36C25219Q0529-001.docx
DOCX document 146 KB Posted
- Solicitation number
- 36C25219Q0529
About this file
36C25219Q0529 36C25219Q0529_1.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0146-000.docx | DOCX document | |
| 36C25219Q0529-002.pdf | ||
| 36C25219Q0529-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL
BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SI
GN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGN
ATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR
LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
695-19-3-6093-0030 36C25219Q0529 04-25-2019
PASHOLK,SUSAN
414-844-4846 05-09-2019
NOON CENTRAL
36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) Southern Tier 3001 Green Bay Rd., Bldg. 1, Rm. 326 North Chicago IL 60064-3048 X X 811219 $20.5 Million X N/A X
CLEMENT J.
ZABLOCKI VA MEDICAL CENTER
5000 W. NATIONAL AVENUE
MILWAUKEE WI 53295-1000
36C252 Department of Veterans Affairs
GLAC
815 S 84TH STREET
MILWAUKEE WI 53214
Department of Veterans Affairs Financial Services Center PO Box 149971 Austin TX 78714-9971 877-353-9791 512-460-5540 See CONTINUATION Page
MEDICAL GAS TESTING SERVICES PER STATEMENT OF WORK
AT THE MILWAUKEE VAMC
100% SB SET ASIDE
SERVICE CONTRACT LABOR STANDARDS APPLY
DOL WD 15-4899 REV-7 1.1.2019 APPLIES AND IS ATTACHED
VA POC: PERRY SCOTT 414-384-2000 X43931
CO: SUSAN PASHOLK 414-844-4846
695-3690162-6093-854100-2543 010050190 X X X
SUSAN PASHOLK
CONTRACTING OFFICER
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
(Continuation from Standard Form 1449, block 18A.)
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: ______________________________________ (Contractor’s Name) ______________________________________ (Address) ______________________________________ (City-State-Zip) ______________________________________ (Point of Contact/Title)
PHONE NUMBER ______________________________________
FAX NUMBER ______________________________________
E-MAIL ADDRESS ______________________________________
DUNS NUMBER NO. ______________________________________
b. GOVERNMENT: SUSAN PASHOLK, CONTRACTING OFFICER
DEPARTMENT OF VETERANS AFFAIRS
GREAT LAKES ACQUISITION CENTER
115 S. 84TH ST., STE 100
MILWAUKEE WI 53214
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
52.232-34 -- Payment by Electronic Funds Transfer--Other Than System for Award Management.
3. INVOICES: Invoices shall be submitted in arrears in accordance with:
a. 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)
b. Monthly in arrears.
4. GOVERNMENT INVOICE ADDRESS: All invoices from the contractor shall be submitted electronically in accordance with 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)
FACSIMILE, E-MAIL, AND SCANNED DOCUMENTS ARE NOT ACCEPTABLE FORMS OF SUBMISSION FOR PAYMENT REQUESTS.
VA’s Electronic Invoice Presentment and Payment System – The FSC uses a third-party contractor, Tungsten Network e-Invoice, to transition vendors from paper to electronic invoice submission. Please go to this website: http://ob10.com/us/en/veterans-affairs-us/ to begin submitting electronic invoices, free of charge.
For assistance setting up e-Invoice, the below information is provided:
* Tungsten Network e-Invoice Setup Information: 1-877-489-6135
* Tungsten Network e-Invoice email: VA.Registration@ob10.com <http://VA.Registration@ob10.com/>
* FSC e-Invoice Contact Information: 1-877-353-9791
* FSC e-invoice email: vafsccshd@va.gov <http://va.gov/>
INVOICES:
Payments shall be made monthly, in arrears, upon receipt of a properly prepared invoice.
In order to comply with the Improper Payment Elimination and Recovery Act of 2010 (IPERA), the VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with Tungsten Network e-Invoicing network, for submissions of all electronic invoices to VA. Tungsten Network electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with Tungsten Network by submitting an email to VA.Registration@ob10.com or calling 1-877-752-0900 option 2 for Enrollment.
Contractor shall submit an electronic invoice by the tenth (10th) of the following month services were performed to the Veterans Affairs Financial Services Center (VAFSC) e-Invoice through the website at https://portal.ob10.com/Login.aspx. For questions regarding the submission of VA electronic invoices, Tungsten Network customer service may be contacted at 1-877-489-6135.
All invoices shall reference the vendor name and address, customer name, contract number, appropriate obligation/funding order number, description of services provided, quantity, unit price, and total invoice amount (any additional info). Invoices shall also include any payment discount terms.
For questions regarding invoice receipt or payment, please call VAFSC directly at 1-877-353-9791 or email vafsccshd@va.gov
OFFERORS MUST COMPLETE AND RETURN ALL INFORMATION DESIGNATED HEREIN PRIOR TO THE TIME SPECIFIED IN BLOCK 8 OF SF 1449 IN ORDER TO BE CONSIDERED FOR AWARD.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
| ______________________________ | __________________________ |
| ______________________________ | __________________________ |
| ______________________________ | __________________________ |
Offers may be submitted electronically to the following email address: susan.pasholk@va.gov. However, a signed, dated and scanned 1449 must be included along with all other information requested herein by the due date and time. Offers may also be submitted through the regular mail and must be received by the date and time specified in Block 8. CAUTION - LATE Submissions, Modifications, and Withdrawals: See provision 52.212-1. All offers are subject to all terms and conditions of this solicitation.
SPECIAL NOTES
In order to maintain integrity of this solicitation and subsequent award date, all offerors are advised that any question and answer requests must be submitted in a written form via e-mail to the Contracting Officer susan.pasholk@va.gov no later than FRIDAY MAY 3, 2019 AT 9:00 AM CENTRAL. Contracting will issue a consolidated response via solicitation amendment to www.fbo.gov within 2 business days to all parties.
The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitment or issue changes that will affect price, quantity or quality of performance of this contract. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred thereof.
REQUIRED DOCUMENTATION: Contractor shall e-mail complete quote package with pricing information completed to susan.pasholk@va.gov:
1. Solicitation document with:
a. Contractor shall fill in the SF 1449 blocks 17a, 30a, 30b, and 30c.
b. Contractor shall fill in Pg. 2, 1(a).
c. Contractor shall fill in all unit and total costs under the PRICE/COST SCHEDULE or submit separately the spreadsheet with line items costs filled in.
2. Insurance, certifications, and documentation in accordance with the requirements within the performance work statement.
3. Quote documentation in accordance with 52.212-1; Instruction to Offerors
A signed, dated and scanned 1449 must be included along with all other information requested herein by the due date and time. Offers may also be submitted through the regular mail and must be received by the date and time specified in Block 8. CAUTION - LATE Submissions, Modifications, and Withdrawals: See provision 52.212-1. All offers are subject to all terms and conditions of this solicitation.
*VA has a maximum allowable incoming email size limitation including attachments of seven megabytes. Offerors submitting responses via email which exceed seven megabytes shall split their response into multiple email messages so as to not exceed the maximum allowable email size limitation. The VA is not responsible for late responses due to undelivered e-mails that exceed seven megabytes.
SECURITY & PRIVACY CONTROL:
The Certification & Accreditation (C&A) requirements of VHA Handbook 6500.6 do not apply to this requirement, therefore, a Security Accreditation Package is not required. No C&A or MOU/ISA is required. Sensitive information exposure as part of this contract involves applicable security controls within the facility as part of the VA Information Security If there are any questions related to privacy, please have a member of your staff contact the VA Privacy Service at (202) 461-6309. If there are any questions related to the information security, please have a member of your staff contact the Office of Cyber Security at (304) 262-7733.
AUTHORITY
This Request for Quote (RFQ) solicitation is issued under the authority of FAR Part 13.5 for Certain Commercial Items in which simplified acquisition procedures in FAR Part 13 will be used. FAR Part 14 and 15 will not be used.
The Lowest Price Technically Acceptable source selection process will be used for this FAR 13.5 procurement. This means award will be made on the basis of the lowest evaluated price of quotes meeting or exceeding the acceptability standards for non-cost factors. See 52.212-2 Evaluation – Commercial Items (Section E) for a description of the factors in addition to price that the Government will use to evaluate offers. Prospective contractors must furnish the information listed herein with their quotations to ensure they receive full consideration.
SITE VISIT
It is strongly suggested and expected that the offeror inspect the campus to be serviced to fully understand the nature of the work and the conditions under which the work is to be performed. In no case shall failure to inspect the campus constitute grounds for a claim after contract award. SITE VISIT IS SCHEDULED FOR WEDNESDAY MAY 1, 2019 AT 9:00 AM CENTRAL. INTERESTED PARTIES ARE TO MEET COR PERRY SCOTT (414-384-2000 X43931) AT BULDING 111 BASEMENT; ROOM BO225.
MEDICAL GAS TESTING
SERVICES PRICES/COSTS
Provide full service maintenance on the Government-owned equipment listed below to include all Labor, Time, Management and Equipment (L,T,M,E) in accordance with the terms and conditions of this Request for Quotation for The Clement J Zablocki VA Hospital Milwaukee, WI.
BASE YEAR JUNE 1, 2019 through MAY 31, 2020
CLIN DESCRIPTION QTY UNIT PRICE TOTAL
| 0001 | All L,T,M,E necessary for vendor to inspect, |
| functionally test and perform preventive | |
| maintenance On the Medical Air Dryer | |
| and the Associated Alarm Panels. Vendor to | |
| provide complete documentation for facility | |
| records after each PM visit. |
| 0001a. | Dryer function testing per manufacturer’ | |||
| Recommendation – semi-annually in | ||||
| Nov and May | 2 | JOBS | $________ $________ |
| 0001b. | Calibrate carbon monoxide monitor – | |||
| annually in May | 1 | JOB | $________ |
| 0001c. | Test/Check dew point monitor with | |||
| Portable Instrumentation – | ||||
| semi-annually in Nov and May | 2 | JOBS | $________ $________ | |
| 0001d. | Replace all filter elements, purge | |||
| mufflers And dew point monitor sensor – | ||||
| annually in May | 1 | JOB $________ |
| 0001e. | Test Dew Point and carbon monoxide | |||
| Master Panel signals – annually in May | 1 | JOB | $________ |
0002 Test and evaluate medical gas system Master Alarm
| Panels; Vendor to provide complete documentation |
| for facility records after each PM visit. |
| 0002a. | Inspect for proper pressure switch |
| locations, test alarm functions and | |
| settings in accordance with |
manufacturer’s specifications. Place each master in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Master Alarm Panels.
Annually in May 1 JOB $_______
| 0002b | Test each Master Alarm Panel for | ||
| Proper audible and visual function, | |||
| and inspect for proper labeling – | |||
| quarterly in Nov, Feb, May and | |||
| August | 4 | JOBS $_________ $_________ |
0003 Test and evaluate medical gas system Area
| Alarm Panels; (Facility Wide). Vendor to |
| provide complete documentation for facility |
| records after each PM visit. |
| 0003a. | Inspect for proper pressure switch locations, | ||
| test alarm functions and settings in | |||
| accordance with manufacturer’s specifications. | |||
| Place each panel in actual alarm conditions | |||
| and recalibrate. Include check of all lamps | |||
| and audible alarms for sound at | |||
| Area Alarm Panels. Annually in May | 1 | JOB | $_________ |
| 0003b | Test each Area Alarm Panel for proper | |||
| audible and visual function, and inspect for | ||||
| Proper labeling – Quarterly | ||||
| (After each panel tested, the | ||||
| Service technician is to provide an immediate | ||||
| Reorientation of panel function and operation | ||||
| to the VA area supervisor. Reorientation | ||||
| training shall be documented on the medical | ||||
| gas panel test and Inspection report | ||||
| (to include date, time and Supervisor(s) | ||||
| name(s)). Due in Nov, Feb, May and Aug | 4 JOBS | $________ $________ |
0004 All L,T,M,E necessary for vendor to inspect,
| functionally test and perform preventive |
| maintenance on the dental air compressor |
| system per manufacturer’s and NFPA 99 |
standards. Vendor to provide complete documentation for facility records after each PM visit.
| 0004a. | Replacement of all filter elements and | |
| Recalibrations of the dew point and carbon | ||
| Monoxide monitors shall also be done | ||
| Semi-annually, if necessary. | ||
| Due in Nov and May | 2 JOBS $________ $_________ |
| 0004b. | Perform laboratory particulate and purity | ||
| annual | Testing on the dental air system. | ||
| Lab results must be included in preventative | |||
| maintenance report. Due in May 1 | JOB | $________ |
| 0004c. | Inspect, functionally test, and perform | |||
| Annual preventative maintenance on the | ||||
| Dental vacuum system per manufacturer’s | ||||
| And NFPA 99 standards. Due in May | 1 | JOB | $_________ |
0005 All L,T,M,E necessary for vendor to perform testing on all medical gas pressure outlets:
| 0005a. | Perform annual performance testing for all | ||
| Medical gas pressure outlets (oxygen, medical | |||
| Air, nitrous oxide, nitrogen) – during normal | |||
| work hours – Annually in Feb | 1 | JOB | $_________ |
| 0005b. | Perform annual performance testing for all | |||
| Medical gas pressure outlets (oxygen, medical | ||||
| Air, nitrous oxide, nitrogen) – during premium | ||||
| work hours – Annually in Feb | 1 | JOB | $_________ |
0006 All L,T,M,E necessary for vendor to perform annual
| Inspection, testing and calibration of all medical |
| Gas manifold systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $_________
0007 All L,T,M,E necessary for vendor to annually provide purity and
| Particulate testing on oxygen, medical air and nitrous |
| Oxide gas systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $_________
0008 All L,T,M,E necessary for vendor to perform annual
| Inspection and testing on all zone valve boxes |
| Throughout Medical Center for proper location, valve type, |
| Label accuracy, and presence/function of gauges per |
| NFPA Standards. Vendor to provide complete |
documentation of testing and results for facility records Due in Feb 1 JOB $_________
0009 All L,T,M,E necessary for vendor to annually
| perform inspection and leak testing of source valves | |||
| (Oxygen, Medical Air, and Vacuum – total of 3). | |||
| Vendor will provide and install CGA/NFPA 99 approved | |||
| valve tags properly identifying the area(s) being served. | |||
| Vendor will install proper NFPA 99 pipe labels on the | |||
| distribution piping adjacent to source valves. | |||
| Vendor to provide complete documentation of testing | |||
| and results for facility records. Due in May | 1 | JOB | $_________ |
0010 All L,T,M,E necessary to inspect, functionally test, and
| Perform preventive maintenance on the Surgery Instrument Air |
| Compressor package and dryer system. Provide complete |
| Documentation for facility records after each PM visit. |
0010a. Replace all compressor filter elements and belts.
Properly lubricate as required. Replace all dryer elements, purge mufflers and dew point sensor
– Due in August 1 JOB $__________
| 0010b. Perform semi-annually, thorough inspection, | ||
| Testing and recalibration of the instrument Air | ||
| Compressor and dryer – | ||
| Due in August and February | 2 JOBS $________ $__________ |
0011 All L,T,M,E necessary for vendor to provide initial
| Inventory and perform testing and evaluation of | |||
| each Medical Gas vacuum inlet for proper | |||
| identification, - function, flow, latching, cleanliness, | |||
| and vacuum pressure per NFPA 99 standards. | |||
| Due in March | 1 | JOB | $_________ |
0012 Provide a medical gas awareness training program for
| each applicable department throughout the facility. | |||
| Provide two (2) focused awareness programs for | |||
| the Police staff. | 1 | JOB | $___________ |
0013 All L,T,M,E necessary to perform Flexible Outlet/Inlet Hose assembly testing – Due in August 1 JOB $___________
0014 Emergency Service/Maintenance performed outside normal hours of coverage 12 MO $________ $___________
TOTAL BASE YEAR: $________________
OPTION YEAR 1 JUNE 1, 2020 through MAY 31, 2021
CLIN DESCRIPTION QTY UNIT PRICE TOTAL
1001. All L,T,M,E necessary for vendor to inspect,
| functionally test and perform preventive maintenance |
| on the Medical Air Dryer and the Associated Alarm Panels. |
| Vendor to provide complete documentation for facility records |
| after each PM visit. |
| 1001a. | Dryer function testing per manufacturer’ | |||
| Recommendation – | ||||
| semi-annually in Nov and May | 2 | JOBS | $_______ $________ |
| 1001b. | Calibrate carbon monoxide monitor – | |||
| annually in May | 1 | JOB | $_________ |
| 1001c. | Test/Check dew point monitor with portable | |||||
| Instrumentation – | ||||||
| semi-annually in Nov and May | 2 | JOBS | $_______ $________ | |||
| 1001d. | Replace all filter elements, purge mufflers | |||||
| And dew point monitor sensor – | ||||||
| annually in May | 1 | JOB | $_________ |
| 1001e. | Test Dew Point and carbon monoxide master | |||
| Panel signals – annually in May | 1 | JOB | $_________ |
1002 Test and evaluate medical gas system Master Alarm Panels;
Vendor to provide complete documentation for facility records after each PM visit.
1002a. Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer’s specifications. Place each master in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Master Alarm Panels.
Annually in May 1 JOB $_______
| 1002b | Test each Master Alarm Panel for proper | |||
| audible and visual function, and inspect for | ||||
| Proper labeling – | ||||
| quarterly in Nov, Feb, May and August | 4 | JOBS | $______ $________ |
1003 Test and evaluate medical gas system Area Alarm Panels;
(Facility Wide). Vendor to provide complete documentation for facility records after each PM visit.
1003a. Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer’s specifications. Place each panel in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Area Alarm Panels.
Annually in May 1 JOB $_______
| 1003b | Test each Area Alarm Panel for proper | |||
| audible and visual function, and inspect for | ||||
| Proper labeling – Quarterly | ||||
| (After each panel tested, the | ||||
| Service technician is to provide an immediate | ||||
| Reorientation of panel function and operation to the | ||||
| VA area supervisor. Reorientation training shall | ||||
| Be documented on the medical gas panel test and | ||||
| Inspection report (to include date, time and | ||||
| Supervisor(s) name(s). | ||||
| Due in Nov, Feb, May and Aug | 4 | JOBS $_______ $________ |
1004 All L,T,M,E necessary for vendor to inspect, functionally test and perform preventive maintenance on the dental air compressor system per manufacturer’s and NFPA 99 standards. Vendor to provide complete documentation for facility records after each PM visit.
| 1004a. | Replacement of all filter elements and | ||
| Recalibrations of the dew point and carbon | |||
| Monoxide monitors shall also be done | |||
| Semi-annually, if necessary. | |||
| Due in Nov and May | 2 | JOBS $_______ $_________ |
| 1004b. | Perform laboratory particulate and purity annual | ||||
| Testing on the dental air system. Lab results | |||||
| Must be included in preventative maintenance | |||||
| Report. | Due in May | 1 | JOB | $________ |
| 1004c. | Inspect, functionally test, and perform annual | |||
| Preventative maintenance on the | ||||
| Dental vacuum system per manufacturer’s | ||||
| And NFPA 99 standards. Due in May | 1 | JOB | $_______ |
1005 All L,T,M,E necessary for vendor to perform testing On all medical gas pressure outlets:
| 1005a. | Perform annual performance testing for all |
| Medical gas pressure outlets (oxygen, medical | |
| Air, nitrous oxide, nitrogen) – during normal |
work hours – Annually in Feb 1 JOB $_______
| 1005b. | Perform annual performance testing for all |
| Medical gas pressure outlets (oxygen, medical | |
| Air, nitrous oxide, nitrogen) – during premium |
work hours – Annually in Feb 1 JOB $_______
1006 All L,T,M,E necessary for vendor to perform annual
| Inspection, testing and calibration of all medical |
| Gas manifold systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $_______
1007 All L,T,M,E necessary for vendor to annually provide purity and
| Particulate testing on oxygen, medical air and nitrous |
| Oxide gas systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $_______
1008 All L,T,M,E necessary for vendor to perform annual
| Inspection and testing on all zone valve boxes |
| Throughout Medical Center for proper location, valve type, |
| Label accuracy, and presence/function of gauges per |
| NFPA Standards. Vendor to provide complete |
documentation of testing and results for facility records Due in Feb 1 JOB $_______
1009 All L,T,M,E necessary for vendor to annually
| perform inspection and leak testing of source valves | |||
| (Oxygen, Medical Air, and Vacuum – total of 3). | |||
| Vendor will provide and install CGA/NFPA 99 approved | |||
| valve tags properly identifying the area(s) being served. | |||
| Vendor will install proper NFPA 99 pipe labels on the | |||
| distribution piping adjacent to source valves. | |||
| Vendor to provide complete documentation of testing | |||
| and results for facility records. | |||
| Due in May | 1 | JOB | $_______ |
1010 All L,T,M,E necessary to inspect, functionally test, and
| Perform preventive maintenance on the Surgery Instrument Air |
| Compressor package and dryer system. Provide complete |
| Documentation for facility records after each PM visit. |
1010a. Replace all compressor filter elements and belts.
Properly lubricate as required. Replace all dryer elements, purge mufflers and dew point sensor
– Due in August 1 JOB $________
1010b. Perform semi-annually, thorough inspection, testing and recalibration of the instrument Air Compressor
| and dryer – | |
| Due in August and February | 2 JOBS $_______ $_______ |
1011 All L,T,M,E necessary for vendor to provide initial inventory
| and perform testing and evaluation of each Medical Gas | |||
| vacuum inlet for proper identification, - function, flow, | |||
| latching, cleanliness, and vacuum pressure per NFPA 99 s | |||
| standards. | |||
| Due in March | 1 | JOB | $_________ |
1012 All L,T,M,E necessary to perform Flexible Outlet/Inlet
| Hose assembly testing – | |||
| Due in August | 1 | JOB | $_________ |
1013 Emergency Service/Maintenance performed outside normal hours of coverage 12 MO $________ $__________
TOTAL OPTION YEAR 1: $_________________
OPTION YEAR 2 JUNE 1, 2021 through MAY 31, 2022
CLIN DESCRIPTION QTY UNIT PRICE TOTAL
2001. All L,T,M,E necessary for vendor to inspect,
| functionally test and perform preventive maintenance |
| on the Medical Air Dryer and the Associated Alarm Panels. |
| Vendor to provide complete documentation for facility records |
| after each PM visit. |
| 2001a. | Dryer function testing per manufacturer’ | |||
| Recommendation – | ||||
| semi-annually in Nov and May | 2 | JOBS | $_______ $________ |
| 2001b. | Calibrate carbon monoxide monitor – | |||
| annually in May | 1 | JOB | $________ |
| 2001c. | Test/Check dew point monitor with portable | |||||
| Instrumentation – | ||||||
| semi-annually in Nov and May | 2 | JOBS $_______ $________ | ||||
| 2001d. | Replace all filter elements, purge mufflers | |||||
| And dew point monitor sensor – | ||||||
| annually in May | 1 | JOB | $________ |
| 2001e. | Test Dew Point and carbon monoxide master | |||
| Panel signals – annually in May | 1 | JOB | $________ |
2002 Test and evaluate medical gas system Master Alarm Panels;
Vendor to provide complete documentation for facility records after each PM visit.
2002a. Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer’s specifications. Place each master in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Master Alarm Panels.
Annually in May 1 JOB $________
| 2002b | Test each Master Alarm Panel for proper | ||
| audible and visual function, and inspect for | |||
| Proper labeling – | |||
| quarterly in Nov, Feb, May and August | 4 | JOBS $_______ $________ |
2003 Test and evaluate medical gas system Area Alarm Panels;
(Facility Wide). Vendor to provide complete documentation for facility records after each PM visit.
2003a. Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer’s specifications. Place each panel in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Area Alarm Panels.
Annually in May 1 JOB $________
| 2003b | Test each Area Alarm Panel for proper | |||
| audible and visual function, and inspect for | ||||
| Proper labeling – Quarterly | ||||
| (After each panel is tested, the | ||||
| Service technician is to provide an immediate | ||||
| Reorientation of panel function and operation to the | ||||
| VA area supervisor. Reorientation training shall | ||||
| Be documented on the medical gas panel test and | ||||
| Inspection report (to include date, time and | ||||
| Supervisor(s) name(s)). | ||||
| Due in Nov, Feb, May and Aug | 4 | JOBS $_______ $_________ |
2004 All L,T,M,E necessary for vendor to inspect, functionally test and perform preventive maintenance on the dental air compressor system per manufacturer’s and NFPA 99 standards. Vendor to provide complete documentation for facility records after each PM visit.
| 2004a. | Replacement of all filter elements and | ||
| Recalibrations of the dew point and carbon | |||
| Monoxide monitors shall also be done | |||
| Semi-annually, if necessary. | |||
| Due in Nov and May | 2 | JOBS $_______ $_________ |
| 2004b. | Perform laboratory particulate and purity annual | |||
| Testing on the dental air system. Lab results | ||||
| Must be included in preventative maintenance | ||||
| Report. | ||||
| Due in May | 1 | JOB | $_________ |
| 2004c. | Inspect, functionally test, and perform annual | |||
| Preventative maintenance on the | ||||
| Dental vacuum system per manufacturer’s | ||||
| And NFPA 99 standards. | ||||
| Due in May | 1 | JOB | $_________ |
2005 All L,T,M,E necessary for vendor to perform testing On all medical gas pressure outlets:
| 2005a. | Perform annual performance testing for all |
| Medical gas pressure outlets (oxygen, medical | |
| Air, nitrous oxide, nitrogen) – during normal |
work hours – Annually in Feb 1 JOB $________
| 2005b. | Perform annual performance testing for all |
| Medical gas pressure outlets (oxygen, medical | |
| Air, nitrous oxide, nitrogen) – during premium |
work hours – Annually in Feb 1 JOB $________
2006 All L,T,M,E necessary for vendor to perform annual
| Inspection, testing and calibration of all medical |
| Gas manifold systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $________
2007 All L,T,M,E necessary for vendor to annually provide purity and
| Particulate testing on oxygen, medical air and nitrous |
| Oxide gas systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $________
2008 All L,T,M,E necessary for vendor to perform annual
| Inspection and testing on all zone valve boxes |
| Throughout Medical Center for proper location, valve type, |
| Label accuracy, and presence/function of gauges per |
| NFPA Standards. Vendor to provide complete |
documentation of testing and results for facility records Due in Feb 1 JOB $________
2009 All L,T,M,E necessary for vendor to annually
| perform inspection and leak testing of source valves | |||
| (Oxygen, Medical Air, and Vacuum – total of 3). | |||
| Vendor will provide and install CGA/NFPA 99 approved | |||
| valve tags properly identifying the area(s) being served. | |||
| Vendor will install proper NFPA 99 pipe labels on the | |||
| distribution piping adjacent to source valves. | |||
| Vendor to provide complete documentation of testing | |||
| and results for facility records. | |||
| Due in May | 1 | JOB | $________ |
2010 All L,T,M,E necessary to inspect, functionally test, and
| Perform preventive maintenance on the Surgery Instrument Air |
| Compressor package and dryer system. Provide complete |
| Documentation for facility records after each PM visit. |
2010a. Replace all compressor filter elements and belts.
Properly lubricate as required. Replace all dryer elements, purge mufflers and dew point sensor
– Due in August 1 JOB $_________
2010b. Perform semi-annually, thorough inspection, testing and recalibration of the instrument Air Compressor
| and dryer – | ||
| Due in August and February | 2 | JOBS $_______ $_________ |
2011 All L,T,M,E necessary for vendor to provide initial inventory
| and perform testing and evaluation of each Medical Gas | |||
| vacuum inlet for proper identification, - function, flow, | |||
| latching, cleanliness, and vacuum pressure per NFPA 99 s | |||
| standards. | |||
| Due in March | 1 | JOB | $_________ |
2012 All L,T,M,E necessary to perform Flexible Outlet/Inlet
| Hose assembly testing – | |||
| Due in August | 1 | JOB | $_________ |
2013 Emergency Service/Maintenance performed outside normal hours of coverage 12 MO $_______ $__________
TOTAL OPTION YEAR 2: $________________
OPTION YEAR 3 JUNE 1, 2022 through MAY 31, 2023
CLIN DESCRIPTION QTY UNIT PRICE TOTAL
3001. All L,T,M,E necessary for vendor to inspect,
| functionally test and perform preventive maintenance |
| on the Medical Air Dryer and the Associated Alarm Panels. |
| Vendor to provide complete documentation for facility records |
| after each PM visit. |
| 3001a. | Dryer function testing per manufacturer’ | |||
| Recommendation – | ||||
| semi-annually in Nov and May | 2 | JOBS | $_______ $________ |
| 3001b. | Calibrate carbon monoxide monitor – | |||
| annually in May | 1 | JOB | $________ |
| 3001c. | Test/Check dew point monitor with portable | |||||
| Instrumentation – | ||||||
| semi-annually in Nov and May | 2 | JOBS | $_______ $________ | |||
| 3001d. | Replace all filter elements, purge mufflers | |||||
| And dew point monitor sensor – | ||||||
| annually in May | 1 | JOB | $________ |
| 3001e. | Test Dew Point and carbon monoxide master | |||
| Panel signals – annually in May | 1 | JOB | $________ |
3002 Test and evaluate medical gas system Master Alarm Panels;
Vendor to provide complete documentation for facility records after each PM visit.
3002a. Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer’s specifications. Place each master in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Master Alarm Panels.
Annually in May 1 JOB $_______
| 3002b | Test each Master Alarm Panel for proper | |
| audible and visual function, and inspect for | ||
| Proper labeling – | ||
| quarterly in Nov, Feb, May and August 4 | JOBS $_______ $________ |
3003 Test and evaluate medical gas system Area Alarm Panels;
(Facility Wide). Vendor to provide complete documentation for facility records after each PM visit.
3003a. Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer’s specifications. Place each panel in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Area Alarm Panels.
Annually in May 1 JOB $________
| 3003b | Test each Area Alarm Panel for proper | |||
| audible and visual function, and inspect for | ||||
| Proper labeling – Quarterly | ||||
| (After each panel is tested, the | ||||
| Service technician is to provide an immediate | ||||
| Reorientation of panel function and operation to the | ||||
| VA area supervisor. Reorientation training shall | ||||
| Be documented on the medical gas panel test and | ||||
| Inspection report (to include date, time and | ||||
| Supervisor(s) name(s)). | ||||
| Due in Nov, Feb, May and Aug | 4 | JOBS $_______ $________ |
3004 All L,T,M,E necessary for vendor to inspect, functionally test and perform preventive maintenance on the dental air compressor system per manufacturer’s and NFPA 99 standards. Vendor to provide complete documentation for facility records after each PM visit.
| 3004a. | Replacement of all filter elements and | ||
| Recalibrations of the dew point and carbon | |||
| Monoxide monitors shall also be done | |||
| Semi-annually, if necessary. | |||
| Due in Nov and May | 2 | JOBS $_______ $________ |
| 3004b. | Perform laboratory particulate and purity annual | |||
| Testing on the dental air system. Lab results | ||||
| Must be included in preventative maintenance | ||||
| Report. | ||||
| Due in May | 1 | JOB | $________ |
| 3004c. | Inspect, functionally test, and perform annual | |||
| Preventative maintenance on the | ||||
| Dental vacuum system per manufacturer’s | ||||
| And NFPA 99 standards. | ||||
| Due in May | 1 | JOB | $__________ |
3005 All L,T,M,E necessary for vendor to perform testing On all medical gas pressure outlets:
| 3005a. | Perform annual performance testing for all | |||
| Medical gas pressure outlets (oxygen, medical | ||||
| Air, nitrous oxide, nitrogen) – approximately | ||||
| 700 outlets, during normal work hours – | ||||
| Annually in Feb | 1 | JOB | $________ |
| 3005b. | Perform annual performance testing for all | |||
| Medical gas pressure outlets (oxygen, medical | ||||
| Air, nitrous oxide, nitrogen) – approximately | ||||
| 100 outlets, during premium work hours – | ||||
| Annually in Feb | 1 | JOB | $________ |
3006 All L,T,M,E necessary for vendor to perform annual
| Inspection, testing and calibration of all medical |
| Gas manifold systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $________
3007 All L,T,M,E necessary for vendor to annually provide purity and
| Particulate testing on oxygen, medical air and nitrous |
| Oxide gas systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $________
3008 All L,T,M,E necessary for vendor to perform annual
| Inspection and testing on all zone valve boxes |
| Throughout Medical Center for proper location, valve type, |
| Label accuracy, and presence/function of gauges per |
| NFPA Standards. Vendor to provide complete |
documentation of testing and results for facility records Due in Feb 1 JOB $________
3009 All L,T,M,E necessary for vendor to annually
| perform inspection and leak testing of source valves | |||
| (Oxygen, Medical Air, and Vacuum – total of 3). | |||
| Vendor will provide and install CGA/NFPA 99 approved | |||
| valve tags properly identifying the area(s) being served. | |||
| Vendor will install proper NFPA 99 pipe labels on the | |||
| distribution piping adjacent to source valves. | |||
| Vendor to provide complete documentation of testing | |||
| and results for facility records. | |||
| Due in May | 1 | JOB | $_________ |
3010 All L,T,M,E necessary to inspect, functionally test, and
| Perform preventive maintenance on the Surgery Instrument Air |
| Compressor package and dryer system. Provide complete |
| Documentation for facility records after each PM visit. |
3010a. Replace all compressor filter elements and belts.
Properly lubricate as required. Replace all dryer elements, purge mufflers and dew point sensor
– Due in August 1 JOB $________
3010b. Perform semi-annually, thorough inspection, testing and recalibration of the instrument Air Compressor and dryer – Due in August and February 2 JOBS $_______ $_________
3011 All L,T,M,E necessary for vendor to provide initial inventory
| and perform testing and evaluation of each Medical Gas | |||
| vacuum inlet for proper identification, - function, flow, | |||
| latching, cleanliness, and vacuum pressure per NFPA 99 s | |||
| standards. Due in March | 1 | JOB | $_________ |
3012 All L,T,M,E necessary to perform Flexible Outlet/Inlet Hose assembly testing – Due in August 1 JOB $_________
3013 Emergency Service/Maintenance performed outside normal hours of coverage 12 MO $_______ $_________
TOTAL OPTION YEAR 3: $_______________
OPTION YEAR 4 JUNE 1, 2023 through MAY 31, 2024
CLIN DESCRIPTION QTY UNIT PRICE TOTAL
4001 All L,T,M,E necessary for vendor to inspect,
| functionally test and perform preventive maintenance |
| on the Medical Air Dryer and the Associated Alarm Panels. |
| Vendor to provide complete documentation for facility records |
| after each PM visit. |
| 4001a. | Dryer function testing per manufacturer’ | ||
| Recommendation – | |||
| semi-annually in Nov and May | 2 | JOBS $_______ $________ |
| 4001b. | Calibrate carbon monoxide monitor – | |||
| annually in May | 1 | JOB | $________ |
| 4001c. | Test/Check dew point monitor with portable | |||||
| Instrumentation – | ||||||
| semi-annually in Nov and May | 2 | JOBS $_______ $_________ | ||||
| 4001d. | Replace all filter elements, purge mufflers, | |||||
| And dew point monitor sensor – | ||||||
| annually in May | 1 | JOB | $________ |
| 4001e. | Test Dew Point and carbon monoxide master | |||
| Panel signals – annually in May | 1 | JOB | $________ |
4002 Test and evaluate medical gas system Master Alarm Panels;
Vendor to provide complete documentation for facility records after each PM visit.
4002a. Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer’s specifications. Place each master in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Master Alarm Panels. Annually in May 1 JOB $________
| 4002b | Test each Master Alarm Panel for proper | ||
| audible and visual function, and inspect for | |||
| Proper labeling – | |||
| quarterly in Nov, Feb, May and August | 4 | JOBS $_______ $________ |
4003 Test and evaluate medical gas system Area Alarm Panels;
(Facility Wide). Vendor to provide complete documentation for facility records after each PM visit.
4003a. Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer’s specifications. Place each panel in actual alarm conditions and recalibrate. Include check of all lamps and audible alarms for sound at Area Alarm Panels.
Annually in May 1 JOB $________
| 4003b | Test each Area Alarm Panel for proper | |||
| audible and visual function, and inspect for | ||||
| Proper labeling – Quarterly | ||||
| (After each panel is tested, the | ||||
| Service technician is to provide an immediate | ||||
| Reorientation of panel function and operation to the | ||||
| VA area supervisor. Reorientation training shall | ||||
| Be documented on the medical gas panel test and | ||||
| Inspection report (to include date, time and | ||||
| Supervisor(s) name(s)). | ||||
| Due in Nov, Feb, May and Aug | 4 | JOBS $_______ $________ |
4004 All L,T,M,E necessary for vendor to inspect, functionally test and perform preventive maintenance on the dental air compressor system per manufacturer’s and NFPA 99 standards. Vendor to provide complete documentation for facility records after each PM visit.
| 4004a. | Replacement of all filter elements and | ||
| Recalibrations of the dew point and carbon | |||
| Monoxide monitors shall also be done | |||
| Semi-annually, if necessary. | |||
| Due in Nov and May | 2 | JOBS $_______ $_________ |
| 4004b. | Perform laboratory particulate and purity annual | ||||
| Testing on the dental air system. Lab results | |||||
| Must be included in preventative maintenance | |||||
| Report. | Due in May | 1 | JOB | $_________ |
| 4004c. | Inspect, functionally test, and perform annual | |||
| Preventative maintenance on the | ||||
| Dental vacuum system per manufacturer’s | ||||
| And NFPA 99 standards. Due in May | 1 | JOB | $_________ |
4005 All L,T,M,E necessary for vendor to perform testing on all medical gas pressure outlets:
| 4005a. | Perform annual performance testing for all | ||||
| Medical gas pressure outlets (oxygen, medical | |||||
| Air, nitrous oxide, nitrogen) – during normal | |||||
| work hours – Annually in Feb | 1 | JOB | $_________ |
| 4005b. | Perform annual performance testing for all | ||||
| Medical gas pressure outlets (oxygen, medical | |||||
| Air, nitrous oxide, nitrogen) – during premium | |||||
| work hours – Annually in Feb | 1 | JOB | $_________ |
4006 All L,T,M,E necessary for vendor to perform annual
| Inspection, testing and calibration of all medical |
| Gas manifold systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $________
4007 All L,T,M,E necessary for vendor to annually provide purity and
| Particulate testing on oxygen, medical air and nitrous |
| Oxide gas systems in accordance with the requirements |
| Of NFPA 99, CGA, USP, and the manufacturer’s |
| Instructions/literature. Vendor to provide complete |
documentation of testing and results for facility records Due in May 1 JOB $_________
4008 All L,T,M,E necessary for vendor to perform annual
| Inspection and testing on all zone valve boxes |
| Throughout Medical Center for proper location, valve type, |
| Label accuracy, and presence/function of gauges per |
| NFPA Standards. Vendor to provide complete |
documentation of testing and results for facility records Due in Feb 1 JOB $_________
4009 All L,T,M,E necessary for vendor to annually
| perform inspection and leak testing of source valves | |||
| (Oxygen, Medical Air, and Vacuum – total of 3). | |||
| Vendor will provide and install CGA/NFPA 99 approved | |||
| valve tags properly identifying the area(s) being served. | |||
| Vendor will install proper NFPA 99 pipe labels on the | |||
| distribution piping adjacent to source valves. | |||
| Vendor to provide complete documentation of testing | |||
| and results for facility records. | |||
| Due in May | 1 | JOB | $_________ |
4010 All L,T,M,E necessary to inspect, functionally test, and
| Perform preventive maintenance on the Surgery Instrument Air |
| Compressor package and dryer system. Provide complete |
| Documentation for facility records after each PM visit. |
4010a. Replace all compressor filter elements and belts.
Properly lubricate as required. Replace all dryer elements, purge mufflers and dew point sensor
– Due in August 1 JOB $__________
4010b. Perform semi-annually, thorough inspection, testing and recalibration of the instrument Air Compressor
| and dryer – | ||
| Due in August and February | 2 | JOBS $_______ $__________ |
4011 All L,T,M,E necessary for vendor to provide initial inventory
| and perform testing and evaluation of each Medical Gas | |||
| vacuum inlet for proper identification, - function, flow, | |||
| latching, cleanliness, and vacuum pressure per NFPA 99 s | |||
| standards. Due in March | 1 | JOB | $__________ |
4012 All L,T,M,E necessary to perform Flexible Outlet/Inlet Hose assembly testing – Due in August 1 JOB $__________
4013 Emergency Service/Maintenance performed outside normal hours of coverage 12 MO $________ $__________
TOTAL OPTION YEAR 4: $________________
TOTAL BASE & 4 OPTION YEARS $_____________________
STATEMENT OF WORK/ TECHNICAL WORK REQUIREMENTS
The contractor shall provide all labor, materials, supervision, tools and equipment necessary to perform Preventive Maintenance/Inspections/Emergency Service for MEDICAL GAS SYSTEMS as described in this Statement of Work for campus buildings 111 and 144. Contractor shall perform scheduled PREVENTIVE MAINTENANCE (PM) INSPECTIONS in accordance with manufacturer's specifications and NFPA 2018 specifications. Services are for Clement J. Zablocki VA Medical Center, 5000 W. National Ave, Milwaukee, WI.
1. CRITICAL ELEMENTS:
A. Contractor will provide complete inventory and initial inspection of each piece of equipment listed herein. Inventory must be submitted to COR electronically using MS Excel (or other mutually agreed upon format). (Para 2) B. Based on initial inventory/inspection; Contractor will establish and provide to the COR a complete Preventive Maintenance Plan to ensure those requirements of the contract are provided within 10 days of completion of initial inventory/inspection. (Para 2) . Inventory will determine actual outlet and inlet count.
C. In addition to a Preventive Maintenance Plan, Contractor will establish a Quality Control Program, provided to COR within 10 days of completion of initial inventory/inspection (Para 12)
D. Contractor will provide in writing to the COR a schedule of all work and provide written work reports. (Para 3, 11) E. Contractor Response time is 8 hours after call is received for emergency services associated with the medical gas systems. (Para 5) F. Preventive maintenance shall be scheduled accordingly as defined per system, (Para 3) G. Frequency of scheduled preventive maintenance shall be either annual or semi-annual. (Para 3) H. Requests for extensive repairs shall be submitted in writing to the COR.
I. Provide documentation for repairs and preventive maintenance. Initial Inventory as well as monthly service reports must be submitted electronically using MS Excel (or other mutually agreed upon format). (Para 2, 11)
J. Contractor's personnel are required to sign-in immediately upon arrival on-site and sign-out at time of departure. (Para 14).
K. Medical gas transducers are located inside alarm panels.
2. TECHNICAL WORK REQUIREMENTS:
Upon award of the contract the Contractor shall coordinate with the COR a non-labor-intensive plan to inventory and inspect the Medical Gas Systems and provide the COR a written and electronic report of condition to include drawings. The report of condition must be provided to the COR before Work in the specified area starts. Within 10 days of completion of initial inventory/inspection, Contractor is required to submit a Preventive Maintenance Plan for all equipment listed herein.
3. PREVENTIVE MAINTENANCE AND INSPECTIONS SHALL INCLUDE:
A. All L,T,M,E necessary for Contractor to inspect, functionally test and perform preventive maintenance on the Medical Air Dryer and the Associated Alarm Panels. Vendor to provide complete documentation for facility records after each PM visit.
· Medical Air Dryer function testing per manufacturer's recommendation — semi-annually in November and May (0001a)
· Calibrate carbon monoxide monitor — annually in May (0001b)
· Test/Check dew point monitor with portable instrumentation — semi-annually in November and May(0001c)
· Replace all filter elements, purge mufflers and dew point monitor sensor — annually in May(0001d)
· Test Dew Point and carbon monoxide master panel signals — annually in May(0001e) B. Test and evaluate medical gas system Master Alarm Panels. Vendor to provide complete documentation for facility records after each PM visit.
· Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer's specifications. Place each master in actual alarm conditions and recalibrate, Include check of all lamps and audible alarms for sound at Master Alarm Panels. Annually in May. (0002a)
· Test each Master Alarm Panel for proper audible and visual function, and inspect for Proper labeling — quarterly in November, February, May and August. (0002b) C. Test and evaluate medical gas system Area Alarm Panels (Facility Wide). Vendor to provide complete documentation for facility records after each PM visit.
· Inspect for proper pressure switch locations, test alarm functions and settings in accordance with manufacturer's specifications. Place each panel in actual alarm conditions and recalibrate, Include check of all lamps and audible alarms for sound at Area Alarm Panels. Annually in May. (0003a)
· Test each Area Alarm Panel for proper audible and visual function, and inspect for Proper labeling — Quarterly in November, February, May and August.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.