36C25219B0023-005.pdf
PDF 8 MB Posted
- Attached to
- 550-18-112 Construct Campus Perimeter Fence Federal contract opportunity
- Solicitation number
- 36C25219B0023
About this file
36C25219B0023 Revised Drawings 51-65.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25219B0023-0003000.docx | DOCX document | |
| 36C25219B0023-0002000.docx | DOCX document | |
| 36C25219B0023-0001004.pdf | ||
| 36C25219B0023-0001003.pdf | ||
| 36C25219B0023-0001002.pdf | ||
| 36C25219B0023-0001001.pdf | ||
| 36C25219B0023-0001005.pdf | ||
| 36C25219B0023-0001000.docx | DOCX document | |
| 36C25219B0023-001.docx | DOCX document | |
| 36C25219B0023-003.pdf | ||
| 36C25219B0023-004.pdf | ||
| 36C25219B0023-002.pdf | ||
| 36C25219B0023-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PACKAGED TERMINAL AIR CONDITIONER SCHEDULE
TAG MAKE MODEL TYPE
COOLING
CAPACITY (BTUH)
EER
HEATING
CAPACITY (BTUH)
COP
ELECTRIC HEAT
CAPACITY (BTUH)
V/HZ/PH MCA MOPD POLES NOTES
PTAC-1 GE AZ65H07DAB
HEAT PUMP WITH
ELECTRICAL RESISTANCE
BACKUP HEAT
6,900 13.0 6,100 4.0 6,600 208/60/1 15 15 2 1,2
NOTES:
1. PROVIDE HEAT PUMP UNIT WITH ELECTRIC RESISTANCE BACKUP HEAT.
2. PROVIDE SUB-BASE AND HARD WIRED POWER CONNECTION KIT.
1 2
A A
BB
M1.00
M1.00
M1.00
PTAC-1
23-01
LEVEL 1
100' - 0"
TRUSS BEARING
109' - 1 1/8"
T.O. FOOTING
96' - 0"
1 2
PTAC-1
LEVEL 1
100' - 0"
TRUSS BEARING
109' - 1 1/8"
T.O. FOOTING
96' - 0"
PTAC-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% For Construction Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
517 7th street rapid city sd 57701 p 605.342.9470 f 605.342.2377 fourfrontdesign.com
Dwg. of 65
BID ALTERNATE #2
L
-2
C F
M I D
IQ
\1
-2
.0
C o n s tr u c t C a m p u s P e ri m e te r F e n c e
\D ra w in g s \A rc h
\2
.0
C A
M P
U S
P E
R
IM
E T
E R
F E
N C
E G
U A
R D
H O
U S
E .r v t
/2
/2
:2
:4
A
M
M1.00
HVAC PLAN Construct Campus Perimeter Fence
Danville, Illinois
550-18-112
Campus Perimeter
August 31, 2018 MJP JB
12" = 1'-0"
PTAC SCHEDULE
1/4" = 1'-0"
Work - Level 1 Mechanical 1/4" = 1'-0"
MECHANICAL SECTION
1/4" = 1'-0"
MECHANICAL NORTH ELEVATION
23-01 PROVIDE PTAC UNIT AND ALL OPTIONS/ACCESSORIES AS SCHEDULED. INSTALL
ACCORDING TO MANUFACTURER WRITTEN INSTRUCTIONS. PROVIDE UNIT MOUNTED
CONTROLS AND PROPER CONDENSATE DRAIN SYSTEM FOR LOCAL CLIMATE. ENSURE
ENTIRE SYSTEM IS COMPLETE AND OPERATIONAL IN ALL HEATING AND COOLING MODES
AS A PART OF INITIAL STARTUP.
KEYNOTES:
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE (IBC), INTERNATIONAL MECHANICAL CODE (IMC), INTERNATIONAL PLUMBING CODE (IPC), INTERNATIONAL FUEL GAS CODE (IFGC), NFPA 101 LIFE SAFETY CODE, AND ANY AUTHORITY HAVING JURISDICTION. THIS IS A FEDERAL PROJECT. AS SUCH, ALL CODE REQUIREMENTS ARE REQUIRED AND ENFORCED BY THE UNITED STATES
VETERANS ADMINISTRATION.
ALL EQUIPMENT, MATERIALS, AND ARTICLES INCORPORATED IN THE WORK SHALL BE NEW AND OF COMPARABLE QUALITY AS SPECIFIED. ALL WORKMANSHIP SHALL BE FIRST-CLASS AND SHALL BE PERFORMED BY MECHANICS
SKILLED AND REGULARLY EMPLOYED IN THEIR RESPECTIVE TRADES.
ALL WORK SHALL BE COORDINATED WITH ALL AFFECTED TRADES PRIOR TO STARTING WORK. REWORK REQUIRED DUE TO COORDINATION ISSUES SHALL BE DONE BY THE INSTALLATION CONTRACTOR WITHOUT
INCREASED COST TO THE OWNER.
THESE DRAWINGS ARE GENERAL IN NATURE. ALTHOUGH EVERY ATTEMPT HAS BEEN MADE TO INDICATE THE EXACT ROUTING AND LOCATION OF PROPOSED SYSTEMS, NOT ALL OFFSETS, REQUIRED FITTINGS AND/OR CONDITIONS CAN BE SHOWN. THE CONTRACTOR SHALL COORDINATE WORK AND MAKE REQUIRED CHANGES TO
THE ROUTING IN ORDER TO AVOID CONFLICTS WITHOUT ANY INCREASED COST TO THE OWNER.
SYSTEMS DESIGNATED TO BE PROVIDED AND INSTALLED WITHIN THESE CONTRACT DOCUMENTS ARE INTENDED TO BE COMPLETE AND OPERATIONAL. PROVIDE EVERYTHING ESSENTIAL FOR THE COMPLETION OF THE WORK TO MAKE THE SYSTEM READY FOR NORMAL AND PROPER OPERATION, INCLUDING ALL WORK OR MATERIALS NOT DIRECTLY SHOWN ON THE DRAWINGS OR IN THE SPECIFICATIONS, BUT NECESSARY FOR THE PROPER
OPERATION OF THE SYSTEM.
HVAC CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER MAINTENANCE CLEARANCES ARE MAINTAINED.
COORDINATE WITH ALL OTHER RELATED TRADES BEFORE CONDUCTING WORK.
GENERAL NOTES:
Revisions: Date:
File details come from the government source that posted it.