36C25218B1033-0001000.docx

DOCX document 83 KB Posted

Attached to
Captain James A. Lovell Federal Health Care Center Job Order Contract IDIQ
Solicitation number
36C25218B1033
Issued by

About this file

36C25218B1033 0001 36C25218B1033 0001.docx

View the file

Other files

File Type Posted
36C25218B1033-003.docx DOCX document
36C25218B1033-001.docx DOCX document
36C25218B1033-004.docx DOCX document
36C25218B1033-002.docx DOCX document
36C25218B1033-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-15-2018 556-18-4-6977-0073 556-18-4-6977-0074

IDIQ

36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) Room 329, Bldg 1 3001 Green Bay Road North Chicago IL 60064 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) Room 328, Bldg 1 3001 Green Bay Road North Chicago IL 60064 To all Offerors/Bidders

36C25218B1033 07-20-2018

X X X one (1) Captain James A. Lovell Federal Health Care Center - IDIQ Job Order Contract (JOC)

The purpose of this amendment is to:

1) Respond to Request for Information (RFI) questions;

2) Change the bid opening location;

3) Update IL8 Wage Determination.

All other solicitation terms and conditions remain unchanged.

Jason Hardy Contracting Officer

VA-VHA-SAOC2016-C26803A8

CONTINUATION PAGE(S)

Solicitation Number: 36C25218B1033 Description: James A. Lovell Federal Health Care Center IDIQ Job Order Contract (JOC)

AMENDMENT A00001

1. BID OPENING LOCATION:

The bid opening location is hereby changed, From:

Department of Veterans Affairs
James A. Lovell Federal Health Care Center
Conference Room 328, Third Floor of Bldg 1
3001 Green Bay Road
North Chicago, IL 60064

To:

Department of Veterans Affairs
James A. Lovell Federal Health Care Center
Engineering Conference Room 114, First Floor of Bldg 3
3001 Green Bay Road
North Chicago, IL 60064

2. RFI Responses:

The following RFI questions have been submitted regarding this solicitation. The following RFI questions and responses represent all questions submitted to the Contracting Officer prior to the deadline established in the solicitation. Bidders are instructed to submit their bids in response to the solicitation “as-is”, taking into consideration all amendments issued. Questions and responses are provided for bidder’s information and use:

Q1: Are Payment and Performance Bonds to be factored into the coefficient?

A1: The cost for payment and performance bonds are included in the coefficient. See page 2 of the Statement of Work for clarification.

As a reminder, performance and payment bonds shall be required for all task orders issued against the IDIQ.

Q2: When will we expect to see another amendment?

A2. If needed, an amendment will be issued after the question submission deadline of August 6th, 2018. Please note additional amendments may be issued before bid opening as needed so please monitor www.fbo.gov closely for any amendments.

Q3. How many decimal points in the coefficient?

A3. The contractor’s coefficient (in number format) shall be no more than 3 decimal places. See page 2 of the Statement of Work for clarification.

Q4. Will there be any seed projects?

A4. No, there is not a seed project for this solicitation.

Q5. How many awards per facility?

A5. There will be one (1) IDIQ JOC awarded per facility.

Q6. Will there be single or separate solicitations to respond to?

A6. Interested bidders will have to submit an individual bid package for each respective station they are interested in bidding on. Per the instructions provided, each package must clearly identify the specific station and solicitation number.

Q7. During the walk-through meeting, there was a question regarding seed project pricing which is a typical way to respond to the IDIQ’s but only see pricing for a RS Means Contract Coefficient standard and premium time. Is this the only pricing that you are requesting overall outside of the submission documents?

A7. The Government is only asking for the contractors to submit a coefficient for standard time and premium along with the average sum. There is no other pricing required for bid submission. Refer to the Bid Schedule for clarification.

3. Update IL8 Wage Determination as follows:

General Decision Number: IL180008 08/10/2018 IL8

Superseded General Decision Number: IL20170008

State: Illinois

Construction Types: Building and Residential

Counties: Du Page, Grundy, Kane, Kendall, Lake, McHenry and Will Counties in Illinois.

BUILDING AND RESIDENTIAL PROJECTS (does not include landscape projects)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/16/2018 3 02/23/2018 4 03/16/2018 5 05/18/2018 6 06/01/2018 7 06/15/2018 8 06/22/2018 9 06/29/2018 10 07/06/2018 11 07/13/2018 12 08/03/2018 13 08/10/2018

ASBE0017-005 06/01/2017

Rates Fringes

ASBESTOS WORKER/INSULATOR

includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 50.50 25.80 Fire Stop Technician.............$ 40.40 24.54

HAZARDOUS MATERIAL HANDLER

includes preparation, wetting, stripping, removal, scrapping vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not.............$ 37.80 24.54

BOIL0001-003 05/01/2017

DU PAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES

Rates Fringes

BOILERMAKER......................$ 46.18 29.58

BRIL0014-001 06/01/2016

DU PAGE, GRUNDY, LAKE, and WILL COUNTIES

Rates Fringes

BRICKLAYER.......................$ 44.88 26.62

BRIL0021-002 06/01/2017

Rates Fringes

MARBLE SETTER....................$ 44.63 26.83

BRIL0021-008 06/01/2017

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 44.38 25.84

TILE FINISHER....................$ 38.56 22.10

TILE SETTER......................$ 45.49 25.72

BRIL0021-010 06/01/2017

Rates Fringes

MARBLE FINISHER..................$ 33.95 26.03

BRIL0027-002 06/01/2016

KANE, KENDALL, and MCHENRY COUNTIES

Rates Fringes

BRICKLAYER.......................$ 44.88 26.62

CARP0555-003 06/01/2018

DUPAGE ANE LAKE COUNTIES

Rates Fringes

CARPENTER

Building....................$ 47.35 32.83 Heavy & Highway.............$ 47.35 32.83

CARP0555-004 10/01/2017

Residential

DU PAGE and LAKE COUNTIES

Rates Fringes

CARPENTER........................$ 37.11 31.29

CARP0555-006 06/01/2018

WILL COUNTY

BUILDING

Rates Fringes

Carpenter; Millwright;

Piledrivermen....................$ 47.35 35.11

CARP0555-007 10/01/2017

WILL COUNTY

RESIDENTIAL

Rates Fringes

CARPENTER........................$ 37.11 31.29

CARP0555-009 06/01/2018

KANE, KENDALL, AND McHENRY COUNTIES

BUILDING

Rates Fringes

CARPENTER

Carpenter, Floor Layer, Lather, Millwright, and Piledriver..................$ 47.35 32.84

CARP0555-010 10/01/2017

KANE, KENDALL, and McHENRY COUNTIES

RESIDENTIAL

Rates Fringes

CARPENTER........................$ 37.11 31.29

CARP0555-012 10/01/2017

GRUNDY COUNTY

Rates Fringes

CARPENTER

Carpenter, Millwright, Piledriver, and Soft Floor Layer Building...................$ 46.35 31.30 Residential................$ 37.11 31.29

ELEC0009-002 06/03/2018

WILL COUNTY

Rates Fringes

Line Construction Groundman...................$ 40.48 61.52% Lineman and Equipment Operator....................$ 51.90 61.52%

ELEC0117-002 06/04/2018

KANE (Northern Half) and McHENRY COUNTIES

Rates Fringes

ELECTRICIAN

Building....................$ 48.64 32.60

ELEC0117-003 10/30/2017

KANE (Northern Half), and McHENRY COUNTIES

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 38.92 32.04%+$13.88

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC0117-004 02/05/2018

KANE (Northern Half) and McHENRY COUNTIES

Rates Fringes

ELECTRICIAN

Residential.................$ 39.62 28.06

ELEC0150-002 01/29/2018

LAKE COUNTY

Rates Fringes

ELECTRICIAN

Building....................$ 40.00 38.49 Residential.................$ 39.05 28.39

ELEC0150-003 10/30/2017

LAKE COUNTY

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 36.95 29.15

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC0176-003 06/01/2018

Grundy and Will Counties

Rates Fringes

ELECTRICIAN

Residential.................$ 40.98 31.38

ELEC0176-008 06/01/2018

GRUNDY and WILL COUNTIES

Rates Fringes

ELECTRICIAN

Building....................$ 43.50 39.26

ELEC0176-015 06/01/2018

GRUNDY and WILL COUNTIES

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 36.00 30.58

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC0461-002 06/04/2018

KANE (Southern Half) AND KENDALL COUNTIES

Rates Fringes

ELECTRICIAN

Building....................$ 47.72 32.39 Residential.................$ 41.75 25.96

ELEC0461-005 10/30/2017

KANE (Southern Half), AND KENDALL COUNTIES

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 40.12 25.94

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

* ELEC0701-002 06/04/2018

DUPAGE COUNTY

Rates Fringes

ELECTRICIAN

Building....................$ 40.50 102.09% Residential.................$ 36.00 28.87

ELEC0701-003 06/04/2018

DU PAGE COUNTY

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 33.82 104.42%

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEV0002-002 01/01/2018

DU PAGE, KANE, KENDALL, LAKE, & WILL COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 54.85 32.645+a+b

FOOTNOTES:

a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.

b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service

ELEV0015-002 01/01/2018

McHENRY COUNTY

Rates Fringes

ELEVATOR MECHANIC................$ 47.94 32.645+a+b

FOOTNOTES:

A. Employer contributes 8% of regular basic hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for under 5 years of service.

B. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, Veterans' Day and Christmas Day.

ELEV0055-001 01/01/2018

GRUNDY COUNTY

Rates Fringes

ELEVATOR MECHANIC................$ 44.78 32.645+a+b

FOOTNOTES:

A. Employer contributes 8% of regular basic hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for under 5 years of service.

B. Paid Holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving; Veterans' Day & Christmas Day

* ENGI0150-026 06/01/2017

BUILDING and RESIDENTIAL

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 50.10 36.45

GROUP 2....................$ 48.80 36.45

GROUP 3....................$ 46.25 36.45

GROUP 4....................$ 44.50 36.45

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;

Autograde*; Backhoes with Caisson attachment*:Batch Plant*;

Benoto(Requires two Engineers); Boiler and Throttle Valve;

Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;

Concrete Breaker (Truck Mounted)*; Concrete Conveyor;

Concrete Conveyor, Truck Mounted; Concrete Paver over 27E

cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;

Cranes, (GCI and similar type Requires two operators only);

Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;

Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36" and Over)*; Roto Mill Grinder (Less Than 36")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.

GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Brick Forklift;

Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over); Conveyor, Portable; Forklift Trucks; Greaser Engineer; Highlift Shovels or Front End loaders under 2 1/4 cu yd; Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed; Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*; Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour); Winch Trucks with "A" Frame.

GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;

Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;

Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)

GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers *-Requires Oiler

IRON0001-014 06/01/2017

DU PAGE (Eastern 1/4), LAKE, AND MCHENRY (Hebron, Woodstock, and East thereof) COUNTIES

Rates Fringes

IRONWORKER

Sheeter.....................$ 47.58 37.34 Structural and Reinforcing..$ 47.33 37.34

IRON0063-003 06/01/2017

LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK &

EAST THEREOF) COUNTIES

IRONWORKER, ORNAMENTAL...........$ 46.75 34.44

IRON0063-004 06/01/2017

LAKE, DUPAGE (Eastern 1/4), and McHENRY (HEBRON, WOODSTOCK &

EAST THEREOF) COUNTIES

Fence Erector...............$ 39.58 27.70

IRON0136-002 07/01/2017

LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK & East thereof) COUNTIES

Machinery Movers; Riggers;

Machinery Erectors..........$ 40.17 33.04 Master Riggers..............$ 42.67 33.04

IRON0393-002 06/01/2017

DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), and MCHENRY

(SOUTHEAST 1/4) COUNTIES

IRONWORKER.......................$ 45.61 34.98

IRON0444-002 06/01/2017

DUPAGE (ARGONNE & VIC), GRUNDY, KENDALL (Southern Part), and

WILL COUNTIES

IRONWORKER.......................$ 42.50 36.70

IRON0498-006 06/01/2017

McHENRY COUNTY (Northwest Part)

Rates Fringes

IRONWORKER.......................$ 38.33 37.44

LABO0002-003 06/01/2017

DU PAGE COUNTY

Rates Fringes

LABORER

GROUP 1....................$ 41.20 27.47

GROUP 2....................$ 41.20 27.47

GROUP 3....................$ 41.28 27.47

GROUP 4....................$ 41.30 27.47

GROUP 5....................$ 41.40 27.47

GROUP 6....................$ 41.40 27.47

GROUP 7....................$ 41.43 27.47

GROUP 8....................$ 41.53 27.47

GROUP 9....................$ 41.55 27.47

GROUP 10....................$ 41.75 27.47

GROUP 11....................$ 41.78 27.47

GROUP 12....................$ 41.40 27.47

LABORER CLASSIFICATIONS

GROUP 1: Building laborers, Plasterer tenders, Pumps for Dewatering & other Unclassified Laborers

GROUP 2: Fireproofing and fire shop laborers

GROUP 3: Cement gun laborers and hose

GROUP 4: Chimney over 40 feet; Scaffold laborers;

Weldman-wreckers Burners

GROUP 5: Cement gun nozzle (gunite) laborers; Windlass and capstan person

GROUP 6: Stone derrickmen and handlers

GROUP 7: Jackhammermen, Power driven concrete saws and other power equipment

GROUP 8: Firebrick & boiler laborers

GROUP 9: Chimney on fire brick; Caisson Diggers; Well Point system men

GROUP 10: Boiler setter plastic laborers

GROUP 11: Jackhammermen on fire brick work only

GROUP 12: Dosimeter (any device) monitoring nuclear exposure); Asbestos abatement laborers; Toxic and Hazardous waste removal laborers

LABO0075-001 06/01/2017

GRUNDY AND WILL COUNTIES

Rates Fringes

LABORER

GROUP 1.....................$ 41.20 27.47

GROUP 2.....................$ 41.20 27.47

GROUP 3.....................$ 41.28 27.47

GROUP 4.....................$ 41.40 27.47

GROUP 5.....................$ 41.40 27.47

GROUP 6.....................$ 41.55 27.47

GROUP 7.....................$ 41.40 27.47

LABORER CLASSIFICATIONS

GROUP 1 - Mortar mixers, handling asphalt shingles;

Scaffolds; Sewer and trench work (ground level down to 8 feet); Catch basin and manhole diggers, mesh handling on road work; Cement and mineral filler handler; Concrete puddlers; Batch dumpers (cement & asphalt); Vibrator operators; Sand and stone wheelers to mixer Handlers);

Concrete wheelers; Airtamping hammermen; Concrete & paving breakers; Rock drillers/Jackhammermen; Chipping hammermen 1-Bag mixer; Asphalt laborer; Chain and power saws; Pit men; Fencing laborers; Mason tenders (mortar and brick wheeler); Kettlemen & tarmen, tank cleaners; Scaffold and staging laborers; Pot Firemen (tarmen); Heaters tender for any purpose; Water pumps (portable water pumps shall be tended by laborers if the employer determines tending is required); Rip rap; Handling of slab steel road forms in any manner, except road form setting, setting center strips, Contraction and expansion joints (road work);

Unloading and handling of lumber, brick, transite materials, cast iron water pipe, reinforced concrete rods, sewer and drain tile, railroad tiles and all other creosoted materials; paving blocks and concrete forms;

Handling of insulation of any type; all work involving the unloading of materials, fixtures, or furnishing, whether crated or uncrated; all mortar and composition mixers of sewer work; track laborers; Chimney and silo laborers working at a height of 1 to 48 feet; All laborers working on swinging suspended, or any type or make of scaffolding 1 to 48 feet; All laborers working inside a sphere or any type or make of tank; Working inside a sphere or any type or make of tank from bottom to a height of 48 feet; Form strippers (any type); Mechanical or motorized buggies, for concrete or masons employers; Use of skid steer loads or any other machinery which replaces the wheelbarrow or buggy; Handling multiple concrete duct or any other type of pipe used in public utility work unless otherwise specified herein; Snapping of wall ties and removal of rods; drilling of anchor bolt holes; Concrete or asphalt clipper type saws and self-propelled saws; Shoulder and grade laborers; All hydraulic electric and air or any other type of tools;

Grouting and caulking; Cleaning lumber, Nail pulling, Deck hand; Dredgehand; Shore laborer; Bankmen on Floating Plant;

Tool and material checkers; Signalmen and Flagmen on all construction work; Cleaning of debris; Removal of trees;

Concrete curing, temporary concrete protection regardless of manner or materials used; Laborers on Apsco; Janitorial;

Wrecking and demolition laborers

GROUP 2 - Sewer and drain pipe layers and multiple concrete duct or any other type of pipe used, on public utility work (ground level to 8 feet); Pumpcrete pipe handlers

GROUP 3 - Asphalt rakers; Hod carriers; Plasterer laborers;

Gunnite laborers, Slab for setters on roads, highways, streets, airport runaways, and radii (any type of form) stringline men for all aforementioned work; Wagon and tower drillers on land and floating plant used on dredging;

Asphalt gunners and plug men (undercoating on road work);

Mortar pump laborers; Plaster pump laborers

GROUP 4 - Tunnel miners, and all laborers inside tunnel; Air blow pipemen; Torchmen (burners); Mortaring men on sewer and drain pipe (the applying of mortar and composition mixes); All bottom men on sewer work-all sewer and drain pipelayers-multiple concrete duct or any other type of pipe used on public utility work-8 feet or more below ground level, and all other sewer and trench laborers 8 feet or more below ground level regardless of excavation area; All labor work inside cofferdam; Use of a 10 foot or more drill steel for hand held drills; Caisson laborers ground level down 15 feet; All air tools 8 feet or more below ground level; All laborers working on swinging-suspended or any type or make of scaffolds, 48 feet to 100 feet; All chimney and silo laborers working at a height of 48 to 100 feet;

All tamping hammers over 150 lbs.; All laborers working inside of a sphere or any type or make of tank at a height of 48 feet to 100 feet; all hydraulic, electric and air tools or any other type 8 feet or more below ground level;

Vibrators-any type-8 feet or more below ground level

GROUP 5 - Gunnite nozzle men; Caisson laborers and all tamping hammers from 150 lbs and over; from 15 feet below ground level down to 50 feet; and all laborers working inside of a sphere or any type of tank for every additional 50 feet or part thereof above 100 feet in height

GROUP 6 - All underground cavern laborers; Caisson laborers 50 feet or more below ground level; Laborers working under radio active conditions (suiting up); Blasting men (Powdermen) GROUP 7 - Dosimeter (any device) used for monitoring nuclear exposure; Asbestos abatement worker; Toxic and hazardous waste removal laborer; and chimney and silo laborers for every additional 50 feet or any part thereof above 100 feet high

LABO0149-001 06/01/2017

KANE, KENDALL, AND McHENRY COUNTIES

Rates Fringes

LABORER

GROUP 1.....................$ 41.20 27.47

GROUP 2.....................$ 41.43 27.47

GROUP 3.....................$ 41.20 27.47

GROUP 4.....................$ 41.43 27.47

GROUP 5.....................$ 41.43 27.47

GROUP 6.....................$ 41.55 27.47

GROUP 7.....................$ 41.55 27.47

GROUP 8.....................$ 41.40 27.47

LABORER CLASSIFICATIONS

GROUP 1 Common Laborer

GROUP 2 Power Vibrator

GROUP 3 Torchman (demolition only), Mortarmen

GROUP 4 Power Tamper

GROUP 5 Jackhammer & Airspade; Chainsaw, Swinging Stage and Boatswain Chair; Cement Gun Nozzleman; Hod Carrier;

Plasterer Tender, and Tunnel Man

GROUP 6 Tile Layers; Bottom Men

GROUP 7 Caisson Laborers; Dynamiters

GROUP 8 Asbestos abatement laborers, Toxic and hazardous waste removal laborers, Dosimeter (any device) monitoring nuclear exposure

LABO0152-001 06/01/2017

LAKE COUNTY

Rates Fringes

LABORER

GROUP 1....................$ 41.20 27.47

GROUP 2....................$ 41.28 27.47

GROUP 3....................$ 41.30 27.47

GROUP 4....................$ 41.40 27.47

GROUP 5....................$ 41.40 27.47

GROUP 6....................$ 41.43 27.47

GROUP 7....................$ 41.53 27.47

GROUP 8....................$ 41.55 27.47

GROUP 9....................$ 41.40 27.47

GROUP 10....................$ 41.75 27.47

GROUP 11....................$ 41.40 27.47

LABORER CLASSIFICATIONS

GROUP 1: Building laborers; Plasterer tenders, General laborers (wrecking and demolition); Fireproofing and fire shop laborers

GROUP 2: Cement gun laborers and hose

GROUP 3: Chimney over 40 feet; Scaffold laborers; Wall men or wreckers

GROUP 4: Cement Gun nozzle (gunite) laborers

GROUP 5: Stone derrickmen and handlers

GROUP 6: Jackhammermen (tampers & vibrators); Power driven concrete saws

GROUP 7: Firebrick & boiler laborer setters

GROUP 8: Chimney laborers (on fire brick); Caisson Diggers;

Well Point system men

GROUP 9: Windlass and capstan persons

GROUP 10: Boiler setter plastic laborers

GROUP 11: Dosimeter (any device) monitoring nuclear exposure; Asbestos abatement laborers; Toxic and hazardous waste removal laborers

PAIN0014-002 06/01/2017

GRUNDY, LAKE, and WILL COUNTIES

Rates Fringes

PAINTER

Brush, Decorator, and Paperhanger.................$ 44.55 26.49

PAIN0027-003 06/01/2018

Rates Fringes

GLAZIER..........................$ 43.85 36.22

PAIN0030-001 07/01/2017

DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES

Rates Fringes

PAINTER

Brush, Drywall Taper/Finisher, Sandblaster, and Spray......$ 45.28 20.10

PLAS0005-003 07/01/2015

GRUNDY and WILL COUNTIES

Rates Fringes

PLASTERER........................$ 42.25 26.65

PLAS0005-006 07/01/2015

DU PAGE COUNTY

Rates Fringes

PLASTERER........................$ 42.25 26.65

PLAS0011-008 06/01/2017

DE KALB, KANE, KENDALL, AND McHENRY COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.84 31.60

PLAS0011-012 06/01/2017

GRUNDY AND WILL COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 42.00 34.56

PLAS0011-014 06/01/2017

LAKE COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.98 31.47

PLASTERER........................$ 44.85 31.77

PLAS0803-002 08/01/2010

DUPAGE COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 38.00 24.03

PLUM0093-001 06/01/2015

LAKE and McHENRY COUNTIES

Rates Fringes

PLUMBER..........................$ 45.76 26.92

PLUM0130-002 06/01/2018

DUPAGE (Argonne National Laboratories and Fermi National Laboratory), GRUNDY & WILL COUNTIES

PLUMBER..........................$ 50.25 30.07

PLUM0501-001 12/01/2013

DUPAGE (excluding Argonne National Laboratory and Fermi National Laboratory), KANE, and KENDALL (except the Mich-Wis Pumping Station in Milbrook, Silicas and Plant and Village of Newark, excludes Yorkville) COUNTIES

PLUMBER/PIPEFITTER...............$ 41.20 29.15

PLUM0597-001 06/01/2018

DUPAGE (Argonne National Laboratories, and Fermi National Laboratory), GRUNDY, LAKE, MCHENRY & WILL COUNTIES

PIPEFITTER.......................$ 48.50 31.44

ROOF0011-004 12/01/2017

DUPAGE, KANE, KENDALL, LAKE, MCHENRY, and WILL COUNTIES

Rates Fringes

ROOFER...........................$ 42.30 22.75

ROOF0011-009 12/01/2017

Rates Fringes

ROOFER...........................$ 33.46 21.85

SFIL0281-002 01/01/2018

DuPAGE, KANE, KENDALL, LAKE, McHENRY, and WILL COUNTIES

Rates Fringes

SPRINKLER FITTER.................$ 48.10 27.05

SHEE0073-003 07/01/2017

LAKE COUNTY

Rates Fringes

Sheet metal worker...............$ 43.50 35.42

SHEE0073-004 07/01/2017

LAKE COUNTY

Rates Fringes

Sheet Metal Worker

ALUMINUM GUTTER WORK........$ 30.57 35.42

SHEE0265-001 06/01/2018

DU PAGE, GRUNDY, KANE, KENDALL, McHENRY, and WILL COUNTIES

Rates Fringes

SHEET METAL WORKER...............$ 48.02 30.22

* TEAM0179-001 06/01/2017

GRUNDY, KENDALL, and WILL COUNTIES

Rates Fringes

TRUCK DRIVER

2 or 3 Axle Trucks..........$ 37.68 0.15+a 4 Axle Trucks...............$ 37.83 0.15+a 5 Axle Trucks...............$ 38.03 0.15+a 6 Axle Trucks...............$ 38.23 0.15+a

FOOTNOTES:

a. $733.20 per week.

b. Lowboy rate based on number of axles

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes;

Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0301-001 06/01/2017

LAKE AND MCHENRY COUNTIES

Rates Fringes

TRUCK DRIVER

2-3 AXLES...................$ 37.69 10.15+a 4 AXLES.....................$ 37.84 10.15+a 5 AXLES.....................$ 38.04 10.15+a 6 AXLES.....................$ 38.24 10.15+a

FOOTNOTES:

a. 325.20 per week.

b. Lowboy rate based on number of axles

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes;

Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0673-003 06/01/2017

DU PAGE and KANE COUNTIES

Rates Fringes

TRUCK DRIVER

2-3 AXLES...................$ 36.93 0.15+a 4 AXLES.....................$ 37.08 0.15+a 5 AXLES.....................$ 37.28 0.15+a 6 AXLES.....................$ 37.48 0.15+a

FOOTNOTE: a. $767.70 per week.

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes;

Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: IL180020 06/15/2018 IL20

Superseded General Decision Number: IL20170020

State: Illinois

Construction Types: Building Landscape, Heavy Landscape, Highway Landscape and Residential Landscape

Counties: Boone, Cook, De Kalb, Du Page, Grundy, Henry, Kane, Kankakee, Kendall, Lake, McHenry, McLean, Ogle, Peoria, Rock Island, Tazewell, Will, Winnebago and Woodford Counties in Illinois.

LANDSCAPING WORK ON BUILDING, RESIDENTIAL, HEAVY AND HIGHWAY

CONSTRUCTION PROJECTS.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 04/27/2018 2 05/04/2018 3 05/11/2018 4 06/15/2018

* ENGI0150-013 06/01/2018

BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): The landscape work for the Landscape Equipment Operator excludes the preparation of sub-grade prior to application of finish landscape materials and the utilization of any equipment over one cubic yard.

BOONE, COOK, DUPAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND

WILL COUNTIES

Operators:.......................$ 31.85 6.50+A+B Includes Angle Dozer, Small; Bobcat and other similar type machines, 1 cu yd or less; Chipping Machine; Combination Backhoe and Front End Loader 1 cu yd or less; Fork Lift Truck;

Hi-Reach and High-Ranger;Hydraulic Boom with Clam;Log Skidder;

Sttraw Blower and Seeder; Stump Machine;Tractors, Crawlers, Rubber Tire Tractors, Highlift Shovels or Front End Loaders 1 cu yd or less; Tree Spades, all; Utility Tractor and attachments, and Rubber Tire Front End loader or similar machine of 1 to 1.5 cu yd solely used for placement of large decorative boulders, trees with balled soil, and other decorative landscape material too large to be accommodated in a 1 cu yd bucket. All other equipment utilized for performing landscape work, tree trimming or removal of stees, and to install plants; transport trees; excavate plant pits; place soil and other landscape materials; and apply finish landscape material on subgrade prepared by others

FOOTNOTE:

A. Health and Welfare contribution is $1,296.00 per month.

B. Paid Holidays: New Year's Day; Memorial Day; Fourth of July; Labor Day; Thanksgiving Day; and Christmas Day provided that all such employees shall have in fact worked their regularly scheduled work day immediately preceding and the regularly scheduled work day immediately succeeding the occurrence of such holiday.

* ENGI0150-023 06/01/2018

HIGHWAY CONSTRUCTION (LANDSCAPE WORK): The landscape work for the Landscape Equipment Operator excludes the preparation of sub-grade prior to application of finish landscape materials and the utilization of any equipment over one cubic yard.

HENRY, MCLEAN, OGLE, PEORIA, ROCK ISLAND, TAZEWELL, WINNEBAGO,

and WOODFORD COUNTIES

Operators:.......................$ 31.85 6.50+A+B Includes the following: Angle Dozer, Small; Bobcat and other similar type machines, 1 cu yd or less; Chipping Machine;

Combination Backhoe and Front End Loader 1 cu yd or less; Fork Lift Truck; Hi-Reach and High-Ranger;Hydraulic Boom with Clam;Log Skidder; Sttraw Blower and Seeder; Stump Machine;Tractors, Crawlers, Rubber Tire Tractors, Highlift Shovels or Front End Loaders 1 cu yd or less; Tree Spades, all; Utility Tractor and…