36C25219B0031-A00003002.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25219B0031
About this file
36C25219B0031 A00003 S06 ATT002 - ADDENDUM No1 - 585-18-111.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0131-000.docx | DOCX document | |
| 36C25219B0031-A00005000.docx | DOCX document | |
| 36C25219B0031-A00005001.pdf | ||
| 36C25219B0031-A00004000.docx | DOCX document | |
| 36C25219B0031-A00003000.docx | DOCX document | |
| 36C25219B0031-A00003001.pdf | ||
| 36C25219B0031-A00002002.pdf | ||
| 36C25219B0031-A00002001.pdf | ||
| 36C25219B0031-A00002000.docx | DOCX document | |
| 36C25219B0031-A00001000.docx | DOCX document | |
| 36C25219B0031-002.docx | DOCX document | |
| 36C25219B0031-006.pdf | ||
| 36C25219B0031-003.pdf | ||
| 36C25219B0031-005.pdf | ||
| 36C25219B0031-004.pdf | ||
| 36C25219B0031-001.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
engineers | consultants | commissioning 2720 Arbor Court, Eau Claire, WI 54701 | P. 715.832.5680 | F. 715.832.5668
Eau Claire, WI | Madison, WI | Twin Cities, MN | Rochester, MN | Norman, OK
ADDENDUM No. 1
Client: Oscar G. Johnson VA Medical Center Project Name: Upgrade Air Handling Units 10 and 11 Project Number: 585-18-111
Issue Date: March 14, 2019
Owner: Oscar G. Johnson VA Medical Center Engineer: MEP Associates, LLC
Contract No: VA69D-16-D-0115 MEP Project No. G29.18.03
To: Prospective Bidders.
This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated February 13, 2019, with amendments and additions noted below. This Addendum consists of 2 pages and attachments.
Index of Attachments:
MP206W
MP206E
EP100
Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.
CHANGES TO THE SPECIFICATIONS
CHANGES TO THE DRAWINGS
Mechanical:
1. MP206E – REPLACE KEY NOTE #1 WITH THE FOLLOWING:
“INSTALL NEW AHU-10 CHILLED WATER COIL PER SCHEDULED COIL
PERFORMANCE REQUIREMENTS. COIL SUPPORT SHALL BE REPLACED AS
NECESSARY TO ACCOMMODATE NEW COIL. REMOVE AND RELOCATE EXISTING
CONTROL INSTRUMENTATION AND DEVICES, AND UV LIGHTS TO
ACCOMMODATE NEW COIL INSTALLATION. AHU HOUSING COMPONENTS SHALL
BE MODIFIED TO ACCOMMODATE NEW COILS INCLUDING COIL ACCESS PANELS
AND DRAIN PANS.”
2. MP206W – REPLACE KEY NOTE #1 WITH THE FOLLOWING:
engineers | consultants | commissioning 2720 Arbor Court, Eau Claire, WI 54701 | P. 715.832.5680 | F. 715.832.5668
Eau Claire, WI | Madison, WI | Twin Cities, MN | Rochester, MN | Norman, OK
“INSTALL NEW AHU-11 CHILLED WATER COIL PER SCHEDULED COIL
PERFORMANCE REQUIREMENTS. COIL SUPPORT SHALL BE REPLACED AS
NECESSARY TO ACCOMMODATE NEW COIL. REMOVE AND RELOCATE EXISTING
CONTROL INSTRUMENTATION AND DEVICES, AND UV LIGHTS TO
ACCOMMODATE NEW COIL INSTALLATION. AHU HOUSING COMPONENTS SHALL
BE MODIFIED TO ACCOMMODATE NEW COILS INCLUDING COIL ACCESS PANELS
AND DRAIN PANS.”
3. EP100 – ADDITION OF CONDUIT PATH TO PLAN.
Revisions have been made to the following drawings and are issued in the form of full-size plans.
Edits are indicated by a revision delta and a cloud surrounding the affected portion of the drawing.
END OF ADDENDUM