36C25219B0044-005.pdf
PDF 13 MB Posted
- Attached to
- Upgrade Emergency Power Distribution 550-14-103 Federal contract opportunity
- Solicitation number
- 36C25219B0044
About this file
36C25219B0044 550-14-103 Drawings 3 of 4 - ED101A-ES611.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25219C0159-000.docx | DOCX document | |
| 36C25219B0044-0004000.docx | DOCX document | |
| 36C25219B0044-0004001.pdf | ||
| 36C25219B0044-0003001.pdf | ||
| 36C25219B0044-0003000.docx | DOCX document | |
| 36C25219B0044-0003002.pdf | ||
| 36C25219B0044-0002000.docx | DOCX document | |
| 36C25219B0044-0002001.pdf | ||
| 36C25219B0044-0001000.docx | DOCX document | |
| 36C25219B0044-001.docx | DOCX document | |
| 36C25219B0044-002.pdf | ||
| 36C25219B0044-006.pdf | ||
| 36C25219B0044-003.pdf | ||
| 36C25219B0044-004.pdf | ||
| 36C25219B0044-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
49 & 125
FOR CONSTRUCTION
PULL/TAP BOX: XFRMR
SECONDARY FEEDER IS TAPPED
TO EACH OF (3) 208v FUSED
SWITCHES
208V FEEDERS
OUT BOTTOM OF
BOX, THROUGH
THE ROOF TO
INTERIOR
PANELBOARDS
480V XFRMR
PRI FUSED SW
480V PRI FEEDER
THROUGH ROOF
150KVA XFRMR
208V XFMR SEC
FUSED SW
ADDITIONAL (2)
208V XFRMR
FUSED
SWITCHES
STACKED ABOVE
TRANSFORMER
SECONDARY FEEDER
TRANSFORMER
PRIMARY FEEDER
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
49 & 125
FOR CONSTRUCTION
BUILDING 101
ROOF MOUNTED DISTRIBUTION GEAR
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
PART A - BLDG 104 EMERGENCY POWER
BUILDING 104 GENERATOR DISTRIBUTION
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
PART B - BLDG 101 EMERGENCY POWER
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
BLDG 104 GENERATOR DISTRIBUTION
PART C - BLDG 102 EMERGENCY POWER
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
BLDG 104 GENERATOR DISTRIBUTION
PART D - BLDG 103 EMERGENCY POWER
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
BLDG 14 GENERATOR DISTRIBUTION
BUILDING 22/69 ONE-LINE DIAGRAM
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
BUILDING 22/69 ONE-LINE DIAGRAM
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
LUMINAIRE SCHEDULE
TYPE DESCRIPTION
DA
INDUSTRIAL LINEAR UTILITY AREA STRIP LUMINAIRE. HOUSING SHALL BE NOMINALLY 2.5" W
X 48" L X 2.5" H WITH HIGH GLOSS BACKED WHITE ENAMEL FINISH. LIGHTING PACKAGE
SHALL NOMINALLY BE 4,600 LUMENS @ 4000 K AND 42 W POWER CONSUMPTION. PROVIDE A
FLAT LENS. LENS SHALL BE LOW LUMINAIRE MOUNTING HEIGHT TYPE. PROVIDE A WIRE
GUARD WITH LUMINAIRE.
GA
WALL MOUNTED OUTDOOR TRAPEZOIDAL LED LUMINAIRE. HOUSING SHALL BE SINGLE
PIECE DIE CAST ALUMINUM WITH DARK BRONZE FINISH. DOOR SHALL BE SEALED WITH A
ONE-PIECE SILICON GASKET PROVIDING A RATING OF IP65. POWER COAT FINISH FINISH
SHALL BE A MINIMUM OF 3 MIL THICKNESS. PROVIDE OPTICS FOR TYPE IV DISTRIBUTION
WITH NOMINAL LIGHTING OUTPUT OF 3800 LUMENS AND 4000K COLOR TEMPREATURE AT A
POWER CONSUMPTION OF 47W. PROVIDE WITH INTEGRAL PHOTOCELL.
EM1
BATTERY POWERED LED EMERGENCY LIGHTING LUMINAIRE IN WHITE PLASTIC HOUSING.
TWO LED LAMP HEADS WITH 12 WHITE LED'S EACH. BATTERY BACKUP SHALL LAST A
MINIMUM OF 90 MINUTES UNDER FULL LOAD. LUMINAIRE SHALL BE RATED UL DAMP
LOCATION. PROVIDE SELF-DIAGNOSTICS SYSTEM INCLUDING 30 SECOND TEST EVER 30
DAYS; 30 MINUTE TEST EVERY 180 DAYS, AND; 90 MINUTE TEST ANNUALLY.
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
49 & 125
FOR CONSTRUCTION
BUILDING 101
ROOF MOUNTED DISTRIBUTION GEAR
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
DEMOLITION SECTION VIEW
BUILDING 102 & 103 MDP
EMERGENCY POWER ENTRY TO MDP
1A
CONSTRUCTION SECTION VIEW
BUILDING 102 & 103 MDP
EMERGENCY POWER ENTRY TO MDP
1B
EXTENDED EMERGENCY FEEDER
GROUNDING PLAN
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
PART A - BLDG 104 EMERGENCY POWER
DISTRIBUTION EQUIPMENT
IDENTIFICATION KEY
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
PART B - BLDG 101 EMERGENCY POWER
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
PART C - BLDG 102 EMERGENCY POWER
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
PART D - BLDG 103 EMERGENCY POWER
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
BLDG 22/69 ONE-LINE DIAGRAM
BLDG 101 ONE-LINE DIAGRAM:
ROOF EQUIPMENT
MAJOR GROUNDING
ELECTRODE SYSTEM SCHEMATIC
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
BLDG 101 ONE-LINE DIAGRAM:
ROOF EQUIPMENT
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
FEEDER SCHEDULE
BASED ON COPPER CONDUCTORS, THHN/THWN, 75°C TERMINALS
# OF
PARALLEL
RUNS
CONDUCTOR SIZE
CONDUIT
TRADE
SIZE
NOTES
PHASE
(3/C UNO)
NEUTRAL
(1 UNO)
GROUND
(1 UNO)
1 8 500 KCM - 400 KCM 3
2 8 500 KCM 500 KCM 400 KCM 3 1/2
3 8 500 KCM 500 KCM - 3
4 6 600 KCM - 350 KCM 3 1/2
5 6 600 KCM 600 KCM 350 KCM 4
6 6 600 KCM 600 KCM - 3 1/2
7 5 600 KCM - 250 KCM 3 1/2
8 5 600 KCM 600 KCM 250 KCM 3 1/2
9 5 600 KCM 600 KCM - 3 1/2
10 5 500 KCM - 250 KCM 3
11 5 500 KCM 500 KCM 250 KCM 3 1/2
12 5 500 KCM 500 KCM - 3
13 4 600 KCM - #4/0 3 1/2
14 4 600 KCM 600 KCM #4/0 3 1/2
15 4 600 KCM 600 KCM - 3 1/2
16 3 750 KCM - #4/0 3 1/2
17 3 750 KCM 750 KCM #4/0 4
18 3 750 KCM 750 KCM - 4
19 3 600 KCM - #3/0 3
20 3 600 KCM 600 KCM #3/0 3 1/2
21 3 600 KCM 600 KCM - 3 1/2
22 3 500 KCM - #3/0 3
23 3 500 KCM 500 KCM #3/0 3 1/2
24 3 500 KCM 500 KCM - 3
25 3 500 KCM - #2/0 3
26 3 500 KCM 500 KCM #2/0 3 1/2
27 3 500 KCM 500 KCM - 3
28 2 600 KCM - #1/0 3
29 2 600 KCM - #1/0 3 1/2
30 2 600 KCM - - 3 1/2
31 2 500 KCM - #1/0 3
32 2 500 KCM 500 KCM #1/0 3 1/2
33 2 500 KCM 500 KCM - 3
34 2 350 KCM - #1 2 1/2
35 2 350 KCM 350 KCM #1 3
36 2 350 KCM 350 KCM - 3
37 2 250 KCM - #2 2
38 2 250 KCM 250 KCM #2 2 1/2
39 2 250 KCM 250 KCM - 2 1/2
40 1 700 KCM - #2 3 1/2
41 1 700 KCM 700 KCM #2 4
42 1 700 KCM 700 KCM - 4
43 1 600 KCM - #3 3
44 1 600 KCM 600 KCM #3 3 1/2
45 1 600 KCM 600 KCM - 3 1/2
46 1 500 KCM - #3 3
47 1 500 KCM 500 KCM #3 3 1/2
48 1 350 KCM - #4 2 1/2
49 1 350 KCM 350 KCM #4 3
50 1 250 KCM - #4 2
51 1 250 KCM 250 KCM #4 2 1/2
52 1 #4/0 - #4 2
53 1 #4/0 #4/0 #4 2 1/2
54 1 #3/0 - #6 2
55 1 #3/0 #3/0 #6 2
56 1 #3/0 #3/0 - 2
57 1 #2/0 - #6 1 1/2
58 1 #2/0 #2/0 #6 2
59 1 #1/0 - #6 1 1/2
60 1 #1/0 #1/0 #6 1 1/2
61 1 #1 - #6 1 1/4
62 1 #1 #1 #6 1 1/2
63 1 #2 - #6 1 1/4
64 1 #2 #2 #6 1 1/4
65 1 #4 - #8 1
66 1 #4 #4 #8 1 /4
67 1 #4 - #8 1
68 1 #4 #4 #8 1 1/4
69 1 #6 - #8 3/4
70 1 #6 #6 #8 1
71 1 #4 - #8 1
72 1 #4 #4 #8 1 1/4
73 1 #6 - #10 3/4
74 1 #6 #6 #10 1
75 1 #8 - #10 3/4
76 1 #8 #8 #10 3/4
77 1 #10 - #10 1/2
78 1 #10 #10 #10 1/2
79 1 #12 - #12 1/2
80 1 #12 #12 #12 1/2 thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
PROJECT PRINCIPAL
PROJECT ARCHITECT
LANDSCAPE ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
STRUCTURAL ENGINEER
PROJECT DESIGNER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
N/A
DEG
N/A
Drawing Title Project Title
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100% Construction Documents 08/19/2016
UPGRADE EMERGENCY POWER DISTRIBUTION
BUILDINGS 14, 101, 102, 103 & 104 / CORRECT
ELECTRICAL DEFICIENCIES BUILDINGS 22/69,
File details come from the government source that posted it.