This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a Department of Veterans Affairs (VA) Request for Quote (RFQ) 36C25026Q0010 for preventive maintenance (PM) services on lift equipment. The amendment extends the receipt of offers deadline to September 26, 2025, at 3:00 PM EDT, with all offers to be emailed to Alexis.Alexander1@va.gov by September 29, 2025, at 3:00 PM EST.
The accompanying questions and answers provide key details about the service requirements: the VA will provide parts for 177 units, the preventive maintenance will be performed once annually in February, and the contractor will be responsible for replacing batteries on lifts with failed batteries or those meeting replacement time. The service is limited to annual preventive maintenance, with the lifts' last battery changes occurring in February/March 2025. Straps have been changed as damage was identified, and upper limit switch upgrades have only been addressed in units requiring strap replacements. Two additional documents (lift inventory age and lift inventory) were referenced but not included in this file.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P01 Copy of lift inventory.xlsx | XLSX spreadsheet | |
| lift inventory age.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0001 09-22-2025
36C250
Department of Veterans Affairs
Network Contracting Office 10
2215 Fuller Road
Ann Arbor MI 48105
36C250
Department of Veterans Affairs
Network Contracting Office 10
2215 Fuller Road
Ann Arbor MI 48105
To all Offerors/Bidders
36C25026Q0010
09-04-2025
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-26-2025 15:00 EDT
X 1
Please see attached bidder questions and answers.
All offers shall be emailed to: Alexis.Alexander1@va.gov NLT September 29, 2025, 3:00PM EST.
NO FURTHER QUESTIONS WILL BE ANSWERED.
Alexis S. Alexander
Contracting Officer
Questions and Answers for RFQ 36C25026Q0010
Question: Under B/3 Statement of Work, 1- it is indicating that contractor shall provide all parts; however, under V. Parts, it indicates that the government will provide all parts for 166 units
Answer: This is a service PM and the government will provide all parts for 177 units.
Question: Is there a list of serial numbers perhaps? Even a partial list?
Answer:. See attached equipment list
Question: Will the batteries be considered parts under the PM and will Ann Arbor have them on site for the PMs to change out if needed?
Answer: NO, but provided batteries provided by the va will need to be replaced by the vendor on lifts with either failed batteries or have met time for replacement.
Question: Will the service include unplanned repairs over the course of this contract period or is the service limited to annual preventative maintenance?
Answer: This is a service PM.
Question: Are the assets PMs current? If so, when are the next PMs inspections due?
Answer: Yes, February
Question: Are the PMs scheduled throughout the year or are they mostly completed all at one time. Would the current schedule have to be adhered to strictly or is there flexibility?
Answer: One time in February, that it would be the requested model going forward.
Question: What is the age of the assets and have the 600s had the necessary Upper Limit Switch upgrades?
Answer: The upper limit switch has only been addressed in units that had required strap replacements.
Question: When were the batteries last changed on the lifts Answer: February/March 2025
Question: When were the straps changed last on the lifts?
Answer: As straps were identified with frays or damage.
Question: Please confirm the VA intends to provide straps, batteries, and other parts needed to complete the PMs as indicated in the SOW. Please note this may slow down service.
Answer: We will provide parts as required in either the service manual or VA directives attached in this request.
See attached document: lift inventory age.