36C25219Q0226-0004000.docx

DOCX document 23 KB Posted

Attached to
Crack Repairs on Asphalt Surfaces - roadways and parking lots
Solicitation number
36C25219Q0226
Issued by

About this file

36C25219Q0226 0004 36C25219Q0226 0004.docx

View the file

Other files

File Type Posted
36C25219C0119-000.docx DOCX document
36C25219Q0226-0007001.pdf PDF
36C25219Q0226-0007000.docx DOCX document
36C25219Q0226-0006013.pdf PDF
36C25219Q0226-0006012.docx DOCX document
36C25219Q0226-0006014.pdf PDF
36C25219Q0226-0005000.docx DOCX document
36C25219Q0226-0003000.docx DOCX document
36C25219Q0226-0002003.docx DOCX document
36C25219Q0226-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-19-2019 695-19-2-6093-0028 N/A 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI 53214-1476

36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25219Q0226 02-19-2019

X X

X

THE PURPOSE OF THIS MODIFICATION IS TO ANSWER THE QUESTIONS BELOW:

FREDERICK WEDDINGTON

CONTRACTING OFFICER

Asphalt Crack Sealing – Bidder Questions

1. Are bids based on asphalt crack filling of 1,607,900 SF of asphalt or do bidders need to measure asphalt areas?

· Yes, quotes should be based off SF provided. No, contractors are not required to measure the square footage of the asphalt area.

2. The bid documents don’t indicate any striping. If crack repairs cross striping, does the striping need to be touched up?

· No line striping required.

3. On page 12 of the Solicitation under Item Information the Quantity is shown as “1” and the Unit is “JB”. This suggests the Unit Cost is a lump sum and would be the same as the Total Cost.

Should a cost/SF or cost/LF be included so quantities can be adjusted if needed?

· Costs should be estimated by cost/SF.

4. There are areas of asphalt that are beyond repair by crack filling. An example of this is Chapel Lane. Will areas not suitable for crack filling be removed from the scope of work? How will the cost for work in these areas be quantified?

· Areas such as this are not part of the SOW and have not been included in the total square footage amount.

5. What is the contract duration for this project?

· Four weeks from the start of project after award (work to be completed during non-operational hours and weekends).

6. There are several areas with significant spider cracking. An example of this is at the end of Flower Drive at Building 102. We recommend patching the asphalt instead of crack filling in areas like this. Should the bids exclude crack filling at badly cracked areas like this?

· Exclude areas with extreme spider cracking and these areas have not been included in the total SF footage amount.

7. The campus map shows Zablocki drive extending north past I-94, but the map cuts off before the end of the road. Should crack filling be included on Zablocki drive all the way to Bluemound rd?

· Yes, but exclude the area of Zablocki Drive north of Gen Mitchell Blvd and South of the I-94 bridge.

8. SOW states cracks ranging from 1/8” to ¾” shall be sealed. Will cracks over ¾” need to be repaired?

· Yes, cracks up to 1” will need to be sealed. Anything over 1” will not be sealed.

9. Will parking lots be cleared when surfaces need to be clean and sealed?

· Yes, all coordination for the clearing of parking lots and road closures will be scheduled between the awardee and the COR.

10. Will pot holes need to be patched?

· No.

11. Are the gravel parking lots included in this SOW?

· No, the gravel parking lots will not be included in the requirement.

12. Is the Hank Aaron trail which goes through the VA grounds be included for asphalt repair?

· No, Hank Aaron trail is not VA property.

13. When will the next site visit be?

· The new site visit date will be March 15, 2019 at 9:00 A.M. in building 70 of the Milwaukee VA Medical Center; Room 70E Facility Managements Office.