Upgrade AHU 10 and 11 Construction Project 585-18-111 at the Oscar G Johnson VAMC
Solicitation number
36C25219B0031
Issued by

About this file

36C25219B0031 A00003 S06 ATT002 - ADDENDUM No1 - 585-18-111.pdf

View the file

Other files

File Type Posted
36C25219C0131-000.docx DOCX document
36C25219B0031-A00005000.docx DOCX document
36C25219B0031-A00005001.pdf PDF
36C25219B0031-A00004000.docx DOCX document
36C25219B0031-A00003000.docx DOCX document
36C25219B0031-A00003001.pdf PDF
36C25219B0031-A00002002.pdf PDF
36C25219B0031-A00002001.pdf PDF
36C25219B0031-A00002000.docx DOCX document
36C25219B0031-A00001000.docx DOCX document
36C25219B0031-002.docx DOCX document
36C25219B0031-006.pdf PDF
36C25219B0031-003.pdf PDF
36C25219B0031-005.pdf PDF
36C25219B0031-004.pdf PDF
36C25219B0031-001.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

engineers | consultants | commissioning 2720 Arbor Court, Eau Claire, WI 54701 | P. 715.832.5680 | F. 715.832.5668

Eau Claire, WI | Madison, WI | Twin Cities, MN | Rochester, MN | Norman, OK

ADDENDUM No. 1

Client: Oscar G. Johnson VA Medical Center Project Name: Upgrade Air Handling Units 10 and 11 Project Number: 585-18-111

Issue Date: March 14, 2019

Owner: Oscar G. Johnson VA Medical Center Engineer: MEP Associates, LLC

Contract No: VA69D-16-D-0115 MEP Project No. G29.18.03

To: Prospective Bidders.

This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated February 13, 2019, with amendments and additions noted below. This Addendum consists of 2 pages and attachments.

Index of Attachments:

MP206W

MP206E

EP100

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

CHANGES TO THE SPECIFICATIONS

CHANGES TO THE DRAWINGS

Mechanical:

1. MP206E – REPLACE KEY NOTE #1 WITH THE FOLLOWING:

“INSTALL NEW AHU-10 CHILLED WATER COIL PER SCHEDULED COIL

PERFORMANCE REQUIREMENTS. COIL SUPPORT SHALL BE REPLACED AS

NECESSARY TO ACCOMMODATE NEW COIL. REMOVE AND RELOCATE EXISTING

CONTROL INSTRUMENTATION AND DEVICES, AND UV LIGHTS TO

ACCOMMODATE NEW COIL INSTALLATION. AHU HOUSING COMPONENTS SHALL

BE MODIFIED TO ACCOMMODATE NEW COILS INCLUDING COIL ACCESS PANELS

AND DRAIN PANS.”

2. MP206W – REPLACE KEY NOTE #1 WITH THE FOLLOWING:

engineers | consultants | commissioning 2720 Arbor Court, Eau Claire, WI 54701 | P. 715.832.5680 | F. 715.832.5668

Eau Claire, WI | Madison, WI | Twin Cities, MN | Rochester, MN | Norman, OK

“INSTALL NEW AHU-11 CHILLED WATER COIL PER SCHEDULED COIL

PERFORMANCE REQUIREMENTS. COIL SUPPORT SHALL BE REPLACED AS

NECESSARY TO ACCOMMODATE NEW COIL. REMOVE AND RELOCATE EXISTING

CONTROL INSTRUMENTATION AND DEVICES, AND UV LIGHTS TO

ACCOMMODATE NEW COIL INSTALLATION. AHU HOUSING COMPONENTS SHALL

BE MODIFIED TO ACCOMMODATE NEW COILS INCLUDING COIL ACCESS PANELS

AND DRAIN PANS.”

3. EP100 – ADDITION OF CONDUIT PATH TO PLAN.

Revisions have been made to the following drawings and are issued in the form of full-size plans.

Edits are indicated by a revision delta and a cloud surrounding the affected portion of the drawing.

END OF ADDENDUM