About this file

36C25219B0030 0001 Amendment 0001 -1995-2005 drawings.pdf

View the file

Other files

File Type Posted
36C25219C0109-000.docx DOCX document
36C25219B0030-0002000.docx DOCX document
36C25219B0030-0002001.pdf PDF
36C25219B0030-0001000.docx DOCX document
36C25219B0030-008.pdf PDF
36C25219B0030-006.pdf PDF
36C25219B0030-005.docx DOCX document
36C25219B0030-007.pdf PDF
36C25219B0030-004.docx DOCX document
36C25219B0030-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fourth

AS-BUILT

DRAWING FOR INFORMATIONAL

PURPOSES ONLY. ALL PIPE

LOCATIONS, SIZES, AND

MEASUREMENTS SHALL BE

VERFIED BY THE CONTRACTOR.

ALL WALLS AND EXACT

DIMENSIONS OF THE ATTICS

SHALL BE VERFIED BY THE

CONTRACTOR.

INFILL ROOF

VHATOMSeideT Line

DRAWING FOR INFORMATIONAL

PURPOSES ONLY. ALL PIPE

LOCATIONS, SIZES, AND

MEASUREMENTS SHALL BE

VERFIED BY THE CONTRACTOR.

UNFINISHED ATTIC SPACE

INDICATED IN THE SOW IS CIRCLED

IN RED. ALL WALL LOCATIONS

AND EXACT DIMENSIONS OF THE

ATTICS SHALL BE VERFIED BY THE

CONTRACTOR.

AS-BUILT FOURTH FLOOR

LOCATIONS, SIZES, AND

MEASUREMENTS SHALL BE

VERFIED BY THE CONTRACTOR.

AS-BUILT PENTHOUSE

VHATOMSeideT Pencil

LOCATIONS, SIZES, AND

MEASUREMENTS SHALL BE

VERFIED BY THE CONTRACTOR.

AS-BUILT

B400-Sprinkler 1995-Fourth Floor
B400 Sprinkler 2005- Fourth Floor
B400-Sprinkler 1995-Penthouse and Bell Tower
B400 Sprinkler 2005- Penthouse