36C25219B0023-005.pdf

PDF 8 MB Posted

Attached to
550-18-112 Construct Campus Perimeter Fence Federal contract opportunity
Solicitation number
36C25219B0023
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25219B0023 Revised Drawings 51-65.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 550-18-112 Construct Campus Perimeter Fence, newest first.
File Type Posted
36C25219B0023-0003000.docx DOCX document
36C25219B0023-0002000.docx DOCX document
36C25219B0023-0001004.pdf PDF
36C25219B0023-0001003.pdf PDF
36C25219B0023-0001002.pdf PDF
36C25219B0023-0001001.pdf PDF
36C25219B0023-0001005.pdf PDF
36C25219B0023-0001000.docx DOCX document
36C25219B0023-001.docx DOCX document
36C25219B0023-003.pdf PDF
36C25219B0023-004.pdf PDF
36C25219B0023-002.pdf PDF
36C25219B0023-000.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PACKAGED TERMINAL AIR CONDITIONER SCHEDULE

TAG MAKE MODEL TYPE

COOLING

CAPACITY (BTUH)

EER

HEATING

CAPACITY (BTUH)

COP

ELECTRIC HEAT

CAPACITY (BTUH)

V/HZ/PH MCA MOPD POLES NOTES

PTAC-1 GE AZ65H07DAB

HEAT PUMP WITH

ELECTRICAL RESISTANCE

BACKUP HEAT

6,900 13.0 6,100 4.0 6,600 208/60/1 15 15 2 1,2

NOTES:

1. PROVIDE HEAT PUMP UNIT WITH ELECTRIC RESISTANCE BACKUP HEAT.

2. PROVIDE SUB-BASE AND HARD WIRED POWER CONNECTION KIT.

1 2

A A

BB

M1.00

M1.00

M1.00

PTAC-1

23-01

LEVEL 1

100' - 0"

TRUSS BEARING

109' - 1 1/8"

T.O. FOOTING

96' - 0"

1 2

PTAC-1

LEVEL 1

100' - 0"

TRUSS BEARING

109' - 1 1/8"

T.O. FOOTING

96' - 0"

PTAC-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% For Construction Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

517 7th street rapid city sd 57701 p 605.342.9470 f 605.342.2377 fourfrontdesign.com

Dwg. of 65

BID ALTERNATE #2

L

-2

C F

M I D

IQ

\1

-2

.0

C o n s tr u c t C a m p u s P e ri m e te r F e n c e

\D ra w in g s \A rc h

\2

.0

C A

M P

U S

P E

R

IM

E T

E R

F E

N C

E G

U A

R D

H O

U S

E .r v t

/2

/2

:2

:4

A

M

M1.00

HVAC PLAN Construct Campus Perimeter Fence

Danville, Illinois

550-18-112

Campus Perimeter

August 31, 2018 MJP JB

12" = 1'-0"

PTAC SCHEDULE

1/4" = 1'-0"

Work - Level 1 Mechanical 1/4" = 1'-0"

MECHANICAL SECTION

1/4" = 1'-0"

MECHANICAL NORTH ELEVATION

23-01 PROVIDE PTAC UNIT AND ALL OPTIONS/ACCESSORIES AS SCHEDULED. INSTALL

ACCORDING TO MANUFACTURER WRITTEN INSTRUCTIONS. PROVIDE UNIT MOUNTED

CONTROLS AND PROPER CONDENSATE DRAIN SYSTEM FOR LOCAL CLIMATE. ENSURE

ENTIRE SYSTEM IS COMPLETE AND OPERATIONAL IN ALL HEATING AND COOLING MODES

AS A PART OF INITIAL STARTUP.

KEYNOTES:

ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE (IBC), INTERNATIONAL MECHANICAL CODE (IMC), INTERNATIONAL PLUMBING CODE (IPC), INTERNATIONAL FUEL GAS CODE (IFGC), NFPA 101 LIFE SAFETY CODE, AND ANY AUTHORITY HAVING JURISDICTION. THIS IS A FEDERAL PROJECT. AS SUCH, ALL CODE REQUIREMENTS ARE REQUIRED AND ENFORCED BY THE UNITED STATES

VETERANS ADMINISTRATION.

ALL EQUIPMENT, MATERIALS, AND ARTICLES INCORPORATED IN THE WORK SHALL BE NEW AND OF COMPARABLE QUALITY AS SPECIFIED. ALL WORKMANSHIP SHALL BE FIRST-CLASS AND SHALL BE PERFORMED BY MECHANICS

SKILLED AND REGULARLY EMPLOYED IN THEIR RESPECTIVE TRADES.

ALL WORK SHALL BE COORDINATED WITH ALL AFFECTED TRADES PRIOR TO STARTING WORK. REWORK REQUIRED DUE TO COORDINATION ISSUES SHALL BE DONE BY THE INSTALLATION CONTRACTOR WITHOUT

INCREASED COST TO THE OWNER.

THESE DRAWINGS ARE GENERAL IN NATURE. ALTHOUGH EVERY ATTEMPT HAS BEEN MADE TO INDICATE THE EXACT ROUTING AND LOCATION OF PROPOSED SYSTEMS, NOT ALL OFFSETS, REQUIRED FITTINGS AND/OR CONDITIONS CAN BE SHOWN. THE CONTRACTOR SHALL COORDINATE WORK AND MAKE REQUIRED CHANGES TO

THE ROUTING IN ORDER TO AVOID CONFLICTS WITHOUT ANY INCREASED COST TO THE OWNER.

SYSTEMS DESIGNATED TO BE PROVIDED AND INSTALLED WITHIN THESE CONTRACT DOCUMENTS ARE INTENDED TO BE COMPLETE AND OPERATIONAL. PROVIDE EVERYTHING ESSENTIAL FOR THE COMPLETION OF THE WORK TO MAKE THE SYSTEM READY FOR NORMAL AND PROPER OPERATION, INCLUDING ALL WORK OR MATERIALS NOT DIRECTLY SHOWN ON THE DRAWINGS OR IN THE SPECIFICATIONS, BUT NECESSARY FOR THE PROPER

OPERATION OF THE SYSTEM.

HVAC CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER MAINTENANCE CLEARANCES ARE MAINTAINED.

COORDINATE WITH ALL OTHER RELATED TRADES BEFORE CONDUCTING WORK.

GENERAL NOTES:

Revisions: Date:

File details come from the government source that posted it.