TO BOILER, (3) PUMPS, AND BOILER CONTROL

PANEL. EXISTING POWER TO H.W. RECIRC. PUMP TO REMAIN.

REMOVE WIRING TO WATER HEATER SENSOR, HWS SENSOR, AND

BOILER LOW WATER CUT-OUT SALVAGE 24V WIRING TO OUTSIDE AIR

SENSOR AND ROOM THERMOSTAT FOR REUSE. REMOVE

TRANSFORMER AND WIRING.

(DEMOLITION WORK ONLY)

GENERAL NOTES

ALL EQUIPMENT SHOWN ON DEMOLITION PLAN IS TO BE

DISCONNECTED, UNLESS NOTED OTHERWISE.

ELECTRICAL SYMBOLS

PLAN NOTE

MOTOR - NO SCHEDULE REFERENCE

SPECIAL CONNECTION - NO SCHEDULE REFERENCE

ELECTRICAL PANEL

X

BOILER WIRING DIAGRAM

WIRE 24V HWS/HWR SENSORS FURNISHED BY BOILER MANUFACTURER.

WIRE 120V POWER TO BOILER PUMP.

PROVIDE NEW PROGRAMMABLE THERMOSTATS; HONEYWELL TH6220D

OR EQUAL. WIRE ASSOCIATED 120V ZONE PUMP.

WIRE LOW WATER CUT-OFF SENSOR FURNISHED BY BOILER

MANUFACTURER.

PROVIDE NEW 24V OA SENSOR.

WIRE 120V POWER.

PROVIDE TEMP SENSOR FOR DOMESTIC WATER HEATER AND WIRE

SENSOR AND 120V POWER TO PUMP.

B

M.L. N.P.

HWS

HWR

HWS

HWR

G

3 "

4"

EXISTING WATER

HEATER - SEE PP101

DEMO BOILER CONTROL

PANEL - SALVAGE OA

SENSOR AND ROOM STAT.

DEMO

BOILER

DEMO EXPANSION

TANK

D4

MH101

DEMO

VENTING

FD

D

HWS

HWR

HWS

HWR

G

NEW WATER

HEATER - SEE PP101

NEW

BOILER

(B-001)

NEW EXPANSION

TANK (ET-002)

D7

MH101

NEW VENTING PER

MANUFACTURERS

THRU EXISTING

HOLES.

FD

D

1"

1"

H

W

S

1 "

H W

R

H

W

R

H

W

S

H

W

S

1-1/4" TO 2ND FLOOR

1" TO 2ND FLOOR

C

W

TEMP.

SENSOR

LOW

WATER

CUTOUT

H

W

R

H

W

R

1" TO BSMT.

& 1ST FLOOR

1-1/4" TO BSMT.

& 1ST FLOOR

1 "

DEMO PRESSURE

REGULATING

DEMO (3) CIRC. PUMPS

W/ 24V THERMOSTAT

CONTROL

VALVE (12 PSI)

DEMO BACKFLOW

PREVENTER

WATTS 9D

4 GAL.

EXP TANK

DEMO BOILER

(BURNHAM RV6NSL)

EXISTING WATER HEATER

(40 GAL - INDIRECT)

D

DRAIN

PIPE

DEMO

3/4" GAS

DEMO

PIPING

DEMO

PIPING

DEMO

PIPING

NOTE: DEMO ALL EQUIPMENT

AND PIPING DASHED

CONDENSING

BOILER (B-001)

INDIRECT WATER

HEATER (SEE

PP101)

NEUTRALIZER

3/4" DRAIN TO

FLOOR DRAIN

TO VENT DUCT

PUMP

LOW

WATER

CUTOUT

EXP. TANK

C

W

NEW PRESSURE

REGULATING

VALVE (12 PSI)

NEW BACKFLOW

PREVENTER

WATTS 9D

AIR SEPERATOR

H

W

S

1 1/4" TO 2ND FLOOR

1 1/4" TO BSMT.

& 1ST FLOOR

H

W

S

NEW CONNECTION

PUMP

PUMP

1 "

1 "

1"

1 "

H

W

R

1 1/4" TO 2ND FLOOR

1 1/4" TO BSMT.

& 1ST FLOOR

H

W

R

NEW CONNECTION

(P-006)

(P-008)

(P-007)

(AS-002)

VENT

(ET-002)

12"

UNION &

DIRT LEG

G

NEW CONNECTION TO GAS

DRAIN

PUMP

(P-005)

NEW CONNECTION

TO FILL SYSTEM

PROVIDE NEW BYPASS PIPE AND

VALVES ON EXISTING FILL SYSTEM

-ALL NEW PIPING SHALL BE INSULATED.

BUILDING 4 - FLOOR PLANS AND

DIAGRAMS

MH101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

OUTBUILDING HEATING

SYSTEM

OSCAR G. JOHNSON VA HOSPITAL

4 AND 5

Project Director

03-29-2019Revisions: Date:

50% DESIGN SUBMITTAL 02-08-2019

5700.20

585-18-117

95% DESIGN SUBMITTAL 02-26-2019

100% DESIGN SUBMITTAL 03-18-2019

ISSUED FOR BIDDING 03-29-2019

MH101

F4

BUILDING 4 - BASEMENT FLOOR PLAN - DEMOLITION

1/8" = 1'-0"

MH101

F7

BUILDING 4 - BASEMENT FLOOR PLAN - NEW WORK

1/8" = 1'-0"

MH101

D4

BUILDING 4 - BOILER PIPING DIAGRAM - DEMOLITION

NO SCALE

MH101

F9

KEYPLAN

NO SCALE

N

N N

GENERAL SYMBOLS

NATURAL GASG

X=

OF PIPE, OR BOTTOM OF DUCT OR EQUIPMENT.

DISTANCE FROM FINISHED FLOOR TO CENTERLINE

WS

TB

SP

PRS

O.A.

FTR

DRGR

AP

E=

UNLESS OTHERWISE NOTED.

HUMIDITY SENSOR AT FOUR FEET ABOVE FINISHED FLOOR

LPCR

LPS

MPCR

MPS

HPCR

HPS

CPD

V

D

CWR

CWS

HWR

HWS

H

S

T

WALL SLEEVE

TIGHT TO BEAM

STATIC PRESSURE

PRESSURE REDUCING STATION

OUTSIDE AIR

FINNED TUBE RADIATION

DOOR GRILLE

ACCESS PANEL IN WALL OR CEILING

OR BOTTOM OF DUCT OR EQUIPMENT FROM DATUM.

ELEVATION - DISTANCE FROM CENTERLINE OF PIPE,

UNLESS OTHERWISE NOTED.

SWITCH AT FOUR FEET ABOVE FINISHED FLOOR

UNLESS OTHERWISE NOTED. (DIGITAL OR PNEUMATIC)

THERMOSTAT AT FOUR FEET ABOVE FINISHED FLOOR

PRESSURE GAUGE

THERMOMETER

STRAINER

BUTTERFLY VALVE

BALL VALVE

GATE OR GLOBE VALVE

RELIEF VALVE

CONTROL VALVES (3-WAY OR 2-WAY)

STEAM CONDENSATE TRAP

CAP PIPING

UNION

REDUCER OR INCREASER

AS DASHED SHALL BE REMOVED.

ANY OF THE ABOVE PIPING SYMBOLS INDICATED

WITH AN (X) IMPLIES PIPING IS EXISTING.

ANY OF THE ABOVE PIPING SYMBOLS INDICATED

LOW PRESSURE CONDENSATE RETURN

LOW PRESSURE STEAM (0-15 psi)

MEDIUM PRESSURE CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16-99 psi)

HIGH PRESSURE CONDENSATE RETURN

HIGH PRESSURE STEAM (100 psi +)

CONDENSATE PUMP DISCHARGE

VENT

DRAIN

CHILLED WATER RETURN

CHILLED WATER SUPPLY

HOT WATER RETURN (155°F)

HOT WATER SUPPLY (180°F)

FIRE RATED PIPE SLEEVE

FRPS

UNLESS NOTED OTHERWISE

UNO

TYPICAL

TYP.

PLUMBING TRADE

PT

GENERAL TRADE

GT

ELECTRICAL TRADE

ET

D OR P

LWT LEAVING WATER TEMPERATURE

MBTU 1,000 BRITISH THERMAL UNITS PER HOUR

IPLV INTEGRATED PART LOAD VALUE

BTUH

BRITISH THERMAL UNITS PER HOUR

CFM

CUBIC FEET PER MINUTE

CV

ENTERING WATER TEMPERATURE

EWT

FINS PER INCH

FPI

FEET PER MINUTE

FPM

FT

FEET

GALLONS PER MINUTE

GPM

HZ

HERTZ

HORSEPOWER

HP

LAT LEAVING AIR TEMPERATURE

MCA MINIMUM CIRCUIT AMPS

MERV MINIMUM EFFICIENCY REPORTING VALUE

MOCP MAXIMUM OVER CURRENT PROTECTION

NC

NO CHANGE REQUIRED

PSI

POUNDS PER SQUARE INCH

RLA

RUNNING LOAD AMPS

RPM

REVOLUTIONS PER MINUTE

SS

STAINLESS STEEL

TC

TEMPERATURE CONTROL

TSP

TOTAL STATIC PRESSURE

V

VENT

WPD

WATER PRESSURE DROP

A/E

ARCHITECT/ENGINEER

COP

COEFFICIENT OF PERFORMANCE

AFF

ABOVE FINISHED FLOOR

D

DOWN

F&T

FLOAT & THERMOSTAT TRAP

FLEXIBLE

FLEX

GAUGE

GA

IFBP INTERNAL FACE AND BYPASS

FLOW COEFFICIENT

BF

BOILER FEED

CHECK VALVE

BALANCE VALVE

EXPANSION VALVE

TRIPLE DUTY VALVE

SOLENOID VALVE

AREA OF

WORK

MH101

D7

BUILDING 4 - BOILER PIPING DIAGRAM - NEW WORK

NO SCALE

J.G.D. K.K.S.

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text 002-4

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

UNEXCAVATED

AutoCAD SHX Text

AutoCAD SHX Text 003-4

AutoCAD SHX Text

MECH. ROOM

AutoCAD SHX Text

AutoCAD SHX Text

UNEXCAVATED

AutoCAD SHX Text

AutoCAD SHX Text 001-4

AutoCAD SHX Text

HOMELESS STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text 002-4

AutoCAD SHX Text

STOR

AutoCAD SHX Text

AutoCAD SHX Text

UNEXCAVATED

AutoCAD SHX Text

AutoCAD SHX Text 003-4

AutoCAD SHX Text

MECH. ROOM

AutoCAD SHX Text

AutoCAD SHX Text

UNEXCAVATED

AutoCAD SHX Text

AutoCAD SHX Text 001-4

AutoCAD SHX Text

HOMELESS STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

BLDG 8

AutoCAD SHX Text

BLDG 5

AutoCAD SHX Text

BLDG 4

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

BLDG 11

AutoCAD SHX Text

BLDG 4

AutoCAD SHX Text

BLDG 8

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SMOKER

AutoCAD SHX Text #17

AutoCAD SHX Text

SMOKER

AutoCAD SHX Text #18

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

H

W

S

1 "

H W

R

H

W

R

H

W

S

H

W

S

1" TO 2ND FLOOR

DEMO (3) CIRC. PUMPS

W/ 24V THERMOSTAT

CONTROL

C

W

TEMP.

SENSOR

LOW

WATER

CUTOUT

H

W

R

H

W

R

1" TO BSMT.

& 1ST FLOOR

1" TO BSMT.

& 1ST FLOOR

1 "

DEMO PRESSURE

REGULATING VALVE

AND VALVES (12 PSI)

DEMO BACKFLOW

PREVENTER

WATTS 9D

4 GAL.

EXP TANK

DEMO BOILER

(BURNHAM RV5NSL)

EXISTING WATER HEATER

(40 GAL - INDIRECT)

D

DRAIN

PIPE

1" TO 2ND FLOOR

DEMO

3/4" GAS

DEMO

PIPING

DEMO

PIPING

DEMO

PIPING

NOTE: DEMO ALL EQUIPMENT

AND PIPING DASHED

H W

R

H W

S

H W

R

H W

S

3"

3 "

D

UP TO 2ND FLOOR

HWR

HWS

HWS

HWR

H W

R

H W

S

H W

R

H W

S

G

3"

3 "

D

UP TO 2ND FLOOR

HWR

HWS

HWS

HWR

H W

R

H W

S

H W

R

H W

S

3"

3 "

D

UP TO 2ND FLOOR

HWR

HWS

HWS

HWR

H W

R

H W

S

H W

R

H W

S

G

3"

3 "

D

UP TO 2ND FLOOR

HWR

HWS

HWS

HWR

DEMO VENTING DEMO VENTING DEMO VENTING

EXISTING

BOILER

EXISTING WATER

HEATER - SEE PP102

D4

MH102

EXISTING WATER

HEATER - SEE PP102

EXISTING

BOILER

D4

MH102

EXISTING

BOILER

EXISTING WATER

HEATER - SEE PP102

D4

MH102

EXISTING WATER

HEATER - SEE PP102

EXISTING

BOILER

D4

MH102

DEMO BOILER CONTROL

PANEL. SALVAGE OA

SENSOR AND ROOM STAT.

DEMO BOILER CONTROL

PANEL. SALVAGE OA

SENSOR AND ROOM STAT.

DEMO BOILER CONTROL

PANEL. SALVAGE OA

SENSOR AND ROOM STAT.

DEMO BOILER CONTROL

PANEL. SALVAGE OA

SENSOR AND ROOM STAT.

H W

R

H W

S

H W

R

H W

S

UP TO 2ND FLOOR

HWS

HWS

HWR

H W

R

H W

S

H W

R

H W

S

G

UP TO 2ND FLOOR

HWS

HWS

HWR

H W

R

H W

S

H W

R

H W

S

UP TO 2ND FLOOR

HWS

HWS

HWR

H W

R

H W

S

H W

R

H W

S

G

UP TO 2ND FLOOR

HWS

HWS

HWR

D

HWR

D

HWR

D

HWR

D

HWR

NEW WATER

HEATER - SEE PP102

NEW WATER

HEATER - SEE PP102

NEW WATER HEATER -

SEE PP102

NEW WATER HEATER -

SEE PP102

NEW BOILER

(B-003)

NEW BOILER

(B-002)

NEW BOILER

(B-004)

NEW BOILER

(B-005)

D7

MH102

D7

MH102

D7

MH102

D7

MH102

NEW VENTING PER

MANUFACTURER

THRU EXISTING

HOLES

NEW VENTING PER

MANUFACTURER

THRU EXISTING

HOLES

NEW VENTING PER

MANUFACTURER

THRU EXISTING

HOLES

NEW VENTING PER

MANUFACTURER

THRU EXISTING

HOLES

CONDENSING BOILER

(B-002 TO B-004)

INDIRECT WATER

HEATER (SEE

PP102)

NEUTRALIZER

3/4" DRAIN TO

FLOOR DRAIN

TO VENT DUCT

PUMP

LOW

WATER

CUTOUT

EXP. TANK

C

W

NEW PRESSURE

REGULATING

VALVE (12 PSI)

NEW BACKFLOW

PREVENTER

WATTS 9D

AIR SEPERATOR

H

W

S

1" TO 2ND FLOOR

1" TO BSMT.

& 1ST FLOOR

H

W

S

NEW CONNECTION

PUMP

PUMP

1 "

1 "

1"

1 "

H

W

R

1" TO 2ND FLOOR

1" TO BSMT.

& 1ST FLOOR

H

W

R

NEW CONNECTION

(P-003)

(ET-001)

P-002)

(P-004)

(AS-001)

VENT

PUMP

(P-001)

DRAIN

12"

NEW CONNECTION

TO FILL SYSTEM

UNION &

DIRT LEG

G

NEW CONNECTION TO GAS

- ALL NEW PIPING SHALL

BE INUSLATED.

BUILDING 5 - FLOOR PLANS AND

DIAGRAMS

MH102

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

OUTBUILDING HEATING

SYSTEM

OSCAR G. JOHNSON VA HOSPITAL

4 AND 5

Project Director

03-29-2019Revisions: Date:

50% DESIGN SUBMITTAL 02-08-2019

5700.20

585-18-117

95% DESIGN SUBMITTAL 02-26-2019

100% DESIGN SUBMITTAL 03-18-2019

ISSUED FOR BIDDING 03-29-2019

GENERAL SYMBOLS

NATURAL GASG

X=

OF PIPE, OR BOTTOM OF DUCT OR EQUIPMENT.

DISTANCE FROM FINISHED FLOOR TO CENTERLINE

WS

TB

SP

PRS

O.A.

FTR

DRGR

AP

E=

UNLESS OTHERWISE NOTED.

HUMIDITY SENSOR AT FOUR FEET ABOVE FINISHED FLOOR

LPCR

LPS

MPCR

MPS

HPCR

HPS

CPD

V

D

CWR

CWS

HWR

HWS

H

S

T

WALL SLEEVE

TIGHT TO BEAM

STATIC PRESSURE

PRESSURE REDUCING STATION

OUTSIDE AIR

FINNED TUBE RADIATION

DOOR GRILLE

ACCESS PANEL IN WALL OR CEILING

OR BOTTOM OF DUCT OR EQUIPMENT FROM DATUM.

ELEVATION - DISTANCE FROM CENTERLINE OF PIPE,

UNLESS OTHERWISE NOTED.

SWITCH AT FOUR FEET ABOVE FINISHED FLOOR

UNLESS OTHERWISE NOTED. (DIGITAL OR PNEUMATIC)

THERMOSTAT AT FOUR FEET ABOVE FINISHED FLOOR

PRESSURE GAUGE

THERMOMETER

STRAINER

BUTTERFLY VALVE

BALL VALVE

GATE OR GLOBE VALVE

RELIEF VALVE

CONTROL VALVES (3-WAY OR 2-WAY)

STEAM CONDENSATE TRAP

CAP PIPING

UNION

REDUCER OR INCREASER

AS DASHED SHALL BE REMOVED.

ANY OF THE ABOVE PIPING SYMBOLS INDICATED

WITH AN (X) IMPLIES PIPING IS EXISTING.

ANY OF THE ABOVE PIPING SYMBOLS INDICATED

LOW PRESSURE CONDENSATE RETURN

LOW PRESSURE STEAM (0-15 psi)

MEDIUM PRESSURE CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16-99 psi)

HIGH PRESSURE CONDENSATE RETURN

HIGH PRESSURE STEAM (100 psi +)

CONDENSATE PUMP DISCHARGE

VENT

DRAIN

CHILLED WATER RETURN

CHILLED WATER SUPPLY

HOT WATER RETURN (155°F)

HOT WATER SUPPLY (180°F)

FIRE RATED PIPE SLEEVE

FRPS

UNLESS NOTED OTHERWISE

UNO

TYPICAL

TYP.

PLUMBING TRADE

PT

GENERAL TRADE

GT

ELECTRICAL TRADE

ET

D OR P

LWT LEAVING WATER TEMPERATURE

MBTU 1,000 BRITISH THERMAL UNITS PER HOUR

IPLV INTEGRATED PART LOAD VALUE

BTUH

BRITISH THERMAL UNITS PER HOUR

CFM

CUBIC FEET PER MINUTE

CV

ENTERING WATER TEMPERATURE

EWT

FINS PER INCH

FPI

FEET PER MINUTE

FPM

FT

FEET

GALLONS PER MINUTE

GPM

HZ

HERTZ

HORSEPOWER

HP

LAT LEAVING AIR TEMPERATURE

MCA MINIMUM CIRCUIT AMPS

MERV MINIMUM EFFICIENCY REPORTING VALUE

MOCP MAXIMUM OVER CURRENT PROTECTION

NC

NO CHANGE REQUIRED

PSI

POUNDS PER SQUARE INCH

RLA

RUNNING LOAD AMPS

RPM

REVOLUTIONS PER MINUTE

SS

STAINLESS STEEL

TC

TEMPERATURE CONTROL

TSP

TOTAL STATIC PRESSURE

V

VENT

WPD

WATER PRESSURE DROP

A/E

ARCHITECT/ENGINEER

COP

COEFFICIENT OF PERFORMANCE

AFF

ABOVE FINISHED FLOOR

D

DOWN

F&T

FLOAT & THERMOSTAT TRAP

FLEXIBLE

FLEX

GAUGE

GA

IFBP INTERNAL FACE AND BYPASS

FLOW COEFFICIENT

BF

BOILER FEED

CHECK VALVE

BALANCE VALVE

EXPANSION VALVE

TRIPLE DUTY VALVE

SOLENOID VALVE

MH102

D4

BUILDING 5 - BOILER PIPING DIAGRAM - DEMOLITION

NO SCALE

MH102

F2

BUILDING 5 - BASEMENT FLOOR PLAN - DEMOLITION

1/8" = 1'-0"

MH102

F5

BUILDING 5 - BASEMENT FLOOR PLAN - NEW WORK

1/8" = 1'-0"

N

MH102

F9

KEYPLAN

NO SCALE

NN

AREA OF

WORK

MH102

D7

BUILDING 5 - BOILER PIPING DIAGRAM - NEW WORK

NO SCALE

J.G.D. K.K.S.

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-1

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-1

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/1

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-2

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-2

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/2

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-3

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-3

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/3

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-4

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-4

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-1

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-1

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/1

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-2

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-2

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/2

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-3

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-3

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/3

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-4

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-4

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

BLDG 8

AutoCAD SHX Text

BLDG 5

AutoCAD SHX Text

BLDG 4

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

BLDG 11

AutoCAD SHX Text

BLDG 4

AutoCAD SHX Text

BLDG 8

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SMOKER

AutoCAD SHX Text #17

AutoCAD SHX Text

SMOKER

AutoCAD SHX Text #18

AutoCAD SHX Text X

AutoCAD SHX Text X

X

5 FT

THRU [20]

6 8 10

[32][25] [40]

[65]

[50]

[75]

1312 14

[125] [100]

[150]

[250]

[200]

[300]

[400]

[350]

[450]

[600]

[500]

20 2418 14 16128

1064 532 2 1/2 1 1/2

1 1 1/4

[9100] [9600][8500] [7600] [8200][7000][5800] [6700]

[5200][4100] [4900][3700][3000] [3400][2700]

[2100]

[4900]

[4100][3700] [4000]

[3000][2400][1800] [1500]

THRU 3/4

[2100] [2100]

[2100]

[2700]

[2400]

SIDE VIEW TRAPEZE HANGER FOR UP TO 1000

LB. [453KG] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER TYPE

43 - SEE SPECIFICATIONS

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" [200mm] MIN.)

BAND

1-5/8" [43mm] 12 GAUGE

CHANNEL OR 2"x2"x1/4"

[50x50x6.4mm] ANGLE

1/2" [15mm] DIA.

HANGER RODS WITH

36" [900mm] MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9 PSF

MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

IN.

[mm]

FT.

[mm]

FT.

[mm] m m

M

A X

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS

SCHEDULES AND DETAILS

MH501

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

OUTBUILDING HEATING

SYSTEM

OSCAR G. JOHNSON VA HOSPITAL

4 AND 5

Project Director

03-29-2019Revisions: Date:

50% DESIGN SUBMITTAL 02-08-2019

5700.20

585-18-117

95% DESIGN SUBMITTAL 02-26-2019

100% DESIGN SUBMITTAL 03-18-2019

ISSUED FOR BIDDING 03-29-2019

BOILER SCHEDULE

AIR DIRT ELIMINATION SCHEDULE

EXPANSION TANK SCHEDULE

MH501

F8

PIPE HANGER

NO SCALE

PUMP SCHEDULE

J.G.D. K.K.S.

TAG LOCATION SYSTEM MANUFACTURER MODEL No.

CONN. SIZE SYSTEM FLOW MAX P.D. DRAIN SIZE

MINIMUM

DIMENSIONS

NOTES

OPER.

WEIGHT

REMARKS

INCH GPM FT INCH

H x D x LF (INCH)

LBS

AS-001

APARTMENT HOT WATER SPIROTHERM VDR 1 1/4" 15 1 1/2 14x3x8.6 1 TO 9 9

(4-TOTAL)

AS-002

OFFICE HOT WATER SPIROTHERM VDR 1 1/2" 30 1 1/2 14x3x8.6 1 TO 9 9

REMARKS:

1. PROVIDE COALESCING TYPE SEPARATORS. CENTRIFUGAL TYPE NOT ACCEPTED.

2. VESSEL SHALL BE RATED FOR 150# WORKING PRESSURE AND BE FURNISHED WITH CLASS 150 STEEL WELD-NECK RAISED-FACE FLANGES.

3. UNIT SHALL INCLUDE AN INTERNAL COPPER BUNDLE FILLING THE ENTIRE VESSEL.

4. VESSELS WITH LOOSE OR PARTIALLY FILLED INTERNAL MEDIA NOT ACCEPTABLE.

5. UNIT SHALL REMOVE 100% OF FREE AND ENTRAINED AIR AND 99.6% OF DISSOLVED AIR AS TESTED BY INDEPENDENT LAB.

6. UNIT SHALL REMOVE 80% OF THE 30 MICRON PARTICLES IN 100 CIRCULATIONS. UNIT CAPABLE OF 5 MICRON PARTICLE SIZE REMOVAL.

7. TEMPERATURE, PRESSURE, AND FLOW VELOCITY MUST BE HELD CONSTANT DURING INDEPENDENT PERFORMANCE TESTS.

8. PROVIDE INTEGRAL FULL PORT FLOAT ACTUATED BRASS VENTING MECHANISM.

9. OR APPROVED EQUAL.

ITEM LOCATION * MANUFACTURER MODEL

INPUT (MBH)

OUTPUT

(MBH)

GPM

EWT (°F) LWT (°F)

WPD FT.

HEAD

NAT. GAS

(IN. WG.)

TURNDOWN

RELIEF

VALVE

EFF @ 140°

EWT (%)

VOLT/PHASE NOTES SIZE

WEIGHT

(LBS)

WATER

VOLUME

VENT SIZE REMARKS

B-001 OFFICE WEIL-McLAIN EVG-220 220 194 20 140 160 5 MAX. 11 10:1 30 PSI 88 120/1 1 TO 4 45x23x23 215 4.6 4" 95% CONDENSING

B-002 APARTMENT WEIL-McLAIN EVG-155 155 137 14 140 160 5 MAX. 11 5:1 30 PSI 88 120/1 1 TO 4 41x18x18 145 3.2 3" 95% CONDENSING

B-003 APARTMENT WEIL-McLAIN EVG-155 155 137 14 140 160 5 MAX. 11 5:1 30 PSI 88 120/1 1 TO 4 41x18x18 145 3.2 3" 95% CONDENSING

B-004 APARTMENT WEIL-McLAIN EVG-155 155 137 14 140 160 5 MAX. 11 5:1 30 PSI 88 120/1 1 TO 4 41x18x18 145 3.2 3" 95% CONDENSING

B-005 APARTMENT WEIL-McLAIN EVG-155 155 137 14 140 160 5 MAX. 11 5:1 30 PSI 88 120/1 1 TO 4 41x18x18 145 3.2 3" 95% CONDENSING

NOTES

1. CONDENSATE NEUTRALIZING KIT

2. MATCH PUMP P-001 AND P-005 TO BOILER PRESSURE PLUS 5 FEET.

3. FLOOR STAND.

4. BOILERS CAPABLE OF OPERATION FROM 100°F TO 180°F.

* OR APPROVED EQUAL.

ITEM LOCATION SERVICE TYPE

TANK

VOLUME

(GAL)

TANK

ACCEPTANCE

VOLUME

(GAL)

DIAMETER

(IN)

HEIGHT /

LENGTH

(IN)

MAX

PRESSURE

(PSIG)

DESIGN

CODE

SUPPORT

SYSTEM FILL

PRESSURE

(PSIG)

SYSTEM RELIEF

PRESSURE (PSIG)

APPROX.

OPER. WEIGHT

(LBS)

REMARKS

ET-001

APARTMENT HEATING DIAPHRAGM 4.4 2.5 11 15 100 ASME PIPE 12 30 9

B&G HFT-30 (4-TOTAL)*

ET-002

OFFICE HEATING DIAPHRAGM 4.4 2.5 11 15 100 ASME PIPE 12 30 9 B&G HFT-30*

* OR APPROVED EQUAL.

ITEM LOCATION FLANGE SIZE

SYSTEM AND/OR

SERVICE

TYPE

CIRCULATING FLUID

MIN % EFF.

MOTOR

REMARKS

FLUID

FLOW HEAD

NPSH

AVAILABLE

TEMPERATURE

SP GR

NOMINAL

POWER

PHASE VOLT MAX RPM

SPPED

CONTROL

GPM FT FT °F HP

P-001 APARTMENT 1 1/4" BOILER BOOSTER INLINE WATER 10 10 1 170 1 125 WATT 1 120V 2950 CONSTANT

B&G NRF-33 (4-TOTAL)*

1.1 FLA

P-002 APARTMENT 1" BLDG. HEAT BOOSTER INLINE WATER 7 11 1 170 1 92 WATT 1 120V 2940 CONSTANT

B&G NRF-22 (4-TOTAL)*

.8 FLA

P-003

APARTMENT 1"

INDIRECT WATER

HEATER

BOOSTER INLINE WATER 8 9 1 170 1 92 WATT 1 120V 2940 CONSTANT

B&G NRF-22 (4-TOTAL)*

.8 FLA

P-004 APARTMENT 1" BLDG. HEAT BOOSTER INLINE WATER 7 11 1 170 1 92 WATT 1 120V 2940 CONSTANT

B&G NRF-22 (4-TOTAL)*

.8 FLA

P-005 OFFICE 1 1/2" BOILER BOOSTER INLINE WATER 15 10 1 170 1 1/6 HP 1 120V 3400 CONSTANT

B&G PL-75*

2.1 FLA

P-006 OFFICE 1 1/4" BLDG. HEAT BOOSTER INLINE WATER 10 10 1 170 1 125 WATT 1 120V 2950 CONSTANT

B&G NRF-33*

1.1 FLA

P-007 OFFICE 1" INDIRECT HEATER BOOSTER INLINE WATER 8 9 1 170 1 92 WATT 1 120V 2940 CONSTANT

B&G NRF-22*

.8 FLA

P-008 OFFICE 1 1/4" BLDG. HEAT BOOSTER INLINE WATER 10 10 1 170 1 125 WATT 1 120V 2950 CONSTANT

B&G NRF-33*

1.1 FLA

* OR APPROVED EQUAL.

V

H W

C W

H

W

R

AQUASTAT

EXISTING

RECIRC PUMP

B&G NBF-8S

NOTE:

DEMO ALL EQUIPMENT AND

PIPING SHOWN DASHED.

REMOVE EXISTING

WATER HEATER

(40 GAL - INDIRECT)

TEMPERATURE SENSOR

TO CONTROL HEATING

PUMP

REMOVE 2 GALLON

EXPANSION TANK

HW

CW

HWR

HW

CW

HWR

HW

CW

HWR

HW

CW

HWR

REMOVE WATER

HEATER(S) AND PIPING

REMOVE WATER

HEATER(S) AND PIPING

D4

PP102

D4

PP102

HW

CW

HWR

HW

CW

HWR

HW

CW

HWR

HW

CW

HWR

NEW WATER

HEATER(S)

AND PIPING

NEW WATER

HEATER(S)

AND PIPING

D5

PP102

D5

PP102

PROVIDE 30x30x4

CONCRETE PAD

PROVIDE 30x30x4

CONCRETE PAD

V

H W

C W

H

W

R

AQUASTAT

EXISTING

RECIRC PUMP

B&G NBF-8S

NEW WATER HEATER

(45 GAL - INDIRECT FIRED)

TEMPERATURE SENSOR

TO CONTROL HEATING

PUMP

NEW 2 GALLON

EXPANSION TANK

RELIEF VALVE

UNION(S) (TYP.)

NEW 3/4" TMV

NEW CONN.

NEW CONN.

BUILDING 5 - FLOOR PLANS AND

DIAGRAMS

PP102

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

OUTBUILDING HEATING

SYSTEM

OSCAR G. JOHNSON VA HOSPITAL

4 AND 5

Project Director

03-29-2019Revisions: Date:

50% DESIGN SUBMITTAL 02-08-2019

5700.20

585-18-117

95% DESIGN SUBMITTAL 02-26-2019

100% DESIGN SUBMITTAL 03-18-2019

ISSUED FOR BIDDING 03-29-2019

N

PP102

F9

KEYPLAN

NO SCALE

NN

AREA OF

WORK

PLUMBING SYMBOLS

WATER CLOSET

WASTE STACK

WASTE PIPING

WALL CLEANOUT

STORM OR CLEARWATER PIPING

SANITARY SEWER

JANITOR'S CURB

FLOOR DRAIN

FLOOR CLEANOUT

VS

WC

WS

W

W.CO

VT

VENT STACK

VENT

ST

SS

SH

SAN

SOIL STACK

SHOWER

LAV / L

JC

HD

FD

F.CO

LAVATORY

HUB DRAIN

CIRCUIT SETTER

BACKFLOW PREVENTER

SHEET DETAIL OR DIAGRAM IS DRAWN ON

DETAIL OR DIAGRAM NUMBER

ROOM NUMBER

ELECTRIC WATER COOLER

CIRCUIT VENT

ACCESS PANEL

THERMOMETER

TYPICAL FIXTURE STOP

WATER HAMMER ARRESTOR

FLOOR CLEANOUT

CHECK VALVE

ARROW INDICATES DIRECTION OF FLOW IN

DISTRIBUTION OR DRAINAGE PIPING

EXISTING PIPING TO BE REMOVED OR ABANDONED

-SEE PLAN FOR NOTES

CO

EWC

BFP

C.VT

CLEANOUT

AP

CORE DRILL

BALL VALVE

HOT WATER RECIRCULATION PIPING [HWR]

HOT WATER DISTRIBUTION PIPING [HW] (110°-120°F)

COLD WATER MAIN OR DISTRIBUTION PIPING [CW]

STORM AND CLEARWATER DRAINAGE PIPING [ST.]

SANITARY VENT PIPING [VT.]

SANITARY PIPING [SAN.]

H/CW HOT AND COLD WATER

WET VENTW.VT

KEYED PLAN NOTE

A1

P101

CLEANOUT

AIR GAP WASTEAGW

OR

OR

GATE VALVE

BUTTERFLY VALVE

PP102

D4

BUILDING 5 - DOMESTIC WATER HEATER - DEMOLITION

NO SCALE

PP102

F2

BUILDING 5 - BASEMENT FLOOR PLAN - DEMOLITION

1/8" = 1'-0"

PP102

F5

BUILDING 5 - BASEMENT FLOOR PLAN - NEW WORK

1/8" = 1'-0"

PP102

D5

BUILDING 5 - DOMESTIC WATER HEATER - NEW WORK

NO SCALE

RELIEF VALVE

J.G.D. K.K.S.

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-1

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-1

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/1

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-2

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-2

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/2

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-3

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-3

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/3

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-4

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-4

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-1

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-1

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/1

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-2

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-2

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/2

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-3

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-3

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text 002A/5/3

AutoCAD SHX Text

MAIN AREA

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 001-5-4

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text 002-5-4

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

BLDG 8

AutoCAD SHX Text

BLDG 5

AutoCAD SHX Text

BLDG 4

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

TUNNEL

AutoCAD SHX Text

BLDG 11

AutoCAD SHX Text

BLDG 4

AutoCAD SHX Text

BLDG 8

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SMOKER

AutoCAD SHX Text #17

AutoCAD SHX Text

SMOKER

#18

E101 - ELECTRICAL NEW WORK PLANS
E101
MH101 BUILDING 4 - FLOOR PLANS AND DIAGRAMS
MH102 BUILDING 5 - FLOOR PLANS AND DIAGRAMS
MH501 SCHEDULES AND DETAILS
PP101 BUILDING 4 - FLOOR PLANS AND DIAGRAMS
PP102 BUILDING 5 - FLOOR PLANS AND DIAGRAMS

File details come from the government source that posted it. Updated .