36C25218B0057-00002001.pdf
PDF 39 KB Posted
- Solicitation number
- 36C25218B0057
About this file
36C25218B0057 00002 S06 - 00002_695-17-120 Questions and Responses.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25218C0047-000.docx | DOCX document | |
| 36C25218B0057-00002000.docx | DOCX document | |
| 36C25218B0057-007.pdf | ||
| 36C25218B0057-002.pdf | ||
| 36C25218B0057-004.pdf | ||
| 36C25218B0057-008.pdf | ||
| 36C25218B0057-006.pdf | ||
| 36C25218B0057-003.pdf | ||
| 36C25218B0057-001.docx | DOCX document | |
| 36C25218B0057-005.pdf | ||
| 36C25218B0057-000.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25218B0057
Replacement of Structural Floor Slab for Bldg 43 Dining Room Mental Health
Project 695-17-120
Solicitation Requests for Information
Replacement of Structural Floor Slab for Bldg 43 Dining Room Mental Health
Solicitation Number: 36C25218B0057
Project Number: 695-17-120
Solicitation Requests for Information
1. Could you please let me know where I can find the asbestos inspection reports for project #695-
17-120?
There is no Asbestos Report. Refer to Spec Section 02 82 11 – 1.1.2.
2. Dwg AS101 Finish Legend indicates PT1 and PT2. Are we required to paint only the wall radiators and wood base affected by the construction?
Yes
3. Project manual have included specification section 02 82 11 (Traditional Asbestos Abatement), Please provide an extent of the asbestos abatement on provided drawings. Also please provide asbestos survey report.
There is no Asbestos Report. Refer to Spec Section 02 82 11 – 1.1.2.
4. Is there an environmental report that we can review?
No
5. Is there a structural engineer report that we can review?
No
6. The construction area must be completely closed to all persons except project construction personnel. Is there a new egress plan that provides proper exiting options from the building? Should a temporary/supplementary exit be added to the scope of this contract?
No
7. Can the road adjacent to the exterior entrance to the construction zone be used for staging/mobilization/storage? Supplies and equipment include: compressor, dumpster, materials, concrete delivery, etc. Please define a service area for project use, and provide enclosure requirements, hours of access, etc.
Refer to Spec Section 01 00 00 – 1.5
8. Can we arrange for site visits by our subcontractors who did not attend the original meeting?
No