36C25026Q0088 0003.docx

DOCX document 37 KB Posted

Attached to
H212--NIHCS Fire Alarm & Suppression Testing Federal contract opportunity
Solicitation number
36C25026Q0088-003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This is an Amendment to Solicitation 36C25026Q0088, issued by the Department of Veterans Affairs Network Contracting Office on February 4, 2026. The amendment extends the deadline for submission of offers to February 12, 2026 at 9:00 a.m. EST and provides responses to 32 submitted questions regarding the fire alarm, suppression system, and related equipment inspection, testing, maintenance, and monitoring services required at the Marion and Fort Wayne campuses of a VA facility under the NIHCS Fire Alarm & Suppression Testing contract.

Key clarifications provided in the questions and answers include: equipment lists and device counts are available in attached Excel spreadsheets; kitchen hood suppression systems and fire dampers can only be serviced after business hours; previous inspection reports and as-built drawings will not be released, but detailed equipment information will be provided after contract award; the $3M liability insurance requirement per facility will not be reduced; 5-year testing requirements will be completed according to the current Price/Cost Schedule with corrections to be addressed via contract modification if necessary; repairs will be quoted separately and addressed through contract modifications; and site visit information was published in a previous amendment. The amendment references attached documentation including Fire Extinguisher lists, Fire Dampers Test information, Hood Information, and an equipment Excel spreadsheet for both Marion and Fort Wayne locations.

View the file

Other files for this federal contract opportunity

Other files attached to H212--NIHCS Fire Alarm & Suppression Testing, newest first.
File Type Posted
Fire ext new fort wayne.xlsx XLSX spreadsheet
Fire Ext. Marion.xlsx XLSX spreadsheet
HOOD INFORMATION FORT WAYNE.docx DOCX document
Fire Dampers Test Marion.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-04-2026 610-26-1-6091-0003 None 36C250 Department of Veterans Affairs Network Contracting Office 10 24 Frank Lloyd Wright Drive Lobby M, Suite M2200 Ann Arbor MI 48105 Y Department of Veterans Affairs Network Contracting Office 10 24 Frank Lloyd Wright Drive Lobby M, Suite M2200 Ann Arbor OH 48105 To all Offerors/Bidders

36C25026Q0088 01-28-2026

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-12-2026 09:00 EST 610-3660162-6091-854100 X

ONE - 1

The purpose of this Amendment is to answer submitted questions regarding the referenced solicitation.

This Amendment also serves to extend the deadline for solicitation 36C25026Q0088 from February 12, at 9:00 a.m. EST

The following attachment are available via Sam.gov:

Fire Ext. Marion excel spreadsheet Fire ext Fort Wayne excel spreadsheet

HOOD INFORMATION FORT WAYNE

Fire Dampers Test Marion

Kristina Peart Contracting Officer Solicitation 36C25026Q0088 Questions and answers

1. Will equipment list be supplied for each line item?

See Excel Spreadsheet

2. When was the last 5 year inspection performed on the sprinkler systems?

Marion Campus - January 20 - 21, 2026 Fort Wayne Campus - - January 27 - 28, 2026

3. Are there any devices located in a pit? If so, how many?

There are no devices in the pit for both campuses

4. What are the manufactures of kitchen hoods? How many links are in these systems?

Ansul 4 links and ProChem 2 links. Canteen are Gaylord hoods and our 174 kitchen is Avtec hood.( Marion)

5. Can the kitchen hoods be serviced during normal business hours or do they need to be serviced after hours?

Must be served after hours only.

6. Is kitchen hood cleaning not included in scope of work?

Kitchen hood Cleanings are done on a separate contract.

7. Are there any areas that need to be inspected after business hours?

No

8. Can we be supplied a map showing the locations of all the Dampers?

We do not have a map of the dampers. Locations are listed on the attached spreadsheet.

9. Are the dampers electronic or fusible link?

Fusible 1 ELEC. (Fort Wayne) Fusible (Marion)

10. Are the stand pipes wet or dry?

Fort Wayne’s are wet. Marion’s are a mixture of wet and dry.

11. Is there a sprinkler pre-action panel in the MRI area and is it included in scope of work?

This is not included in the scope of work.

12. Are fire line backflows included in scope of work? If yes, how many are to be tested?

No, fire line backflows are not included in scope of work.

13. Can you please extend the bid date to 2/13/26 or later?

The solicitation response date will be extended to February 12, 2026

14. We would like to schedule a site visit for the above reference solicitation if one is not currently being setup already. Can you help us coordinate this? We understand the need for this to happen quickly. More information is required in order to accurately quote the fire alarm inspection, testing, maintenance & monitoring for this solicitation.

An amendment was published that included information regarding the site visit.

· Please provide the previous inspection reports.

The government will not be releasing previous inspection reports.

· Please provide the device counts for all building.

Please review the attached Excel Spreadsheet

16. The Price/Cost Schedule is not consistent year over year. For example, the base year does not have line items for annual fire extinguishers, duct/heat/smoke detection, notifying devices, emergency notification, smoke detection shutdown of HVAC, etc., but they are included in option years. We see a note about fire hydrants to start in option year 1, but I don't see similar notes for the other equipment. Will the Price/Cost Schedule be updated so line items are provided for all services required at each campus? Or are we not required to perform some of these services in the base year?

Some tasks are not required during the option years which is why they were not included.

17. Will a site visit be scheduled to observe the existing conditions of the equipment covered under this contract? If not, who can we contact to setup a site visit?

An amendment was published that included information regarding the site visit.

18. Are as-built drawings available for the fire alarm and sprinkler systems covered under this contract?

The government will not be releasing drawings for the fire alarm and sprinkler systems.

19. Can you please provide previous inspection reports for all equipment and systems covered under this contract? Previous inspection reports allow offerors to accurately calculate pricing based on actual devices and components requiring inspection and testing.

The government will not be releasing previous inspection reports.

20. While previous inspection reports will provide a far more accurate depiction of the scope of work, if those will not be provided, offerors will require a complete and accurate inventory of all equipment covered under this contract to provide a fair and reasonable bid. Unfortunately, the information provided is not enough to bid this work. For example, are there 200 smoke detectors or 2000 smoke detectors, it identified the number of fire sprinkler "risers", however there's no indication of the quantity of flow switches and tamper switches on these systems. Please provide the quantities of the following devices (a site visit will not substitute the need for this information as it will not be possible to gather all these details during a short site visit):

0. Fire alarm control panels including manufacturer and model of each- will be provided after award

0. Annunciator panels- will be provided after award

0. Batteries broken out by size- will be provided after award

0. Power supplies- will be provided after award

0. Communication lines to off-site monitoring (specify cellular or POTS) Seimens is the 3rd party

0. Smoke detectors- ON EXCEL SPREADSHEET

0. Heat detectors- ON EXCEL SPREADSHEET

0. Duct detectors- EXCEL SPREADSHEET

0. HVAC units for shutdown- DUCT DETECTORS ON EXCEL SPREADSHEET

0. Manual pull stations- ON EXCEL SPREADSHEET

0. Audible and/or Visual notification devices (all types)- ON EXCEL SPREADSHEET

0. Waterflow switches- ON EXCEL SPREADSHEET

0. Tamper switches- ON EXCEL SPREADSHEET

0. Building numbers containing standpipe systems, and number of standpipes in each of those buildings - will be provided after award

0. Fire pumps (include make, model and size of each) - will be provided after award

0. Fire department connections- will be provided after award

0. Control valves- will be provided after award

0. Post indicator valves - will be provided after award

0. Fire Hydrants- will be provided after award

0. Number of elevators in each of the buildings identified as having elevators- will be provided after award

0. Fire extinguishers (types [ABC, CO2, K, etc.] and sizes [5 lbs, 10 lbs, 2.5 gal, etc.) – On separate excel document

0. Size of each antifreeze system (gallons) and type of antifreeze material used - will be provided after award

0. Fire/smoke dampers on adobe document

0. Electromagnetic door hold open devices ON EXCEL SPREADSHEET

0. Sliding vertical and horizontal fire doors ON EXCEL SPREADSHEET

21. On page 24 of the solicitation, item d states the first year of the contract is to include the 5-year testing requirements. However, the Price/Cost Schedule shows 5-year testing requirements are to be completed in Option Year 4. Can you please clarify and update either the scope of work or the Price/Cost Schedule to reflect the correct year these services are to be performed?

Please price according to the current Price/Cost Schedule. If correction is needed, it will be completed via a contract modification.

22. On page 25 of the solicitation, item g states hydrostatic flow testing of the standpipe at the Marion campus is due in January 2026. Can you please clarify this requirement as January 2026 has passed? Also, there's no line item in the Price/Cost Schedule for a standpipe hydrostatic flow test in the base year.- That information was included as background information only. It has already been completed. Please price according to the current Price/Cost Schedule. If correction is needed, it will be completed via a contract modification.

23. Will repairs be quoted separately and addressed through a contract modification? There is no line item in the Price/Cost Schedule for repairs; we typically see repairs handled through a NTE CLIN for parts and labor, or via contract modification once the inspections are completed and extent of repairs are known. – When a repair is needed vendor will submit a quote on issue and if we need the vendor to fix issue we will submit a modification to contract to have issue fixed. Once issue is fixed whether VA fixes issue or vendor fixes issue it states in contract vendor will come back and verify issue is fixed.

24. On pages 23 and 24 of the solicitation there is an "example" schedule provided, is this an example of what the schedule format should look like, or is this the current testing schedule? If this is not the current schedule, can you please provide the months when all semi-annual and annual inspection and testing is to occur for each building covered under this contract?

Current schedule is accurate, will work with Contractor in more detail once the contract is awarded

25. On page 23 of the solicitation, item 3 references verifying operation of smoke dampers and sliding fire doors. Can you please clarify we're not to physically inspect dampers and doors in accordance with NFPA 80 and 105, just that when the fire alarm system activates the dampers and doors operate as intended?

Dampers require inspection one year after installation and every 4 years thereafter (6 years for hospitals).

26. For inspection and testing work the requires an elevator technician, will the VA provide their own elevator technician who is contracted to maintain the elevators, or are we required to hire our own elevator technician? VA has a current contract with Elevator Tech HOWEVER it is the responsibility of the vendor to coordinate with the VA on what days the Elevator Tech will need to be here

27. Additional information regarding the kitchen hood suppression systems is required.

a. How many systems require inspection? Information provided on attached word document. Additional information will be provided after award

b. How many cylinders are there? Information provided on attached word document. Additional information will be provided after award

c. What are the sizes of each cylinder? Information provided on attached word document. Additional information will be provided after award

d. Who is the manufacturer of the systems? Information provided on attached word document. Additional information will be provided after award

e. How many fusible links broken out by temperature rating are installed on each system? Information provided on attached word document. Additional information will be provided after award

f. Can these be inspected during normal working hours?. – Can only be inspected after working hours.

28. On page 25 of the solicitation, Section III.D.i mentions changing fusible links on fire dampers. Can you clarify if a full damper inspection is required, or are you just looking for fusible links to be replaced?

Dampers require inspection for one year after installation and every 4 years thereafter (6 years for hospitals).

a. We'll need to know how many links, type, temperature, etc. to properly price the replacements. Information provided on attached word document. Additional information will be provided after award

b. This is listed under the requirements for elevator recall testing. Are we only to change fusible links on dampers in elevator shafts, or every fire/smoke damper in every building? Information provided on attached word document. Additional information will be provided after award

c. There is no line item in the Price/Cost Schedule for replacing fusible links, where should this be included or will a line item be added to the Price/Cost Schedule? If needed, services will submit a contract modification.

29. On page 27 of the solicitation, it states "The grid must be used for reporting of testing and shall contain the building number, the device/equipment type, and any problems encountered. The purpose of the grid is to maintain consistency in the reporting of the device/equipment tested, and to assure testing of all devices at the specified frequency." What is "the grid" and can you please provide an example for reference? Typically, inspections are reported on NFPA type forms and contain the required information for the Joint Commission. We are unfamiliar with "the grid".

The government will not be releasing previous inspection reports. Business that submit a quote on this contract VA recommends being familiar with NFPA and Joint Commissions standards in Fire Alarm Inspection and Testing.

30. On page 27 of the solicitation, Section XIII, Parts, states that unserviceable parts are to be replaced by the contractor on an exchange basis. Can you please clarify what this means? It is our understanding that any replacement parts will be paid for via contract modification or a not-to-exceed CLIN for replacement parts. We will not exchange an unserviceable part with a new part without being paid for the new part.

This is for accountability. When a part is replaced vendor is to give VA bad part to verify it was fixed.

31. On page 28 of the solicitation, it states $3M is required for property damage and personal injury liability, and it is in lieu of the requirements in paragraph 23. We believe this refers to the requirements in paragraph 25 which outline different insurance requirements. We believe based on several comparable contracts performing these exact services at other VAs across the country that a requirement of $3M is unnecessarily high for the work being performed. The requirements defined in paragraph 25 on page 29, as well as C.4 Supplemental Insurance Requirements on page 37, directly align with the typical insurance requirements found in comparable contracts (reference contract awards #36C25625P0883, 36C25620P0134, 36C24224P1563, for the same size and scope of services). Will the government revise the insurance requirements to numbers identified in paragraph 25 on page 29 of the solicitation?

NO This would be 1.5M per facility, we are not changing this requirement

32. Will you allow for follow up questions once answers to these questions and a site visit is conducted to allow offerors to ask additional questions once we better understand the scope of work? With as many questions as we have now, the responses may generate additional critical questions.

The government will determine at a later date if follow-up questions will be addressed.

See attached document: HOOD INFORMATION FORT WAYNE.

See attached document: Fire Dampers Test Marion.

See attached document: Fire ext new fort wayne.

See attached document: Fire Ext. Marion.