36C25219B0008_0005.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C25219B0008
About this file
36C25219B0008 0005 36C25219B0008 0005.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0047.docx | DOCX document | |
| 36C25219B0008_0004.docx | DOCX document | |
| 36C25219B0008_0003.docx | DOCX document | |
| 36C25219B0008_0002.docx | DOCX document | |
| Wage_Determination_Dated_12-7-18.pdf | ||
| 36C25219B0008-0001000.docx | DOCX document | |
| 36C25219B0008-0001001.pdf | ||
| 36C25219B0008-003.pdf | ||
| 36C25219B0008-001.docx | DOCX document | |
| 36C25219B0008-004.pdf | ||
| 36C25219B0008-002.pdf | ||
| 36C25219B0008-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 12-18-2018 537-19-1-6985-0012 537-18-161 36C252 Department of Veterans Affairs
GLAC-NORTH CHICAGO
3001 Green Bay Road Building 1, Room 329 North Chicago
IL
60064-3048 36C252 Department of Veterans Affairs
GLAC-NORTH CHICAGO IL
3001 Green Bay Road Building 1, Room 329 North Chicago
IL
60064-3048 To all Offerors/Bidders
36C25219B0008 12-18-2018
X X
12/19/2018 11:30 AM CST
X
PROJECT 537-18-161 CORRECTIONS TO FUME HOODS & BIO-SAFETY CABINET
This amendment issued to extend the closing date and time and to disseminate RFIs. Please see the following pages for the RFI questions and answers.
The closing date and time is extended to December 19, 2018 at 11:30 am CST. The location remains the same.
All other terms and conditions remain the same and in full force and effect.
537-18-161 Corrections to Fume Hoods & Bio-Safety Cabinets RFIs #2
· Drawing 1B-M9 “FOURTH FLOOR BLDG. 1B” the scale calls for ¼” = 1’-0”. If you measure the doorways at ¼”= 1’ the dimensions are 1’-3” showing that the scale is incorrect. Please see attached.
· This will affect lineal footage of new duct to be installed and overall bid cost A 1/4 “ = 1’-0” scale was used when developing the CAD drawings, but in making the corresponding pdf to fit on an E size sheet, the scale became 1” = 10’ – 0” so the long length of the duct work in the corridor measures 8.87 inches which translates 87.7 feet.
· Drawing 11A-M3 – “EXHAUST FAN REPLACEMENT” detail calls for 25% of exhaust fan flow to come from the interior and 75% to come from the Outside Air (O.A.) to dilute the exhaust air.
· Fan HE-18F is scheduled to be 2700CFM. HE-18F exhausts lab hoods H9, H11, & H13 with a total 2595CFM. Utilizing the “EXHAUST FAN REPLACEMENT” detail the calculation will be 2595CFM + 75% OA = 10,380CFM. This calculation will require larger exhaust fans affecting the project cost.
· This is true for other Exhaust Fans on the project and will affect project costs
Contractor is right, drawing only states the flow from the label hoods
· They have a note calling for “Lab exhaust applications to have a 1” external insulation on all ductwork exposed to the elements, provide water proof chemical resistant jacket” 11A-M3 bottom left. This is not standard practice since it’s exhaust and the material is Stainless Steel Already.
· This is anticipated to add a large unnecessary cost to the project.
It is acceptable to have the insulation removed.