36C25219B0008_0005.docx

DOCX document 19 KB Posted

Attached to
537-18-161: Corrections to Fume Hoods Blood Lab and Research
Solicitation number
36C25219B0008
Issued by

About this file

36C25219B0008 0005 36C25219B0008 0005.docx

View the file

Other files

File Type Posted
36C25219C0047.docx DOCX document
36C25219B0008_0004.docx DOCX document
36C25219B0008_0003.docx DOCX document
36C25219B0008_0002.docx DOCX document
Wage_Determination_Dated_12-7-18.pdf PDF
36C25219B0008-0001000.docx DOCX document
36C25219B0008-0001001.pdf PDF
36C25219B0008-003.pdf PDF
36C25219B0008-001.docx DOCX document
36C25219B0008-004.pdf PDF
36C25219B0008-002.pdf PDF
36C25219B0008-000.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-18-2018 537-19-1-6985-0012 537-18-161 36C252 Department of Veterans Affairs

GLAC-NORTH CHICAGO

3001 Green Bay Road Building 1, Room 329 North Chicago

IL

60064-3048 36C252 Department of Veterans Affairs

GLAC-NORTH CHICAGO IL

3001 Green Bay Road Building 1, Room 329 North Chicago

IL

60064-3048 To all Offerors/Bidders

36C25219B0008 12-18-2018

X X

12/19/2018 11:30 AM CST

X

PROJECT 537-18-161 CORRECTIONS TO FUME HOODS & BIO-SAFETY CABINET

This amendment issued to extend the closing date and time and to disseminate RFIs. Please see the following pages for the RFI questions and answers.

The closing date and time is extended to December 19, 2018 at 11:30 am CST. The location remains the same.

All other terms and conditions remain the same and in full force and effect.

537-18-161 Corrections to Fume Hoods & Bio-Safety Cabinets RFIs #2

· Drawing 1B-M9 “FOURTH FLOOR BLDG. 1B” the scale calls for ¼” = 1’-0”. If you measure the doorways at ¼”= 1’ the dimensions are 1’-3” showing that the scale is incorrect. Please see attached.

· This will affect lineal footage of new duct to be installed and overall bid cost A 1/4 “ = 1’-0” scale was used when developing the CAD drawings, but in making the corresponding pdf to fit on an E size sheet, the scale became 1” = 10’ – 0” so the long length of the duct work in the corridor measures 8.87 inches which translates 87.7 feet.

· Drawing 11A-M3 – “EXHAUST FAN REPLACEMENT” detail calls for 25% of exhaust fan flow to come from the interior and 75% to come from the Outside Air (O.A.) to dilute the exhaust air.

· Fan HE-18F is scheduled to be 2700CFM. HE-18F exhausts lab hoods H9, H11, & H13 with a total 2595CFM. Utilizing the “EXHAUST FAN REPLACEMENT” detail the calculation will be 2595CFM + 75% OA = 10,380CFM. This calculation will require larger exhaust fans affecting the project cost.

· This is true for other Exhaust Fans on the project and will affect project costs

Contractor is right, drawing only states the flow from the label hoods

· They have a note calling for “Lab exhaust applications to have a 1” external insulation on all ductwork exposed to the elements, provide water proof chemical resistant jacket” 11A-M3 bottom left. This is not standard practice since it’s exhaust and the material is Stainless Steel Already.

· This is anticipated to add a large unnecessary cost to the project.

It is acceptable to have the insulation removed.